1. Mechanical Engineer 2015
Last update: Jan
2016 Page 1
Address: Egypt , Damietta ,New Damietta
Mobile: (+2) 01061471525
Home : (+2057)66026088
E-mail: khalid.elmowafy@gmail.com
Khalid_elmowafy@yahoo.com
Khalid Mohammed Ismail El-Mowafy
Mechanical Engineer have more than 10 years over all experience and 3 years in GCC as Assistant
operation manager for plant service in oil and gas field ( Turn around , Planned and unplanned
shutdown and EPC projects )
Senior Mechanical Engineer specialized at Static Equipment & Piping, maintenance & construction
works in the international LNG/oil& gas and petrochemicals industries. In Egypt, Saudi Arabia and
Kuwait.
Responsible to develop the overall turnaround/shutdown plan for Mechanical equipments and to
supervise its execution.
Prepare all static Equipment work package in annual plant shut down.
Good experience on heat Exchangers, valves, boilers, columns, vessels, piping systems etc
Good knowledge about NDT methods and giving recommendation for inspection teams.
Evaluating tender documents, drawings and schedules
Provide engineering support for all projects and studies executed by engineering and projects units
Aware by (SAUDI ARAMCO& SABIC) HSE and Rules.
Current job
From 03/11/2015 till now
Job Title: Static equipment Engineer
Employer : UNION FENOSA GAS , SPAIN
Plant: Spanish Egyptian liquefaction gas SEGAS , LNG Plant , Damietta port
Responsibilities & duties:
Prepare all work package related to all maintenance type PM, CM and MM.
Prepare all spare parts inventory for next planned shutdown.
Follow up working order through OCEN (CMMC) program.
Prepare all stock proposal for new installed equipment spare parts .
Follow up with planning team to prepare P6 plane for planned shutdown including all
resources and tasks
Utilize all resourced to get maximum performance with lowest cost
Experience summary
2. Mechanical Engineer 2015
Last update: Jan
2016 Page 2
1. Period from 05/2014 till 11/2016
Job Title: Mechanical superintendent
Employer: Al-Barrak Industrial Services Company (ABIS) at oil & gas and petrochemical plants in
Saudi Arabia & Kuwait.
Plant: EQUATE & SAUDI ARAMCO and SABIC plants.
Responsibilities & duties:
Supervise, coordinate and follow up all preparing work packages for turnaround
Performing campaign for man power recruitment related to turnaround
Comply with Company Health, Safety and Environment System , also promote awareness
of its use among staff.
Technical, administrative and commercial management of the Project to achieve both the
optimum exploitation and the best administration of the contract .
Managing the project activities and the contract scope of work .
Reviewing, with the Project engineers; the project maintenance plans and follow up the
progress.
Reviewing and directing the project’s manpower, equipment and tools periodically with the
project departments.
Giving technical maintenance support during T&I shutdown activities and ensuring that the
correct components and procedures are followed to ensure quality control.
Responsible for fully understanding the scope of work and planning the work in conjunction
with the assigned supervisors and engineers.
Responsible for monitoring progress and adherence to the plan during execution and
providing recommended corrective actions based on analysis of schedule and financial data.
Required to manage all turnaround financial and schedule reporting and forecasting.
Coordinate with Operation /inspection /supervisor for other equipment to make the plan
effectively
Prepare budget, man hour, and schedule for TA.
Developing overall a plan for TA.
Prepare risk schedules to identify and quantify risks and mitigation measures.
Maintain good client relationships at all times.
Built a data base for mechanical equipment.
Review contract documents & technical clarification to Company (client)
Preparing Technical Requisition package.
Technical Bid Evaluation and Risk Analysis
Coordination with other disciplines, supplier and client
Participating in site surveys, EX meeting and kick off meeting to establish and identify the
requirements
Material requisitions as a part of the commercial department purchase requisitions for new
equipment
Work Experiences
3. Mechanical Engineer 2015
Last update: Jan
2016 Page 3
Engineering packages, including equipment specifications, datasheets, drawings, etc.
Projects and turnaround
- Polyethylene TA 2014 ( Equate , Kuwait )
- Fast track job EPC project for new caustic offloading station ( Maaden Aluminum )
- Replacing of 22 static equipment (Petrochemya ,Sabic Affiliates )
- Replacing of C3 splitter reboiler ( Advanced petrochemicals company )
- Module A & B TA 2015 ( Hadeed , Sabic Affiliates )
- MSFC repairing , maintenance and hydrotest ( Jeddah Refinery , Aramco )
- Replacing of train A reactors roof 4 Nos ( Maaden Phosphate )
- Piping project ( Riyadh refinery , Aramco )
Period from 01/04/2012 to 28/04/2014
Job Title: Senior Static Equipments Engineer
Employer: Egyptian Maintenance Company – EMC , it is the one of the largest maintenance and
projects company , leading of global maintenance in oil and gas fields , it is specialized in providing
the "Turn-Key Engineered Solutions" for Oil & Gas Sector, Petrochemicals, Power Generation and
Infrastructure Industries
Plant: SEGAS Plant (Liquefied Natural Gas)
Responsibilities & duties:
Supervise, coordinate and participate in the preventive, corrective and troubleshooting
maintenance activities of the plant static equipment at the assigned location.
Participate in the planning, scheduling and execution of shutdown and major overhaul
maintenance activities
Assist my head in establishing priorities, making improvements on work methods and to
participate in evaluating
modification proposals, failure analysis and unscheduled shutdowns.
Comply with Company Health, Safety and Environment System, also promote awareness of
its use among staff.
Prepare the list of spares, tools and other material required for the maintenance jobs and
issue the Purchase/Material requisitions for the Head approval.
Conduct Toolbox meetings with subordinates for discussing safety and methods of
completing job tasks
Evaluate equipment performance problems and to suggest modification / available new
technology to reduce overall maintenance cost.
Implementation of ISO 9001, ISO 14001, OSAS 18001, Prepare risk assessment & Tool
Box Talk
4. Mechanical Engineer 2015
Last update: Jan
2016 Page 4
Good knowledge about standards: ASME, ASTM, DIN, BS, IN & TEMA for Heat
exchanger
Tender preparation
* Prepare material take off MTO according to isometric drawing
* prepare dry cost calculation for project
* prepare method of statement
* prepare welding map and as built drawing
* Prepare the test package which include ( P&ID – Isometric Drawing – Daily report –
Welding summery report – Welder certificate – test gauge certificate – blowing certificate
– hydro test certificate – material mill certificate – QC plane .
2. Period from 01/04/2007 to 01/04/2012
Job Title: Static Equipments Engineer
Plant: SEGAS Plant (Liquefied Natural Gas)
Responsibilities:
Supervising all static maintenance activity.
Overhaul Maintenance and repairing all valves types (Gate, Globe, Ball, Non return valve,
Etc)
PRV & PSV and Pilot Operated Relive valve calibration.
Loading Arm preventive and corrective maintenance.
Overhaul Maintenance and repairing for all Heat Exchanger types (Shell & tube – Plate –
Air Fan Coolers)
Tower maintenance and internal replacement (valve trays – bubble cap trays – packing)
Good knowledge for using hydraulic torque wrench , bolt tension machine and applying
flange management system.
Operation and maintenance for desalination unit (RO system)
Implementation of ISO 9001, ISO 14001, OSAS 18001, Prepare risk assessment & Tool
Box Talk
Good knowledge about standards: ASME, ASTM, DIN, BS, IN & TEMA for Heat
exchanger
Identifying spare parts requirements.
Attended the following shutdowns:
SEGAS Plant ( LNG production plant ) August 2007.
About 10 heat exchanger , 15 vessels , 5 drums , 4 tank , 7 towers
5. Mechanical Engineer 2015
Last update: Jan
2016 Page 5
Responsibilities:
- Prepare all shut down requirement tools , equipment and consumables
- Review with client all required spare parts
- Prepare method of statement for each equipment
- Discuss and review with EHS department all jobs safety plan
- Develop with planning department shutdown progress planned VS actual
SEGAS Plant November 2008.
- Replacing the metal seat of the triple eccentric metal seat valve (ORTON MV SERIES)
during SEGAS shutdown 2008
SEGAS Plant shutdown ( Fractionation Area ) July 2009
- About 5 columns , 30 shell and tube Heat Exchanger
MOPCO Plant ( UREA production plant )shutdown October 2009
- High pressure Equipment : Reactor , Stripper , Scrubber , LPCC , HPCC
SEGAS Major Shutdown 2010
Waste Heat recovery boiler shell removal and tube plugging ( MOPCO site 2011)
Replacing the cold box at SEGAS site ( chart heat exchanger ) ( MAY 2012 )
Emethanix Plant shut down ( JUNE 2012 ) ( Methanol production plant ) , overhaul
maintenance for plate heat exchanger ( TRANTER INTERNATIONAL )
Some of Projects :AS Mechanical Construction Engineer
Acid Gas vent Modification ( SEGAS Site – LNG production plant )
- Piping job about 380 Dia Inches stainless steel 304 L
New deluge valve installation ( SEGAS Site – LNG production plant )
- Piping job about 500 Dia Inches carbon steel
Waste heat boiler installation ( MOPCO Site – Urea & Ammonia plant )
- Replacing old one by new 80 tonnes weight vertical Heat exchanger, reweld Inconel 600
diaphragm gasket
New Surface Jet Pump installation offshore ( TAO platform ) (NOSPCO Site -Gas Plant )
- Piping job around 700 Dia inches alloy steel sch. 160 with 200 % RT.
- Prepare all required isometric drawing using AutoCAD 3D
- Calculate material take off according to NOSPCO specification
- Supervise offshore pump installing with attached piping
- Perform piping hydro test at 140 bar
New Ethylene project ( installing of five tower internals , packing and trays ( TCI SANMAR –
Petrochemical Plant )
6. Mechanical Engineer 2015
Last update: Jan
2016 Page 6
- 3 towers flex valve trays , 1 towers rushing ring packing and one tower have top five bubble
cap trays
Period from 01/2007 till 04/2007
Gold Star Plastic Company
- Install , pre commissioning , commissioning , start up and production test for new plastic
production line using Extrusion and thermoforming technique with raw material polystyrene
( SABIC ) .
Period from 01/2005 till 12/2006
Military Service
- Diesel engine maintenance at Armed forces .
Course Title Organizer Duration
API 510 Preparation course , Licence certificate is going on Intertek 10 days
PMP preparation course Engineering Syndicate 30 days
Pipe Line Design and Fabrication EMC head Training Centre 5 days
(PRV,PSV) calibration SEGAS Training Centre 2 days
Material Selection EMC head Training Centre 5 days
Lifting Gears and Safety lifting EMC ( Rasheed site ) 5 days
Tender preparation EMC (SEGAS site ) 5 days
Safety induction EMC (SEGAS site ) 7 days
Faculty of Engineering, Al Mansoura University, Egypt, 2001-2005
Mechanical power department.
Overall grade: Very Good (6th
rank )
Project grade : Excellent ( Water desalination using R.O system )
Microsoft Office (word-excel-power point-access)
Graphic AutoCAD
Internet (navigation, searching... etc.).
Appreciation Certificates& Training Courses
Education
Computer Skills
7. Mechanical Engineer 2015
Last update: Jan
2016 Page 7
Arabic: mother tongue
English: very good (spoken and written)
Self-motivated, patient, energetic, willing to work hard.
Able to learn new tasks quickly.
Good communicating skills.
Flexibility (relocation).
Follow up the safety instruction and rules during carry out the job.
Adhering with the safety instructions for hazardous area work orders and take the proper
precautions before starting the job
Personal information
Date of birth: 30th
January 1983.
Place of birth: Damietta, Egypt.
Nationality: Egyptian.
Marital status: Married.
Military status: Completed.
Passport status: Available.
Drive License: Available (Egypt, Saudi Arabia).
References
Available upon your request
Languages
Personal Profile