SlideShare a Scribd company logo
A TECHNICAL PRESENTATION
HORIZONTAL DIRECTIONAL
DRILLING (HDD) TECHNOLOGY
GEORGE UDEMEOBONG NTA
0803 512 8478
BY
ON
Objective
• To enlighten the audience on Horizontal
Directional Drilling Technology and how it
can contribute towards developing and
securing effective pipeline infrastructure in
Nigeria.
Some of the Factors affecting development and
security of Pipeline Infrastructure in Nigeria
• Technology
• Technical Expertise
• Finance
• Vandalization
• Comprehensive Pipeline Infrastructure
Database
• Government and Regulatory Authorities
• Social Awareness
Horizontal Directional Drilling Technology
Overview
• Developed in the early 70’s
• Combination of road boring and oil well
directional drilling
• Lengths up to 3900m
• Pipelines up to 56 inch. Diameter
• Installation through sand, silts, clays
and rock
Directional Drilling Applications
• Land to Land Crossing
– Rail, Road and River Crossings
– Contaminated and environmentally significant areas
Directional Drilling Applications
Water to Water
crossing Islands
crossings Channel
Land to water crossing
Shore approaches
Outfalls
PROCEDURE FOR HDD
• INITIAL PLANNING / FEASIBILITY
• GEOTECHNICAL REVIEW
• ENGINEERING DESIGN
• INSTALLATION PROCEDURE
• PULL BACK
• DEMOBILISATION
INITIAL PLANNING/ FEASIBILITY
• Site Investigation
• Preliminary Design
• Construction Costs
• Time scale: - engineering &
preparations 3 months, drill hole 2
weeks, pull back 1 day.
Directional Drilling Installation Procedure
• Mobilization and Site Preparation
• Pre-HDD Activities Installation Procedure
• Rig-up
• Temporary Casing Installation (If required)
• Pilot Hole
• Hole Opening Pass
• Pullback
• De-Mobilization
Site Preparation
• Two sites normally required
• Rig site 50m x 50m
• Pipe side and stringing site
• Staged on land and offshore
Typical Drilling Rig Site
Pilot Hole Assembly
• Jetting or rock bit
• Non-magnetic collars
• Survey tool
• Non-magnetic collars
DRILL BIT TYPE
Mill-tooth Cutter TCI - Cutter
PILOT HOLE PASS
• Installation of Para-track Guidance System
• Typical Sizes
– 8.5” (216 mm) – 12.25” (311.2 mm)
• Drill Path Design
– Entry Angles: 10 – 18 degrees
– Design Vertical Curves: 100 x Outside Diameter
(100 x 12) = 1200’ (366 m)
– Exit Angles: 6 – 10 degrees. Subject to final
design calculations.
Drilling Fluids
• Purpose
– Cutting medium for jet bits
– Drive mud motors
– To suspend carry cuttings away from face of drill and out of
drilled bore
– Provide fill to stabilize bore
• Basic Materials
– Dry Bentonite (naturally occurring clay)
– Fresh water
REAMING-HOLE EXPANSION
FLY CUTTERS & BARREL
REAMERS
BARREL REAMERS
FLY CUTTER
CONVENTIONAL HOLE OPENERS – MILL
TOOTH CUTTERS
PULLBACK
• Swab Pass(es)
• Connection to Carrier Pipe
• Rate of Pull
• Buoyancy Control
TYPICAL PIPELINE
PULLBACK
ENTRY POINT PULLBACK
Project Principles
• To assess the feasibility of a HDD project
the following basic information is required.
 Environmental Considerations
 Logistics
 Topography
 Geology
Project Principles
• Environmental
Disturbance to the local
environment from Drilling
Operations.
Drilling Fluid discharge
risks, control and mitigation.
• Logistics
 Transport of Equipment.
 Support for Drilling
Operations.
 Movement of Tools.
 Disposal of Cuttings and
Drilling Fluids.
 Movement of Personnel
Project Principles
• Topography
– Location Plan
– Area Plan
– Longitudinal Section
including levels
– Depth of Steams and
Rivers
• Geology
– Evaluation of Existing
Documentation
– Historical Research
– Boreholes
– Penetration Tests
– Geophysical Tests
– Laboratory Tests
– Geotechnical Reports
GEOTECHNICAL REVIEW
• Number / Depth of Borings
• Sieve Analysis Tests
• Unconfined Compressive Strength
Tests
• Rock Quality Designation (RQD)
ENGINEERING DESIGN
• Detailed Crossing Profile Design
• Operating Stress Calculations
• Installation Stress Calculations
• Free Stress Minimum Bending Radius
• Estimated Fluid Quantity Calculations
• Pipeline Buoyancy Analysis
Equipments
• Drilling Rig
 American Augers DD625
 American Augers DD440T
 Astec DD3238
 MPR 6000 MUD SYSTEM
 TULSA IRON 1000 MUD
SYSTEM
HDD Landfalls - General Details
• Rig located onshore, (can be placed on
marine spread offshore).
• Drill to exit point from beach entry subject to
pipe size and soil conditions.
• Engineer coating on pipe-string to give
temporary stability during the laying of the
string and to have a low friction value when
being pulled through the hole.
• Pipe-string is preferably pulled directly into the
hole either from a laybarge or from a pre-laid
position on the seabed.
Offshore Support “Back Reaming”
• Support vessel
– Locate and survey exit
point
– Pick-up wash pipe
– Stage prereaming
operations
Offshore Support Pipeline Pullback
• Support vessel
– Hold product string
– connection for pullback
Intercept Drilling
• Concept developed from oilfield technology for
tapping into capped wells.
• Requirements
– Two HDD Maxi Rigs
– Insert Casings at each Drill Site.
– Drill from one side to within a notional 500m of the
opposed rig
– Drill from the opposed side to intercept the first drill
HDD Intercept Drilling
• Restrictions
–Ground Conditions (Rock, Stiff clays)
–Depth of Geotechnical Survey
–New
–Repeatability.
INSTALLATION METHODOLOGY FOR INTERCEPT CROSSINGS
• Mobilize Equipment and Personnel to Site.
• Survey and re-establish entry and exit co-ordinates.
• Set up Equipment at both sides of the River (Rig, mud unit and
Steering Tool and wire coils).
• Install casing in alignment to entry angles to firm ground bed at both
sides.
• Drill 2nos Pilot holes into the intersect area, from both sides of the
river.
• Switch the Guidance system on the shorter crossing to the Passive
Magnetic ranging system (PMRS) mode and establish contact
between both guidance systems.
• Retrieve the short crossing as the longer crossing is steered into the
same hole as the shorter crossing, using the PMRS as a homing
device to the exit point.
• Disconnect both guidance systems.
• Connect a reamer and commence the hole expansion process
My Various Site HDD Experiences
• 24” X 1.5Km River Niger Crossing At Kwale For Daewoo/NAOC In
March Of 2004 Using 300Ton (625,000#) American Augers Rig
• 40” X 760M Road & Creek Crossing For Daewoo/SPDC In January
201O Using The 300Ton American Augers Rig.
• 18” X 1.3KM Uruan River Crossing at Uruan, Akwa-Ibom State.
(swamp)
• 18” x 950m Aka-Ibonda River crossing at Creek Town, Cross River
state. (swamp)
• 18” x 704m Calabar River Crossing at Calabar. (land)
• 18” x 650m Itu River Crossing, C.River State. (swamp)
• 18” x 550m Esu and Esukudo River crosings, CRS. (swamp)
• 18” x 363m Abak river Crossing, Aks. (land)
My Various Site HDD Experiences
 30” x 300m Road Xing – Zakhem Constr Ltd (October 2011)
 12” x 300m Liverpool River Xing – Oando Plc (September 2011)
 Test Pilot Hole Bore, 300m – Oando Plc (August 2011)
Installation Period: November 2011
 24” X 1.7km Oron River Crossing
 24” x 1.2km Uruan River Crossing
 24” x 950m Calabar River Crossing
 24” x 650m Itu River Crossing
 24” x 600m Esu River crossing
Client – NIPP/KAZTEC
Status– Swamp Site Preparations and Mobilization
Installation Period – 2nd Quarter 2012
16”,6” and 4” X 700m Mid-Stream, Bundle Crossing across
Commodore Channel Lagos.
 Method – HDD, Shore Approach.
Client – Oando Plc
Status – Engineering and Design Completed
HDD EQUIPMENT & CREW WORKED WITH
 RIG – AMERICAN AUGERS DD625 HDD RIG (2004)
 CAPABILITY – 300 TON (625,000 LB) PULL BACK
CAPABILITY (CAPABLE OF PULLING 3.5KM X 12” P/L)
 PUMP/CLEANING SYSTEM – TULSA RIG IRON 10,000
GALLONS MUD CLEANING / RECYCLING SYSTEM
 750GPM WEATHERFORD T425 MUD PUMP
 6” SYKES TRASH PUMPS (3 NOS).
 3KM 6-5/8” FH DRILL PIPES.
 VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND
BARREL REAMERS Frm 12” to 60”.
HDD EQUIPMENT & CREW WORKED WITH
 RIG – AMERICAN AUGERS DD440T HDD RIG (2009)
 CAPABILITY – 200 TON (440,000 LB) PULL BACK
CAPABILITY (CAPABLE OF PULLING 2.5KM X 12” P/L)
 PUMP/CLEANING SYSTEM – MPR 6000 MUD CLEANING /
RECYCLING SYSTEM/PUMPING SYSTEM.
 200 GALLONS MUD RECYCLING UNIT COMPLETE WITH
SHAKERS, DESANDERS AND DESILTERS.
 3 NOS 6” SYKES TRASH PUMPS.
 2.5KM 5” X 4-1/2 IF DRILL PIPES.
 VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND
BARREL REAMERS
HDD EQUIPMENT & CREW WORKED WITH
 RIG – ASTEC 3238 DIRECTIONAL DRILLING RIG
 CAPABILITY – 15 TON (30,000 LB) PULL BACK
 PUMP/CLEANING SYSTEM – MX 330 MUD CLEANING /
RECYCLING SYSTEM/PUMPING SYSTEM.
 2 NOS 4” SYKES SUBMERSIBLE PUMPS.
 750M 2-3/8” DRILL PIPES.
 VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND
BARREL REAMERS
The Benefits of Directional Drilling
• Minimum environmental disturbance
• No interruption to shipping, road or rail traffic
• Accurate installation
• Shorter construction schedules
• Lower installation costs
• Minimal maintenance
• Greater protection from external damage
• Requires no concrete coating.
• Cheaper alternative to open cut.
• Less logistics
• Can be buried up to 30mtrs, hence out of
the reach of vandals.
• Fewer personnel.
• Depth of cover add as additional
protection to the pipe.
• Accurate As-Built Documentation.
The Benefits of Directional Drilling cont.
THANK YOU
FOR
LISTENING

More Related Content

What's hot

Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systems
Giuseppe Moricca
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the future
Statoil
 
Well Control
Well ControlWell Control
Well Control
AAPG SU SC
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
Bladimir R
 
Pipeline pigging
Pipeline piggingPipeline pigging
Pipeline pigging
Mohammad Javad Ranjbar
 
Well intervention
Well  interventionWell  intervention
Well intervention
Mohammed Ismail
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft system
Safdar Ali
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
Will Butler, P.Eng
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
HPHT Wells Summit
 
Well intervention
Well interventionWell intervention
Well intervention
Touseef Rehman
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
Elsayed Amer
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
Saifuddoja Muhammad
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
Elsayed Amer
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
Elsayed Amer
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
Elsayed Amer
 
Piping Material Specification
Piping Material Specification Piping Material Specification
Piping Material Specification
Gaurav Singh Rajput
 
Qazma - Drilling Azərbaycanca
Qazma - Drilling AzərbaycancaQazma - Drilling Azərbaycanca
Qazma - Drilling Azərbaycanca
Engineers Change
 
subsea
subseasubsea
subsea
densands
 
Well abandonment process procedures
Well abandonment process proceduresWell abandonment process procedures
Well abandonment process procedures
Drilling Manual
 

What's hot (20)

Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systems
 
Tubing string
Tubing stringTubing string
Tubing string
 
Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the future
 
Well Control
Well ControlWell Control
Well Control
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Pipeline pigging
Pipeline piggingPipeline pigging
Pipeline pigging
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft system
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
Well intervention
Well interventionWell intervention
Well intervention
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
Piping Material Specification
Piping Material Specification Piping Material Specification
Piping Material Specification
 
Qazma - Drilling Azərbaycanca
Qazma - Drilling AzərbaycancaQazma - Drilling Azərbaycanca
Qazma - Drilling Azərbaycanca
 
subsea
subseasubsea
subsea
 
Well abandonment process procedures
Well abandonment process proceduresWell abandonment process procedures
Well abandonment process procedures
 

Viewers also liked

Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional Drilling
Tim Leung
 
Is there one machine to replace manual plaster the wall?
Is there one machine to replace manual plaster the wall?Is there one machine to replace manual plaster the wall?
Is there one machine to replace manual plaster the wall?
Jacky Miao
 
Horizontal Directional Drilling in India
Horizontal Directional Drilling in IndiaHorizontal Directional Drilling in India
Horizontal Directional Drilling in India
Safar Md. Khan
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
Rishabh Gupta
 
Horizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection GuideHorizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection Guide
nodigseo
 
DDP PROFILE
DDP PROFILEDDP PROFILE
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute Telecom
Kevin James
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
kumarrajagp
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
Yatiraj Battul
 
Fiber to the Home: Making That Business Model Work
Fiber to the Home: Making That Business Model WorkFiber to the Home: Making That Business Model Work
Fiber to the Home: Making That Business Model Work
Yankee Group
 
Telecommunications Products Business Plan
Telecommunications Products Business PlanTelecommunications Products Business Plan
Telecommunications Products Business Plan
Fadi Ghaleb Zaid, MSc, CFA, CSMA
 
Trenchless technology
Trenchless technologyTrenchless technology
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
MD AMANULLAH
 
Fiber to the Home business model
Fiber to the Home business modelFiber to the Home business model
Fiber to the Home business model
Bill St. Arnaud
 
Business Plan
Business PlanBusiness Plan
Business Plan
Sergey Chubuk
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
Narendra Kumar Dewangan
 
Investor pitch deck template for business plan start up investment
Investor pitch deck template for business plan start up investmentInvestor pitch deck template for business plan start up investment
Investor pitch deck template for business plan start up investment
Fraser Hay
 
G&VTechnobuild Pvt Ltd Company Profile
G&VTechnobuild Pvt Ltd Company Profile G&VTechnobuild Pvt Ltd Company Profile
G&VTechnobuild Pvt Ltd Company Profile
shailesh18s
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
Choong KW
 

Viewers also liked (20)

Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional Drilling
 
Is there one machine to replace manual plaster the wall?
Is there one machine to replace manual plaster the wall?Is there one machine to replace manual plaster the wall?
Is there one machine to replace manual plaster the wall?
 
Horizontal Directional Drilling in India
Horizontal Directional Drilling in IndiaHorizontal Directional Drilling in India
Horizontal Directional Drilling in India
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
Vermeer case upload
Vermeer case uploadVermeer case upload
Vermeer case upload
 
Horizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection GuideHorizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection Guide
 
DDP PROFILE
DDP PROFILEDDP PROFILE
DDP PROFILE
 
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute Telecom
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
Fiber to the Home: Making That Business Model Work
Fiber to the Home: Making That Business Model WorkFiber to the Home: Making That Business Model Work
Fiber to the Home: Making That Business Model Work
 
Telecommunications Products Business Plan
Telecommunications Products Business PlanTelecommunications Products Business Plan
Telecommunications Products Business Plan
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
 
Fiber to the Home business model
Fiber to the Home business modelFiber to the Home business model
Fiber to the Home business model
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Investor pitch deck template for business plan start up investment
Investor pitch deck template for business plan start up investmentInvestor pitch deck template for business plan start up investment
Investor pitch deck template for business plan start up investment
 
G&VTechnobuild Pvt Ltd Company Profile
G&VTechnobuild Pvt Ltd Company Profile G&VTechnobuild Pvt Ltd Company Profile
G&VTechnobuild Pvt Ltd Company Profile
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 

Similar to Demzy's Presentation on HDD

Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
DeanGarratt
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
Andika Mahardika
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
GEORG Geothermal Workshop 2016
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
patrickhudd
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptx
MailapalliJayaRaju
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
Apollo Techno Industries Pvt Ltd
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
Apollo Techno Industries Pvt Ltd
 
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
muralikrishna317515
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
RaviNobleseas
 
DREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTDREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECT
INDRANIL BANERJEE
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
Martin (Marty) McDonald
 
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
Appalachian Research Initiative for Environmental Science
 
d_walsh_directional.pdf
d_walsh_directional.pdfd_walsh_directional.pdf
d_walsh_directional.pdf
peter877754
 
Alternative vertical tunneling techniques
Alternative vertical tunneling techniquesAlternative vertical tunneling techniques
Alternative vertical tunneling techniques
Erhan Uludag
 
Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015
law138
 
Deep Lake Water Cooling
Deep Lake Water CoolingDeep Lake Water Cooling
Deep Lake Water Cooling
SBCBreakfastSessions
 
SPE Evangiline Presentation
SPE Evangiline Presentation SPE Evangiline Presentation
SPE Evangiline Presentation
David Mayhall
 
Excavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHMExcavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHM
Atlantic Training, LLC.
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
Shashank Gaurav
 

Similar to Demzy's Presentation on HDD (20)

Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptx
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
 
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
 
DREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTDREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECT
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
A Methodology to Assess the Potential Impacts of Longwall Mining on Streams i...
 
d_walsh_directional.pdf
d_walsh_directional.pdfd_walsh_directional.pdf
d_walsh_directional.pdf
 
Alternative vertical tunneling techniques
Alternative vertical tunneling techniquesAlternative vertical tunneling techniques
Alternative vertical tunneling techniques
 
Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015
 
Deep Lake Water Cooling
Deep Lake Water CoolingDeep Lake Water Cooling
Deep Lake Water Cooling
 
SPE Evangiline Presentation
SPE Evangiline Presentation SPE Evangiline Presentation
SPE Evangiline Presentation
 
Excavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHMExcavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHM
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 

Demzy's Presentation on HDD

  • 1. A TECHNICAL PRESENTATION HORIZONTAL DIRECTIONAL DRILLING (HDD) TECHNOLOGY GEORGE UDEMEOBONG NTA 0803 512 8478 BY ON
  • 2. Objective • To enlighten the audience on Horizontal Directional Drilling Technology and how it can contribute towards developing and securing effective pipeline infrastructure in Nigeria.
  • 3. Some of the Factors affecting development and security of Pipeline Infrastructure in Nigeria • Technology • Technical Expertise • Finance • Vandalization • Comprehensive Pipeline Infrastructure Database • Government and Regulatory Authorities • Social Awareness
  • 4. Horizontal Directional Drilling Technology Overview • Developed in the early 70’s • Combination of road boring and oil well directional drilling • Lengths up to 3900m • Pipelines up to 56 inch. Diameter • Installation through sand, silts, clays and rock
  • 5. Directional Drilling Applications • Land to Land Crossing – Rail, Road and River Crossings – Contaminated and environmentally significant areas
  • 6. Directional Drilling Applications Water to Water crossing Islands crossings Channel Land to water crossing Shore approaches Outfalls
  • 7. PROCEDURE FOR HDD • INITIAL PLANNING / FEASIBILITY • GEOTECHNICAL REVIEW • ENGINEERING DESIGN • INSTALLATION PROCEDURE • PULL BACK • DEMOBILISATION
  • 8. INITIAL PLANNING/ FEASIBILITY • Site Investigation • Preliminary Design • Construction Costs • Time scale: - engineering & preparations 3 months, drill hole 2 weeks, pull back 1 day.
  • 9. Directional Drilling Installation Procedure • Mobilization and Site Preparation • Pre-HDD Activities Installation Procedure • Rig-up • Temporary Casing Installation (If required) • Pilot Hole • Hole Opening Pass • Pullback • De-Mobilization
  • 10. Site Preparation • Two sites normally required • Rig site 50m x 50m • Pipe side and stringing site • Staged on land and offshore
  • 12. Pilot Hole Assembly • Jetting or rock bit • Non-magnetic collars • Survey tool • Non-magnetic collars
  • 13. DRILL BIT TYPE Mill-tooth Cutter TCI - Cutter
  • 14. PILOT HOLE PASS • Installation of Para-track Guidance System • Typical Sizes – 8.5” (216 mm) – 12.25” (311.2 mm) • Drill Path Design – Entry Angles: 10 – 18 degrees – Design Vertical Curves: 100 x Outside Diameter (100 x 12) = 1200’ (366 m) – Exit Angles: 6 – 10 degrees. Subject to final design calculations.
  • 15. Drilling Fluids • Purpose – Cutting medium for jet bits – Drive mud motors – To suspend carry cuttings away from face of drill and out of drilled bore – Provide fill to stabilize bore • Basic Materials – Dry Bentonite (naturally occurring clay) – Fresh water
  • 17. FLY CUTTERS & BARREL REAMERS BARREL REAMERS FLY CUTTER
  • 18. CONVENTIONAL HOLE OPENERS – MILL TOOTH CUTTERS
  • 19. PULLBACK • Swab Pass(es) • Connection to Carrier Pipe • Rate of Pull • Buoyancy Control
  • 20.
  • 23. Project Principles • To assess the feasibility of a HDD project the following basic information is required.  Environmental Considerations  Logistics  Topography  Geology
  • 24. Project Principles • Environmental Disturbance to the local environment from Drilling Operations. Drilling Fluid discharge risks, control and mitigation. • Logistics  Transport of Equipment.  Support for Drilling Operations.  Movement of Tools.  Disposal of Cuttings and Drilling Fluids.  Movement of Personnel
  • 25. Project Principles • Topography – Location Plan – Area Plan – Longitudinal Section including levels – Depth of Steams and Rivers • Geology – Evaluation of Existing Documentation – Historical Research – Boreholes – Penetration Tests – Geophysical Tests – Laboratory Tests – Geotechnical Reports
  • 26. GEOTECHNICAL REVIEW • Number / Depth of Borings • Sieve Analysis Tests • Unconfined Compressive Strength Tests • Rock Quality Designation (RQD)
  • 27. ENGINEERING DESIGN • Detailed Crossing Profile Design • Operating Stress Calculations • Installation Stress Calculations • Free Stress Minimum Bending Radius • Estimated Fluid Quantity Calculations • Pipeline Buoyancy Analysis
  • 28. Equipments • Drilling Rig  American Augers DD625  American Augers DD440T  Astec DD3238  MPR 6000 MUD SYSTEM  TULSA IRON 1000 MUD SYSTEM
  • 29. HDD Landfalls - General Details • Rig located onshore, (can be placed on marine spread offshore). • Drill to exit point from beach entry subject to pipe size and soil conditions. • Engineer coating on pipe-string to give temporary stability during the laying of the string and to have a low friction value when being pulled through the hole. • Pipe-string is preferably pulled directly into the hole either from a laybarge or from a pre-laid position on the seabed.
  • 30. Offshore Support “Back Reaming” • Support vessel – Locate and survey exit point – Pick-up wash pipe – Stage prereaming operations
  • 31. Offshore Support Pipeline Pullback • Support vessel – Hold product string – connection for pullback
  • 32. Intercept Drilling • Concept developed from oilfield technology for tapping into capped wells. • Requirements – Two HDD Maxi Rigs – Insert Casings at each Drill Site. – Drill from one side to within a notional 500m of the opposed rig – Drill from the opposed side to intercept the first drill
  • 33. HDD Intercept Drilling • Restrictions –Ground Conditions (Rock, Stiff clays) –Depth of Geotechnical Survey –New –Repeatability.
  • 34. INSTALLATION METHODOLOGY FOR INTERCEPT CROSSINGS • Mobilize Equipment and Personnel to Site. • Survey and re-establish entry and exit co-ordinates. • Set up Equipment at both sides of the River (Rig, mud unit and Steering Tool and wire coils). • Install casing in alignment to entry angles to firm ground bed at both sides. • Drill 2nos Pilot holes into the intersect area, from both sides of the river. • Switch the Guidance system on the shorter crossing to the Passive Magnetic ranging system (PMRS) mode and establish contact between both guidance systems. • Retrieve the short crossing as the longer crossing is steered into the same hole as the shorter crossing, using the PMRS as a homing device to the exit point. • Disconnect both guidance systems. • Connect a reamer and commence the hole expansion process
  • 35. My Various Site HDD Experiences • 24” X 1.5Km River Niger Crossing At Kwale For Daewoo/NAOC In March Of 2004 Using 300Ton (625,000#) American Augers Rig • 40” X 760M Road & Creek Crossing For Daewoo/SPDC In January 201O Using The 300Ton American Augers Rig. • 18” X 1.3KM Uruan River Crossing at Uruan, Akwa-Ibom State. (swamp) • 18” x 950m Aka-Ibonda River crossing at Creek Town, Cross River state. (swamp) • 18” x 704m Calabar River Crossing at Calabar. (land) • 18” x 650m Itu River Crossing, C.River State. (swamp) • 18” x 550m Esu and Esukudo River crosings, CRS. (swamp) • 18” x 363m Abak river Crossing, Aks. (land)
  • 36. My Various Site HDD Experiences  30” x 300m Road Xing – Zakhem Constr Ltd (October 2011)  12” x 300m Liverpool River Xing – Oando Plc (September 2011)  Test Pilot Hole Bore, 300m – Oando Plc (August 2011) Installation Period: November 2011  24” X 1.7km Oron River Crossing  24” x 1.2km Uruan River Crossing  24” x 950m Calabar River Crossing  24” x 650m Itu River Crossing  24” x 600m Esu River crossing Client – NIPP/KAZTEC Status– Swamp Site Preparations and Mobilization Installation Period – 2nd Quarter 2012 16”,6” and 4” X 700m Mid-Stream, Bundle Crossing across Commodore Channel Lagos.  Method – HDD, Shore Approach. Client – Oando Plc Status – Engineering and Design Completed
  • 37. HDD EQUIPMENT & CREW WORKED WITH  RIG – AMERICAN AUGERS DD625 HDD RIG (2004)  CAPABILITY – 300 TON (625,000 LB) PULL BACK CAPABILITY (CAPABLE OF PULLING 3.5KM X 12” P/L)  PUMP/CLEANING SYSTEM – TULSA RIG IRON 10,000 GALLONS MUD CLEANING / RECYCLING SYSTEM  750GPM WEATHERFORD T425 MUD PUMP  6” SYKES TRASH PUMPS (3 NOS).  3KM 6-5/8” FH DRILL PIPES.  VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND BARREL REAMERS Frm 12” to 60”.
  • 38. HDD EQUIPMENT & CREW WORKED WITH  RIG – AMERICAN AUGERS DD440T HDD RIG (2009)  CAPABILITY – 200 TON (440,000 LB) PULL BACK CAPABILITY (CAPABLE OF PULLING 2.5KM X 12” P/L)  PUMP/CLEANING SYSTEM – MPR 6000 MUD CLEANING / RECYCLING SYSTEM/PUMPING SYSTEM.  200 GALLONS MUD RECYCLING UNIT COMPLETE WITH SHAKERS, DESANDERS AND DESILTERS.  3 NOS 6” SYKES TRASH PUMPS.  2.5KM 5” X 4-1/2 IF DRILL PIPES.  VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND BARREL REAMERS
  • 39. HDD EQUIPMENT & CREW WORKED WITH  RIG – ASTEC 3238 DIRECTIONAL DRILLING RIG  CAPABILITY – 15 TON (30,000 LB) PULL BACK  PUMP/CLEANING SYSTEM – MX 330 MUD CLEANING / RECYCLING SYSTEM/PUMPING SYSTEM.  2 NOS 4” SYKES SUBMERSIBLE PUMPS.  750M 2-3/8” DRILL PIPES.  VARIOUS SIZES OF FLY CUTTERS/HOLE OPENERS AND BARREL REAMERS
  • 40. The Benefits of Directional Drilling • Minimum environmental disturbance • No interruption to shipping, road or rail traffic • Accurate installation • Shorter construction schedules • Lower installation costs • Minimal maintenance • Greater protection from external damage
  • 41. • Requires no concrete coating. • Cheaper alternative to open cut. • Less logistics • Can be buried up to 30mtrs, hence out of the reach of vandals. • Fewer personnel. • Depth of cover add as additional protection to the pipe. • Accurate As-Built Documentation. The Benefits of Directional Drilling cont.