A professional in Oil & Gas industry with more than 7.8 years’ experience in QA/QC, Inspection, Shut
Downs, Commissioning and Start-up, Pipeline construction, Plant Piping Project, Static equipment
Construction & Erection with engineering consultants. Experienced in the execution, & testing of Pipeline,
piping, with sound knowledge of International codes & technologies. Having deep knowledge in
Inspection of Piping, Pipeline & Static Equipment like Welding, Lowering, Erection, Testing,
Sectionalizing Valve Station, Knowledge of All Codes and Standard related to Pressure Piping.
Professional Education:
Bachelor of Engineering in Mechanical Engineering from Uttar Pradesh Technical University,
INDIA
API-510 Pressure Vessel Inspector Certification Cert No-57255, Expiry Date- 28-02-2018
CSWIP -3.1 (Welding Inspector Level-2). Cert No-90774, Expiry Date-13-08-2019
ASNT LEVEL-II (RT, UT, DPT, MPT) from Alpha NDT Training centre.
Work Experience:
1. Company Name: Axis Inspection Ltd
Project Sadara Petrochemical Company
Designation: Mechanical Inspector (Asset Integrity Division)
Date of joining: Sept-2015 to till date
Roles & Responsibilities:
Review project documents / Dossiers and Test packages for the construction work during project
execution.
Involved in walkthrough inspections / punching activities, PSSR and preservation during the
C&SU.
Set up and maintains all the comprehensive records of all Plant and equipment’s and compilation
of Technical data/ reports /Punch items for management, reported through Inspection head.
Excellent engineering drawing and P&ID reading capacity that helps resolve many execution
discrepancies
Preparing all on-stream and shutdown inspection activities for stationary equipment, pressure
relieving devices, corrosion monitoring and investigation of failures through RCA.
Review TML or CML report for static & piping work during construction.
Review registration forms of all critical equipment’s & piping lines.
Prepare Corrosion circuit for system.
Detail internal Inspection of Column / Reactors / heat exchangers and pressure
vessels.
Page 1 of 5
2. To supervise and participates in non-destructive testing of equipment and piping, including review
of preliminary interpretations carried out by subordinates
Involved in inspection procedure development for Pressure vessel/ Safety valve / Furnace
inspection / heat exchanger / Tank and other equipment.
To perform shop and field inspections and review QA/QC documents, method statements etc.
during project execution.
To ensure that all the plant pipe lines / Static equipment’s are maintained, improved or replaced
for optimum plant availability to meet the plant integrity requirements.
Attained pre commissioning meeting with C&SU and EPC.
Also Familiar with Monitoring Non conformances (NCR/CAR) and following up closeouts, Punch
list database for construction close out system before mechanical completion of New Construction
Project.
To comply with health, safety & environment management systems and also promote awareness of
its use among the staff.
2. Company Name: Abdullah A Al-Barrak & Sons Co. Jubail, Saudi Arabia
Designation: Sr.QA/QC Engineer
Date of joining: Jan-2013 to till date
Projects:
SR# PROJECTS CLIENTS
1 Module A/B shutdown. Saudi Iron & Steel Company (Hadeed)
2 Poly Ethylene Turnaround-2014 Equate Petrochemical Co, Kuwait.
3 EDC & IWS Piping Work SAUDI ARAMCO/ Riyadh Refinery
4 Wash water Line to CDU OVHD Unit SATORP
5 Jeddah TRS-2013 SAUDI ARAMCO / Jeddah Refinery
6 EDC Turnaround-2013 SADAF (SABIC Affiliate)
7 Saudi Kayan turnaround-2013 Saudi Kayan (SABIC Affiliate)
8 GOSP-3 Piping Modification SAUDI ARAMCO
Roles & Responsibilities:
Monitoring of various welding processes like SMAW, GTAW, and choosing of correct WPS as
per the requirements
Prepare and review of ITP, WPS, PQR, WQT, Hydrotest Procedure, and method statement of
static equipment and piping as per international standard and client spec.
Stage wise inspection of stationary equipment like, Column, Vessels/Drums, Heat Exchangers, etc.
Inspection of all equipment and Piping jobs as per ITP.
Prepare inspection findings, observation and recommendation. Visual inspection of tubes, tube
sheet and channel for exchangers, & Vessels etc.
Prepare Weld Map and Hydro test packages.
Inspections are carried out at each stage like fit up, welding and weld visual.
Interpretation of Radiographs as per international codes.
Review of Testing certificates, Internal Inspection Reports.
Page 2 of 5
3. Prepare and witness of Hydrostatic /Pneumatic test of piping jobs
Actively preparing inspection plan for the turnarounds and conducting internal quality audits for
Checking QMS and process effectiveness
Preparation of Daily Progress Report and Weekly & Monthly Report
Looking after quality control maintaining documentation
Attained Kick off Meting, Weekly QA/QC Meeting with Clint and consultant.
Selection of welder’s from India as per job requirement.
2. Company Name: International Certification Services Pvt Ltd, India
Designation: Third Party Inspector (TPI)
Date of joining: 31.10.2011 to 29.12.2012
Projects:
SR#
PROJECTS CLIENTS
1 Palsana to Bardoli Pipeline Project, Spread-2 (8” 8 Km) Gujarat Gas Company Ltd
2 Palsana to Bardoli Pipeline Project, Spread-1 (8” 7.5 Km) Gujarat Gas Company Ltd
3 Palanpur patiya to Variyao Pipeline Project (12” 4.8 Km) Gujarat Gas Company Ltd
Roles & Responsibilities:
To carry out third party inspection at site as per API-1104 & Client Scope of Work.
Reviewing welding related documents like WPS, PQR, WQT, weld repair procedure, welding
consumable control and supplemental procedures for new and existing facilities as per Client
Scope of Work
Inspection of all pipeline activities as per client’s specification (ITP)
Reporting of inspection activities to all project concerned.
Review and verification of documents/reports.
Witnessed welding process as per approved WPS & PQR, WQT.
Inspections are carried out at each stage like fit up, welding and weld visual
Interpretation Radiographic films as per international codes.
Review of Testing certificates, Internal Inspection Reports.
Inspection of external Fusion bond epoxy coating of pipes as per approved PQR.
Maintain the records of different parameters like DFT, WFT, RH, Surface temperature, adhesion
test.
Witnessed Hydro testing of pipes and Dimension check.
Witnessed for calibration of Measuring Instruments.
Certifying as laid drawing, joint reports, test reports, commissioning reports material consumption
reports and verifying bills of contractors.
Interaction with Client/ Consultant for Configuration of solution.
Enforcement of safety procedures to be implemented at construction sites as per the requirement.
Ensure use of all safe practices at site to achieve zero injury/ maintain smooth and safe functioning
of project.
3. Company Name: Jai Hind Projects ltd
Designation: QA/QC Engineer
Date of Joining:
14.07.2008 to
16.09.2011
Projects:
Page 3 of 5
4. Sr.#Project Client
1
Kondapalli Spur Pipeline-II Project (16” Dia 9.5 Km)
Reliance Gas Transportation And
Infrastructure Ltd.
2 Bawana Nangal Pipeline Project (36” Dia ,150kms) Gas Authority of India Ltd (GAIL)
Roles & Responsibilities:
Prepared Job procedure and ITPs of all activities as per Standard and client specification.
Take part in the qualification of welders, welding procedure (WPS, WQT, &PQR) and welding
consumable (EQT) as per ASME Section IX and Section II (PART-C).
Monitored welding processes like SMAW and choosing of correct WPS as per the requirements
Preparation of Daily Progress Reports and weekly & Monthly Reports.
Looking after quality control maintaining documents.
To work as a document controller in hard and soft formats.
Co-ordination with Clint and consultant.
Certifications and Training
Undergone training for GUJRAT GAS COMPANY LTD. (GGCL) at Bharuch Training Center,
GGCL, SURAT for Steel Project.
Undergone Basic Safety, fire fighting & first aid Training for GGCL Steel Project.
Project on Magnetic Levitation Vehicle towards partial fulfillment of the requirement for award of
degree of Uttar Pradesh Technical University.
One month summer training in Indian Railway at Gorakhpur Railway Division (N.E. Railway) in
Mechanical Workshop from 18-06-07 to 17-07-2007.
Soft Skills:
Operating Systems MS DOS, Windows 98/2000, Windows Xp. Windows7
Office Tools MS Project, Microsoft office tools, 2003/2007/2010
PERSONAL DETAILS
Date Of Birth :15-Nov-1987
Mother’s Name :Mrs. Mehrun Nisha
Father’s Name :Mr. Shaikh Alimuddin
Language Known :Hindi ,English, Urdu, Arabic
Permanent Address :Post- Sikanderpur, District - BALLIA,(U.P)-India
DECLARATION
I, hereby declare that the above mentioned information is true to my knowledge.
Place: Jubail, Saudi Arabia Saif Ali
Date:
Page 4 of 5