SlideShare a Scribd company logo

00 resume of site supervisor (Pipeline & welding)

Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.

00 resume of site supervisor (Pipeline & welding)

1 of 4
Download to read offline
1
MOHAMMAD ADIL RASHID KHAN
: Cell: +965 98045523/+91 7091218829.
: adilrashid1976@gmail.com, skype Id; adil.rashid46
Res: Mohammad Adil Rashid Khan, S/O, Salahuddin Khan, Village: - Akbarpur
Post: - Rohtas, Distt: - Rohtas Pin Code: 821311, Bihar
Post Applied for: Site Supervisor(Pipeline & Welding)
Piping, Pipeline, Tank, Vessel, Petro chemical, Oil & Gas, Offshore & Onshore Project.
Total Experience: 15 Years (Abroad)
Date of Birth: 22nd February, 1976
Piping &Welding Professional- Construction Industry
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating
resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over
15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals,
& Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
 Presently working withshorttermwork, GSE&C Co. ltd.as a PipelineSupervisor inWPMP,(KOC-Project)Kuwait.
 Acquired hands-on experience in performing at all levels of business and operations; honed skills in anticipating
and visualizing scenarios beforehand
 Excels in handling Qualification of Piping & Welding procedures and Welders, ITP’s / ACP’s and method
statements, etc.
 Splendid questioning and listening skills with ability to analyze responses, understand clients' needs and focus on
quality, precision& punctual delivery of results.
 Experienced in building and maintaining healthy business relations with Contractors etc., ensuring service quality
norms Check / witness the testing of welders on their pre-qualification papers.
 Monitor and Control the fabrication activities as per the contract specification codes and standards, approved
drawings and procedures, work instructions and material identification.
 An outgoing enthusiastic individual who likes to perform always challenging tasks. Summed up with Technical,
Safe and along with Quality to accomplish the job on or before time.
 An effective communicator with leadership and mentoring skills and proven ability to create new business.
 Familiar with GTAW, SMAW, FCAW, SAW, welding of heavy and small wall thickness.
 Code Knowledge in different ASME codes.
 Working knowledge of ASME Section VIII & IX, AWS D1.1, API-1104, and API-5L.
I am good at Effective interpersonal, communication and organizational skills with proven abilities in enhancing
production operations, optimizing resources & capacity utilization, improving, resolving problems, ramping up project
activities with on time deliverables and maximizing efficiency.
CAREER PROGRESS
Employer Project Designation Period
KAD Construction LLC.
Fujairah U.A.E.
Transco pipe line Project,
Al Fujairah U.A.E.
Client : Transco
Contractor: Lindenberg Emirates LLC
Pipeline
Supervisor
( Pipe Line tie in job)
June’2014 To June’2015
Saudi KAD
Construction LLC.
SAUDIARABIA.
Wasea Bulk PlantProject,
Riyadh, Saudi Arabia.
Client : Saudi Aramco.
Contractor : Sinopec Services
Site Supervisor
(Piping & Pipe Line)
July’2012 To Mar’2014
2
GS Neotek Co. Ltd,
Ruwais, Abu Dhabi,
U.A.E.
Ruwais Refinery Expansion Project,
Package-2.
Client : Takreer - Abu Dhabi
Contractor : GS E&C Corp, ltd.
Piping Supervisor
(Fabrication Shop &
Site)
Apr’2011 To Apr’2012
Inco International Fz
Co., Jabel Ali, U.A.E.
Mertech, Dugas, Dubal Project
Client Mertech, Dugas, Dubal Project
Fabrication
Supervisor
(Fabrication Shop)
Jan’2010 To Jan’2011
Gama Industry Arabia
Ltd.,K.S.A.
1). Tasnee HDPE/ LDPE/ Project
Jubail.
2). Hawiyah for Saudi Aramco NGL
Recovery Project.
Client: Tecnimont & Snamprogetti
WeldingSupervisor
(Petro
Chemical/Oil/Gas
Project)
Sept’2007 ToSept’2009
Yanbu Steel Co. In KSA. SSSP Project, Site-3 & Site-7 /
Sulayyil Bulk PlantProject.
ABV RockGroup Kb / Saudi Aramco
Piping Supervisor
( Pipeline, Tank)
Jul’2001 ToJul’2007
NESMA EMCOR CO.
LTD., K.S.A.
Diesel Hydro Treater Complex
Riyadh Refinery
Technip Saudi Arabia Ltd.
Welding Foreman
(Petro Chemical/ Oil
& Gas}
Jan’1999 To Jan’2001
Key Responsibility Piping Areas
 Preparation of material take off (M.T.O) from isometric drawings.
 Fabrication & Erection at Pipe Line, Knowledge of Isometric Drawing Fixing Flanges, with process Line, Knowledge
of Hydro Testing.
 Spool details list and available materials.
 Working knowledge of ASME Section VIII & IX, AWS D1.1, API-1104, and API-5L.
 Code Knowledge in different ASME codes.
 Supervision of Fabrication and fit up & dimensional inspection of pipe spools.
 Supervision of Fabrication,Assembly, Erection and Testing of various Piping Systems as per drawing, code and standards
Materials specifications and Quality Control procedure.
 Supervision of Fabrication Assembly & Erection of Small Bore and Big Bore Piping around Gas Turbine, Lube
Oil, Tank area, Diffuser Drawings meeting Contract Specification and standards efficiently and safely. Pump
Erection, Vessels Erection, Vessels Connected Valve, Pipe Support Fabrication & Erection.
 Supervise & Lead a team of workers & sub- contractors to perform site piping works. Preparation of piping
specification as per process date.
 Documentation control o f piping and other discipline.
 Follow up for fabrication status for execution. Prepare reports on job status &projects completion. Review of plan &
Isometric layouts & Revisions piping related drawing & documents.
 Monitor job progress and ensure quality work as targeted schedule. Explain a job detail to subordinated and give
solution of any technical problem arises. Maintain safety &- standard in quality for both shop & site.
 Fabrication, Erection & Testing of Piping Systems as per ISO metric drawing.
 Fabrication Assembly & Erection of Small Bore and Big Bore Piping around Gas Turbine, Lube Oil, Tank etc.
Mechanical valves fixing, Flange with process line, Grinding and Gas Cutting etc.
 Monitoring / checking of fit-up, edge preparation, orientation of pipe prior final welding.
 Well familiar with different type of WPS use as per the specific standard of various company.
 Erection of pipe racks, big bore and small bore steel pipelines of CS, SS and LTCS, installation of pipe supports,valves,
instruments, preparation of test packs.
 Having the responsibility for the erection and installation of various processes piping in the main pipe rack.
 Fabrication Knowledge of Miter cut, Dummy Support, Saddle Support and Fitting make with Plate.
 Planning and Coordinating QA/QC activities, ensuring quality control of the work according to contractual requirements
 Identifying, Analyzing and Resolving Issues and problems related to the Quality for Construction of oil & Gas and
Petrochemical field.
 Supervision of Fabrication, Erection & Testing of Piping Systemsas perdrawing is ISO metric drawing.
 Supervision of Fabrication and fit up & dimensional inspection of pipe spools.
 Pipe Cut and Bevel Knowledge by Cutting machine (KYOUNG. Bong machine)
3
Key Responsibility Welding Areas
 Review and approve high risk in-service welding procedures.
 Develop and approve weld repair plans and procedures for pressure containing and structural assets foroffshore and onshore
pipeline and facility assets.
 Check approved WPS, WPQR with respect to job. If not available concern to engineer.
 Provide technical expertise and support for welding associated with maintenance activities and new projects addressing
pressure containing and structural assets foroffshore and onshore pipeline and facility assets .
 Always focus over different types of welding process,SMAW, GTAW, FCAW, GMAW etc. Filler rods for different
materials, welding procedure qualification as per ASME Code Sec. IX.
 Review and approve proposed welding procedures that deviate from existing welding procedures.
 Develop procedures which qualify and monitor vendorand manufacture welding programs.
 Review and approved third party contractor, vendor,manufacturer welding procedures i.e., pipe manufacture, tower
manufacture, skid manufacture, vesselmanufacture, tank manufacture, etc.
 Interface with third party welding engineering resources in various projects.
 Responsible for maintain & improve Welding Quality & minimize rejection percentage.
 Review current purchase/material specifications, i.e., chemical composition of pipe and flange material, and determine if
modifications can be made so as to create the most construction and in-service "weld friendly" environment as possible based
on the various geographic locations,temperatures, products and pressures in which we operate.
 Mobilization of Manpower, Equipment, and tools as per work and condition.
 To plan the job one day before, Target to achieve as per work schedule,provide the job front to all your workmen with
proper sequence.
 Must stay abreast of current applicable regulations and industry standards.
 Monitoring the workmen, jobs time to time and analysis about target commitment.
 Proper co-ordination with Concern engineer, Client, as well sub-ordinates.
 Analysis Risk and Hazard safety point of view before starting the job.
 Receive the permit as per requirement. Hot Work Permit is required for Welding & Cutting work.
 Conduct every day Tool Box Talk and aware them about precaution
 Understanding of jobs, location, volume, and estimated time.
 Keep emergency number always, Know assembly point area etc.
 Make sure that workmen are working as per trade and specialization.
 Make sure that all welders are qualified and approved by client. Don’t engage any unqualified welders on job.
 Always Focus over Production, Quality & Safety.
 Monitoring of stockcondition of consumable materials and request before 15 days to procure the material by store.
 Make sure that only baking electrodes are used by your welder. All balance electrode to be send back to welding store for re-
baking and proper keeping record.
 Before giving instruction to welding, check material specification and correspondence Approved WPS. Select the electrodes
and then allow for welding.
 Check quality of welding, before, during and after.
 If face any difficulties ask with superior, engineer, superintendent for the clarification.
 To send welders for qualification as per requirement on site/multiple qualification if required.
 Proper communication with QC and Execution team.
 Motivation of Manpower. Appreciate who is performing outstanding
 To report the erection daily basis.
 Check / witness the testing of welders on their pre-qualification papers.
 Carried out visual inspection, welding consumable verification, dimensional check, performance test.
 Welder’s qualification, training and performance monitoring.
 Familiar with FCAW, SAW, GTAW, SMAW welding of heavy and small wall thickness.
 Monitoring / checking of fit-up, edge preparation, orientation of pipe prior final welding.
 Controlling & conducting of welder‘s qualification test for new and old welders as per the companies need & in
accordance with different materials such as (Stainless Steel, Carbon Steel, Alloy Steel, Copper Nickel, Chrome,
Aluminum, Low Alloy etc.
 Following documents to be maintained proper, Tool box talk / Attendance / Welding production report / Weld map /
Calibration certificate / test certificate / welding record / manpower record / Electrode record / set of drawings /
NDT Record / WPS / WPQR / Support details / Welder ID record.
.
4
TECHNICAL & PROFESSIONAL QUALIFICATION
 Three Year Diploma in Mechanical Engineering from Al -Kabir Polytechnic, Jamshedpur in 1997 with first class (70%).
 Diploma in Quality Control & ISO 9000 from National Institute of Labour Education and Management, India.
 Diploma in Industrial Safety from National Institute of Labour Education and Management, India.
 I-WANT Institute of Welding and NDT Technology under requirement of SNT-TC-1A of ASNT, Kamothe, Navi Mumbai-
410209.
 Radiographic Testing Level-II
 Penetrant Testing Level-II
 Ultrasonic Testing Level-II
 Magnetic Particle Testing Level-II
OFFSHORE CERTIFICATIONS
 Offshore Training Courses done from UNITED MARINE ACADEMY TRUST, C.B.D. Belapur, Navi Mumbai, India.
o Helicopter Underwater Escape (H.U.E.T.) & Sea Survival Techniques.
o Personal Survival Techniques (P.S.T.)
EDUCATION / IT SKILLS
1993 HSC from Bihar School Examination Board, Patna Bihar, India.
Operating Systems : Window 98/2000/ME/XP/Vista/Window7/Window8/Window10
Software Packages : MS-Office
AWARDS & ACCOLADES
 Certificate of Appreciation in Azmeel Contracting Company – Saudi Aramco Wasea Bulk Plant Project.
 Certificate of Commendation for Best Welding Supervisor by GAMA INDUSTRY ARABIA LTD.
 Supervising IIF in Action Work shop by GS E&C CORP, ABU DHABI under JMJ Associates.
 Certificate of Appreciation in Hawiyah for Snamprogetti – Saudi Aramco NGL Recovery Project.
 Certificate of Appreciation icant efforts, Maintaining Good Area Housekeeping, Material Arrangements & Helping
to provide a safe working place for the workforce at the TASNEE HDPEE-LDPE Project.
 Rescumatic Training Certificate at Buraida Site-3 in Saudi Arabia by ABV ROCK GROUP.
 Safety Induction Training Certificate by ABV ROCK GROUP at Site-3 in Saudi Arabia by ABV ROCK GROUP.
 Safety Induction Certificate for Personal Protective Equipment & Fire Safety Training by PDM SAUDI ARABIA
MADINA at Site-7 in Saudi Arabia.
PERSONAL CONTOUR
 Father’s Name = Mohammad Salahuddin Khan
 Sex / Marital Status = Male / Married
 Nationality = Indian
 Religion = Islam
 Languages Known = English, Hindi, Urdu, Arabic & Turkish
PASSPORT DETAILS
 Passport No = F 7209858
 Place of Issue = Riyadh (Patna, Bihar)
 Date of Expiry = 25-Feb-2018
DECLARATION
I hereby declare that the above information provided is true to the best of my knowledge. I am confident of my ability to
work in a team. All the testimonials in original can be presented during F2F interview.
Date:
Place: MOHAMMAD ADIL RASHID KHAN

Recommended

Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 

More Related Content

What's hot

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gasjaison varkey
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Makbul Cv
Makbul CvMakbul Cv
Makbul CvMakbul
 

What's hot (20)

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
resume piping
resume pipingresume piping
resume piping
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 

Similar to 00 resume of site supervisor (Pipeline & welding)

Similar to 00 resume of site supervisor (Pipeline & welding) (20)

Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
cv_piping engineer updated
cv_piping engineer updatedcv_piping engineer updated
cv_piping engineer updated
 
RESUME
RESUMERESUME
RESUME
 
CV
CVCV
CV
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
 
Prem's Resume
Prem's  ResumePrem's  Resume
Prem's Resume
 
NABEEL_SME_23012015
NABEEL_SME_23012015NABEEL_SME_23012015
NABEEL_SME_23012015
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
 
MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)
 
Adnan cv
Adnan cvAdnan cv
Adnan cv
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
my cv
my cvmy cv
my cv
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
KUMARESH.CV
KUMARESH.CVKUMARESH.CV
KUMARESH.CV
 
EL-SAYES_CV
EL-SAYES_CV EL-SAYES_CV
EL-SAYES_CV
 

Recently uploaded

Finance Strategies for Business Leaders
Finance Strategies for Business LeadersFinance Strategies for Business Leaders
Finance Strategies for Business LeadersVICTOR MAESTRE RAMIREZ
 
Leadership Qualities 2024.pptx
Leadership Qualities 2024.pptxLeadership Qualities 2024.pptx
Leadership Qualities 2024.pptxap77kumar
 
Finance Strategies for Business Leaders
Finance Strategies for Business LeadersFinance Strategies for Business Leaders
Finance Strategies for Business LeadersVICTOR MAESTRE RAMIREZ
 
Editable Events Calendar for 2024 PPT Slide
Editable Events Calendar for 2024 PPT SlideEditable Events Calendar for 2024 PPT Slide
Editable Events Calendar for 2024 PPT SlideAstroniverse
 
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdf
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdfCopy of the PMP study prep notes Third3rock PMP-Study-Notes.pdf
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdfengirfan189
 
Project Management Foundations: Schedules
Project Management Foundations: SchedulesProject Management Foundations: Schedules
Project Management Foundations: SchedulesVICTOR MAESTRE RAMIREZ
 
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...johnhartphiladelphia
 

Recently uploaded (9)

Finance Strategies for Business Leaders
Finance Strategies for Business LeadersFinance Strategies for Business Leaders
Finance Strategies for Business Leaders
 
Leadership Qualities 2024.pptx
Leadership Qualities 2024.pptxLeadership Qualities 2024.pptx
Leadership Qualities 2024.pptx
 
Finance Strategies for Business Leaders
Finance Strategies for Business LeadersFinance Strategies for Business Leaders
Finance Strategies for Business Leaders
 
BoSON22 | Rita McGrath | Discovery Driven Planning
BoSON22 | Rita McGrath | Discovery Driven PlanningBoSON22 | Rita McGrath | Discovery Driven Planning
BoSON22 | Rita McGrath | Discovery Driven Planning
 
Editable Events Calendar for 2024 PPT Slide
Editable Events Calendar for 2024 PPT SlideEditable Events Calendar for 2024 PPT Slide
Editable Events Calendar for 2024 PPT Slide
 
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdf
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdfCopy of the PMP study prep notes Third3rock PMP-Study-Notes.pdf
Copy of the PMP study prep notes Third3rock PMP-Study-Notes.pdf
 
Project Management Foundations: Schedules
Project Management Foundations: SchedulesProject Management Foundations: Schedules
Project Management Foundations: Schedules
 
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...
John Hart Philadelphia, PA: A Comprehensive Exploration of His Leadership Jou...
 
Project Management Foundations: Teams
Project Management Foundations: TeamsProject Management Foundations: Teams
Project Management Foundations: Teams
 

00 resume of site supervisor (Pipeline & welding)

  • 1. 1 MOHAMMAD ADIL RASHID KHAN : Cell: +965 98045523/+91 7091218829. : adilrashid1976@gmail.com, skype Id; adil.rashid46 Res: Mohammad Adil Rashid Khan, S/O, Salahuddin Khan, Village: - Akbarpur Post: - Rohtas, Distt: - Rohtas Pin Code: 821311, Bihar Post Applied for: Site Supervisor(Pipeline & Welding) Piping, Pipeline, Tank, Vessel, Petro chemical, Oil & Gas, Offshore & Onshore Project. Total Experience: 15 Years (Abroad) Date of Birth: 22nd February, 1976 Piping &Welding Professional- Construction Industry Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.  Presently working withshorttermwork, GSE&C Co. ltd.as a PipelineSupervisor inWPMP,(KOC-Project)Kuwait.  Acquired hands-on experience in performing at all levels of business and operations; honed skills in anticipating and visualizing scenarios beforehand  Excels in handling Qualification of Piping & Welding procedures and Welders, ITP’s / ACP’s and method statements, etc.  Splendid questioning and listening skills with ability to analyze responses, understand clients' needs and focus on quality, precision& punctual delivery of results.  Experienced in building and maintaining healthy business relations with Contractors etc., ensuring service quality norms Check / witness the testing of welders on their pre-qualification papers.  Monitor and Control the fabrication activities as per the contract specification codes and standards, approved drawings and procedures, work instructions and material identification.  An outgoing enthusiastic individual who likes to perform always challenging tasks. Summed up with Technical, Safe and along with Quality to accomplish the job on or before time.  An effective communicator with leadership and mentoring skills and proven ability to create new business.  Familiar with GTAW, SMAW, FCAW, SAW, welding of heavy and small wall thickness.  Code Knowledge in different ASME codes.  Working knowledge of ASME Section VIII & IX, AWS D1.1, API-1104, and API-5L. I am good at Effective interpersonal, communication and organizational skills with proven abilities in enhancing production operations, optimizing resources & capacity utilization, improving, resolving problems, ramping up project activities with on time deliverables and maximizing efficiency. CAREER PROGRESS Employer Project Designation Period KAD Construction LLC. Fujairah U.A.E. Transco pipe line Project, Al Fujairah U.A.E. Client : Transco Contractor: Lindenberg Emirates LLC Pipeline Supervisor ( Pipe Line tie in job) June’2014 To June’2015 Saudi KAD Construction LLC. SAUDIARABIA. Wasea Bulk PlantProject, Riyadh, Saudi Arabia. Client : Saudi Aramco. Contractor : Sinopec Services Site Supervisor (Piping & Pipe Line) July’2012 To Mar’2014
  • 2. 2 GS Neotek Co. Ltd, Ruwais, Abu Dhabi, U.A.E. Ruwais Refinery Expansion Project, Package-2. Client : Takreer - Abu Dhabi Contractor : GS E&C Corp, ltd. Piping Supervisor (Fabrication Shop & Site) Apr’2011 To Apr’2012 Inco International Fz Co., Jabel Ali, U.A.E. Mertech, Dugas, Dubal Project Client Mertech, Dugas, Dubal Project Fabrication Supervisor (Fabrication Shop) Jan’2010 To Jan’2011 Gama Industry Arabia Ltd.,K.S.A. 1). Tasnee HDPE/ LDPE/ Project Jubail. 2). Hawiyah for Saudi Aramco NGL Recovery Project. Client: Tecnimont & Snamprogetti WeldingSupervisor (Petro Chemical/Oil/Gas Project) Sept’2007 ToSept’2009 Yanbu Steel Co. In KSA. SSSP Project, Site-3 & Site-7 / Sulayyil Bulk PlantProject. ABV RockGroup Kb / Saudi Aramco Piping Supervisor ( Pipeline, Tank) Jul’2001 ToJul’2007 NESMA EMCOR CO. LTD., K.S.A. Diesel Hydro Treater Complex Riyadh Refinery Technip Saudi Arabia Ltd. Welding Foreman (Petro Chemical/ Oil & Gas} Jan’1999 To Jan’2001 Key Responsibility Piping Areas  Preparation of material take off (M.T.O) from isometric drawings.  Fabrication & Erection at Pipe Line, Knowledge of Isometric Drawing Fixing Flanges, with process Line, Knowledge of Hydro Testing.  Spool details list and available materials.  Working knowledge of ASME Section VIII & IX, AWS D1.1, API-1104, and API-5L.  Code Knowledge in different ASME codes.  Supervision of Fabrication and fit up & dimensional inspection of pipe spools.  Supervision of Fabrication,Assembly, Erection and Testing of various Piping Systems as per drawing, code and standards Materials specifications and Quality Control procedure.  Supervision of Fabrication Assembly & Erection of Small Bore and Big Bore Piping around Gas Turbine, Lube Oil, Tank area, Diffuser Drawings meeting Contract Specification and standards efficiently and safely. Pump Erection, Vessels Erection, Vessels Connected Valve, Pipe Support Fabrication & Erection.  Supervise & Lead a team of workers & sub- contractors to perform site piping works. Preparation of piping specification as per process date.  Documentation control o f piping and other discipline.  Follow up for fabrication status for execution. Prepare reports on job status &projects completion. Review of plan & Isometric layouts & Revisions piping related drawing & documents.  Monitor job progress and ensure quality work as targeted schedule. Explain a job detail to subordinated and give solution of any technical problem arises. Maintain safety &- standard in quality for both shop & site.  Fabrication, Erection & Testing of Piping Systems as per ISO metric drawing.  Fabrication Assembly & Erection of Small Bore and Big Bore Piping around Gas Turbine, Lube Oil, Tank etc. Mechanical valves fixing, Flange with process line, Grinding and Gas Cutting etc.  Monitoring / checking of fit-up, edge preparation, orientation of pipe prior final welding.  Well familiar with different type of WPS use as per the specific standard of various company.  Erection of pipe racks, big bore and small bore steel pipelines of CS, SS and LTCS, installation of pipe supports,valves, instruments, preparation of test packs.  Having the responsibility for the erection and installation of various processes piping in the main pipe rack.  Fabrication Knowledge of Miter cut, Dummy Support, Saddle Support and Fitting make with Plate.  Planning and Coordinating QA/QC activities, ensuring quality control of the work according to contractual requirements  Identifying, Analyzing and Resolving Issues and problems related to the Quality for Construction of oil & Gas and Petrochemical field.  Supervision of Fabrication, Erection & Testing of Piping Systemsas perdrawing is ISO metric drawing.  Supervision of Fabrication and fit up & dimensional inspection of pipe spools.  Pipe Cut and Bevel Knowledge by Cutting machine (KYOUNG. Bong machine)
  • 3. 3 Key Responsibility Welding Areas  Review and approve high risk in-service welding procedures.  Develop and approve weld repair plans and procedures for pressure containing and structural assets foroffshore and onshore pipeline and facility assets.  Check approved WPS, WPQR with respect to job. If not available concern to engineer.  Provide technical expertise and support for welding associated with maintenance activities and new projects addressing pressure containing and structural assets foroffshore and onshore pipeline and facility assets .  Always focus over different types of welding process,SMAW, GTAW, FCAW, GMAW etc. Filler rods for different materials, welding procedure qualification as per ASME Code Sec. IX.  Review and approve proposed welding procedures that deviate from existing welding procedures.  Develop procedures which qualify and monitor vendorand manufacture welding programs.  Review and approved third party contractor, vendor,manufacturer welding procedures i.e., pipe manufacture, tower manufacture, skid manufacture, vesselmanufacture, tank manufacture, etc.  Interface with third party welding engineering resources in various projects.  Responsible for maintain & improve Welding Quality & minimize rejection percentage.  Review current purchase/material specifications, i.e., chemical composition of pipe and flange material, and determine if modifications can be made so as to create the most construction and in-service "weld friendly" environment as possible based on the various geographic locations,temperatures, products and pressures in which we operate.  Mobilization of Manpower, Equipment, and tools as per work and condition.  To plan the job one day before, Target to achieve as per work schedule,provide the job front to all your workmen with proper sequence.  Must stay abreast of current applicable regulations and industry standards.  Monitoring the workmen, jobs time to time and analysis about target commitment.  Proper co-ordination with Concern engineer, Client, as well sub-ordinates.  Analysis Risk and Hazard safety point of view before starting the job.  Receive the permit as per requirement. Hot Work Permit is required for Welding & Cutting work.  Conduct every day Tool Box Talk and aware them about precaution  Understanding of jobs, location, volume, and estimated time.  Keep emergency number always, Know assembly point area etc.  Make sure that workmen are working as per trade and specialization.  Make sure that all welders are qualified and approved by client. Don’t engage any unqualified welders on job.  Always Focus over Production, Quality & Safety.  Monitoring of stockcondition of consumable materials and request before 15 days to procure the material by store.  Make sure that only baking electrodes are used by your welder. All balance electrode to be send back to welding store for re- baking and proper keeping record.  Before giving instruction to welding, check material specification and correspondence Approved WPS. Select the electrodes and then allow for welding.  Check quality of welding, before, during and after.  If face any difficulties ask with superior, engineer, superintendent for the clarification.  To send welders for qualification as per requirement on site/multiple qualification if required.  Proper communication with QC and Execution team.  Motivation of Manpower. Appreciate who is performing outstanding  To report the erection daily basis.  Check / witness the testing of welders on their pre-qualification papers.  Carried out visual inspection, welding consumable verification, dimensional check, performance test.  Welder’s qualification, training and performance monitoring.  Familiar with FCAW, SAW, GTAW, SMAW welding of heavy and small wall thickness.  Monitoring / checking of fit-up, edge preparation, orientation of pipe prior final welding.  Controlling & conducting of welder‘s qualification test for new and old welders as per the companies need & in accordance with different materials such as (Stainless Steel, Carbon Steel, Alloy Steel, Copper Nickel, Chrome, Aluminum, Low Alloy etc.  Following documents to be maintained proper, Tool box talk / Attendance / Welding production report / Weld map / Calibration certificate / test certificate / welding record / manpower record / Electrode record / set of drawings / NDT Record / WPS / WPQR / Support details / Welder ID record. .
  • 4. 4 TECHNICAL & PROFESSIONAL QUALIFICATION  Three Year Diploma in Mechanical Engineering from Al -Kabir Polytechnic, Jamshedpur in 1997 with first class (70%).  Diploma in Quality Control & ISO 9000 from National Institute of Labour Education and Management, India.  Diploma in Industrial Safety from National Institute of Labour Education and Management, India.  I-WANT Institute of Welding and NDT Technology under requirement of SNT-TC-1A of ASNT, Kamothe, Navi Mumbai- 410209.  Radiographic Testing Level-II  Penetrant Testing Level-II  Ultrasonic Testing Level-II  Magnetic Particle Testing Level-II OFFSHORE CERTIFICATIONS  Offshore Training Courses done from UNITED MARINE ACADEMY TRUST, C.B.D. Belapur, Navi Mumbai, India. o Helicopter Underwater Escape (H.U.E.T.) & Sea Survival Techniques. o Personal Survival Techniques (P.S.T.) EDUCATION / IT SKILLS 1993 HSC from Bihar School Examination Board, Patna Bihar, India. Operating Systems : Window 98/2000/ME/XP/Vista/Window7/Window8/Window10 Software Packages : MS-Office AWARDS & ACCOLADES  Certificate of Appreciation in Azmeel Contracting Company – Saudi Aramco Wasea Bulk Plant Project.  Certificate of Commendation for Best Welding Supervisor by GAMA INDUSTRY ARABIA LTD.  Supervising IIF in Action Work shop by GS E&C CORP, ABU DHABI under JMJ Associates.  Certificate of Appreciation in Hawiyah for Snamprogetti – Saudi Aramco NGL Recovery Project.  Certificate of Appreciation icant efforts, Maintaining Good Area Housekeeping, Material Arrangements & Helping to provide a safe working place for the workforce at the TASNEE HDPEE-LDPE Project.  Rescumatic Training Certificate at Buraida Site-3 in Saudi Arabia by ABV ROCK GROUP.  Safety Induction Training Certificate by ABV ROCK GROUP at Site-3 in Saudi Arabia by ABV ROCK GROUP.  Safety Induction Certificate for Personal Protective Equipment & Fire Safety Training by PDM SAUDI ARABIA MADINA at Site-7 in Saudi Arabia. PERSONAL CONTOUR  Father’s Name = Mohammad Salahuddin Khan  Sex / Marital Status = Male / Married  Nationality = Indian  Religion = Islam  Languages Known = English, Hindi, Urdu, Arabic & Turkish PASSPORT DETAILS  Passport No = F 7209858  Place of Issue = Riyadh (Patna, Bihar)  Date of Expiry = 25-Feb-2018 DECLARATION I hereby declare that the above information provided is true to the best of my knowledge. I am confident of my ability to work in a team. All the testimonials in original can be presented during F2F interview. Date: Place: MOHAMMAD ADIL RASHID KHAN