The document provides background information on lean manufacturing and the Toyota Production System. It summarizes that traditional manufacturing systems have high inventory levels and long lead times, while lean systems based on Toyota aim to reduce waste and optimize flow. The core of lean is the Toyota Production System (TPS) which treats all processes as experiments to continuously improve. TPS creates a "community of scientists" using the scientific method to solve problems at all levels.