SlideShare a Scribd company logo
1 of 5
Page 1 of 5
CURRICULUM VITAE
FULL NAME: MAI VAN BINH
DOB: 15-NOV-1983
PHONE: +84 906777883
EMAIL: binhmv@gmail.com
ADDRESS: 168/59A Che Lan Vien, Tay Thanh,
Tan Phu, Ho Chi Minh City, Vietnam
SUMMARY:
I have about 08 years' experience working in the Oil & Gas industry. I was a mechanical design engineer at
GE Oil & Gas, where I handled the top performing design and technology. Before that, I worked at a
mechanical engineer at PetroVietnam, where I was in charge of multiple roles from survey, design, bidding,
installation, commissioning and field service for Oil & Gas clients. Here are my abilities:
 Experience in survey, design, installation, commissioning, troubleshoot of equipment
 Knowledge of mechanical, electrical, plumbing, HVAC and subsea products
 Experience in field service, client support, sales support
 Good at 2D/3D design software: AutoCAD, SolidWorks, Pro/Engineer; Project management
software: Primavera, MS Project
 Good at communications, presentation, listening and customer skills.
 Good at project planning and management
 Working well under high pressure, well organized
 Good team player, ability to work independently
Although I do not have experience in the healthcare sector, but I have spent time studying from medical
equipment, such as CT, MRI, PET... to the healthcare market in Vietnam. I find this vacancy consistent with my
experience in the oil and gas sector, just a difference in the product line.
EMPLOYMENT HISTORY:
2013 to 2/2016 GE Oil & Gas
2008 to 2013 PetroVietnam Marine Shipyard
PROFESSIONAL EXPERIENCE:
Mechanical Design Engineer, GE Oil & Gas - 2013 to 2/2016
In my role as a mechanical design engineer, I am responsible for
Page 2 of 5
 Produce layouts, drawings, data sheets and technical documents for manufacturing, testing and
installation
 Support engineering works for Intervention and System Disciplines
 Ensure compliance with company and Industry specifications, e.g. ISO 13628, API 6A/17D
relating to the design and build of subsea equipment
 Minimise risk to the Health, Safety and Environmental impact as a result of the design,
manufacture and operation of Vetco Gray equipment
 Take a lead role in the technical execution of tenders/feeds/quotes, for individual Subsea
Package orders
 Work with ITO Subsea Designers for input into the execution of drawings for tenders, P&ID’s,
general assembly drawings
 Interface with the Subsea OTR Product and Projects group for technical support
 Interface with other technical and commercial leaders and account managers in the pursuit and
support of new business
 Communicate with vendors for the supply of third party equipment
 Communicate with peers in the sharing of knowledge
Project Engineer, GE Oil & Gas - 2014 to 2/2016
 Project planning and management to ensure completion of projects within delivery schedule
 Co-ordinate the entire documentation process and follow up with internal & external parties to
ensure timely submission to customer
 Liaise with customer, supplier, sub-contractor & internal parties for all project matters
 Support project cost control
I have experience working on the following projects:
 Ichthys EDP/LRP Gate/Seat Upgrade, Australia
- LRP assembly
- LRP disassembly
- Spare parts
- Tools required
- LRP Post refurbishment FATs
 ROV Access report, Apache Julimar, Australia
- ROV access to Manifolds systems follow operating procedure, issue & report
- ROV access to Tie-in systems follow operating procedure, issue & report
 NPI Rental CWOR 7x2, , Aberdeen UK
- Product data sheet
- LRP TSS Technical write-up
- BOM
 Amerada Hess FFFA Re-Mobilisation, UK
- Prepare Standard Replacement Parts Lists
Page 3 of 5
- BOM
 Asset Spares Lists Spare Parts, Subsea Replacement Parts, Montrose UK
 NPI Safety Joint, Bangalore, India
- Project management
- Technical specification, documents, drawing, timesheet, work breakdown structure
Mechanical Engineer, PetroVietnam Marine Shipyard - 2008 to 2013
In my role as a mechanical engineer, I was responsible for
 Office:
 In charge of equipment on jack -up rig: Top Drive, Drawworks, Derrick, Rotary Table, High
Pressure Triplex Mud Pump, Centrifugal Pumps, Actuators, Blowout Preventers, Compressors,
Tanks…
 2D/ 3D GA, lay-out drawings by AutoCAD, SolidWorks 3D design software
 Approval, checking and preparation of design/engineering documentation and specifications
related to the equipment package. Participate in project and review meetings
 Joining tendering work to support for equipment purchase, commercial support
 Discussing technical subjects with other design disciplines and clients
 Plan and maintain progress for the package aspects of the project
 Ensure all interfaces to other disciplines are clearly defined and correctly engineered
 Review and comment on contractors/sub-contractors spares and special tools recommendations
 Site service:
 Survey, obtaining relevant data, carrying out engineering analysis on site and recommending
necessary actions and writing up reports
 Identifying problems at an early stage and resolving issues before they become problems
 Monitoring safety and ensuring the good operation condition of equipment
 Install equipment according standards with respect to quality and installation time
 Perform planned maintenance and equipment modifications within the scheduled time and to the
quality standards
 Responsible for reporting customer feedback according to applicable quality standard policy and
follow up relevant assigned quality & regulatory training in a timely manner
 Maintain proper communication and good relationship with customer. Satisfy customer’s
expectation by the highest product quality and service.
I have experience working on the following projects:
 EPC for new building of “TAM DAO 03” - Self-elevating Jack-up Offshore Drilling Rig, Vietnam
This is an EPC contract for New Building of Mobile Offshore Self- Elevating Drilling Rig 90m Water Depth
Project for Vietnam National Oil And Gas Group (PetroVietnam).
Page 4 of 5
The Drilling Rig 90m water depth consists of three (3) legs 143m length, 12.000MT.
I was responsible for the following activities:
- Design & supervision of fabrication of 06 pressure cement/barite storage tanks, air receivers: detail
drawings, BOM, fabrication-assembly-installation processes (marking, cutting, fit-ups, welding, NDT,
hydro test).
- Supervise of fabrication structural steel structures, rotating machineries, pipe support, pressure vessel,
high pressure pipe lines to low temperature service pipe lines.
- Supervise of installation of high/low pressure pumps, compressors, BOP, Choke/Kill manifolds, pressure
vessels, P-tanks, draw-works, derrick, CTU, HPU, hoisting equipment, heat exchangers.
- Procedures preparation and supervision of commissioning of drilling system, mud circulation system,
bulk handling system.
- Check OS&D, FAT.
- Offshore assignment to maintenance and troubleshooting for equipment.
- Ensure the construction works are complied with Company’s QHSE Policy and Regulations.
- Weekly report to construction manager & project manager.
- Maintain primary contact and a good relationship with owner, sub-contractors site representatives.
 Liftboat H7060A Leg joining and installation, Vietnam
The project is part of the contract between PetroVietnam Supply Base (PVSB) and Sai Gon Offshore
Fabrication and Engineering Ltd. PV-Shipyard, as subcontractor to PVSB, provides package service of
manpower, calculation and heavy lift fleets including Crawler Cranes Terex Demag 1250T to join and erect
3 legs into the existing 3 legs of “Lekwek Lifter” vessel whose owner is Ezion Holdings (Singapore).
I was responsible for the following activities:
- Update drawings & documents.
- Preparing the reports and weekly submitted to the client.
- Attend to any site problems associated with project and suggest solutions/alternatives for the client’
approval.
- Issue site Queries, follow up, and close out.
- Supervision of legs fabrication involving welding of carbon steel, stabilized grade stainless steel, chrome
- molybdenum alloy steel pipes with MMA and TIG welding, inspections, pre & post heat treatment, non-
destructive testing, stress-relieve, hardness test on welded joints and hydro- test etc of pipe lines
conforming to ASME B 31.1, ASME B 31.3 and ASTM Section II, Section V, Section VIII, Section IX,
and ANSI code, hot and cold insulations etc and subsequent start-up of the plant.
 Repair of jack-up "PVD III", Vietnam
PVD III is a Jack-up rig with model Keppel FELS KFELS B Class, owned by PetroVietnam Drilling
Company (PVD) and was delivered to PVD in December 31st, 2009.
In July 27, 2012 PetroVietnam Marine Shipyard JS Company (PV Shipyard) has received PVD III drilling rig
for an urgent repair.
I was responsible for the following activities:
- Inspect rigging procedures to ensure safety and reliability.
- Create pipe fittings, perform cutting, threading, and joining of piping components.
- Perform hydrostatic and pneumatic testing.
- Ensure the construction works are comply with Company’s QHSE Policy and Regulations.
Page 5 of 5
- Weekly report to construction manager & project manager.
 Repair services of Murmanskaya Jack Up Rig for Russian Client, Vietnam
On 05 July 2013, PV Shipyard received Murmanskaya Jack-Up Rig owned by Arktikmorneftegazrazvedka
(AMNGR) to complete major works such as installation & commissioning of two Deck Cranes &
Submersible Pump Water Tower, Reinforcement and Renew of Steel Work, Painting approx 20,000 m2
and providing other general port services as well.
I was responsible for the following activities:
- Develop bid document consist of scope of work, technical specifications to buy new equipment.
- Supervise of installation & commissioning of two Deck Cranes & Submersible Pump Water Tower.
- Ensure the construction works are complied with Company’s QHSE Policy and Regulations.
- Weekly report to construction manager & project manager.
- Identify basic safety and rigging practices.
- Identify pumps, drivers, valves, and their installation and troubleshooting practices.
- Remove, troubleshoot, and install bearings and couplings.
- Alignment of pump shaft couplings and motor drive shafts to ensure efficient running.
EDUCATION:
Bachelor of Mechanical Engineering Hanoi University of Mining & Geology, Oil & Gas faculty,
2002 to 2007
COURSES:
o Harvard Online courses: Work/Life Balance - 2015, Subsea Field Training - 2015, Coaching Skill -
2015, Geometric Dimensioning & Tolerancing - 2015, O&G QMS Awareness Training - 2015, Time
Management - 2014, Virtual Team - 2014, Product Safety Process - 2014, EHS Overview for
Engineers - 2014, O&G Product Safety - 2014, Team Leadership - 2013.
o Subsea Engineering Workshop - 2014
o Presentation Skills, Influencing skills at GE - 2014
o O&G Quality Policy Acknowledgement- 2013
o GE Quality Management System - 2013
o Product Safety Process - 2013
o Gas Processing Technology - 2010
o Law of Tendering - 2010
o HSE, BOSIET

More Related Content

What's hot

00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 

What's hot (20)

Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
Resume - NATARAJAN SIVASUBRAMANI
Resume - NATARAJAN  SIVASUBRAMANIResume - NATARAJAN  SIVASUBRAMANI
Resume - NATARAJAN SIVASUBRAMANI
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Mani cv
Mani   cvMani   cv
Mani cv
 
cv 2016
cv 2016cv 2016
cv 2016
 

Viewers also liked

Phung Tran Resume
Phung Tran ResumePhung Tran Resume
Phung Tran ResumePhung Tran
 
CV.PhamVoThanhDat
CV.PhamVoThanhDatCV.PhamVoThanhDat
CV.PhamVoThanhDatDat Pham
 
My Resume (Agricultural Engineer)
My Resume (Agricultural Engineer)My Resume (Agricultural Engineer)
My Resume (Agricultural Engineer)Hưng Bùi
 
CV _ Ha Van_310588 - LT
CV _ Ha Van_310588 - LTCV _ Ha Van_310588 - LT
CV _ Ha Van_310588 - LTnguyen ha van
 
CV_ Tran anh Tuan - EN (17122014)
CV_ Tran anh Tuan  - EN (17122014)CV_ Tran anh Tuan  - EN (17122014)
CV_ Tran anh Tuan - EN (17122014)Tr?n Tuan
 
Cv nguyen thi khanh ngoc - recherche de stage
Cv   nguyen thi khanh ngoc - recherche de stageCv   nguyen thi khanh ngoc - recherche de stage
Cv nguyen thi khanh ngoc - recherche de stageNGUYEN Thi Khanh Ngoc
 
CURRICULUMVITAE ĐẶNG HOÀI LINH
CURRICULUMVITAE ĐẶNG HOÀI LINH CURRICULUMVITAE ĐẶNG HOÀI LINH
CURRICULUMVITAE ĐẶNG HOÀI LINH ĐẶNG Linh
 
CV-TONG NGOC HAI ANH-En new
CV-TONG NGOC HAI ANH-En newCV-TONG NGOC HAI ANH-En new
CV-TONG NGOC HAI ANH-En newHai Anh
 
RESUME_Nguyen Thi Le Thuy 1 (1)
RESUME_Nguyen Thi Le Thuy 1 (1)RESUME_Nguyen Thi Le Thuy 1 (1)
RESUME_Nguyen Thi Le Thuy 1 (1)Thuy Nguyen
 
Sa Vo resume
Sa Vo resumeSa Vo resume
Sa Vo resumeSa Vo
 

Viewers also liked (19)

Cuong nguyen CV
Cuong nguyen CVCuong nguyen CV
Cuong nguyen CV
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
CV_Anh Hào
CV_Anh HàoCV_Anh Hào
CV_Anh Hào
 
Caodai's CV
Caodai's CVCaodai's CV
Caodai's CV
 
CV_NGUYEN HON
CV_NGUYEN HONCV_NGUYEN HON
CV_NGUYEN HON
 
Cv tai
Cv taiCv tai
Cv tai
 
Phung Tran Resume
Phung Tran ResumePhung Tran Resume
Phung Tran Resume
 
CV.PhamVoThanhDat
CV.PhamVoThanhDatCV.PhamVoThanhDat
CV.PhamVoThanhDat
 
SON-HONG-PHUC-CV
SON-HONG-PHUC-CVSON-HONG-PHUC-CV
SON-HONG-PHUC-CV
 
My Resume (Agricultural Engineer)
My Resume (Agricultural Engineer)My Resume (Agricultural Engineer)
My Resume (Agricultural Engineer)
 
CV _ Ha Van_310588 - LT
CV _ Ha Van_310588 - LTCV _ Ha Van_310588 - LT
CV _ Ha Van_310588 - LT
 
CV_ Tran anh Tuan - EN (17122014)
CV_ Tran anh Tuan  - EN (17122014)CV_ Tran anh Tuan  - EN (17122014)
CV_ Tran anh Tuan - EN (17122014)
 
Cv nguyen thi khanh ngoc - recherche de stage
Cv   nguyen thi khanh ngoc - recherche de stageCv   nguyen thi khanh ngoc - recherche de stage
Cv nguyen thi khanh ngoc - recherche de stage
 
CURRICULUMVITAE ĐẶNG HOÀI LINH
CURRICULUMVITAE ĐẶNG HOÀI LINH CURRICULUMVITAE ĐẶNG HOÀI LINH
CURRICULUMVITAE ĐẶNG HOÀI LINH
 
CV
CVCV
CV
 
CV-TONG NGOC HAI ANH-En new
CV-TONG NGOC HAI ANH-En newCV-TONG NGOC HAI ANH-En new
CV-TONG NGOC HAI ANH-En new
 
CV-Nguyen Thi Thuy Tien
CV-Nguyen Thi Thuy TienCV-Nguyen Thi Thuy Tien
CV-Nguyen Thi Thuy Tien
 
RESUME_Nguyen Thi Le Thuy 1 (1)
RESUME_Nguyen Thi Le Thuy 1 (1)RESUME_Nguyen Thi Le Thuy 1 (1)
RESUME_Nguyen Thi Le Thuy 1 (1)
 
Sa Vo resume
Sa Vo resumeSa Vo resume
Sa Vo resume
 

Similar to MaiVanBinh_CV (20)

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
cv
cvcv
cv
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Curriculum vitae new (1) (1)
Curriculum vitae new (1) (1)Curriculum vitae new (1) (1)
Curriculum vitae new (1) (1)
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 

MaiVanBinh_CV

  • 1. Page 1 of 5 CURRICULUM VITAE FULL NAME: MAI VAN BINH DOB: 15-NOV-1983 PHONE: +84 906777883 EMAIL: binhmv@gmail.com ADDRESS: 168/59A Che Lan Vien, Tay Thanh, Tan Phu, Ho Chi Minh City, Vietnam SUMMARY: I have about 08 years' experience working in the Oil & Gas industry. I was a mechanical design engineer at GE Oil & Gas, where I handled the top performing design and technology. Before that, I worked at a mechanical engineer at PetroVietnam, where I was in charge of multiple roles from survey, design, bidding, installation, commissioning and field service for Oil & Gas clients. Here are my abilities:  Experience in survey, design, installation, commissioning, troubleshoot of equipment  Knowledge of mechanical, electrical, plumbing, HVAC and subsea products  Experience in field service, client support, sales support  Good at 2D/3D design software: AutoCAD, SolidWorks, Pro/Engineer; Project management software: Primavera, MS Project  Good at communications, presentation, listening and customer skills.  Good at project planning and management  Working well under high pressure, well organized  Good team player, ability to work independently Although I do not have experience in the healthcare sector, but I have spent time studying from medical equipment, such as CT, MRI, PET... to the healthcare market in Vietnam. I find this vacancy consistent with my experience in the oil and gas sector, just a difference in the product line. EMPLOYMENT HISTORY: 2013 to 2/2016 GE Oil & Gas 2008 to 2013 PetroVietnam Marine Shipyard PROFESSIONAL EXPERIENCE: Mechanical Design Engineer, GE Oil & Gas - 2013 to 2/2016 In my role as a mechanical design engineer, I am responsible for
  • 2. Page 2 of 5  Produce layouts, drawings, data sheets and technical documents for manufacturing, testing and installation  Support engineering works for Intervention and System Disciplines  Ensure compliance with company and Industry specifications, e.g. ISO 13628, API 6A/17D relating to the design and build of subsea equipment  Minimise risk to the Health, Safety and Environmental impact as a result of the design, manufacture and operation of Vetco Gray equipment  Take a lead role in the technical execution of tenders/feeds/quotes, for individual Subsea Package orders  Work with ITO Subsea Designers for input into the execution of drawings for tenders, P&ID’s, general assembly drawings  Interface with the Subsea OTR Product and Projects group for technical support  Interface with other technical and commercial leaders and account managers in the pursuit and support of new business  Communicate with vendors for the supply of third party equipment  Communicate with peers in the sharing of knowledge Project Engineer, GE Oil & Gas - 2014 to 2/2016  Project planning and management to ensure completion of projects within delivery schedule  Co-ordinate the entire documentation process and follow up with internal & external parties to ensure timely submission to customer  Liaise with customer, supplier, sub-contractor & internal parties for all project matters  Support project cost control I have experience working on the following projects:  Ichthys EDP/LRP Gate/Seat Upgrade, Australia - LRP assembly - LRP disassembly - Spare parts - Tools required - LRP Post refurbishment FATs  ROV Access report, Apache Julimar, Australia - ROV access to Manifolds systems follow operating procedure, issue & report - ROV access to Tie-in systems follow operating procedure, issue & report  NPI Rental CWOR 7x2, , Aberdeen UK - Product data sheet - LRP TSS Technical write-up - BOM  Amerada Hess FFFA Re-Mobilisation, UK - Prepare Standard Replacement Parts Lists
  • 3. Page 3 of 5 - BOM  Asset Spares Lists Spare Parts, Subsea Replacement Parts, Montrose UK  NPI Safety Joint, Bangalore, India - Project management - Technical specification, documents, drawing, timesheet, work breakdown structure Mechanical Engineer, PetroVietnam Marine Shipyard - 2008 to 2013 In my role as a mechanical engineer, I was responsible for  Office:  In charge of equipment on jack -up rig: Top Drive, Drawworks, Derrick, Rotary Table, High Pressure Triplex Mud Pump, Centrifugal Pumps, Actuators, Blowout Preventers, Compressors, Tanks…  2D/ 3D GA, lay-out drawings by AutoCAD, SolidWorks 3D design software  Approval, checking and preparation of design/engineering documentation and specifications related to the equipment package. Participate in project and review meetings  Joining tendering work to support for equipment purchase, commercial support  Discussing technical subjects with other design disciplines and clients  Plan and maintain progress for the package aspects of the project  Ensure all interfaces to other disciplines are clearly defined and correctly engineered  Review and comment on contractors/sub-contractors spares and special tools recommendations  Site service:  Survey, obtaining relevant data, carrying out engineering analysis on site and recommending necessary actions and writing up reports  Identifying problems at an early stage and resolving issues before they become problems  Monitoring safety and ensuring the good operation condition of equipment  Install equipment according standards with respect to quality and installation time  Perform planned maintenance and equipment modifications within the scheduled time and to the quality standards  Responsible for reporting customer feedback according to applicable quality standard policy and follow up relevant assigned quality & regulatory training in a timely manner  Maintain proper communication and good relationship with customer. Satisfy customer’s expectation by the highest product quality and service. I have experience working on the following projects:  EPC for new building of “TAM DAO 03” - Self-elevating Jack-up Offshore Drilling Rig, Vietnam This is an EPC contract for New Building of Mobile Offshore Self- Elevating Drilling Rig 90m Water Depth Project for Vietnam National Oil And Gas Group (PetroVietnam).
  • 4. Page 4 of 5 The Drilling Rig 90m water depth consists of three (3) legs 143m length, 12.000MT. I was responsible for the following activities: - Design & supervision of fabrication of 06 pressure cement/barite storage tanks, air receivers: detail drawings, BOM, fabrication-assembly-installation processes (marking, cutting, fit-ups, welding, NDT, hydro test). - Supervise of fabrication structural steel structures, rotating machineries, pipe support, pressure vessel, high pressure pipe lines to low temperature service pipe lines. - Supervise of installation of high/low pressure pumps, compressors, BOP, Choke/Kill manifolds, pressure vessels, P-tanks, draw-works, derrick, CTU, HPU, hoisting equipment, heat exchangers. - Procedures preparation and supervision of commissioning of drilling system, mud circulation system, bulk handling system. - Check OS&D, FAT. - Offshore assignment to maintenance and troubleshooting for equipment. - Ensure the construction works are complied with Company’s QHSE Policy and Regulations. - Weekly report to construction manager & project manager. - Maintain primary contact and a good relationship with owner, sub-contractors site representatives.  Liftboat H7060A Leg joining and installation, Vietnam The project is part of the contract between PetroVietnam Supply Base (PVSB) and Sai Gon Offshore Fabrication and Engineering Ltd. PV-Shipyard, as subcontractor to PVSB, provides package service of manpower, calculation and heavy lift fleets including Crawler Cranes Terex Demag 1250T to join and erect 3 legs into the existing 3 legs of “Lekwek Lifter” vessel whose owner is Ezion Holdings (Singapore). I was responsible for the following activities: - Update drawings & documents. - Preparing the reports and weekly submitted to the client. - Attend to any site problems associated with project and suggest solutions/alternatives for the client’ approval. - Issue site Queries, follow up, and close out. - Supervision of legs fabrication involving welding of carbon steel, stabilized grade stainless steel, chrome - molybdenum alloy steel pipes with MMA and TIG welding, inspections, pre & post heat treatment, non- destructive testing, stress-relieve, hardness test on welded joints and hydro- test etc of pipe lines conforming to ASME B 31.1, ASME B 31.3 and ASTM Section II, Section V, Section VIII, Section IX, and ANSI code, hot and cold insulations etc and subsequent start-up of the plant.  Repair of jack-up "PVD III", Vietnam PVD III is a Jack-up rig with model Keppel FELS KFELS B Class, owned by PetroVietnam Drilling Company (PVD) and was delivered to PVD in December 31st, 2009. In July 27, 2012 PetroVietnam Marine Shipyard JS Company (PV Shipyard) has received PVD III drilling rig for an urgent repair. I was responsible for the following activities: - Inspect rigging procedures to ensure safety and reliability. - Create pipe fittings, perform cutting, threading, and joining of piping components. - Perform hydrostatic and pneumatic testing. - Ensure the construction works are comply with Company’s QHSE Policy and Regulations.
  • 5. Page 5 of 5 - Weekly report to construction manager & project manager.  Repair services of Murmanskaya Jack Up Rig for Russian Client, Vietnam On 05 July 2013, PV Shipyard received Murmanskaya Jack-Up Rig owned by Arktikmorneftegazrazvedka (AMNGR) to complete major works such as installation & commissioning of two Deck Cranes & Submersible Pump Water Tower, Reinforcement and Renew of Steel Work, Painting approx 20,000 m2 and providing other general port services as well. I was responsible for the following activities: - Develop bid document consist of scope of work, technical specifications to buy new equipment. - Supervise of installation & commissioning of two Deck Cranes & Submersible Pump Water Tower. - Ensure the construction works are complied with Company’s QHSE Policy and Regulations. - Weekly report to construction manager & project manager. - Identify basic safety and rigging practices. - Identify pumps, drivers, valves, and their installation and troubleshooting practices. - Remove, troubleshoot, and install bearings and couplings. - Alignment of pump shaft couplings and motor drive shafts to ensure efficient running. EDUCATION: Bachelor of Mechanical Engineering Hanoi University of Mining & Geology, Oil & Gas faculty, 2002 to 2007 COURSES: o Harvard Online courses: Work/Life Balance - 2015, Subsea Field Training - 2015, Coaching Skill - 2015, Geometric Dimensioning & Tolerancing - 2015, O&G QMS Awareness Training - 2015, Time Management - 2014, Virtual Team - 2014, Product Safety Process - 2014, EHS Overview for Engineers - 2014, O&G Product Safety - 2014, Team Leadership - 2013. o Subsea Engineering Workshop - 2014 o Presentation Skills, Influencing skills at GE - 2014 o O&G Quality Policy Acknowledgement- 2013 o GE Quality Management System - 2013 o Product Safety Process - 2013 o Gas Processing Technology - 2010 o Law of Tendering - 2010 o HSE, BOSIET