1 of 25
LEAN & KAIZEN Course Content
Day1

WORLD CLASS MANUFACTURING
The origin of Lean Manufacturing
Global Competition
Characteristics of WCM
Traditional and Lean approaches

LEAN MANUFACTURING
What is Lean Manufacturing
Value Added & Non value added
Improvement traditional vs Lean

CHARACTERISTICS OF LEAN
PRODUCTION
Cellular Factory Layout
Multi-skilled Operators

Andon Lights
Kanban and Supermarkets
Rapid Changeover
Total Quality Approach
Right-sized, flexible Equipment
Water Striders
Moving Production Lines
Total Preventive Maintenance
Continuous Improvement
More……

LEAN PRODUCTION SYSTEM
Lean Production House
JIT – Continuous Flow
Takt Time
Pull Production
Jidoka
LEAN & KAIZEN Content
Day 2

Day3

STANDARD WORK & 3Ts
Element 1: Takt time
Element 2: Standard work sequence
Element 3: Line Balancing
Element 4: Standard work in Process
(SWIP)
3Ts – Takt Time, Cycle Time & Lead
time

PULL PRODUCTION & KANBAN
Overproduction
Continuous flow
Push vs Pull system
Kanban system
STANDARD OPERATION REVIEW
(Exercises)

STANDARD OPERATION
TOOLS
Kaizen Target and Scope
Standard work sheet
Time observation sheet
Percent loading chart
Standard combination sheet
Progress Result Report
Kaizen Newspaper

TOTAL PRODUCTIVE
MAINTENANCE (TPM)
KAIZEN WORKSHOP
Day1
WORLD CLASS MANUFACTURING
Class outlines:
The origin of Lean Manufacturing
Global Competition
Characteristics of WCM
Traditional and Lean approaches
Day1
LEAN MANUFACTURING
Class outlines:
What is Lean Manufacturing
Value Added & Non value added
Improvement traditional vs Lean
Day1
CHARACTERISTICS OF LEAN
PRODUCTION
Tools and practices commonly associated
Lean Production System
Cellular Factory Layout
Multi-skilled Operators
5s and Visual Control
Andon Lights
Kanban and
Supermarkets
Rapid Changeover
Total Quality
Approach

Right-sized, flexible
Equipment
Water Striders
Moving Production Lines
Total Preventive
Maintenance
Continuous Improvement
More……
Day1
LEAN PRODUCTION SYSTEM
Class Outlines:
Lean Production House
JIT – Continuous Flow
Takt Time
Pull Production
Jidoka
Day2
STANDARD OPERATION
Class Outlines:
Element 1: Takt time
Element 2: Standard work sequence
Element 3: Line Balancing
Element 4: Standard work in Process (SWIP)
3Ts – Takt Time, Cycle Time & Lead time
Day2
PULL SYSTEM & KANBAN
Class Outlines:
Overproduction
Continuous flow
Push vs Pull system
Kanban system
Day2
Standard Operations
Exercise
Example 1 of Exercise
Data
1 shift (8 hours)
2 - 15 minute breaks
1 - 15 minute crew meeting
Requirements 290 per month
20 days per month
WIP 26
Heads 5
Day3
STANDARD OPERATION
TOOLS

Class outlines:

Tools used in Standard Operation
Kaizen Target and Scope
Standard work sheet
Time observation sheet
Percent loading chart
Standard combination sheet
Progress Result Report
Kaizen Newspaper
Day3
Total Productive Maintenance

Class Outlines:
Day3
KAIZEN WORKSHOP
Class Outlines:
What is Kaizen?
Roles and benefit of Kaizen events
Key roles for Successful Kaizen Events
Phase 1: Planning & prepare for Kaizen Event
Phase 2: Implementation – the event itself
Phase 3: Follow up
What is Kaizen?
KAIZEN = CONTINOUS IMPROVEMENT

IMPROVEMENT
WITHOUT
ENDING

In Japanese
KAI
ZEN
Change Good
KAI ZEN = Change for better

The small, gradual, incremental changes applied over a
long period can be add up for a major impact on business
in the future.
The spirit of Kaizen

Throw all
your concrete
head

10 people’s
ideas is
better than 1

Kaizen with
LESS COST
or NO COST

Think how it
would work
NOT won’t

Improvement
has NO limits

Don’t accept
excuses

Don’t seek for
perfection

Correct the
mistake the
moment you
found

Ask WHY 5
times

Problem gives
your brain a
chance to work
Why Kaizen?
To continuously eliminate waste without
removing the value added activities in the
process
Waiting
Processing

Inventory
Transportation
Take all
FOUR

Movement

I
need
ONE!

MUDA
Defects

Over
Production
Why Kaizen?
Benefits to the Company
Eliminates hidden cost – 11 wastes
Improve value added – Quality, Cost &
Delivery
Benefits to YOU
Improved work place – eliminate
unnecessary movement & delay
Improve the best methods
YOU HELP THE COMPANY TO MEET QCD
Key roles for a Successful Kaizen
event
Upper Management
The initiation MUST come from Upper
Management
Build the culture of continuous
improvement
Additional training on the concept of
cell design, one piece flow, Pull
production, TPM, 5s’
Kaizen is not about eliminating people
but eliminate waste for better work
place
Production Manager
Work with KPO
Choose areas
Identify problems
Identify leaders

To guide and support the Kaizen team Lean principles
Phase 1: Planning and
preparation
STEP 1: Select area
STEP 2: Identify problems
Eliminate waste
Eliminate bottleneck
Implement 5s
Implement Cell Design, Line Balancing or Kanban

STEP 3: Select leader
STEP 4: Select Team
Train the team

STEP 5: Walk and document the process
STEP 6: Prepare the area
Advanced production
Required material, equipment & Support people
KICKOFF MEETING
Team leader provides welcome and quick
introduction
Sub-team leaders introduce area “as is” via
standard work charts
These slides are mandatory:
1.
2.
3.
4.
5.

Target & Scope – Problem statement, target to the
week, team member & scope
Target sheet – Narrow key target for the week
Standard work sheet – product flow ie process map
& people flow and wip
Percent Loading Chart – Takt time against cycle time
Standard work combination sheet – the major
process
Phase 2: Implementation
Walk and document the process – gather data
prior to the Kaizen event
Data that represent a study on:
Process flow
People Travel
Product travel
Operator cycle time
Cycle time against Takt time
Quality issues
Identifying CLOSEMIDTTS

Fill out Standard Operation Tools
GEMBA KAIZEN
Start day working on shop floor. Gather together for lunch
(no report) and at end of day for daily report out.

Go and have fun!!!!

Afternoon bring down key management to see progress
made in work area.
Kaizen REPORT OUT
DAILY REPORT OUT
Team leader prepare for end of day 10 mins report
out in afternoon
Review the progress through:
Target sheet
Used any combination of charts – Standard work
sheet, Percent Loading, Std Combination or Kaizen
Cartoon , Progress Result Report .

Standard Work Sheet

Percent Loading Chart (Bar Chart)
Process Name: Find Core Remnant

Scope Of Operation

Process Name: Mohd Noor

Model Number: 777 Cutting Core

From: Core Store

Model Name: 777

To: Core Area

Standard Work Combination Sheet

To: Core Area

Team Leader: Mohd Noor

Wait

CTT RACK

REMNANT RACK

140

TIME (Sec)

DOWNDRAFT
TABLE

B
REMNANT RACK

A

Target 100 sec

CTT RACK

CUTTING

REMNANT RACK

100

DOWNDRAFT
TABLE

3
QA TABLE

80

QA TABLE

2

40

CHAMFER SAW

20

163 ft
51 ft

0
BEFORE
KAIZEN

DAY 1

DAY 2

DAY 3
DAY

DAY 4

DAY 5

REMNANT RACK

CUTTING
SANDING CUTTING
TABLE

REMNANT RACK

REMNANT RACK
B

REMNANT RACK

60

CHAMFER SAW

C

C

PEOPLE TRAVEL
CUTTING
PRODUCT TRAVEL

8

CUTTING
CTT RACK

A)REMNANT BEHIND TORRIT BOOTH
B)REMNANT AT CORE AREA
C)REMNANT UNDER TABLE

#
Operation/Process
1 Target and scope
Hazli
2 Progress report out
Sommat
3 Kanban system
Hazli
4 Work instruction for block saw machine
Bashri
5 5S practice
Osnizal
6 Process improvement cartoon
Fauzi
7 Kaizen Newspaper
Hazli

9

CHAMFER SAW
CHAMFER SAW

10
Quality
Check

Safety
Precaution

Standard Work
in Process

# of pieces of Std.
Work-in-Process

Takt
Time

Operator
Number
19

Area: CORE AREA
Team Leader: MOHD HAZLI

Time

Step

1

Takt Time: 1200 SEC

Process:

potting area

CYCLE TIME TO FIND CORE REMNANT

Requirements: 1

Product: CORE BLOCK SAW

LAYUP ROOM

160

Manual
Automatic
Walking

Manager: Ku Mohd Soffi

Before kaizen

120

Date: 8 - 12 JUL 2002

From: Core Store

Model Name: Boeing

Area: Core Area

Date: 31/3/2003 - 4/4/2003

Scope of Operations

Model Number: 737/747/767/777

Date: 31/3/03 - 4/4/03

Manual

2
2
4
2
2
3
4

Mach

1
Walk

2

3

Ope. Time

6

7

8

9

10
Phase 3: Follow up
The event should
NEVER end.
Result MUST be
monitored
and improvements
continually made
Monthly Followup REPORT OUT
•Team reports completed implementation
actions for the week/month

• Prepare final report out with key personals.
• All team members are involved, use standard work
combination sheet to set sub-team agenda and to allocate time
to each member.

More Related Content

What's hot

What's hot (20)

5 why analysis
5 why analysis5 why analysis
5 why analysis
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Kaizen Poster
Kaizen PosterKaizen Poster
Kaizen Poster
 
Poka yoke error proofing
Poka yoke error proofing Poka yoke error proofing
Poka yoke error proofing
 
Corrective & Preventive Action
Corrective & Preventive Action Corrective & Preventive Action
Corrective & Preventive Action
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Plan-Do-Check-Act (P-D-C-A)
Plan-Do-Check-Act (P-D-C-A)Plan-Do-Check-Act (P-D-C-A)
Plan-Do-Check-Act (P-D-C-A)
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
Developing Job Breakdown Sheets according TWI methodology
Developing Job Breakdown Sheets according TWI methodologyDeveloping Job Breakdown Sheets according TWI methodology
Developing Job Breakdown Sheets according TWI methodology
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
 
KAIZEN Technique
KAIZEN TechniqueKAIZEN Technique
KAIZEN Technique
 
Manufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual FactoryManufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual Factory
 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
 
Kaizen_ presentation
Kaizen_ presentationKaizen_ presentation
Kaizen_ presentation
 

Viewers also liked

5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
Operational Excellence Consulting
 
Kaizen study material
Kaizen study materialKaizen study material
Kaizen study material
Anitha CM
 
Al Rand Shipping & Logistics Profile
Al Rand Shipping & Logistics ProfileAl Rand Shipping & Logistics Profile
Al Rand Shipping & Logistics Profile
Issam El Mir
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
Shravan Bhumkar
 
Kaizen pom presentation
Kaizen pom presentationKaizen pom presentation
Kaizen pom presentation
Minal Kashyap
 
5s Apresentacao
5s Apresentacao5s Apresentacao
5s Apresentacao
aavbatista
 

Viewers also liked (20)

Jeff Attoe Kaizen 5S (Case Study)
Jeff Attoe Kaizen 5S (Case Study)Jeff Attoe Kaizen 5S (Case Study)
Jeff Attoe Kaizen 5S (Case Study)
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen study material
Kaizen study materialKaizen study material
Kaizen study material
 
Al Rand Shipping & Logistics Profile
Al Rand Shipping & Logistics ProfileAl Rand Shipping & Logistics Profile
Al Rand Shipping & Logistics Profile
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen pom presentation
Kaizen pom presentationKaizen pom presentation
Kaizen pom presentation
 
Zero Defects Through Lean six Sigma
Zero Defects Through Lean six SigmaZero Defects Through Lean six Sigma
Zero Defects Through Lean six Sigma
 
5s Apresentacao
5s Apresentacao5s Apresentacao
5s Apresentacao
 
Programa 5S
Programa 5SPrograma 5S
Programa 5S
 
5s and kaizen
5s and kaizen5s and kaizen
5s and kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen và 5S
Kaizen và 5SKaizen và 5S
Kaizen và 5S
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
 
Keynote speech (Alison Terry, NAO)
Keynote speech (Alison Terry, NAO)Keynote speech (Alison Terry, NAO)
Keynote speech (Alison Terry, NAO)
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
SIX SIGMA IN HR
SIX SIGMA IN HRSIX SIGMA IN HR
SIX SIGMA IN HR
 
5 s ppt
5 s ppt5 s ppt
5 s ppt
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 

Similar to Overview of 3 day Lean & Kaizen Course Content

LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
ssuser72b8e8
 

Similar to Overview of 3 day Lean & Kaizen Course Content (20)

Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 
Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptx
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Kaizen
KaizenKaizen
Kaizen
 
aLean Manufacturingeddy
aLean ManufacturingeddyaLean Manufacturingeddy
aLean Manufacturingeddy
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
LeanSigma for IW 2005
LeanSigma for IW 2005LeanSigma for IW 2005
LeanSigma for IW 2005
 
03.KK ...pdf
03.KK ...pdf03.KK ...pdf
03.KK ...pdf
 
Slides 2015 for contact 7
Slides 2015 for contact 7Slides 2015 for contact 7
Slides 2015 for contact 7
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
Kanban India 2023 | Renjith Achuthanunni and Anoop Kadur Vijayakumar | DevOps...
 
Conducting a Kaizen.pdf
Conducting a Kaizen.pdfConducting a Kaizen.pdf
Conducting a Kaizen.pdf
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 

More from Timothy Wooi

More from Timothy Wooi (20)

Story of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save othersStory of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save others
 
MV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.pptMV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.ppt
 
Faith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.pptFaith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.ppt
 
SEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQMSEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQM
 
LATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptxLATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptx
 
Profesionalism in efficient customer service
Profesionalism in efficient customer serviceProfesionalism in efficient customer service
Profesionalism in efficient customer service
 
Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal
 
Leadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normalLeadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normal
 
Communication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural WorkplaceCommunication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural Workplace
 
The Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven CoveyThe Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven Covey
 
Digital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessionsDigital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessions
 
Kaizen in Education Online Teaching
Kaizen in Education Online TeachingKaizen in Education Online Teaching
Kaizen in Education Online Teaching
 
Touraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing StreetTouraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing Street
 
Disruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management ShiftDisruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management Shift
 
Waste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R'sWaste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R's
 
INTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in EducationINTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in Education
 
Implication of Ir4.0 to Teaching
Implication of Ir4.0 to TeachingImplication of Ir4.0 to Teaching
Implication of Ir4.0 to Teaching
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
 
Service Excellence at Workplace
Service Excellence at WorkplaceService Excellence at Workplace
Service Excellence at Workplace
 
My Teacher Shamed me when I could not read
My Teacher Shamed me when I could not readMy Teacher Shamed me when I could not read
My Teacher Shamed me when I could not read
 

Recently uploaded

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
Boundify
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
bleessingsbender
 

Recently uploaded (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Asansol Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Asansol Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service AvailableAsansol Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Asansol Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
 
MEHSANA 💋 Call Girl 9827461493 Call Girls in Escort service book now
MEHSANA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowMEHSANA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
MEHSANA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Berhampur Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Berhampur Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Berhampur Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Berhampur Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
How does a bike-share company navigate speedy success? - Cyclistic
How does a bike-share company navigate speedy success? - CyclisticHow does a bike-share company navigate speedy success? - Cyclistic
How does a bike-share company navigate speedy success? - Cyclistic
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docxManagerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
DUNGARPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
DUNGARPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowDUNGARPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
DUNGARPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 

Overview of 3 day Lean & Kaizen Course Content

  • 1. LEAN & KAIZEN Course Content Day1 WORLD CLASS MANUFACTURING The origin of Lean Manufacturing Global Competition Characteristics of WCM Traditional and Lean approaches LEAN MANUFACTURING What is Lean Manufacturing Value Added & Non value added Improvement traditional vs Lean CHARACTERISTICS OF LEAN PRODUCTION Cellular Factory Layout Multi-skilled Operators Andon Lights Kanban and Supermarkets Rapid Changeover Total Quality Approach Right-sized, flexible Equipment Water Striders Moving Production Lines Total Preventive Maintenance Continuous Improvement More…… LEAN PRODUCTION SYSTEM Lean Production House JIT – Continuous Flow Takt Time Pull Production Jidoka
  • 2. LEAN & KAIZEN Content Day 2 Day3 STANDARD WORK & 3Ts Element 1: Takt time Element 2: Standard work sequence Element 3: Line Balancing Element 4: Standard work in Process (SWIP) 3Ts – Takt Time, Cycle Time & Lead time PULL PRODUCTION & KANBAN Overproduction Continuous flow Push vs Pull system Kanban system STANDARD OPERATION REVIEW (Exercises) STANDARD OPERATION TOOLS Kaizen Target and Scope Standard work sheet Time observation sheet Percent loading chart Standard combination sheet Progress Result Report Kaizen Newspaper TOTAL PRODUCTIVE MAINTENANCE (TPM) KAIZEN WORKSHOP
  • 3. Day1 WORLD CLASS MANUFACTURING Class outlines: The origin of Lean Manufacturing Global Competition Characteristics of WCM Traditional and Lean approaches
  • 4. Day1 LEAN MANUFACTURING Class outlines: What is Lean Manufacturing Value Added & Non value added Improvement traditional vs Lean
  • 5. Day1 CHARACTERISTICS OF LEAN PRODUCTION Tools and practices commonly associated Lean Production System Cellular Factory Layout Multi-skilled Operators 5s and Visual Control Andon Lights Kanban and Supermarkets Rapid Changeover Total Quality Approach Right-sized, flexible Equipment Water Striders Moving Production Lines Total Preventive Maintenance Continuous Improvement More……
  • 6. Day1 LEAN PRODUCTION SYSTEM Class Outlines: Lean Production House JIT – Continuous Flow Takt Time Pull Production Jidoka
  • 7. Day2 STANDARD OPERATION Class Outlines: Element 1: Takt time Element 2: Standard work sequence Element 3: Line Balancing Element 4: Standard work in Process (SWIP) 3Ts – Takt Time, Cycle Time & Lead time
  • 8. Day2 PULL SYSTEM & KANBAN Class Outlines: Overproduction Continuous flow Push vs Pull system Kanban system
  • 9. Day2 Standard Operations Exercise Example 1 of Exercise Data 1 shift (8 hours) 2 - 15 minute breaks 1 - 15 minute crew meeting Requirements 290 per month 20 days per month WIP 26 Heads 5
  • 10. Day3 STANDARD OPERATION TOOLS Class outlines: Tools used in Standard Operation Kaizen Target and Scope Standard work sheet Time observation sheet Percent loading chart Standard combination sheet Progress Result Report Kaizen Newspaper
  • 12. Day3 KAIZEN WORKSHOP Class Outlines: What is Kaizen? Roles and benefit of Kaizen events Key roles for Successful Kaizen Events Phase 1: Planning & prepare for Kaizen Event Phase 2: Implementation – the event itself Phase 3: Follow up
  • 13. What is Kaizen? KAIZEN = CONTINOUS IMPROVEMENT IMPROVEMENT WITHOUT ENDING In Japanese KAI ZEN Change Good KAI ZEN = Change for better The small, gradual, incremental changes applied over a long period can be add up for a major impact on business in the future.
  • 14. The spirit of Kaizen Throw all your concrete head 10 people’s ideas is better than 1 Kaizen with LESS COST or NO COST Think how it would work NOT won’t Improvement has NO limits Don’t accept excuses Don’t seek for perfection Correct the mistake the moment you found Ask WHY 5 times Problem gives your brain a chance to work
  • 15. Why Kaizen? To continuously eliminate waste without removing the value added activities in the process Waiting Processing Inventory Transportation Take all FOUR Movement I need ONE! MUDA Defects Over Production
  • 16. Why Kaizen? Benefits to the Company Eliminates hidden cost – 11 wastes Improve value added – Quality, Cost & Delivery Benefits to YOU Improved work place – eliminate unnecessary movement & delay Improve the best methods YOU HELP THE COMPANY TO MEET QCD
  • 17. Key roles for a Successful Kaizen event Upper Management The initiation MUST come from Upper Management Build the culture of continuous improvement Additional training on the concept of cell design, one piece flow, Pull production, TPM, 5s’ Kaizen is not about eliminating people but eliminate waste for better work place
  • 18. Production Manager Work with KPO Choose areas Identify problems Identify leaders To guide and support the Kaizen team Lean principles
  • 19. Phase 1: Planning and preparation STEP 1: Select area STEP 2: Identify problems Eliminate waste Eliminate bottleneck Implement 5s Implement Cell Design, Line Balancing or Kanban STEP 3: Select leader STEP 4: Select Team Train the team STEP 5: Walk and document the process STEP 6: Prepare the area Advanced production Required material, equipment & Support people
  • 20. KICKOFF MEETING Team leader provides welcome and quick introduction Sub-team leaders introduce area “as is” via standard work charts These slides are mandatory: 1. 2. 3. 4. 5. Target & Scope – Problem statement, target to the week, team member & scope Target sheet – Narrow key target for the week Standard work sheet – product flow ie process map & people flow and wip Percent Loading Chart – Takt time against cycle time Standard work combination sheet – the major process
  • 21. Phase 2: Implementation Walk and document the process – gather data prior to the Kaizen event Data that represent a study on: Process flow People Travel Product travel Operator cycle time Cycle time against Takt time Quality issues Identifying CLOSEMIDTTS Fill out Standard Operation Tools
  • 22. GEMBA KAIZEN Start day working on shop floor. Gather together for lunch (no report) and at end of day for daily report out. Go and have fun!!!! Afternoon bring down key management to see progress made in work area.
  • 23. Kaizen REPORT OUT DAILY REPORT OUT Team leader prepare for end of day 10 mins report out in afternoon Review the progress through: Target sheet Used any combination of charts – Standard work sheet, Percent Loading, Std Combination or Kaizen Cartoon , Progress Result Report . Standard Work Sheet Percent Loading Chart (Bar Chart) Process Name: Find Core Remnant Scope Of Operation Process Name: Mohd Noor Model Number: 777 Cutting Core From: Core Store Model Name: 777 To: Core Area Standard Work Combination Sheet To: Core Area Team Leader: Mohd Noor Wait CTT RACK REMNANT RACK 140 TIME (Sec) DOWNDRAFT TABLE B REMNANT RACK A Target 100 sec CTT RACK CUTTING REMNANT RACK 100 DOWNDRAFT TABLE 3 QA TABLE 80 QA TABLE 2 40 CHAMFER SAW 20 163 ft 51 ft 0 BEFORE KAIZEN DAY 1 DAY 2 DAY 3 DAY DAY 4 DAY 5 REMNANT RACK CUTTING SANDING CUTTING TABLE REMNANT RACK REMNANT RACK B REMNANT RACK 60 CHAMFER SAW C C PEOPLE TRAVEL CUTTING PRODUCT TRAVEL 8 CUTTING CTT RACK A)REMNANT BEHIND TORRIT BOOTH B)REMNANT AT CORE AREA C)REMNANT UNDER TABLE # Operation/Process 1 Target and scope Hazli 2 Progress report out Sommat 3 Kanban system Hazli 4 Work instruction for block saw machine Bashri 5 5S practice Osnizal 6 Process improvement cartoon Fauzi 7 Kaizen Newspaper Hazli 9 CHAMFER SAW CHAMFER SAW 10 Quality Check Safety Precaution Standard Work in Process # of pieces of Std. Work-in-Process Takt Time Operator Number 19 Area: CORE AREA Team Leader: MOHD HAZLI Time Step 1 Takt Time: 1200 SEC Process: potting area CYCLE TIME TO FIND CORE REMNANT Requirements: 1 Product: CORE BLOCK SAW LAYUP ROOM 160 Manual Automatic Walking Manager: Ku Mohd Soffi Before kaizen 120 Date: 8 - 12 JUL 2002 From: Core Store Model Name: Boeing Area: Core Area Date: 31/3/2003 - 4/4/2003 Scope of Operations Model Number: 737/747/767/777 Date: 31/3/03 - 4/4/03 Manual 2 2 4 2 2 3 4 Mach 1 Walk 2 3 Ope. Time 6 7 8 9 10
  • 24. Phase 3: Follow up The event should NEVER end. Result MUST be monitored and improvements continually made
  • 25. Monthly Followup REPORT OUT •Team reports completed implementation actions for the week/month • Prepare final report out with key personals. • All team members are involved, use standard work combination sheet to set sub-team agenda and to allocate time to each member.

Editor's Notes

  1. {"5":"When you see visit lean factories you may notice they have many common traits. All lean manufacturers use a set of common tools to implement their lean production system. The methods of application may vary, but a good lean facility will practice all these techniques and more.\n","13":"Kaizen event is as much as important as other activities because it is the builiding block of all LEAN Prod. Methology.\nLean production is founded on the idea of KAIZEN or Continous Improvement\n","14":"Kaizen event is as much as important as other activities because it is the builiding block of all LEAN Prod. Methology.\nLean production is founded on the idea of KAIZEN or Continous Improvement\n"}