SlideShare a Scribd company logo
1 of 25
 2000, QualityToolBox.com, LLC, all rights reserved
A STRATEGY FOR
PERFORMANCE
EXCELLENCE
 2000, QualityToolBox.com, LLC, all rights reserved
Executive Overview
Participant manual
Tools Workbook
Knowledge
Breakthrough
Lecture notes Lecture notes
Performance Excellence Series
Training Module Elements
 2000, QualityToolBox.com, LLC, all rights reserved
Table of Contents
Knowledge Breakthrough
Session 1.0 Introduction…………………………3
Session 2.0 Wastes Elimination…………………7
Session 3.0 One-piece flow…………………….26
Session 4.0 Single Minute Exchange of Dies…..65
Session 5.0 Visual Control and Workplace
Organization……………………… 78
Session 6.0 Quality the first time, every time… 97
Session 7.0 Total Productive Maintenance…...127
 2000, QualityToolBox.com, LLC, all rights reserved
Is the continuous
elimination of waste
Continuous Improvement
 2000, QualityToolBox.com, LLC, all rights reserved
What Does Kaizen Mean?
KAI ZEN
To modify, to change Think, make good, make better
= KAIZEN
Make it easier by studying it, and making the improvement through
elimination of waste.
+
 2000, QualityToolBox.com, LLC, all rights reserved
Why Kaizen
Time
CPI Project
Time
CPI
Time
Savings
Savings
Savings
Process
Improvement
Project
Implemented
Maintenance of
Process
Performance
Kaizen
CPI (Continual Performance Improvement)
• Data Driven Methodology to Magnify Impact of
Process Improvement
• Apply Control Techniques to Eliminate Erosion of
Improvements
• Proceduralize/Standardize Improvements for
Improved Maintenance of Critical Process Parameters
Kaizen
• Use Small Teams to Optimize Process Performance
by Implementing Incremental Change
• Apply Intellectual Capital of Team Members Intimate
with Process
CPI Projects Emphasize
Control and Long Term
Maintenance
Kaizen Projects
Emphasize Incremental
Improvements
 2000, QualityToolBox.com, LLC, all rights reserved
The Nine types of waste
• Overproduction
• Delays (waiting time)
• Transportation
• Process
• Inventories
• Motions
• Defective products
• Untapped resources
• Misused resources
9
Wastes
 2000, QualityToolBox.com, LLC, all rights reserved
1. Overproduction
To produce more than is required *
To produce before required *
*Required by external and internal customers
9
Wastes
 2000, QualityToolBox.com, LLC, all rights reserved
• The Secret:
• Be Systematic
• Work with a versatile team
• Measure, evaluate
• Find the 5 Whys
• Follow up
• Standardize, make uniform
• Simplify
• Combine
• Prevent
• Make waste ugly
Elimination of Wastes and Continuous Improvement
 2000, QualityToolBox.com, LLC, all rights reserved
Exercise 1: Wastes Identification
1. List at least one example of each of the 9 categories of waste
from a process within your organization.
2. Identify at least one possible cause for each of the specific
wastes listed.
3. Propose one or more actions to reduce each of these wastes.
4. Identify methods of measurement to determine results of
waste reduction efforts.
Think Break
 2000, QualityToolBox.com, LLC, all rights reserved
Exercise 1: Wastes Identification
Identify one example
of each type of waste
below
Possible cause Proposed
Action
Method of
measurement
Overproduction
Delays
Transportation
Process
Inventories
Motions
Defective products
Untapped
resources
Misused resources
Think Break
 2000, QualityToolBox.com, LLC, all rights reserved
• Recognize our lead-times
• Identify their components
• Reduce them with the help of
– the dedicated lines
– a one piece flow
• Establish dedicated lines
– in relation to family of parts
– in relation to TAKT time
• Attain one piece flow
We will learn to:
 2000, QualityToolBox.com, LLC, all rights reserved
Delivery lead time
This is life!
If not, it’s torture…
When the delivery lead-time is bigger than the
manufacturing lead time:
Manufacturing lead time
Delivery lead time
Manufacturing lead time
 2000, QualityToolBox.com, LLC, all rights reserved
False appearance of a solution
Solution…
What is the solution?
Generate and
support stocks
Delivery lead time
Manufacturing lead time
Delivery lead time
Manufacturing lead time
 2000, QualityToolBox.com, LLC, all rights reserved
Identify and eliminate all wastes in our manufacturing
processes
Example: manufacture a
Total operations: 6 hours
Mfg. lead-time: 40 days = 320 hours
Difference: 314 hours
How to reduce the manufacturing lead time?
Delivery lead time
Manufacturing lead time
?
 2000, QualityToolBox.com, LLC, all rights reserved
Example: manufacture a
Total operations: 6 hours
Mfg. lead-time: 40 days = 320 hours
Difference: 314 hours
What are processes made of ?
Delivery lead time
Manufacturing lead time
Storage,
Transport,
Waiting time
98%
 2000, QualityToolBox.com, LLC, all rights reserved
Visual Control & the Workstation
The
5 S
To Sort
Eliminate what’s
not absolutely
necessary
To Sanitize
Improvement of
the workstation.
Be organized to
reduce clutter.
To Straighten
Ensure space for
each thing, and a
thing for each space.
No more searching.
To Sweep
Maintain a clean
and orderly space to
make problems
easily identifiable.
Eliminate rejects
and scrap..
To Sustain
Maintain
continuous
effort. This is a
way of life.
 2000, QualityToolBox.com, LLC, all rights reserved
Visual Control & the Workstation
Ergonomics
•Adapt the workstation to the
employee
- more security
- more comfort
•Reduce waste
- excessive fatigue
- useless efforts and movement
- less physical constraints
Kaizen for the
Workplace
Training and
Sourcebook
for
Kaizen
Worksheets
How to Use This Manual
The continuous improvement tools that are presented in Sections 1-9 of this manual are shown in order of
use. These forms MUST be completed in the order presented in this manual. Each section contains a brief
description of the tool, its purpose, when to use it, who should use it, how to use it, and the expected
results.
Remember to focus on the elimination of waste. Strive to maximize yields and obtain
cost reductions from existing machinery and equipment before “buying solutions”.
Improve current systems and techniques before automation. Automating a system or
practices without first having an understanding of the process will not solve underlying
process problems.
Perhaps the most important point to remember is that we must understand a process
before we make any attempt in changing it. “No Tampering” is the first rule of
continuous improvement. We can not tamper with a process without understanding it.
By using these tools, we will all share a common and systematic approach for
questioning, analyzing, proposing solutions, experimenting, and finally, implementing
proven changes.
“The problems that exist in the world today
cannot be solved by the same level of thinking
that created them.”
Leadership
Improvement
Identify waste
Measurement
Kaizen
Template
Table of Contents
Section 1 Standard Work Sheet (SWS): Used to create a visual picture of a
work area. Shows crew size and location; office layout, distances
within the work area, work in process, quality checks, and safety
precautions………………………………………………………………..
.
4
Section 2 Time Observation Form (TOF): Used to identify each task
performed in a process or section of a process. Further used to
identify actual times for each task in order to determine the overall
process cycle time……………………………………………………….. 7
Section 3 Standard Work Combination Sheet (SWCS): Used to
graphically show each task time within a process in terms of it’s
relation to Walking, Manual, Auto and Idle time. It further shows
tasks which are performed in series and/or parallel [for further
analysis]…………
11
Section 4 Workload Balancing Sheet (WBS): Used to graphically show the
relationship between process cycle time(s) and TAKT time in order
to examine the line balance and resolve any rebalance [waste]
opportunities which may
exist……………………………………………
14
Section 5 Kaizen Action Sheet: Used to record problems/opportunities
which are identified by the process. The Action Sheet also records
the corrective actions, expected results, a drawing of the before
and after process, and finally measurements which will be used to
assess results…………………………………………………………….. 17
Section 6 Kaizen To Do List: Used to provide a summarized list of all
KAIZEN Action Sheets, the primary person responsible to follow-up
on each action, a due date for action item completion, and finally a
graphic display of the percent completion for each action
item………………………………………………………………………… 20
Section 7 Kaizen Target Sheet: A visual format for comparing continuous
improvement efforts to a desired target and known starting
value………………………………………………………………………. 23
26
Section 8 Kaizen Target Sheet Definitions……………………………………..
Section 9 Kaizen Improvement Results: Used to document the before and
after results of improvement activities associated with key
performance metrics. …………………………………………………. 28
TIME OBSERVATION WORKSHEET
Sheet 2
Date: Page of
Task/Process Being Observed Observer(s) Day/Time Of Observation
Observation Number
Step
No. Task Component
1 2 3 4 5 6 7 8 9 10 11 12
Assigned
Component
time
REMARKS
Time For One Cycle Total
Time
Running Time
(cumulative)
Time for each
Component
Purpose Used to identify each task performed in a process or section of a process.
Further used to identify actual times for each task in order to determine the
overall process cycle time.
When To Use The Time Observation Form (TOF) should be used after the Standard Work
Sheet and Spaghetti Diagram have been completed.
Who Should Use It The Time Observation Form can be used by anyone involved in continuous
process improvement.
Expected Benefits The Time Observation Form will provide information about work sequence,
work content, and operation times. The TOF not only provides actual times,
but also provides best demonstrated performance, on the specific process
being analyzed.
Time Observation Form
1. Complete Sections A. B, and C. with the necessary information.
2. Fill in the Task Component blanks with the steps of the process. List the components in as
specific terms as possible, i.e., 1. Walking to get work piece. 2. Removing work piece from
basket. 3. Walking to machine. 4. Loading piece into machine. And so on.
3. Begin timing the tasks. As each task is completed, stop the watch and record the cumulative
time on the form. Continue recording task times in this manner until the end of the process
cycle
4. At the completion of 12 full cycles, calculate and enter the “Assigned Component Time” for
each “Task Component”. Then sum up the “Assigned Component Time” for each “Task
Component” and enter this into the “Time For One Cycle” field. Be sure to include the time
spent on closing out work orders, or moving parts to next job.
5. During the manufacturing process, be aware of the steps taken to perform the job, i.e. If a
particular task component varies from 4 second for observation #1 and 47 seconds for
observation #2, provide comments about the observed variance in the remarks column.
Remember, in our quest to remove waste from the process, we want to question every task
component of the process.
6. Once the actual cycle times are known, compare them to TAKT time. TAKT Time for
measurable, repetitive task processes is calculated as follows:
A. Calculate the total time available per shift, day, etc. excluding breaks and lunches.
Let’s say that we have a full 8 hours available. 8 hours would equal 480 minutes or
28,800 seconds.
B. Determine the required product quantity. [How many units have been sold] For this
example, let’s use 395 units for the required production for this operation.
C. Next, divide the total time available by the required production to arrive at the TAKT
Time. 28,800 / 395 = 73 seconds per unit.
D. Compare this TAKT time to the average cycle time of the observation.
1. If TAKT Time is greater than average cycle time, then we can conclude that
the required production can be met within the total time available. However,
we need to examine adding work from another process to minimize idle time.
2. If TAKT Time is less than average cycle time, then we can conclude that the required production cannot be
met within the total time available. We must eliminate work through Kaizen or transfer work to another
worker.
How to use it
Kaizen.ppt

More Related Content

Similar to Kaizen.ppt

Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptxSathriyanSathi
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptxminhajulislam90
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentTimothy Wooi
 
Top 32 technologies
Top 32 technologiesTop 32 technologies
Top 32 technologiesNaga Muruga
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Lean manufacturing tools By Er. Manish Dwivedi
Lean manufacturing tools By Er. Manish DwivediLean manufacturing tools By Er. Manish Dwivedi
Lean manufacturing tools By Er. Manish DwivediEr. Manish Dwivedi
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS studentStudy Guide Pro
 
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeQuality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeSaurabh Bhange
 
Project cycle
Project cycleProject cycle
Project cycleDema Dias
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual ManagementRhonda Kovera
 
Profit improvement workshop advise
Profit improvement workshop   adviseProfit improvement workshop   advise
Profit improvement workshop adviseChrisGamuyao1
 
Advanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptAdvanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptThinL389917
 

Similar to Kaizen.ppt (20)

Setup and changeover.ppt
Setup and changeover.pptSetup and changeover.ppt
Setup and changeover.ppt
 
Slides 2015 for contact 7
Slides 2015 for contact 7Slides 2015 for contact 7
Slides 2015 for contact 7
 
Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptx
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx
 
25 essential lean tools
25 essential lean tools25 essential lean tools
25 essential lean tools
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course Content
 
Top 32 technologies
Top 32 technologiesTop 32 technologies
Top 32 technologies
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Tech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.pptTech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.ppt
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
 
Lean manufacturing tools By Er. Manish Dwivedi
Lean manufacturing tools By Er. Manish DwivediLean manufacturing tools By Er. Manish Dwivedi
Lean manufacturing tools By Er. Manish Dwivedi
 
03.KK ...pdf
03.KK ...pdf03.KK ...pdf
03.KK ...pdf
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS student
 
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeQuality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
 
Project cycle
Project cycleProject cycle
Project cycle
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
 
Profit improvement workshop advise
Profit improvement workshop   adviseProfit improvement workshop   advise
Profit improvement workshop advise
 
Advanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptAdvanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.ppt
 
7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)
 

Recently uploaded

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxSamahhassan30
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (17)

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptx
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

Kaizen.ppt

  • 1.  2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE
  • 2.  2000, QualityToolBox.com, LLC, all rights reserved Executive Overview Participant manual Tools Workbook Knowledge Breakthrough Lecture notes Lecture notes Performance Excellence Series Training Module Elements
  • 3.  2000, QualityToolBox.com, LLC, all rights reserved Table of Contents Knowledge Breakthrough Session 1.0 Introduction…………………………3 Session 2.0 Wastes Elimination…………………7 Session 3.0 One-piece flow…………………….26 Session 4.0 Single Minute Exchange of Dies…..65 Session 5.0 Visual Control and Workplace Organization……………………… 78 Session 6.0 Quality the first time, every time… 97 Session 7.0 Total Productive Maintenance…...127
  • 4.  2000, QualityToolBox.com, LLC, all rights reserved Is the continuous elimination of waste Continuous Improvement
  • 5.  2000, QualityToolBox.com, LLC, all rights reserved What Does Kaizen Mean? KAI ZEN To modify, to change Think, make good, make better = KAIZEN Make it easier by studying it, and making the improvement through elimination of waste. +
  • 6.  2000, QualityToolBox.com, LLC, all rights reserved Why Kaizen Time CPI Project Time CPI Time Savings Savings Savings Process Improvement Project Implemented Maintenance of Process Performance Kaizen CPI (Continual Performance Improvement) • Data Driven Methodology to Magnify Impact of Process Improvement • Apply Control Techniques to Eliminate Erosion of Improvements • Proceduralize/Standardize Improvements for Improved Maintenance of Critical Process Parameters Kaizen • Use Small Teams to Optimize Process Performance by Implementing Incremental Change • Apply Intellectual Capital of Team Members Intimate with Process CPI Projects Emphasize Control and Long Term Maintenance Kaizen Projects Emphasize Incremental Improvements
  • 7.  2000, QualityToolBox.com, LLC, all rights reserved The Nine types of waste • Overproduction • Delays (waiting time) • Transportation • Process • Inventories • Motions • Defective products • Untapped resources • Misused resources 9 Wastes
  • 8.  2000, QualityToolBox.com, LLC, all rights reserved 1. Overproduction To produce more than is required * To produce before required * *Required by external and internal customers 9 Wastes
  • 9.  2000, QualityToolBox.com, LLC, all rights reserved • The Secret: • Be Systematic • Work with a versatile team • Measure, evaluate • Find the 5 Whys • Follow up • Standardize, make uniform • Simplify • Combine • Prevent • Make waste ugly Elimination of Wastes and Continuous Improvement
  • 10.  2000, QualityToolBox.com, LLC, all rights reserved Exercise 1: Wastes Identification 1. List at least one example of each of the 9 categories of waste from a process within your organization. 2. Identify at least one possible cause for each of the specific wastes listed. 3. Propose one or more actions to reduce each of these wastes. 4. Identify methods of measurement to determine results of waste reduction efforts. Think Break
  • 11.  2000, QualityToolBox.com, LLC, all rights reserved Exercise 1: Wastes Identification Identify one example of each type of waste below Possible cause Proposed Action Method of measurement Overproduction Delays Transportation Process Inventories Motions Defective products Untapped resources Misused resources Think Break
  • 12.  2000, QualityToolBox.com, LLC, all rights reserved • Recognize our lead-times • Identify their components • Reduce them with the help of – the dedicated lines – a one piece flow • Establish dedicated lines – in relation to family of parts – in relation to TAKT time • Attain one piece flow We will learn to:
  • 13.  2000, QualityToolBox.com, LLC, all rights reserved Delivery lead time This is life! If not, it’s torture… When the delivery lead-time is bigger than the manufacturing lead time: Manufacturing lead time Delivery lead time Manufacturing lead time
  • 14.  2000, QualityToolBox.com, LLC, all rights reserved False appearance of a solution Solution… What is the solution? Generate and support stocks Delivery lead time Manufacturing lead time Delivery lead time Manufacturing lead time
  • 15.  2000, QualityToolBox.com, LLC, all rights reserved Identify and eliminate all wastes in our manufacturing processes Example: manufacture a Total operations: 6 hours Mfg. lead-time: 40 days = 320 hours Difference: 314 hours How to reduce the manufacturing lead time? Delivery lead time Manufacturing lead time ?
  • 16.  2000, QualityToolBox.com, LLC, all rights reserved Example: manufacture a Total operations: 6 hours Mfg. lead-time: 40 days = 320 hours Difference: 314 hours What are processes made of ? Delivery lead time Manufacturing lead time Storage, Transport, Waiting time 98%
  • 17.  2000, QualityToolBox.com, LLC, all rights reserved Visual Control & the Workstation The 5 S To Sort Eliminate what’s not absolutely necessary To Sanitize Improvement of the workstation. Be organized to reduce clutter. To Straighten Ensure space for each thing, and a thing for each space. No more searching. To Sweep Maintain a clean and orderly space to make problems easily identifiable. Eliminate rejects and scrap.. To Sustain Maintain continuous effort. This is a way of life.
  • 18.  2000, QualityToolBox.com, LLC, all rights reserved Visual Control & the Workstation Ergonomics •Adapt the workstation to the employee - more security - more comfort •Reduce waste - excessive fatigue - useless efforts and movement - less physical constraints
  • 19. Kaizen for the Workplace Training and Sourcebook for Kaizen Worksheets
  • 20. How to Use This Manual The continuous improvement tools that are presented in Sections 1-9 of this manual are shown in order of use. These forms MUST be completed in the order presented in this manual. Each section contains a brief description of the tool, its purpose, when to use it, who should use it, how to use it, and the expected results. Remember to focus on the elimination of waste. Strive to maximize yields and obtain cost reductions from existing machinery and equipment before “buying solutions”. Improve current systems and techniques before automation. Automating a system or practices without first having an understanding of the process will not solve underlying process problems. Perhaps the most important point to remember is that we must understand a process before we make any attempt in changing it. “No Tampering” is the first rule of continuous improvement. We can not tamper with a process without understanding it. By using these tools, we will all share a common and systematic approach for questioning, analyzing, proposing solutions, experimenting, and finally, implementing proven changes. “The problems that exist in the world today cannot be solved by the same level of thinking that created them.” Leadership Improvement Identify waste Measurement Kaizen Template
  • 21. Table of Contents Section 1 Standard Work Sheet (SWS): Used to create a visual picture of a work area. Shows crew size and location; office layout, distances within the work area, work in process, quality checks, and safety precautions……………………………………………………………….. . 4 Section 2 Time Observation Form (TOF): Used to identify each task performed in a process or section of a process. Further used to identify actual times for each task in order to determine the overall process cycle time……………………………………………………….. 7 Section 3 Standard Work Combination Sheet (SWCS): Used to graphically show each task time within a process in terms of it’s relation to Walking, Manual, Auto and Idle time. It further shows tasks which are performed in series and/or parallel [for further analysis]………… 11 Section 4 Workload Balancing Sheet (WBS): Used to graphically show the relationship between process cycle time(s) and TAKT time in order to examine the line balance and resolve any rebalance [waste] opportunities which may exist…………………………………………… 14 Section 5 Kaizen Action Sheet: Used to record problems/opportunities which are identified by the process. The Action Sheet also records the corrective actions, expected results, a drawing of the before and after process, and finally measurements which will be used to assess results…………………………………………………………….. 17 Section 6 Kaizen To Do List: Used to provide a summarized list of all KAIZEN Action Sheets, the primary person responsible to follow-up on each action, a due date for action item completion, and finally a graphic display of the percent completion for each action item………………………………………………………………………… 20 Section 7 Kaizen Target Sheet: A visual format for comparing continuous improvement efforts to a desired target and known starting value………………………………………………………………………. 23 26 Section 8 Kaizen Target Sheet Definitions…………………………………….. Section 9 Kaizen Improvement Results: Used to document the before and after results of improvement activities associated with key performance metrics. …………………………………………………. 28
  • 22. TIME OBSERVATION WORKSHEET Sheet 2 Date: Page of Task/Process Being Observed Observer(s) Day/Time Of Observation Observation Number Step No. Task Component 1 2 3 4 5 6 7 8 9 10 11 12 Assigned Component time REMARKS Time For One Cycle Total Time Running Time (cumulative) Time for each Component
  • 23. Purpose Used to identify each task performed in a process or section of a process. Further used to identify actual times for each task in order to determine the overall process cycle time. When To Use The Time Observation Form (TOF) should be used after the Standard Work Sheet and Spaghetti Diagram have been completed. Who Should Use It The Time Observation Form can be used by anyone involved in continuous process improvement. Expected Benefits The Time Observation Form will provide information about work sequence, work content, and operation times. The TOF not only provides actual times, but also provides best demonstrated performance, on the specific process being analyzed. Time Observation Form
  • 24. 1. Complete Sections A. B, and C. with the necessary information. 2. Fill in the Task Component blanks with the steps of the process. List the components in as specific terms as possible, i.e., 1. Walking to get work piece. 2. Removing work piece from basket. 3. Walking to machine. 4. Loading piece into machine. And so on. 3. Begin timing the tasks. As each task is completed, stop the watch and record the cumulative time on the form. Continue recording task times in this manner until the end of the process cycle 4. At the completion of 12 full cycles, calculate and enter the “Assigned Component Time” for each “Task Component”. Then sum up the “Assigned Component Time” for each “Task Component” and enter this into the “Time For One Cycle” field. Be sure to include the time spent on closing out work orders, or moving parts to next job. 5. During the manufacturing process, be aware of the steps taken to perform the job, i.e. If a particular task component varies from 4 second for observation #1 and 47 seconds for observation #2, provide comments about the observed variance in the remarks column. Remember, in our quest to remove waste from the process, we want to question every task component of the process. 6. Once the actual cycle times are known, compare them to TAKT time. TAKT Time for measurable, repetitive task processes is calculated as follows: A. Calculate the total time available per shift, day, etc. excluding breaks and lunches. Let’s say that we have a full 8 hours available. 8 hours would equal 480 minutes or 28,800 seconds. B. Determine the required product quantity. [How many units have been sold] For this example, let’s use 395 units for the required production for this operation. C. Next, divide the total time available by the required production to arrive at the TAKT Time. 28,800 / 395 = 73 seconds per unit. D. Compare this TAKT time to the average cycle time of the observation. 1. If TAKT Time is greater than average cycle time, then we can conclude that the required production can be met within the total time available. However, we need to examine adding work from another process to minimize idle time. 2. If TAKT Time is less than average cycle time, then we can conclude that the required production cannot be met within the total time available. We must eliminate work through Kaizen or transfer work to another worker. How to use it