Improve 
Lean Six Sigma Improve Phase 
Tollgate Review 
Lean Six Sigma 
Group
Improve 
Lean Six Sigma 
DMAIC Tools and Activities 
 Review Project Charter 
 Validate High-Level Value 
Stream Map and Scope 
 Validate Voice of the 
Customer 
& Voice of the Business 
 Validate Problem Statement 
and Goals 
 Validate Financial Benefits 
 Create Communication Plan 
 Select and Launch Team 
 Develop Project Schedule 
 Complete Define Tollgate 
 Identify Root Causes 
 Reduce List of Potential Root 
Causes 
 Confirm Root Cause to 
Output Relationship 
 Estimate Impact of Root 
Causes on Key Outputs 
 Prioritize Root Causes 
 Value-Add Analysis 
 Takt Rate Analysis 
 Quick Wins 
 Statistical Analysis 
 Complete Analyze Tollgate 
 Develop Potential Solutions 
 Evaluate, Select, and 
Optimize Best Solutions 
 Develop ‘To-Be’ Value 
Stream Map(s) 
 Develop and Implement Pilot 
Solution 
 Implement 5s Program 
 Develop Full Scale 
Implementation Plan 
 Cost/Benefit Analysis 
 Benchmarking 
 Complete Improve Tollgate 
 Develop SOP’s, Training 
Plan & Process Controls 
 Implement Solution and 
Ongoing Process 
Measurements 
 Confirm Attainment of Project 
Goals 
 Identify Project Replication 
Opportunities 
 Training 
 Complete Control Tollgate 
 Transition Project to Process 
Owner 
 Project Charter 
 Voice of the Customer and 
Kano Analysis 
 SIPOC Map 
 Project Valuation/ROIC 
Analysis Tools 
 RACI and Quad Charts 
 Stakeholder Analysis 
 Communication Plan 
 Effective Meeting Tools 
 Inquiry and Advocacy Skills 
 Time Lines, Milestones, 
and Gantt Charting 
 Pareto Analysis 
 Value Stream Mapping 
 Process Cycle 
Efficiency/Little’s Law 
 Operational Definitions 
 Data Collection Plan 
 Statistical Sampling 
 Measurement System 
Analysis (MSA) 
 Gage R&R 
 Kappa Studies 
 Control Charts 
 Spaghetti Diagrams 
 Histograms 
 Normality Test 
 Process Capability Analysis 
 Process Constraint ID and 
Takt Time Analysis 
 Cause & Effect Analysis 
 FMEA 
 Hypothesis Tests/Conf. 
Intervals 
 Simple & Multiple Regression 
 ANOVA 
 Components of Variation 
 Conquering Product and 
Process Complexity 
 Queuing Theory 
 Replenishment Pull/Kanban 
 Stocking Strategy 
 Process Flow Improvement 
 Process Balancing 
 Analytical Batch Sizing 
 Total Productive Maintenance 
 Design of Experiments (DOE) 
 Solution Selection Matrix 
 Piloting and Simulation 
Work Control System 
 Setup reduction 
 Pugh Matrix 
 Pull System 
 Mistake-Proofing/ 
Zero Defects 
 Standard Operating 
Procedures (SOP’s) 
 Process Control Plans 
 Visual Process Control Tools 
 MGPP 
 Statistical Process Controls 
(SPC) 
 Solution Replication 
 Visual Workplace 
 Metrics 
 Project Transition Model 
 Team Feedback Session 
 Value Stream Map Flow 
 Identify Key Input, Process 
and Output Metrics 
 Develop Operational 
Definitions 
 Develop Data Collection Plan 
 Validate Measurement 
System 
 Collect Baseline Data 
 Determine Process Capability 
 Complete Measure Tollgate 
Define Measure Analyze Improve Control 
Kaizen Events Targeted in Measure to Accelerate Results 
Lean Six Sigma Online Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 2
Improve 
Improve Summary 
Vital X (root cause) Proof of Causation 
Practical Solution (process change 
to address X) 
Operating 
Tolerances for X 
Client IT need to reverify 
all exit data received from 
Client HR 
Average delay between 
reception of information 
from Client HR until it 
reaches NT Admin or 
general admin 
Eliminate process - Place accountability 
on Client HR for information placed into 
new database. 
n/a 
E-mail vendor's contract 
with Client 
The SLA has a range of 3- 
5 business days for the 
completion of a delete 
request 
E-mail vendor instituted new web 
interface for all add/delete requests, 
vastly improving request processing 
time. 
1 - 2 days 
E-mail vendor's contract 
with Client 
The SLA has a range of 3- 
5 business days for the 
completion of a delete 
request 
E-mail vendor instituted new web 
interface for all add/delete requests, 
vastly improving request processing 
time. 
1 - 2 days 
How the solution was determined: 
 What was the solution selection tool used? 
 What project management tools were used? 
 Cost/benefit analysis? 
 Include any other tools or methods used 
1. ? 
2. ? 
3. ? 
4. ? 
5. ? 
Enter Key Slide Take Away (Key Point) Here 
3 
Solution Selection Criteria Pilot and Implementation Plan 
The Toyota Way to Lean Leadership Video by Lean Leadership Institute 
International Standards for Lean Six Sigma (ISLSS)
To-Be Process Map Improve 
Places information into HR 
EXIT database 
Utilize web tool to 
submit a delete request 
to vendor 
Access database 
daily 
Delete account 
Create Work 
Request 
Avg. Cycle 
time = 0 
days 
Avg. Cycle 
time = 1 
day 
Avg. Cycle 
time = 1 
day 
Avg. Cycle 
time = 1 
day 
Avg. Cycle 
time = 1 
day 
Client 
Mgr 
Client HR 
Client 
Contact 
NT 
Admin 
Email 
Vendor 
Admin 
Admin closes work request 
and manager notified 
Notify HR of 
employee exit date 
Enter Key Slide Take Away (Key Point) Here 
Lab Collection Workflow Swimlane Video Example by HealthITWorkforce 
International Standards for Lean Six Sigma (ISLSS) 4
Improve 
Quick Win Documentation 
Template 
Examples Where Used 
 5s 
 4-Step Setup Reduction 
 Inventory Reduction 
 MSA Improvements 
 Price reductions 
 Reduced DOWNTIME 
Process Name: ______________________ Process Lead: ___________________ 
Process Owner: ______________________ Start Date: ______________________ 
Process Area: ________________________ Stop Date: ______________________ 
1. Root Cause: _______________________________ 
2. Obvious Solution: ___________________________ 
3. Low or No Cost: ____________________________ 
4. Low Risk: _________________________________ 
5. Implementation Plan: ________________________ 
6. Stakeholder(s) Approval: _____________________ 
Benefit(s): 
 _________________________________________ 
 _________________________________________ 
 _________________________________________ 
(NVA steps or work) 
 Pull System 
 Kaizen events 
Add Visual Example 
Before 
Add Visual Example 
After 
Enter Key Slide Take Away (Key Point) Here 
Lean Improvement Walk Training Video by FastCap 
International Standards for Lean Six Sigma (ISLSS) 5
Improve 
Item/ Process Step 
Potential 
Failure 
Mode 
Potential 
Failure 
Effects 
Severity # 
Causes of 
Failure 
Occurrence # 
Current Control 
Detection # 
RPN 
Recommended 
Action Responsibility 
Target 
Completion 
Date 
Actual Date 
Action 
Completed 
New Severity # 
New Occurance # 
New Detection # 
New RPN 
Example 
Document 
not 
Received 
delay of 
scheduled 
delivery 
7 
User forgot to 
update system 
and send 
document 
3 
Call user to escalate 
issue 
7 147 
Automate system 
settings for 
missing field 
values and auto 
send 
Ima N. Charge, 
Program 
Manager 
Joe Schmoe, 
Process Mgr 
9/30/2005 10/20/2005 7 1 1 7 
FMEA 
 Risk Analysis recommended actions (Key Speaking Points) 
 Rating Index 
 Total Current Risk Priority Number (RPN) Risk 
Enter Key Slide Take Away (Key Point) Here 
Failure Mode and Effects Analysis Training Video by leansixsigmasource 
International Standards for Lean Six Sigma (ISLSS) 6
Improve 
Value Stream Map (VSM) 
Future State 
Information 
Flow 
Supplier Customer 
<Step1> <Step3> <Step3> 
1 2 1 
Sources of Value 
 ? 
 ? 
 ? 
 ? 
 ? 
Enter Key Slide Take Away (Key Point) Here 
Future State Value Stream Map Training Video by educatevirtually 
International Standards for Lean Six Sigma (ISLSS) 7
Business Impact Improve 
 State financial impact of future project leverage opportunities 
 Separate “hard or Type 1” from “soft Type 2 or 3” dollars 
Annual Estimate Replicated Estimate 
Revenue 
Enhancement 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Expenses 
Reduction 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Loss Reduction • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Cost Avoidance • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Total Savings • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
8 
Enter Key Slide Take Away (Key Point) Here 
Excel Annual Cost Calculator Training Video by Contextures Inc. 
International Standards for Lean Six Sigma (ISLSS)
Business Impact Details Improve 
 Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story 
with cause & effect relationships, on how the proposed change should create the desired financial result ($) in 
your project. 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. source of data, clear Operational Definitions?) 
 Assumption #2 (i.e. hourly rate + incremental benefit cost + travel) 
 Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the 
story with cause & effect relationships on how the change should create the desired financial result ($). 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. Labor rate used, period of time, etc…) 
 Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…) 
 Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance) 
 Assumption #1 (i.e. project is driven by the Business strategy?) 
 Assumption #2 (i.e. Customer service rating, employee moral, etc…) 
 Other Questions 
 Stakeholders agree on the project’s impact and how it will be measured in financial terms? 
 What steps were taken to ensure the integrity & accuracy of the data? 
 Has the project tracking worksheet been updated? 
9 
Enter Key Slide Take Away (Key Point) Here 
Direct vs, Indirect Cost Training Video – by Andromedia Productions 
International Standards for Lean Six Sigma (ISLSS)
Current Status Improve 
 Key actions 
completed 
 Issues 
 Lessons learned 
 Communications, 
team building, 
organizational 
activities 
Lean Six Sigma Project Status and Planning 
Deliverables/Tasks Completed last week Comments 
Deliverable/Action Who Due Revised Due Comments/Issue/Risk Who Due Revised Due Recommended Upcoming Deliverables/Tasks - 2 weeks out Due Revised Due 
For deliverables due thru: 
Actions Scheduled for next 2 Weeks 
Current Issues and Risks 
Enter Key Slide Take Away (Key Point) Here 
A3 Thinking and Problem Solving Training Video by tpyzdek 
10 
International Standards for Lean Six Sigma (ISLSS)
Next Steps Improve 
 Key actions? 
 Planned Lean Six Sigma 
Tools/Activities to be used? 
 Questions to answer? 
 Barrier/risk mitigation activities? 
 Kaizen or Quick Win Opportunities? 
Last Revised: 
No. Description/Recommendation 
Status 
Open/Closed/Hold 
Due Date 
Revised Due 
Date 
Resp Comments / Resolution 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
Lean Six Sigma Project Issue Log 
11 
Enter Key Slide Take Away (Key Point) Here 
How to Deliver a Great Presentation Video by projectmanagervideos 
International Standards for Lean Six Sigma (ISLSS)
Sign Off Improve 
 I concur that the Improve phase was successfully completed on MM/DD/YYYY 
 I concur the project is ready to proceed to next phase: Control 
Enter Name Here 
Deployment Champion 
Enter Name Here 
Green Belt/Black Belt 
Enter Name Here 
Financial Representative 
Enter Name Here 
Master Black Belt 
Enter Name Here 
Sponsor / Process Owner 
12 
Enter Key Slide Take Away (Key Point) Here 
Gaining Stakeholder Buy-in Video by Five Star Development 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Lean Six Sigma Tollgate 
Review Backup Slides 
Lean Six Sigma 
Group 
International Standards for Lean Six Sigma (ISLSS)
Project Charter Improve 
Problem/Goal Statement 
Problem: Describe problem in non-technical terms 
 Statement should explain why project is important; why 
working on it is a priority 
Goal: Goals communicate “before” and “after” conditions 
 Shift mean, variance, or both? 
 Should impact cost, time, quality dimensions 
 Express goals using SMART criteria 
 Specific, Measurable, Attainable, Resource 
Requirements, Time Boundaries 
 Explain leverage and strategic implications (if any) 
Financial Impact 
Tollgate Review Schedule 
Team 
 Scope: 
 In-Scope/Out-of-Scope 
 (Process Start/Stop 
 State financial impact of project 
 Expenses 
 Investments (inventory, capital, A/R) 
 Revenues 
 Separate “hard” from “soft” dollars 
 State financial impact of leverage opportunities (future 
projects, replication opportunities, project iterations) 
 PES Name Project Executive Sponsor (if different from PS) 
 PS Name Project Sponsor/Process Owner 
 DC Name Deployment Champion 
 GB/BB Name Green Belt/Black Belt 
 MBB Name Master Black Belt 
Core Team Role % Contrib. LSS Training 
 Team Member 1 SME XX YB 
 Team Member 2 TM XX GB 
 Team Member 3 SME XX PS 
Extended Team 
 Team Member 1 BFM XX Not Trained 
 Team Member 2 IT XX Not Trained 
Tollgate Scheduled Revised Complete 
Define: XX/XX/XX - XX/XX/XX 
Measure: XX/XX/XX XX/XX/XX XX/XX/XX 
Analyze: XX/XX/XX XX/XX/XX XX/XX/XX 
Improve: XX/XX/XX XX/XX/XX XX/XX/XX 
Control: XX/XX/XX XX/XX/XX XX/XX/XX 
 Review high-level schedule milestones here: 
 Phase Completions 
 Tollgate Reviews 
Enter Key Slide Take Away (Key Point) Here 
Project Charter Video by Rita Mulcahy 
International Standards for Lean Six Sigma (ISLSS) 14
Measure Overview Improve 
 CTQ: ? 
 Unit (d) or Mean (c): ? 
 Defect (d) or St. Dev. (c): ? 
 PCE%: ? 
 DPMO (d): ? 
 Sigma (Short Term): ? 
 Sigma (Long Term):? 
 MSA Results: show the percentage result of the GR&R, 
AR&R or other MSA carried out in the project 
 Root cause: 
 Quick Win #1 
 Root cause: 
 Quick Win #2 
 Root cause: 
 Quick Win #3 
Observation 
Individual Value 
1 28 55 82 109 136 163 190 217 244 
40 
35 
30 
25 
20 
UC L=37.70 
_ 
X=29.13 
LC L=20.56 
Observation 
Moving Range 
1 28 55 82 109 136 163 190 217 244 
10.0 
7.5 
5.0 
2.5 
0.0 
UC L=10.53 
__ 
MR=3.22 
LC L=0 
I-MR Chart of Delivery Time 
 Detailed process mapping 
MSA 
 Value Stream Mapping 
 Data Collection Planning 
 Basic Statistics 
 Process Capability 
 Histograms 
 Time Series Plot 
 Probability Plot 
 Pareto Analysis 
 Operational Def. 
 5s 
 Pull 
 Control Charts 
Enter Key Slide Take Away (Key Point) Here 
15 
Process Capability Graphical Analysis 
Root Cause / Quick Win Tools Used 
Minimum Sample Size for Robust T-Tests and ANOVA Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS)
Analyze Overview Improve 
Value Add Analysis - Current State 
80 
60 
40 
20 
0 
Takt Time = 55 
1 2 3 4 5 6 7 8 9 10 
Task # 
Task Time (seconds) 
CVA Time BVA Time NVA Time 
 Root cause: 
Effect 
 Root cause: 
Effect 
 Root cause: 
Effect 
 Value Add Analysis 
 One-Way ANOVA 
 Two-Way ANOVA 
 Pareto Plots 
 Simple Linear Regression 
 Multiple Regression 
 Test for Equal Variance 
 Scatter Plots 
 C&E Matrix 
 Complexity 
 Cause & Effect Diagram 
 Kaizen/Quick Wins 
 FMEA 
 Control/Impact Chart 
 T-Test 
 Other 
Hypothesis Test 
(ANOVA, 1 or 2 sample t - test, Chi Squared, 
Regression, Test of Equal Variance, etc) 
Factor (x) 
Tested 
p Value Observations/Conclusion 
Example: ANOVA Location 0.030 
Significant factor - 1 hour driving time from DC 
to Baltimore office causes ticket cycle time to 
generally be longer for the Baltimore site 
Example: ANOVA Part vs. No Part 0.004 
Significant factor - on average, calls requiring 
parts have double the cycle time (22 vs 43 
hours) 
Example: Chi Squared Department 0.000 
Significant factor - Department 4 has digitized 
addition of customer info to ticket and less 
human intervention, resulting in fewer errors 
Example: Pareto Region n/a 
South region accounted for 59% of the defects 
due to their manual process and distance from 
the parts warehouse 
Describe any other observations about the root cause (x) data 
Enter Key Slide Take Away (Key Point) Here 
16 
Hypothesis Tests Value-Add Analysis 
Root Cause / Effect Tools Used 
DiscoverSim Case Study by SigmaXL 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Improve 
Tollgate Checklist 
Deliverables: 
 Prioritized List of Solutions 
 “To-Be” Value Stream Map(s) 
 Pilot Plan & Results 
 Approved Solution and 
Detailed Implementation Plan 
 Additional “Quick Wins”, if 
applicable 
 Refined Charter, as necessary 
 Updated Risk Mitigation Plan 
 Deliverables Uploaded to 
Central Storage Location or 
Deployment Management 
System 
Tollgate Review 
 What techniques were used to generate ideas for potential solutions? 
 What narrowing and screening techniques were used to further develop and qualify 
potential solutions? 
 What evaluation criteria were used to select a recommended solution? 
 Do proposed solutions address all the identified root causes, at least the most critical? 
 Were the solutions verified with the Project Sponsor and Stakeholders? Has an 
approval been received to implement? 
 Was a pilot run to test the solution? What was learned? What modifications made? 
 Has the team seen evidence that the root causes of the initial problems have been 
addressed during the pilot? What are the expected benefits? 
 Has the team considered potential problems and unintended consequences (FMEA) of 
the solution and developed preventive and contingency actions to address them? 
 Has the proposed solution been documented, including process participants, job 
descriptions and if applicable, their estimated time commitment to support the process? 
 Has the team developed an implementation plan? What is the status? 
 Have changes been communicated to all the appropriate people? 
 Has the team been able to identify any additional ‘Quick Wins’? 
 Have ‘learning's’ to-date required modification of the Project Charter? If so, have these 
changes been approved by the Project Sponsor and the Key Stakeholders? 
 Have any new risks to project success been identified and added to the Risk Mitigation 
Plan? 
Has the team developed improvement solutions for the critical X’s, piloted 
the solution and verified that the solution will solve the problem? 
Improve Phase Success Criteria Training Video by educatevirtually 
International Standards for Lean Six Sigma (ISLSS) 17
Improve 
 Define the opportunity from both the customer 
 Identify the critical X factors 
 Develop solutions 
linked to critical x’s 
18 
Lean Six Sigma 
DMAIC Improvement Process 
Define 
and business perspective 
Measure 
 Understand the baseline process 
Analyze 
performance 
and root causes impacting 
process performance 
Improve 
Control 
 Implement 
solutions & 
control plan 
Enter Key Slide Take Away (Key Point) Here 
The Harada Method Video by Norman Bodek 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Control 
Tollgate Checklist 
 Has the team prepared all the essential documentation for the improved process, 
including revised/new Standard Operating Procedures (SOP’s), a training plan and a 
process control system? 
 Has the necessary training for process owners/operators been performed? 
 Have the right measures been selected, and documented as part of the Process 
Control System, to monitor performance of the process and the continued 
effectiveness of the solution? Has the metrics briefing plan/schedule been 
documented? Who owns the measures? Has the Process Owner’s job description 
been updated to reflect the new responsibilities? What happens if minimum 
performance is not achieved? 
 Has the solution been effectively implemented? Has the team compiled results data 
confirming that the solution has achieved the goals defined in the Project Charter? 
 Has the Benefits Realization Schedule been verified by the Financial Representative? 
 Has the process been transitioned to the Process Owner, to take over responsibility 
for managing continuing operations? Do they concur with the control plan? 
 Has a final Storyboard documenting the project work been developed? 
 Has the team forwarded other issues/opportunities, which were not able to be 
addressed, to senior management? 
 Have “lessons learned” been captured? 
 Have replication opportunities been identified and communicated? 
 Has the hard work and successful efforts of our team been celebrated? 
Deliverables: 
Tollgate Review 
 SOP’s 
 Training Plan 
 Process Control System 
 Benefits Realization Schedule, 
validated by Financial 
Representative 
 Validated Solution 
 Replication/ Standardization Plan 
 Lessons Learned 
 Transitioned Project 
 Project Risk Performance 
 Deliverables Uploaded to 
Central Storage Location or 
Deployment Management 
System 
Has the team implemented the solution, and a control plan to 
insure the process is robust to change? 
Control Phase Success Criteria Training Video by educatevirtually 
International Standards for Lean Six Sigma (ISLSS) 19
Improve 
Evaluating Solutions 
Against Criteria (Optional) 
250 
200 
150 
100 
50 
0 
100% 
80% 
60% 
40% 
20% 
0% 
#1 #2 #3 #4 
Root Causes 
Example: Independent Solutions 
Solutions 
% Contribution of Root Cause to Process Deficiency 
Root Cause #1 
40% 
Root Cause #2 
25% 
Root Cause #3 
20% 
Root Cause #4 
10% 
Solution A 80% 
Solution B 20% 80% 
Solution C 30% 100% 
Solution D 
Solution E 20% 5% 
Solution A = a 32% reduction in defects (80% of 40%) 
Solution B = a 21% reduction in defects (20% of 25% + 80% of 20%)=(5%+16%) 
Solution C = a 17.5% reduction in defects (30% of 25% + 100% of 10%)=(7.5%+10%) 
Implementing Solutions A & B achieve a 53% reduction in defects. 
(Assumes no interaction effects of the solutions) 
Original goal is a 50% reduction. 
Enter Key Slide Take Away (Key Point) Here 
Solution Selection Training Video by Camille Corum 
International Standards for Lean Six Sigma (ISLSS) 20
Improve 
FMEA Guidelines 
(Optional) 
Enter Key Slide Take Away (Key Point) Here 
Examples of FMEA and RPN Training Video by Simplilearn 
International Standards for Lean Six Sigma (ISLSS) 21 
 The recommended 
scales for Severity, 
Occurrence, and 
Detection
Improve 
Sample Value Stream 
Mapping Symbols (Optional) 
Quotes 
Machining C/T = 36 Sec 
Set Up Time 7 Min 
Uptime 86% 
Process Box 
Data Box 
I 
Queue/ 
Inventory 
1 
Personnel 
Flow 
(Information) 
Electronic 
Information 
Sign Off Point 
Push Systems 
Truck Shipment 
Supplier/ 
Customer 
Flow 
(Physical) 
Physical Pull 
Project 
Burst 
Supermarket 
Replenishment 
Kanban 
Station 
Paper 
Kanban 
Electronic 
Data 
System F I F O 
FIFO Lane 
Physical 
Transport 
“Go See” 
Monitoring 
Enter Key Slide Take Away (Key Point) Here 
Value Stream Map Icons Training Video by UttanaOnline 
International Standards for Lean Six Sigma (ISLSS) 22
Improve 
Main Effects Plot (data means) for Mean 
Training Dollars Jets 
Employees %Overbooked 
The number of Employees is the biggest 
Term 
driver for Mean Time Late 
Standardized Effect 
2.6 
C 
BD 
D 
CD 
A 
BC 
AB 
AD 
B 
AC 
Design of Experiments 
(DOE) Results (Optional) 
0 50 100 150 200 250 300 350 
F actor 
Name 
A Training Dollars 
B Jets 
C Employ ees 
D 
%O v erbooked 
Pareto Chart of the Standardized Effects 
(response is Mean, Alpha = .05) 
Mean of Mean 
-1 1 
60 
45 
30 
15 
0 
-1 1 
-1 1 
60 
45 
30 
15 
0 
-1 1 
Number of Employees is the only significant 
factor for Mean - Time Late 
Pareto Chart for 
Mean Time Late 
Fractional Factorial Fit: Response = Mean 
Estimated Effects and Coefficients for Mean (coded units) 
Term Effect Coef SE Coef T P 
Constant 29.64 0.08610 344.22 0.000 
Training 0.10 0.05 0.08610 0.60 0.573 
Jets -0.08 -0.04 0.08610 -0.44 0.676 
Employee -55.93 -27.97 0.08610 -324.81 0.000 
% Overbo 0.36 0.18 0.08610 2.11 0.088 
Training*Jets -0.10 -0.05 0.08610 -0.57 0.591 
Training*Employee 0.05 0.02 0.08610 0.28 0.788 
Training*% Overbo 0.09 0.05 0.08610 0.53 0.619 
Jets*Employee 0.10 0.05 0.08610 0.57 0.591 
Jets*% Overbo -0.40 -0.20 0.08610 -2.34 0.066 
Employee*% Overbo 0.17 0.09 0.08610 1.01 0.359 
 Employee is the only statistically significant factor for 
Mean besides the constant term. All other main effects 
& 2-way interactions have a p-value > 0.05. 
Ymean=f(x) equation is: 
Ymean = -27.97(Employee) + 29.64 
Enter Key Slide Take Away (Key Point) Here 
Design of Experiments (DOE) Intro Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 23
Improve 
Pugh (Selection) Matrix 
Key Criteria 
Pugh Matrix 
Importance Rating 
Benchmark Option 
Solution Alternatives 
Alternative 1 
Alternative 2 
Alternative 3 
Alternative 4 
Alternative 5 
Criteria 1 4 + S + + - - 
Criteria 2 2 S - S + + + 
Criteria 3 3 - + - + S S 
Criteria 4 2 + S + + - + 
Criteria 5 5 S - S S + S 
Criteria 6 6 - - - - - - 
Criteria 7 10 + + + + + + 
Criteria 8 8 S S S S S S 
Criteria 9 5 - - - - - - 
Criteria 10 6 + + - + + + 
Sum of Positives 4 3 3 6 4 4 
Sum of Negatives 3 4 4 2 4 3 
Sum of Sames 3 3 3 2 2 3 
Weighted Sum of Positives 22 19 16 27 23 20 
Weighted Sum of Negatives 14 18 20 11 17 15 
Totals 8 1 -4 16 6 5 
Concept Selection Legend 
Better + 
Same S 
Worse - 
(Optional) 
Enter Key Slide Take Away (Key Point) Here 
Pugh Matrix Training Video by 6ixsigmaorg 
International Standards for Lean Six Sigma (ISLSS) 24
Improve 
Benefit-Effort Matrix 
(Optional) 
Effort 
Benefit 
1 8 
3 
7 
Low Med High 
Low Med High 
13 
6 
15 
12 
9 
4 
17 
14 
11 2 
5 
10 
16 
Highly Desirable Opportunities 
Projects in upper left are the most 
desirable projects. 
Potentially Desirable Opportunities 
Projects in the upper right are potentially 
desirable, but usually require more 
analysis to ensure good decision making. 
“Potential Quick Hits” 
Possibility for Kaizen event or small GB 
project 
Least Desirable Opportunities 
Projects in the lower right are the least 
desirable. 
Enter Key Slide Take Away (Key Point) Here 
Ranking Your Projects Using Bubble Chart Pro™ Video by DataMachines 
International Standards for Lean Six Sigma (ISLSS) 25
Improve 
Stakeholder Analysis 
1 1 1 
2 
3 
4 
3 
2 
1 
0 
Strongly 
Against 
Moderately 
Against 
Neutral Moderately 
Supportive 
Strongly 
Supportive 
Stakeholder Analysis 
(Optional) 
Enter Key Slide Take Away (Key Point) Here 
Stakeholder Analysis Training Video by the University of Louisville 
International Standards for Lean Six Sigma (ISLSS) 26
Improve 
Influence Strategy 
(Optional) 
Influence Strategy 
Stakeholder Issues/Concerns Identify "Wins" Influence Strategy 
Enter Key Slide Take Away (Key Point) Here 
Influencer Training Video by Al Switzler From VitalSmarts Speakers 
International Standards for Lean Six Sigma (ISLSS) 27
Improve 
Measurement Systems 
Analysis (MSA) (Optional) 
 Measurement system is 
unacceptable with the System 
Effectiveness Score < 80% 
Enter Key Slide Take Away (Key Point) Here 
Measurement Systems Analysis Training Video by Advance Innovation Group 
International Standards for Lean Six Sigma (ISLSS) 28 
 The Between Appraiser Agreement and All 
Appraisers vs. Standard Agreement are 
also known as “System Effectiveness 
Scores”, with > 95% considered very 
good, 90-95% acceptable, 80 to < 90 % 
marginal, and < 80 % unacceptable. 
 Clearly this measurement system needs 
to be improved, but we should not be 
quick to judge Appraiser C. 
 The confidence intervals are quite wide 
and overlap. It is a good practice to 
“blame the process not the people”. Look 
for unclear or confusing operational 
definitions, inadequate training, operator 
distractions or poor lighting. Consider the 
use of pictures to clearly define a defect. 
Use Attribute MSA as a way to “put your 
stake in the ground” and track the 
effectiveness of improvements to the 
measurement system.
Improve 
Pull System 
(Optional) 
1. Always pull stock from bin with GREEN card if it 
Bin 2 
Bin 1 
Bin 1 Bin 2 
BBinin 11 Bin 1 Bin 2 
Bin 1 Bin 2 
Bin 1 Bin 2 
BBinin 1B1Binin 22 Bin 1 Bin 2 
Bin 1 Bin 1 Bin 2 Bin 1 
Bin 1Bin 2 Bin 1 Bin 2 Bin 1 Bin 2 
2-Bin 
Order Cards Mailbox 
is there. 
2. Store/supply room replaces stocked items and 
switches RED card to items just replaced. 
3. The cards are attached to magnetic strip labels 
(for ease of movement for resizing). 
Bin 1 
Bin 2 
Enter Key Slide Take Away (Key Point) Here 
Pull Systems and Kanban Training Video by GBMP1 
International Standards for Lean Six Sigma (ISLSS) 29
Improve 
Setup Reduction 
(Optional) 
Setup Documentation Worksheet 
MACHINE: DOCUMENTOR: 
DATE: PAGE 1 OF 1 
SEQ # 
START 
TIME 
EVENT 
ELAPSED 
TIME 
INT EXT 
1 0 Shut down machine :30 :30 
2 0:30 Get change parts 3:00 3:00 
3 3:30 Remove change parts from machine 3:30 3:30 
4 7:00 Place new change parts on machine 3:30 3:30 
5 10:30 Return change parts to storage 3:00 3:00 
6 13:30 Load material onto machine 1:00 1:00 
7 14:30 Generate test piece :30 :30 
8 15:00 Measure and inspect 2:00 2:00 
9 17:00 Adjust dies 1:00 1:00 
10 18:00 Generate test piece :30 :30 
11 18:30 Measure and inspect 1:30 1:30 
12 20:00 Generate first good piece 1:00 1:00 
TOTAL TIME THIS PAGE: 21:00 
TOTAL TIME ALL PAGES: 21:00 
Enter Key Slide Take Away (Key Point) Here 
Quick Changeover & SMED Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 30
Improve 
PDCA 
(Optional) 
 Plan: 
 ? 
 ? 
 Do: 
 ? 
 ? 
 Check: 
 ? 
 ? 
 Act: 
 ? 
 ? 
? 
? 
? 
? 
Plan 
Do 
Check 
Act 
Enter Key Slide Take Away (Key Point) Here 
The PDSA Cycle Training Video by LMSOS 
International Standards for Lean Six Sigma (ISLSS) 31
Improve 
5s 
(Optional) 
Sort 
 ? 
 ? 
Set Order 
 ? 
 ? 
Shine 
 ? 
 ? 
Standardize 
 ? 
 ? 
Sustain 
 ? 
 ? 
5s FORM 
IDENTIFICATION 
ITEM NAME TAG NUMBER TAGGED BY 
TAG DATE 
CLASSIFICATION 
o RAW MATERIAL o TOOLS o FURNITURE o OTHER (EXPLAIN) 
o WIP o SUPPLIES o OFFICE MATERIAL 
o FINISHED GOOD o EQUIPMENT o BOOKS/MAGAZINES 
QUANTITY CELL / AREA 
REASON 
o UNNECESSARY o LEFTOVER MATERIAL 
o DEFECTIVE o UNKNOWN 
o NON-URGENT o OTHER (EXPLAIN) 
DISPOSITION REQUIRED 
o DISCARD o TRANSFER 
o IN-CELL STORAGE o LONG-TERM STORAGE 
o REDUCE o OTHER (EXPLAIN) 
ACTION TAKEN 
ACTION DESCRIPTION APPROVED BY 
DATE 
NEW LOCATION NEW CELL / AREA 
Enter Key Slide Take Away (Key Point) Here 
5S Factory Makeover Video by 5S Supply 
International Standards for Lean Six Sigma (ISLSS) 32
Improve 
Kaizen 
(Optional) 
 Typical Kaizen Weekly Schedule 
Typical Kaizen Weekly ScheduleWeekly Calendar Status 
XX/XX Pre-work 
1. Review Scope, Goals, Objectives, and Deliverables With Senior Staff 
2. Select Team Leader 2A. Select Team Members 2B. Inform Team Members 
3. Gather Data (Demand, Quality, Headcount, WIP, Downtime, Overtime, Safety, Before Pics) 
4. Set Meeting Rooms, Food, Develop Team Tool Box 
XX/XX Monday 
1. Kaizen Kickoff (Senior Staff Representative) 
2. Kaizen Training (Lean Principles) & Specialized for Project 
3. Review Project Scope, Goals (SMART), Deliverables with Team 
4. Assign Tasks for Process Observations, Timestudies, 5-S, Spaghetti Charts, Takt Time Chart 
5. Train Team Members in Timestudy Basics and Begin Observation and Data Gathering 
XX/XX Tuesday 
1. Complete Present State Analysis Using All Appropriate Data 
2. Brainstorm Based on Goals & Objectives, Ergonomics, Safety, & Waste Elimination 
3. Create Future State Analysis and Action Plan 
4. Team Lead and Consultant Review FSA With Senior Staff 
5 Launch Sub-Teams and Complete Plan 
XX/XX Wednesday 
1. Complete Action Plan 
2. Train Process Participants in New Process 
3. Fine-tune New Process and Take After Digital Pics 
4. Retime and Compare to Goals, Objectives 
XX/XX Thursday 
1. Run New Process and Assess Effectiveness 
2. Calculate Improvements in Cycle Time, WIP, Cost Savings, Etc. 
3. Complete New Takt Time Cycle Time Bar Chart and Create 30 Day Follow-up List 
4. Complete New Standard Operating Procedure 
5. Prepare Presentation, Assign Presenters 
XX/XX Friday 
1. Practice Presentation 
2. Present to Senior Staff 2A. Set 30 Day Follow-up 2B. Create Final Report & Monitor Results 
3. Celebration Luncheon and or event 
Finalize 
Pre-Event 
Prep 
Implement 
Improvements 
Perform Process 
Participant Training 
Tweak Design 
Implement 
Improvements 
Perform Process 
Participant Training 
Tweak Design 
Finalize Future State 
Complete Training 
on Std Work 
8AM 
Monday Tuesday Wednesday Thursday Friday 
10AM 
12PM 
2PM 
4PM 
6PM 
Kaizen Kickoff 
Lean/Kaizen Training 
Specialized Training 
Measure 
(Present State 
Analysis) 
Measure 
(Present State 
Analysis) 
Analyze 
Lunch Lunch 
Analyze 
Brainstorm Ideas 
Idea Effort/Impact 
Idea Prioritization 
Future State Design 
Mid-Week Review 
Process Part Design 
Review 
Future State Des 
Future State Des 
Implement 
Improvements 
Final Presentation 
Lunch Lunch Lunch and 
Celebration 
Create and 
Implement Standard 
Work 
Measure Future 
State 
Calculate Actual 
Benefits 
Create Final 
Presentation 
Step 1 
Time 
Activity 
1-1 
Time 
Activity 
1-2 
Time 
Activity 
1-3 
Time 
Activity 
1-4 
Time 
Step 2 
Time 
Activity 
2-1 
Time 
Activity 
2-2 
Time 
Activity 
2-3 
Time 
Activity 
2-4 
Time 
Step 3 
Time 
Activity 
3-1 
Time 
Step 4 
Time 
Activity 
4-1 
Time 
Activity 
4-2 
Time 
Activity 
4-3 
Time 
Activity 
4-4 
Time 
Step 5 
Time 
Activity 
5-1 
Time 
Activity 
5-2 
Time 
Activity 
5-3 
Time 
Step 6 
Time 
Activity 
6-1 
Time 
Activity 
6-2 
Time 
Enter Key Slide Take Away (Key Point) Here 
Kaizen Events Training Video by Steven Bonacorsi and George Trachilis 
International Standards for Lean Six Sigma (ISLSS) 33
Improve 
Kaizen 
Action Workout (Optional) 
Planning Execution Before 
 ? 
 ? 
 ? 
 ? 
 ? 
Root Causes / Quick Wins Graphical Analysis After 
 ? 
 ? 
 ? 
 ? 
 ? 
 Root cause: 
 Quick Win #1 
 Root cause: 
 Quick Win #2 
 Root cause: 
 Quick Win #3 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
Enter Key Slide Take Away (Key Point) Here 
Kamishibai / TPM Audit System Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 34
Improve 
Pilot Plan 
(Optional) 
Pilot Test Description Success Criteria Test Team Schedule 
Hand-Chek/ 
Hot-Chek 
Interface 
Test 
• Sample Check-in Data entered in Hand-Chek device 
• Sample Data Sets Transmitted to Hot-Chek System – 
All Hotel Floors, All Hotel Rooms 
• Confirmation Data Received from Hot-Chek to Hand- 
Chek Device – All Hotel Floors &Rooms 
• Data Set Entry Accuracy < 
3.4 DPMO 
• Data Time < 6 Sec 
• Data Transmission/ 
Accuracy < 3.4 DPMO 
SB, plus Hot- 
Chek tech rep 
Start 3/1 
Complete 3/3 
Check-in 
Verification 
Test 
• Sample Guest Data Entered in Hot-Chek System 
(variety of room requirements) 
• “Guests” (Hotel Employees) Walked Through Check-in 
Process (90% Pre-Registered, 10% Non-Pre- 
Registered) 
• Volume Stress Test – Simulated Arrival 20 Guests in a 
“Tour Bus” 
• Process Measurements recorded via Observer (see 
Design Scorecard); “Guest” Observations Recorded. 
• Data Set Entry Accuracy < 
3.4 DPMO 
• Data Set Entry Time < 6 
Seconds 
• Data Set Transmission/ 
Reception Accuracy < 3.4 
DPMO 
• Design Scorecard CCRs 
SB, + 6 
Check-in Staff 
Start 3/6 
Complete 3/7 
Check-in 
Validation 
Test 
• 25 Guests invited to experience hotel check-in 
• Guests “pre-registered” with their room requirements 
in Hot-Chek system. 
• Guests Walked Through Check-in Process (90% Pre- 
Registered, 10% Non-Pre-Registered) 
• Process Measurements recorded via Observer (see 
Design Scorecard) 
• Guests Debriefed Following Experience. 
• Data Set Entry Accuracy < 
3.4 DPMO 
• Data Set Entry Time < 6 
Seconds 
• Data Set Transmission/ 
Reception Accuracy < 3.4 
DPMO 
• Design Scorecard CCRs 
SB, + 6 
Check-in Staff 
Start 3/10 
Complete 
3/10 
Enter Key Slide Take Away (Key Point) Here 
How to Cut Non-Value Added Activity Training Video by i-nexus 
International Standards for Lean Six Sigma (ISLSS) 35
Improve 
Verify Pilot Results 
(Optional) 
Pilot Observations: 1) Data Reception Weak – 12th Floor, SW Rooms 
2) Data Entry Sequence Confusing 
GAP Analysis/Root Causes: 1) Insufficient radio transceivers, 12th Floor 
2) Order of questions confusing staff 
Follow-up Actions: 1) Add four more radio transceivers 
2) Re-sequence guest questions 
Measurement Plan: 
Measure 
Pilot 
s 
Plan 
Target x 
CTQs 
Process time 
CTQs 
Data Transmission 
Accuracy 
1 minute 
< 3.4 DPMO 
0.5 min. 
100 DPMO 
0.05 min. 
Comments 
Enter Key Slide Take Away (Key Point) Here 
Visual Metrics Training Video by UttanaOnline 
International Standards for Lean Six Sigma (ISLSS) 36
Improve 
Summarizing Pilot 
Conclusions (Optional) 
 Once all the pilot data has been collected and the results verified, the team can determine the 
next steps toward solution implementation. Only after an objective and comprehensive 
assessment of the pilot can responsible “next step” decisions be made. 
 Some questions a team should ask upon the completion of a pilot to help guide them toward 
identification of the proper next steps are: 
 Did pilot have anticipated results? 
 Was the plan for conducting the pilot effective? 
 What improvements can we make to the solution? 
Enter Key Slide Take Away (Key Point) Here 
“Lean Healthcare. Why Lean? Why now?” Training Video by David Daisher 
International Standards for Lean Six Sigma (ISLSS) 37 
 What lessons learned and 
best practices can we apply 
during solution 
implementation? 
 Did the solution achieve the 
required design goals? 
 Can the solution be implemented 
“as-is”? Should it be? 
 Can the solution remain in place at 
the pilot location?
Improve 
Technical-Political-Cultural 
TPC Analysis (Optional) 
Technical-Political-Cultural (TPC) Analysis 
Sources Of Resistance D e f i n i t i o n Causes Of Resistance Rating Examples 
Technical 
Political 
Cultural 
Enter Key Slide Take Away (Key Point) Here 
Change Management Training Video by Gavin Wedell 
International Standards for Lean Six Sigma (ISLSS) 38
Improve 
Multi-Generational 
Project Plan (Optional) 
Gen1 Gen2 Gen3 
Target Date 
MGPP 
Vision 
Key Functionality 
Technology 
Requirements 
Target 
Customers 
Metrics 
Dependencies 
How to Manage Multiple Projects Training Video by projectmanagervideos 
39 
Enter Key Slide Take Away (Key Point) Here 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Cost/Benefit Analysis 
(Optional) 
 Identify the various solution options 
 Describe the Type 1 solution $ gained from the expected process 
improvement 
 Calculate the total cost of ownership to fully implement the solution 
Financial Benefits: Solution A Solution B Solution C 
Budget Increase $0.00 $0.00 $0.00 
Expense Reduction $0.00 $0.00 $0.00 
Loss Avoidance $0.00 $0.00 $0.00 
Other $0.00 $0.00 $0.00 
$0.00 $0.00 $0.00 
Financial Cost: $0.00 $0.00 $0.00 
Labor $0.00 $0.00 $0.00 
Technology $0.00 $0.00 $0.00 
Materials $0.00 $0.00 $0.00 
Other $0.00 $0.00 $0.00 
$0.00 $0.00 $0.00 
$0.00 $0.00 $0.00 
Pre-Implementation & 
first 12 months after 
Total Cost 
Cost/Benefit 
Cost/Benefit Analysis 
First 12 months after 
Implementation 
Total Benefits 
Enter Key Slide Take Away (Key Point) Here 
Benefit Cost Analysis Training Video by Engineer In Training Exam TV 
International Standards for Lean Six Sigma (ISLSS) 40
Improve 
Lean Six Sigma 
Additional Resources 
Lean Six Sigma 
Group
Improve 
Lean Six Sigma Tollgate 
Template Notes 
The Lean Six Sigma Tollgate Templates are: 
 Free and intended as a guide in documenting a Lean Six Sigma 
Project. I grant permission for you to modify these templates to meet 
the specific needs of your process improvement project. 
 Instructional - a video has been linked to each Template, I selected a 
mix of videos from Thought Leaders in the Lean Six Sigma Group. 
I included reference links to all video’s should you want to learn more 
information. Also included guidelines in the Note’s section of each 
slide. 
 Efficient and Effective – Placeholders for Graphic or Video Examples 
for various tools and methods across each DMAIC Phase. 
How to Use These Templates: 
 Collaboratively – use as a guide, reuse templates independently or 
across phases as needed, and change the order as needed to best 
capture the execution of Lean Six Sigma in each phase, and 
summarize in the final Case Study. 
 Use as a Communication tool, and document your findings and 
results. 
42 
My name is Steven 
Bonacorsi, Author of the 
Lean Six Sigma Tollgate 
Templates, President of 
the International 
Standard for Lean Six 
Sigma (ISLSS), and 
Owner of the LinkedIn 
Lean Six Sigma Group. 
Replace the content of this slide with images or video’s 
related to your process improvement project 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Resources Improve 
43 
 Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987 
 Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987 
 International Standard for Lean Six Sigma (ISLSS): http://www.islss.com 
Best Wishes in Continuously Improving Your Business Processes 
– Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt 
International Standards for Lean Six Sigma (ISLSS) 
 i-nexus: http://www.i-nexus.com 
 Strategy Execution Community LinkedIn Group 
https://www.linkedin.com/groups/Strategy-Execution-Community-3725091 
 SigmaXL: http://www.sigmaxl.com 
 SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101 
 Gemba Academy http://www.gembaacademy.com Lean CEO Group: 
 Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998 
 PEX Network http://www.processexcellencenetwork.com 
 PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement 
 Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
Improve Lean Six Sigma Groups 
(Click Logo’s to Join Group) 
Lean Six Sigma Group 
Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 
44 
Six Sigma Jobs; +200 Discussions; +500 Comments 
+280,000 Members – Come Join the Conversation 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Lean Six Sigma Resource Blogs 
(Click Logo’s to Follow Blogs) 
45 
See Notes Section for Links to Lean Six Sigma Group Contributors 
International Standards for Lean Six Sigma (ISLSS)
Improve 
Lean Six Sigma Improve Phase 
Video References – Set 13 
46 
Lean Six Sigma Online Training 
Video by Gemba Academy 
The Toyota Way to Lean 
Leadership Video by the 
Lean Leadership Institute 
Lab Collection Workflow 
Swimlane Video Example by 
HealthITWorkforce 
Lean Improvement Walk 
Training Video by FastCap 
Join the Process Improvement Consultants Group: 
http://www.linkedin.com/groups?gid=4183003 
International Standards for Lean Six Sigma (ISLSS) 
Failure Mode and Effects 
Analysis Training Video by 
leansixsigmasource 
Future State Value Stream 
Map Training Video by 
educatevirtually 
Excel Annual Cost 
Calculator Training Video 
by Contextures Inc. 
Direct vs, Indirect Cost 
Training Video – by 
Andromedia Productions
Improve 
Lean Six Sigma Improve Phase 
Video References – Set 14 
A3 Thinking and Problem 
Solving Training Video by 
tpyzdek 
How to Deliver a Great 
Presentation Video by 
projectmanagervideos 
Project Charter Video by 
Rita Mulcahy 
Join the International Organization for Standardization Group: 
47 
http://www.linkedin.com/groups?gid=3004797 
International Standards for Lean Six Sigma (ISLSS) 
Gaining Stakeholder 
Buy-in Video by 
Five Star Development 
Minimum Sample Size for 
Robust T-Tests and ANOVA 
Video by SigmaXL 
DiscoverSim Case Study 
by SigmaXL 
Improve Phase Success Criteria 
Training Video by 
educatevirtually 
Improve Phase Success 
Criteria Training Video 
by educatevirtually
Improve 
Lean Six Sigma Improve Phase 
Video References – Set 15 
Value Stream Map 
Icons Video by 
48 
The Harada Method Video by 
Norman Bodek 
Control Phase Success Criteria 
Training Video by 
educatevirtually 
Join the Supply Chain Optimization Group: 
UttanaOnline 
http://www.linkedin.com/groups/Supply-Chain-Optimization-73495 
International Standards for Lean Six Sigma (ISLSS) 
Solution Selection 
Training Video by 
Camille Corum 
Design of Experiments (DOE) 
Intro Video by Gemba Academy 
Pugh Matrix Training 
Video by 6ixsigmaorg 
Ranking Your Projects Using 
Bubble Chart Pro™ Video by 
DataMachines 
Stakeholder Analysis 
Training Video by the 
University of Louisville
Improve 
Lean Six Sigma Improve Phase 
Video References – Set 16 
The PDSA Cycle 
Training Video by 
5S Factory Makeover 
Video by 5S Supply 
49 
Join the Lean Six Sigma Innovation Group: 
LMSOS 
http://www.linkedin.com/groups/Lean-Six-Sigma-Innovation-65552 
International Standards for Lean Six Sigma (ISLSS) 
Value Stream Map 
Icons Video by 
UttanaOnline 
Influencer Training Video by 
Al Switzler From 
VitalSmarts Speakers 
Measurement Systems Analysis 
Training Video by 
Advance Innovation Group 
Pull Systems and Kanban 
Training Video by GBMP1 
Quick Changeover & 
SMED Training Video 
by Gemba Academy 
Kaizen Events Training Video by 
Steven Bonacorsi and 
George Trachilis
Improve 
Lean Six Sigma Improve Phase 
Video References – Set 17 
Visual Metrics Training 
Video by UttanaOnline 
50 
Benefit Cost Analysis Video by 
Engineer In Training Exam TV 
Join the Value Chain Transformation Group: 
http://www.linkedin.com/groups/Value-Chain-Transformation-74197 
International Standards for Lean Six Sigma (ISLSS) 
Value Stream Map 
Icons Video by 
UttanaOnline 
Kamishibai / TPM Audit System 
Video by Gemba Academy 
How to Cut Non-Value 
Added Activity Video 
by i-nexus 
“Lean Healthcare. Why Lean? 
Why now?” Training Video by 
David Daisher 
Change Management 
Training Video by 
Gavin Wedell 
How to Manage Multiple 
Projects Video by 
projectmanagervideos

Improve phase lean six sigma tollgate template

  • 1.
    Improve Lean SixSigma Improve Phase Tollgate Review Lean Six Sigma Group
  • 2.
    Improve Lean SixSigma DMAIC Tools and Activities  Review Project Charter  Validate High-Level Value Stream Map and Scope  Validate Voice of the Customer & Voice of the Business  Validate Problem Statement and Goals  Validate Financial Benefits  Create Communication Plan  Select and Launch Team  Develop Project Schedule  Complete Define Tollgate  Identify Root Causes  Reduce List of Potential Root Causes  Confirm Root Cause to Output Relationship  Estimate Impact of Root Causes on Key Outputs  Prioritize Root Causes  Value-Add Analysis  Takt Rate Analysis  Quick Wins  Statistical Analysis  Complete Analyze Tollgate  Develop Potential Solutions  Evaluate, Select, and Optimize Best Solutions  Develop ‘To-Be’ Value Stream Map(s)  Develop and Implement Pilot Solution  Implement 5s Program  Develop Full Scale Implementation Plan  Cost/Benefit Analysis  Benchmarking  Complete Improve Tollgate  Develop SOP’s, Training Plan & Process Controls  Implement Solution and Ongoing Process Measurements  Confirm Attainment of Project Goals  Identify Project Replication Opportunities  Training  Complete Control Tollgate  Transition Project to Process Owner  Project Charter  Voice of the Customer and Kano Analysis  SIPOC Map  Project Valuation/ROIC Analysis Tools  RACI and Quad Charts  Stakeholder Analysis  Communication Plan  Effective Meeting Tools  Inquiry and Advocacy Skills  Time Lines, Milestones, and Gantt Charting  Pareto Analysis  Value Stream Mapping  Process Cycle Efficiency/Little’s Law  Operational Definitions  Data Collection Plan  Statistical Sampling  Measurement System Analysis (MSA)  Gage R&R  Kappa Studies  Control Charts  Spaghetti Diagrams  Histograms  Normality Test  Process Capability Analysis  Process Constraint ID and Takt Time Analysis  Cause & Effect Analysis  FMEA  Hypothesis Tests/Conf. Intervals  Simple & Multiple Regression  ANOVA  Components of Variation  Conquering Product and Process Complexity  Queuing Theory  Replenishment Pull/Kanban  Stocking Strategy  Process Flow Improvement  Process Balancing  Analytical Batch Sizing  Total Productive Maintenance  Design of Experiments (DOE)  Solution Selection Matrix  Piloting and Simulation Work Control System  Setup reduction  Pugh Matrix  Pull System  Mistake-Proofing/ Zero Defects  Standard Operating Procedures (SOP’s)  Process Control Plans  Visual Process Control Tools  MGPP  Statistical Process Controls (SPC)  Solution Replication  Visual Workplace  Metrics  Project Transition Model  Team Feedback Session  Value Stream Map Flow  Identify Key Input, Process and Output Metrics  Develop Operational Definitions  Develop Data Collection Plan  Validate Measurement System  Collect Baseline Data  Determine Process Capability  Complete Measure Tollgate Define Measure Analyze Improve Control Kaizen Events Targeted in Measure to Accelerate Results Lean Six Sigma Online Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 2
  • 3.
    Improve Improve Summary Vital X (root cause) Proof of Causation Practical Solution (process change to address X) Operating Tolerances for X Client IT need to reverify all exit data received from Client HR Average delay between reception of information from Client HR until it reaches NT Admin or general admin Eliminate process - Place accountability on Client HR for information placed into new database. n/a E-mail vendor's contract with Client The SLA has a range of 3- 5 business days for the completion of a delete request E-mail vendor instituted new web interface for all add/delete requests, vastly improving request processing time. 1 - 2 days E-mail vendor's contract with Client The SLA has a range of 3- 5 business days for the completion of a delete request E-mail vendor instituted new web interface for all add/delete requests, vastly improving request processing time. 1 - 2 days How the solution was determined:  What was the solution selection tool used?  What project management tools were used?  Cost/benefit analysis?  Include any other tools or methods used 1. ? 2. ? 3. ? 4. ? 5. ? Enter Key Slide Take Away (Key Point) Here 3 Solution Selection Criteria Pilot and Implementation Plan The Toyota Way to Lean Leadership Video by Lean Leadership Institute International Standards for Lean Six Sigma (ISLSS)
  • 4.
    To-Be Process MapImprove Places information into HR EXIT database Utilize web tool to submit a delete request to vendor Access database daily Delete account Create Work Request Avg. Cycle time = 0 days Avg. Cycle time = 1 day Avg. Cycle time = 1 day Avg. Cycle time = 1 day Avg. Cycle time = 1 day Client Mgr Client HR Client Contact NT Admin Email Vendor Admin Admin closes work request and manager notified Notify HR of employee exit date Enter Key Slide Take Away (Key Point) Here Lab Collection Workflow Swimlane Video Example by HealthITWorkforce International Standards for Lean Six Sigma (ISLSS) 4
  • 5.
    Improve Quick WinDocumentation Template Examples Where Used  5s  4-Step Setup Reduction  Inventory Reduction  MSA Improvements  Price reductions  Reduced DOWNTIME Process Name: ______________________ Process Lead: ___________________ Process Owner: ______________________ Start Date: ______________________ Process Area: ________________________ Stop Date: ______________________ 1. Root Cause: _______________________________ 2. Obvious Solution: ___________________________ 3. Low or No Cost: ____________________________ 4. Low Risk: _________________________________ 5. Implementation Plan: ________________________ 6. Stakeholder(s) Approval: _____________________ Benefit(s):  _________________________________________  _________________________________________  _________________________________________ (NVA steps or work)  Pull System  Kaizen events Add Visual Example Before Add Visual Example After Enter Key Slide Take Away (Key Point) Here Lean Improvement Walk Training Video by FastCap International Standards for Lean Six Sigma (ISLSS) 5
  • 6.
    Improve Item/ ProcessStep Potential Failure Mode Potential Failure Effects Severity # Causes of Failure Occurrence # Current Control Detection # RPN Recommended Action Responsibility Target Completion Date Actual Date Action Completed New Severity # New Occurance # New Detection # New RPN Example Document not Received delay of scheduled delivery 7 User forgot to update system and send document 3 Call user to escalate issue 7 147 Automate system settings for missing field values and auto send Ima N. Charge, Program Manager Joe Schmoe, Process Mgr 9/30/2005 10/20/2005 7 1 1 7 FMEA  Risk Analysis recommended actions (Key Speaking Points)  Rating Index  Total Current Risk Priority Number (RPN) Risk Enter Key Slide Take Away (Key Point) Here Failure Mode and Effects Analysis Training Video by leansixsigmasource International Standards for Lean Six Sigma (ISLSS) 6
  • 7.
    Improve Value StreamMap (VSM) Future State Information Flow Supplier Customer <Step1> <Step3> <Step3> 1 2 1 Sources of Value  ?  ?  ?  ?  ? Enter Key Slide Take Away (Key Point) Here Future State Value Stream Map Training Video by educatevirtually International Standards for Lean Six Sigma (ISLSS) 7
  • 8.
    Business Impact Improve  State financial impact of future project leverage opportunities  Separate “hard or Type 1” from “soft Type 2 or 3” dollars Annual Estimate Replicated Estimate Revenue Enhancement • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Expenses Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Loss Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Cost Avoidance • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Total Savings • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? 8 Enter Key Slide Take Away (Key Point) Here Excel Annual Cost Calculator Training Video by Contextures Inc. International Standards for Lean Six Sigma (ISLSS)
  • 9.
    Business Impact DetailsImprove  Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story with cause & effect relationships, on how the proposed change should create the desired financial result ($) in your project.  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. source of data, clear Operational Definitions?)  Assumption #2 (i.e. hourly rate + incremental benefit cost + travel)  Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the story with cause & effect relationships on how the change should create the desired financial result ($).  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. Labor rate used, period of time, etc…)  Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…)  Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance)  Assumption #1 (i.e. project is driven by the Business strategy?)  Assumption #2 (i.e. Customer service rating, employee moral, etc…)  Other Questions  Stakeholders agree on the project’s impact and how it will be measured in financial terms?  What steps were taken to ensure the integrity & accuracy of the data?  Has the project tracking worksheet been updated? 9 Enter Key Slide Take Away (Key Point) Here Direct vs, Indirect Cost Training Video – by Andromedia Productions International Standards for Lean Six Sigma (ISLSS)
  • 10.
    Current Status Improve  Key actions completed  Issues  Lessons learned  Communications, team building, organizational activities Lean Six Sigma Project Status and Planning Deliverables/Tasks Completed last week Comments Deliverable/Action Who Due Revised Due Comments/Issue/Risk Who Due Revised Due Recommended Upcoming Deliverables/Tasks - 2 weeks out Due Revised Due For deliverables due thru: Actions Scheduled for next 2 Weeks Current Issues and Risks Enter Key Slide Take Away (Key Point) Here A3 Thinking and Problem Solving Training Video by tpyzdek 10 International Standards for Lean Six Sigma (ISLSS)
  • 11.
    Next Steps Improve  Key actions?  Planned Lean Six Sigma Tools/Activities to be used?  Questions to answer?  Barrier/risk mitigation activities?  Kaizen or Quick Win Opportunities? Last Revised: No. Description/Recommendation Status Open/Closed/Hold Due Date Revised Due Date Resp Comments / Resolution 1 2 3 4 5 6 7 8 9 10 Lean Six Sigma Project Issue Log 11 Enter Key Slide Take Away (Key Point) Here How to Deliver a Great Presentation Video by projectmanagervideos International Standards for Lean Six Sigma (ISLSS)
  • 12.
    Sign Off Improve  I concur that the Improve phase was successfully completed on MM/DD/YYYY  I concur the project is ready to proceed to next phase: Control Enter Name Here Deployment Champion Enter Name Here Green Belt/Black Belt Enter Name Here Financial Representative Enter Name Here Master Black Belt Enter Name Here Sponsor / Process Owner 12 Enter Key Slide Take Away (Key Point) Here Gaining Stakeholder Buy-in Video by Five Star Development International Standards for Lean Six Sigma (ISLSS)
  • 13.
    Improve Lean SixSigma Tollgate Review Backup Slides Lean Six Sigma Group International Standards for Lean Six Sigma (ISLSS)
  • 14.
    Project Charter Improve Problem/Goal Statement Problem: Describe problem in non-technical terms  Statement should explain why project is important; why working on it is a priority Goal: Goals communicate “before” and “after” conditions  Shift mean, variance, or both?  Should impact cost, time, quality dimensions  Express goals using SMART criteria  Specific, Measurable, Attainable, Resource Requirements, Time Boundaries  Explain leverage and strategic implications (if any) Financial Impact Tollgate Review Schedule Team  Scope:  In-Scope/Out-of-Scope  (Process Start/Stop  State financial impact of project  Expenses  Investments (inventory, capital, A/R)  Revenues  Separate “hard” from “soft” dollars  State financial impact of leverage opportunities (future projects, replication opportunities, project iterations)  PES Name Project Executive Sponsor (if different from PS)  PS Name Project Sponsor/Process Owner  DC Name Deployment Champion  GB/BB Name Green Belt/Black Belt  MBB Name Master Black Belt Core Team Role % Contrib. LSS Training  Team Member 1 SME XX YB  Team Member 2 TM XX GB  Team Member 3 SME XX PS Extended Team  Team Member 1 BFM XX Not Trained  Team Member 2 IT XX Not Trained Tollgate Scheduled Revised Complete Define: XX/XX/XX - XX/XX/XX Measure: XX/XX/XX XX/XX/XX XX/XX/XX Analyze: XX/XX/XX XX/XX/XX XX/XX/XX Improve: XX/XX/XX XX/XX/XX XX/XX/XX Control: XX/XX/XX XX/XX/XX XX/XX/XX  Review high-level schedule milestones here:  Phase Completions  Tollgate Reviews Enter Key Slide Take Away (Key Point) Here Project Charter Video by Rita Mulcahy International Standards for Lean Six Sigma (ISLSS) 14
  • 15.
    Measure Overview Improve  CTQ: ?  Unit (d) or Mean (c): ?  Defect (d) or St. Dev. (c): ?  PCE%: ?  DPMO (d): ?  Sigma (Short Term): ?  Sigma (Long Term):?  MSA Results: show the percentage result of the GR&R, AR&R or other MSA carried out in the project  Root cause:  Quick Win #1  Root cause:  Quick Win #2  Root cause:  Quick Win #3 Observation Individual Value 1 28 55 82 109 136 163 190 217 244 40 35 30 25 20 UC L=37.70 _ X=29.13 LC L=20.56 Observation Moving Range 1 28 55 82 109 136 163 190 217 244 10.0 7.5 5.0 2.5 0.0 UC L=10.53 __ MR=3.22 LC L=0 I-MR Chart of Delivery Time  Detailed process mapping MSA  Value Stream Mapping  Data Collection Planning  Basic Statistics  Process Capability  Histograms  Time Series Plot  Probability Plot  Pareto Analysis  Operational Def.  5s  Pull  Control Charts Enter Key Slide Take Away (Key Point) Here 15 Process Capability Graphical Analysis Root Cause / Quick Win Tools Used Minimum Sample Size for Robust T-Tests and ANOVA Video by SigmaXL International Standards for Lean Six Sigma (ISLSS)
  • 16.
    Analyze Overview Improve Value Add Analysis - Current State 80 60 40 20 0 Takt Time = 55 1 2 3 4 5 6 7 8 9 10 Task # Task Time (seconds) CVA Time BVA Time NVA Time  Root cause: Effect  Root cause: Effect  Root cause: Effect  Value Add Analysis  One-Way ANOVA  Two-Way ANOVA  Pareto Plots  Simple Linear Regression  Multiple Regression  Test for Equal Variance  Scatter Plots  C&E Matrix  Complexity  Cause & Effect Diagram  Kaizen/Quick Wins  FMEA  Control/Impact Chart  T-Test  Other Hypothesis Test (ANOVA, 1 or 2 sample t - test, Chi Squared, Regression, Test of Equal Variance, etc) Factor (x) Tested p Value Observations/Conclusion Example: ANOVA Location 0.030 Significant factor - 1 hour driving time from DC to Baltimore office causes ticket cycle time to generally be longer for the Baltimore site Example: ANOVA Part vs. No Part 0.004 Significant factor - on average, calls requiring parts have double the cycle time (22 vs 43 hours) Example: Chi Squared Department 0.000 Significant factor - Department 4 has digitized addition of customer info to ticket and less human intervention, resulting in fewer errors Example: Pareto Region n/a South region accounted for 59% of the defects due to their manual process and distance from the parts warehouse Describe any other observations about the root cause (x) data Enter Key Slide Take Away (Key Point) Here 16 Hypothesis Tests Value-Add Analysis Root Cause / Effect Tools Used DiscoverSim Case Study by SigmaXL International Standards for Lean Six Sigma (ISLSS)
  • 17.
    Improve Improve TollgateChecklist Deliverables:  Prioritized List of Solutions  “To-Be” Value Stream Map(s)  Pilot Plan & Results  Approved Solution and Detailed Implementation Plan  Additional “Quick Wins”, if applicable  Refined Charter, as necessary  Updated Risk Mitigation Plan  Deliverables Uploaded to Central Storage Location or Deployment Management System Tollgate Review  What techniques were used to generate ideas for potential solutions?  What narrowing and screening techniques were used to further develop and qualify potential solutions?  What evaluation criteria were used to select a recommended solution?  Do proposed solutions address all the identified root causes, at least the most critical?  Were the solutions verified with the Project Sponsor and Stakeholders? Has an approval been received to implement?  Was a pilot run to test the solution? What was learned? What modifications made?  Has the team seen evidence that the root causes of the initial problems have been addressed during the pilot? What are the expected benefits?  Has the team considered potential problems and unintended consequences (FMEA) of the solution and developed preventive and contingency actions to address them?  Has the proposed solution been documented, including process participants, job descriptions and if applicable, their estimated time commitment to support the process?  Has the team developed an implementation plan? What is the status?  Have changes been communicated to all the appropriate people?  Has the team been able to identify any additional ‘Quick Wins’?  Have ‘learning's’ to-date required modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders?  Have any new risks to project success been identified and added to the Risk Mitigation Plan? Has the team developed improvement solutions for the critical X’s, piloted the solution and verified that the solution will solve the problem? Improve Phase Success Criteria Training Video by educatevirtually International Standards for Lean Six Sigma (ISLSS) 17
  • 18.
    Improve  Definethe opportunity from both the customer  Identify the critical X factors  Develop solutions linked to critical x’s 18 Lean Six Sigma DMAIC Improvement Process Define and business perspective Measure  Understand the baseline process Analyze performance and root causes impacting process performance Improve Control  Implement solutions & control plan Enter Key Slide Take Away (Key Point) Here The Harada Method Video by Norman Bodek International Standards for Lean Six Sigma (ISLSS)
  • 19.
    Improve Control TollgateChecklist  Has the team prepared all the essential documentation for the improved process, including revised/new Standard Operating Procedures (SOP’s), a training plan and a process control system?  Has the necessary training for process owners/operators been performed?  Have the right measures been selected, and documented as part of the Process Control System, to monitor performance of the process and the continued effectiveness of the solution? Has the metrics briefing plan/schedule been documented? Who owns the measures? Has the Process Owner’s job description been updated to reflect the new responsibilities? What happens if minimum performance is not achieved?  Has the solution been effectively implemented? Has the team compiled results data confirming that the solution has achieved the goals defined in the Project Charter?  Has the Benefits Realization Schedule been verified by the Financial Representative?  Has the process been transitioned to the Process Owner, to take over responsibility for managing continuing operations? Do they concur with the control plan?  Has a final Storyboard documenting the project work been developed?  Has the team forwarded other issues/opportunities, which were not able to be addressed, to senior management?  Have “lessons learned” been captured?  Have replication opportunities been identified and communicated?  Has the hard work and successful efforts of our team been celebrated? Deliverables: Tollgate Review  SOP’s  Training Plan  Process Control System  Benefits Realization Schedule, validated by Financial Representative  Validated Solution  Replication/ Standardization Plan  Lessons Learned  Transitioned Project  Project Risk Performance  Deliverables Uploaded to Central Storage Location or Deployment Management System Has the team implemented the solution, and a control plan to insure the process is robust to change? Control Phase Success Criteria Training Video by educatevirtually International Standards for Lean Six Sigma (ISLSS) 19
  • 20.
    Improve Evaluating Solutions Against Criteria (Optional) 250 200 150 100 50 0 100% 80% 60% 40% 20% 0% #1 #2 #3 #4 Root Causes Example: Independent Solutions Solutions % Contribution of Root Cause to Process Deficiency Root Cause #1 40% Root Cause #2 25% Root Cause #3 20% Root Cause #4 10% Solution A 80% Solution B 20% 80% Solution C 30% 100% Solution D Solution E 20% 5% Solution A = a 32% reduction in defects (80% of 40%) Solution B = a 21% reduction in defects (20% of 25% + 80% of 20%)=(5%+16%) Solution C = a 17.5% reduction in defects (30% of 25% + 100% of 10%)=(7.5%+10%) Implementing Solutions A & B achieve a 53% reduction in defects. (Assumes no interaction effects of the solutions) Original goal is a 50% reduction. Enter Key Slide Take Away (Key Point) Here Solution Selection Training Video by Camille Corum International Standards for Lean Six Sigma (ISLSS) 20
  • 21.
    Improve FMEA Guidelines (Optional) Enter Key Slide Take Away (Key Point) Here Examples of FMEA and RPN Training Video by Simplilearn International Standards for Lean Six Sigma (ISLSS) 21  The recommended scales for Severity, Occurrence, and Detection
  • 22.
    Improve Sample ValueStream Mapping Symbols (Optional) Quotes Machining C/T = 36 Sec Set Up Time 7 Min Uptime 86% Process Box Data Box I Queue/ Inventory 1 Personnel Flow (Information) Electronic Information Sign Off Point Push Systems Truck Shipment Supplier/ Customer Flow (Physical) Physical Pull Project Burst Supermarket Replenishment Kanban Station Paper Kanban Electronic Data System F I F O FIFO Lane Physical Transport “Go See” Monitoring Enter Key Slide Take Away (Key Point) Here Value Stream Map Icons Training Video by UttanaOnline International Standards for Lean Six Sigma (ISLSS) 22
  • 23.
    Improve Main EffectsPlot (data means) for Mean Training Dollars Jets Employees %Overbooked The number of Employees is the biggest Term driver for Mean Time Late Standardized Effect 2.6 C BD D CD A BC AB AD B AC Design of Experiments (DOE) Results (Optional) 0 50 100 150 200 250 300 350 F actor Name A Training Dollars B Jets C Employ ees D %O v erbooked Pareto Chart of the Standardized Effects (response is Mean, Alpha = .05) Mean of Mean -1 1 60 45 30 15 0 -1 1 -1 1 60 45 30 15 0 -1 1 Number of Employees is the only significant factor for Mean - Time Late Pareto Chart for Mean Time Late Fractional Factorial Fit: Response = Mean Estimated Effects and Coefficients for Mean (coded units) Term Effect Coef SE Coef T P Constant 29.64 0.08610 344.22 0.000 Training 0.10 0.05 0.08610 0.60 0.573 Jets -0.08 -0.04 0.08610 -0.44 0.676 Employee -55.93 -27.97 0.08610 -324.81 0.000 % Overbo 0.36 0.18 0.08610 2.11 0.088 Training*Jets -0.10 -0.05 0.08610 -0.57 0.591 Training*Employee 0.05 0.02 0.08610 0.28 0.788 Training*% Overbo 0.09 0.05 0.08610 0.53 0.619 Jets*Employee 0.10 0.05 0.08610 0.57 0.591 Jets*% Overbo -0.40 -0.20 0.08610 -2.34 0.066 Employee*% Overbo 0.17 0.09 0.08610 1.01 0.359  Employee is the only statistically significant factor for Mean besides the constant term. All other main effects & 2-way interactions have a p-value > 0.05. Ymean=f(x) equation is: Ymean = -27.97(Employee) + 29.64 Enter Key Slide Take Away (Key Point) Here Design of Experiments (DOE) Intro Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 23
  • 24.
    Improve Pugh (Selection)Matrix Key Criteria Pugh Matrix Importance Rating Benchmark Option Solution Alternatives Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Criteria 1 4 + S + + - - Criteria 2 2 S - S + + + Criteria 3 3 - + - + S S Criteria 4 2 + S + + - + Criteria 5 5 S - S S + S Criteria 6 6 - - - - - - Criteria 7 10 + + + + + + Criteria 8 8 S S S S S S Criteria 9 5 - - - - - - Criteria 10 6 + + - + + + Sum of Positives 4 3 3 6 4 4 Sum of Negatives 3 4 4 2 4 3 Sum of Sames 3 3 3 2 2 3 Weighted Sum of Positives 22 19 16 27 23 20 Weighted Sum of Negatives 14 18 20 11 17 15 Totals 8 1 -4 16 6 5 Concept Selection Legend Better + Same S Worse - (Optional) Enter Key Slide Take Away (Key Point) Here Pugh Matrix Training Video by 6ixsigmaorg International Standards for Lean Six Sigma (ISLSS) 24
  • 25.
    Improve Benefit-Effort Matrix (Optional) Effort Benefit 1 8 3 7 Low Med High Low Med High 13 6 15 12 9 4 17 14 11 2 5 10 16 Highly Desirable Opportunities Projects in upper left are the most desirable projects. Potentially Desirable Opportunities Projects in the upper right are potentially desirable, but usually require more analysis to ensure good decision making. “Potential Quick Hits” Possibility for Kaizen event or small GB project Least Desirable Opportunities Projects in the lower right are the least desirable. Enter Key Slide Take Away (Key Point) Here Ranking Your Projects Using Bubble Chart Pro™ Video by DataMachines International Standards for Lean Six Sigma (ISLSS) 25
  • 26.
    Improve Stakeholder Analysis 1 1 1 2 3 4 3 2 1 0 Strongly Against Moderately Against Neutral Moderately Supportive Strongly Supportive Stakeholder Analysis (Optional) Enter Key Slide Take Away (Key Point) Here Stakeholder Analysis Training Video by the University of Louisville International Standards for Lean Six Sigma (ISLSS) 26
  • 27.
    Improve Influence Strategy (Optional) Influence Strategy Stakeholder Issues/Concerns Identify "Wins" Influence Strategy Enter Key Slide Take Away (Key Point) Here Influencer Training Video by Al Switzler From VitalSmarts Speakers International Standards for Lean Six Sigma (ISLSS) 27
  • 28.
    Improve Measurement Systems Analysis (MSA) (Optional)  Measurement system is unacceptable with the System Effectiveness Score < 80% Enter Key Slide Take Away (Key Point) Here Measurement Systems Analysis Training Video by Advance Innovation Group International Standards for Lean Six Sigma (ISLSS) 28  The Between Appraiser Agreement and All Appraisers vs. Standard Agreement are also known as “System Effectiveness Scores”, with > 95% considered very good, 90-95% acceptable, 80 to < 90 % marginal, and < 80 % unacceptable.  Clearly this measurement system needs to be improved, but we should not be quick to judge Appraiser C.  The confidence intervals are quite wide and overlap. It is a good practice to “blame the process not the people”. Look for unclear or confusing operational definitions, inadequate training, operator distractions or poor lighting. Consider the use of pictures to clearly define a defect. Use Attribute MSA as a way to “put your stake in the ground” and track the effectiveness of improvements to the measurement system.
  • 29.
    Improve Pull System (Optional) 1. Always pull stock from bin with GREEN card if it Bin 2 Bin 1 Bin 1 Bin 2 BBinin 11 Bin 1 Bin 2 Bin 1 Bin 2 Bin 1 Bin 2 BBinin 1B1Binin 22 Bin 1 Bin 2 Bin 1 Bin 1 Bin 2 Bin 1 Bin 1Bin 2 Bin 1 Bin 2 Bin 1 Bin 2 2-Bin Order Cards Mailbox is there. 2. Store/supply room replaces stocked items and switches RED card to items just replaced. 3. The cards are attached to magnetic strip labels (for ease of movement for resizing). Bin 1 Bin 2 Enter Key Slide Take Away (Key Point) Here Pull Systems and Kanban Training Video by GBMP1 International Standards for Lean Six Sigma (ISLSS) 29
  • 30.
    Improve Setup Reduction (Optional) Setup Documentation Worksheet MACHINE: DOCUMENTOR: DATE: PAGE 1 OF 1 SEQ # START TIME EVENT ELAPSED TIME INT EXT 1 0 Shut down machine :30 :30 2 0:30 Get change parts 3:00 3:00 3 3:30 Remove change parts from machine 3:30 3:30 4 7:00 Place new change parts on machine 3:30 3:30 5 10:30 Return change parts to storage 3:00 3:00 6 13:30 Load material onto machine 1:00 1:00 7 14:30 Generate test piece :30 :30 8 15:00 Measure and inspect 2:00 2:00 9 17:00 Adjust dies 1:00 1:00 10 18:00 Generate test piece :30 :30 11 18:30 Measure and inspect 1:30 1:30 12 20:00 Generate first good piece 1:00 1:00 TOTAL TIME THIS PAGE: 21:00 TOTAL TIME ALL PAGES: 21:00 Enter Key Slide Take Away (Key Point) Here Quick Changeover & SMED Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 30
  • 31.
    Improve PDCA (Optional)  Plan:  ?  ?  Do:  ?  ?  Check:  ?  ?  Act:  ?  ? ? ? ? ? Plan Do Check Act Enter Key Slide Take Away (Key Point) Here The PDSA Cycle Training Video by LMSOS International Standards for Lean Six Sigma (ISLSS) 31
  • 32.
    Improve 5s (Optional) Sort  ?  ? Set Order  ?  ? Shine  ?  ? Standardize  ?  ? Sustain  ?  ? 5s FORM IDENTIFICATION ITEM NAME TAG NUMBER TAGGED BY TAG DATE CLASSIFICATION o RAW MATERIAL o TOOLS o FURNITURE o OTHER (EXPLAIN) o WIP o SUPPLIES o OFFICE MATERIAL o FINISHED GOOD o EQUIPMENT o BOOKS/MAGAZINES QUANTITY CELL / AREA REASON o UNNECESSARY o LEFTOVER MATERIAL o DEFECTIVE o UNKNOWN o NON-URGENT o OTHER (EXPLAIN) DISPOSITION REQUIRED o DISCARD o TRANSFER o IN-CELL STORAGE o LONG-TERM STORAGE o REDUCE o OTHER (EXPLAIN) ACTION TAKEN ACTION DESCRIPTION APPROVED BY DATE NEW LOCATION NEW CELL / AREA Enter Key Slide Take Away (Key Point) Here 5S Factory Makeover Video by 5S Supply International Standards for Lean Six Sigma (ISLSS) 32
  • 33.
    Improve Kaizen (Optional)  Typical Kaizen Weekly Schedule Typical Kaizen Weekly ScheduleWeekly Calendar Status XX/XX Pre-work 1. Review Scope, Goals, Objectives, and Deliverables With Senior Staff 2. Select Team Leader 2A. Select Team Members 2B. Inform Team Members 3. Gather Data (Demand, Quality, Headcount, WIP, Downtime, Overtime, Safety, Before Pics) 4. Set Meeting Rooms, Food, Develop Team Tool Box XX/XX Monday 1. Kaizen Kickoff (Senior Staff Representative) 2. Kaizen Training (Lean Principles) & Specialized for Project 3. Review Project Scope, Goals (SMART), Deliverables with Team 4. Assign Tasks for Process Observations, Timestudies, 5-S, Spaghetti Charts, Takt Time Chart 5. Train Team Members in Timestudy Basics and Begin Observation and Data Gathering XX/XX Tuesday 1. Complete Present State Analysis Using All Appropriate Data 2. Brainstorm Based on Goals & Objectives, Ergonomics, Safety, & Waste Elimination 3. Create Future State Analysis and Action Plan 4. Team Lead and Consultant Review FSA With Senior Staff 5 Launch Sub-Teams and Complete Plan XX/XX Wednesday 1. Complete Action Plan 2. Train Process Participants in New Process 3. Fine-tune New Process and Take After Digital Pics 4. Retime and Compare to Goals, Objectives XX/XX Thursday 1. Run New Process and Assess Effectiveness 2. Calculate Improvements in Cycle Time, WIP, Cost Savings, Etc. 3. Complete New Takt Time Cycle Time Bar Chart and Create 30 Day Follow-up List 4. Complete New Standard Operating Procedure 5. Prepare Presentation, Assign Presenters XX/XX Friday 1. Practice Presentation 2. Present to Senior Staff 2A. Set 30 Day Follow-up 2B. Create Final Report & Monitor Results 3. Celebration Luncheon and or event Finalize Pre-Event Prep Implement Improvements Perform Process Participant Training Tweak Design Implement Improvements Perform Process Participant Training Tweak Design Finalize Future State Complete Training on Std Work 8AM Monday Tuesday Wednesday Thursday Friday 10AM 12PM 2PM 4PM 6PM Kaizen Kickoff Lean/Kaizen Training Specialized Training Measure (Present State Analysis) Measure (Present State Analysis) Analyze Lunch Lunch Analyze Brainstorm Ideas Idea Effort/Impact Idea Prioritization Future State Design Mid-Week Review Process Part Design Review Future State Des Future State Des Implement Improvements Final Presentation Lunch Lunch Lunch and Celebration Create and Implement Standard Work Measure Future State Calculate Actual Benefits Create Final Presentation Step 1 Time Activity 1-1 Time Activity 1-2 Time Activity 1-3 Time Activity 1-4 Time Step 2 Time Activity 2-1 Time Activity 2-2 Time Activity 2-3 Time Activity 2-4 Time Step 3 Time Activity 3-1 Time Step 4 Time Activity 4-1 Time Activity 4-2 Time Activity 4-3 Time Activity 4-4 Time Step 5 Time Activity 5-1 Time Activity 5-2 Time Activity 5-3 Time Step 6 Time Activity 6-1 Time Activity 6-2 Time Enter Key Slide Take Away (Key Point) Here Kaizen Events Training Video by Steven Bonacorsi and George Trachilis International Standards for Lean Six Sigma (ISLSS) 33
  • 34.
    Improve Kaizen ActionWorkout (Optional) Planning Execution Before  ?  ?  ?  ?  ? Root Causes / Quick Wins Graphical Analysis After  ?  ?  ?  ?  ?  Root cause:  Quick Win #1  Root cause:  Quick Win #2  Root cause:  Quick Win #3  ?  ?  ?  ?  ?  ?  ?  ?  ?  ?  ?  ?  ?  ?  ? Enter Key Slide Take Away (Key Point) Here Kamishibai / TPM Audit System Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 34
  • 35.
    Improve Pilot Plan (Optional) Pilot Test Description Success Criteria Test Team Schedule Hand-Chek/ Hot-Chek Interface Test • Sample Check-in Data entered in Hand-Chek device • Sample Data Sets Transmitted to Hot-Chek System – All Hotel Floors, All Hotel Rooms • Confirmation Data Received from Hot-Chek to Hand- Chek Device – All Hotel Floors &Rooms • Data Set Entry Accuracy < 3.4 DPMO • Data Time < 6 Sec • Data Transmission/ Accuracy < 3.4 DPMO SB, plus Hot- Chek tech rep Start 3/1 Complete 3/3 Check-in Verification Test • Sample Guest Data Entered in Hot-Chek System (variety of room requirements) • “Guests” (Hotel Employees) Walked Through Check-in Process (90% Pre-Registered, 10% Non-Pre- Registered) • Volume Stress Test – Simulated Arrival 20 Guests in a “Tour Bus” • Process Measurements recorded via Observer (see Design Scorecard); “Guest” Observations Recorded. • Data Set Entry Accuracy < 3.4 DPMO • Data Set Entry Time < 6 Seconds • Data Set Transmission/ Reception Accuracy < 3.4 DPMO • Design Scorecard CCRs SB, + 6 Check-in Staff Start 3/6 Complete 3/7 Check-in Validation Test • 25 Guests invited to experience hotel check-in • Guests “pre-registered” with their room requirements in Hot-Chek system. • Guests Walked Through Check-in Process (90% Pre- Registered, 10% Non-Pre-Registered) • Process Measurements recorded via Observer (see Design Scorecard) • Guests Debriefed Following Experience. • Data Set Entry Accuracy < 3.4 DPMO • Data Set Entry Time < 6 Seconds • Data Set Transmission/ Reception Accuracy < 3.4 DPMO • Design Scorecard CCRs SB, + 6 Check-in Staff Start 3/10 Complete 3/10 Enter Key Slide Take Away (Key Point) Here How to Cut Non-Value Added Activity Training Video by i-nexus International Standards for Lean Six Sigma (ISLSS) 35
  • 36.
    Improve Verify PilotResults (Optional) Pilot Observations: 1) Data Reception Weak – 12th Floor, SW Rooms 2) Data Entry Sequence Confusing GAP Analysis/Root Causes: 1) Insufficient radio transceivers, 12th Floor 2) Order of questions confusing staff Follow-up Actions: 1) Add four more radio transceivers 2) Re-sequence guest questions Measurement Plan: Measure Pilot s Plan Target x CTQs Process time CTQs Data Transmission Accuracy 1 minute < 3.4 DPMO 0.5 min. 100 DPMO 0.05 min. Comments Enter Key Slide Take Away (Key Point) Here Visual Metrics Training Video by UttanaOnline International Standards for Lean Six Sigma (ISLSS) 36
  • 37.
    Improve Summarizing Pilot Conclusions (Optional)  Once all the pilot data has been collected and the results verified, the team can determine the next steps toward solution implementation. Only after an objective and comprehensive assessment of the pilot can responsible “next step” decisions be made.  Some questions a team should ask upon the completion of a pilot to help guide them toward identification of the proper next steps are:  Did pilot have anticipated results?  Was the plan for conducting the pilot effective?  What improvements can we make to the solution? Enter Key Slide Take Away (Key Point) Here “Lean Healthcare. Why Lean? Why now?” Training Video by David Daisher International Standards for Lean Six Sigma (ISLSS) 37  What lessons learned and best practices can we apply during solution implementation?  Did the solution achieve the required design goals?  Can the solution be implemented “as-is”? Should it be?  Can the solution remain in place at the pilot location?
  • 38.
    Improve Technical-Political-Cultural TPCAnalysis (Optional) Technical-Political-Cultural (TPC) Analysis Sources Of Resistance D e f i n i t i o n Causes Of Resistance Rating Examples Technical Political Cultural Enter Key Slide Take Away (Key Point) Here Change Management Training Video by Gavin Wedell International Standards for Lean Six Sigma (ISLSS) 38
  • 39.
    Improve Multi-Generational ProjectPlan (Optional) Gen1 Gen2 Gen3 Target Date MGPP Vision Key Functionality Technology Requirements Target Customers Metrics Dependencies How to Manage Multiple Projects Training Video by projectmanagervideos 39 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma (ISLSS)
  • 40.
    Improve Cost/Benefit Analysis (Optional)  Identify the various solution options  Describe the Type 1 solution $ gained from the expected process improvement  Calculate the total cost of ownership to fully implement the solution Financial Benefits: Solution A Solution B Solution C Budget Increase $0.00 $0.00 $0.00 Expense Reduction $0.00 $0.00 $0.00 Loss Avoidance $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Financial Cost: $0.00 $0.00 $0.00 Labor $0.00 $0.00 $0.00 Technology $0.00 $0.00 $0.00 Materials $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pre-Implementation & first 12 months after Total Cost Cost/Benefit Cost/Benefit Analysis First 12 months after Implementation Total Benefits Enter Key Slide Take Away (Key Point) Here Benefit Cost Analysis Training Video by Engineer In Training Exam TV International Standards for Lean Six Sigma (ISLSS) 40
  • 41.
    Improve Lean SixSigma Additional Resources Lean Six Sigma Group
  • 42.
    Improve Lean SixSigma Tollgate Template Notes The Lean Six Sigma Tollgate Templates are:  Free and intended as a guide in documenting a Lean Six Sigma Project. I grant permission for you to modify these templates to meet the specific needs of your process improvement project.  Instructional - a video has been linked to each Template, I selected a mix of videos from Thought Leaders in the Lean Six Sigma Group. I included reference links to all video’s should you want to learn more information. Also included guidelines in the Note’s section of each slide.  Efficient and Effective – Placeholders for Graphic or Video Examples for various tools and methods across each DMAIC Phase. How to Use These Templates:  Collaboratively – use as a guide, reuse templates independently or across phases as needed, and change the order as needed to best capture the execution of Lean Six Sigma in each phase, and summarize in the final Case Study.  Use as a Communication tool, and document your findings and results. 42 My name is Steven Bonacorsi, Author of the Lean Six Sigma Tollgate Templates, President of the International Standard for Lean Six Sigma (ISLSS), and Owner of the LinkedIn Lean Six Sigma Group. Replace the content of this slide with images or video’s related to your process improvement project International Standards for Lean Six Sigma (ISLSS)
  • 43.
    Lean Six SigmaResources Improve 43  Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987  Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987  International Standard for Lean Six Sigma (ISLSS): http://www.islss.com Best Wishes in Continuously Improving Your Business Processes – Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt International Standards for Lean Six Sigma (ISLSS)  i-nexus: http://www.i-nexus.com  Strategy Execution Community LinkedIn Group https://www.linkedin.com/groups/Strategy-Execution-Community-3725091  SigmaXL: http://www.sigmaxl.com  SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101  Gemba Academy http://www.gembaacademy.com Lean CEO Group:  Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998  PEX Network http://www.processexcellencenetwork.com  PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement  Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
  • 44.
    Improve Lean SixSigma Groups (Click Logo’s to Join Group) Lean Six Sigma Group Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 44 Six Sigma Jobs; +200 Discussions; +500 Comments +280,000 Members – Come Join the Conversation International Standards for Lean Six Sigma (ISLSS)
  • 45.
    Improve Lean SixSigma Resource Blogs (Click Logo’s to Follow Blogs) 45 See Notes Section for Links to Lean Six Sigma Group Contributors International Standards for Lean Six Sigma (ISLSS)
  • 46.
    Improve Lean SixSigma Improve Phase Video References – Set 13 46 Lean Six Sigma Online Training Video by Gemba Academy The Toyota Way to Lean Leadership Video by the Lean Leadership Institute Lab Collection Workflow Swimlane Video Example by HealthITWorkforce Lean Improvement Walk Training Video by FastCap Join the Process Improvement Consultants Group: http://www.linkedin.com/groups?gid=4183003 International Standards for Lean Six Sigma (ISLSS) Failure Mode and Effects Analysis Training Video by leansixsigmasource Future State Value Stream Map Training Video by educatevirtually Excel Annual Cost Calculator Training Video by Contextures Inc. Direct vs, Indirect Cost Training Video – by Andromedia Productions
  • 47.
    Improve Lean SixSigma Improve Phase Video References – Set 14 A3 Thinking and Problem Solving Training Video by tpyzdek How to Deliver a Great Presentation Video by projectmanagervideos Project Charter Video by Rita Mulcahy Join the International Organization for Standardization Group: 47 http://www.linkedin.com/groups?gid=3004797 International Standards for Lean Six Sigma (ISLSS) Gaining Stakeholder Buy-in Video by Five Star Development Minimum Sample Size for Robust T-Tests and ANOVA Video by SigmaXL DiscoverSim Case Study by SigmaXL Improve Phase Success Criteria Training Video by educatevirtually Improve Phase Success Criteria Training Video by educatevirtually
  • 48.
    Improve Lean SixSigma Improve Phase Video References – Set 15 Value Stream Map Icons Video by 48 The Harada Method Video by Norman Bodek Control Phase Success Criteria Training Video by educatevirtually Join the Supply Chain Optimization Group: UttanaOnline http://www.linkedin.com/groups/Supply-Chain-Optimization-73495 International Standards for Lean Six Sigma (ISLSS) Solution Selection Training Video by Camille Corum Design of Experiments (DOE) Intro Video by Gemba Academy Pugh Matrix Training Video by 6ixsigmaorg Ranking Your Projects Using Bubble Chart Pro™ Video by DataMachines Stakeholder Analysis Training Video by the University of Louisville
  • 49.
    Improve Lean SixSigma Improve Phase Video References – Set 16 The PDSA Cycle Training Video by 5S Factory Makeover Video by 5S Supply 49 Join the Lean Six Sigma Innovation Group: LMSOS http://www.linkedin.com/groups/Lean-Six-Sigma-Innovation-65552 International Standards for Lean Six Sigma (ISLSS) Value Stream Map Icons Video by UttanaOnline Influencer Training Video by Al Switzler From VitalSmarts Speakers Measurement Systems Analysis Training Video by Advance Innovation Group Pull Systems and Kanban Training Video by GBMP1 Quick Changeover & SMED Training Video by Gemba Academy Kaizen Events Training Video by Steven Bonacorsi and George Trachilis
  • 50.
    Improve Lean SixSigma Improve Phase Video References – Set 17 Visual Metrics Training Video by UttanaOnline 50 Benefit Cost Analysis Video by Engineer In Training Exam TV Join the Value Chain Transformation Group: http://www.linkedin.com/groups/Value-Chain-Transformation-74197 International Standards for Lean Six Sigma (ISLSS) Value Stream Map Icons Video by UttanaOnline Kamishibai / TPM Audit System Video by Gemba Academy How to Cut Non-Value Added Activity Video by i-nexus “Lean Healthcare. Why Lean? Why now?” Training Video by David Daisher Change Management Training Video by Gavin Wedell How to Manage Multiple Projects Video by projectmanagervideos