International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -1
Barriers to Implement Lean Principles in the Indian
Construction Industry
S M Abdul Mannan Hussain1
Apoorva Mercy Nama2
Asra Fatima3
Research Scholar, GITAM University,Hyd B.Tech Final Year Student Research Scholar, GITAM University
Assistant Professor ,Dept. of Civil Engg Malla Reddy Engineering College Assistant Professor, Civil Eng. Dept
Malla Reddy Engineering College Department of Civil Engineering Muffakham Jah Engineering College
Autonomous Campus, Secundrabad. Autonomous Campus, Secundrabad Banjara Hills, Hyderabad
Abstract— Lean construction emerged from attempts of transferring and applying the Japanese Lean production
philosophy to the construction industry. Lean construction is a confluence of ideas including continuous
improvement, flattened organization structure, efficient usage of resources, elimination of waste, and cooperative
supply chain. Based on the success of Lean Production in manufacturing and the development of Lean Construction
in countries such as Brazil, Denmark and the USA, the application of Lean Construction is currently debated in India.
The aim of the study is identification of barriers to successful implementation of lean construction in the Indian
construction sector. The data was collected by questionnaire survey of project managers of building construction
organizations and senior consultants of architectural and project management firms. The data collected was then
analyzed to rank the main barriers and lean principles are suggested to overcome these barriers
Keywords—Lean construction; waste; barriers; management; project
INTRODUCTION
Toyota was the first to bring the Lean principles into limelight. Toyota created a focus on eliminating waste and grew to
be the world’s largest automotive industry by adopting seven principles of reducing waste. It believed in preserving value
with less work and also improvement in efficiency by improving the workflow. Today Lean manufacturing is practiced
by many leading auto makers.
Lean principles have slowly made inroads into the construction industry because of its approach to waste elimination and
providing value with less effort and time. Construction management is defined as the judicious allocation of resources to
finish a project on time, at budget and at desired quality [1]. The biggest cost impact of the construction today is the way
the whole process is managed and not the cost of labor and materials. Construction process consists of countless activities
that add no value to the product. According to Hines and Rich, these non value adding activities (e.g. waiting time
,double handling, searching for material etc) are pure waste and should be eliminated completely [2]. In a study
conducted by Josephson and Saukkorippi, a group of workers were followed around for 22 working days and it was noted
that 33.4% of their time was waste [3].
I. NEED FOR STUDY
India‘s rapid economic growth over the past few decades has placed a tremendous stress on its limited infrastructure.
Construction industry is one of the largest industries which support the economy of a country. Since construction has a
major and direct influence on many other industries reducing waste in construction can go a long way in helping the
economy of the world.
II. LITERATURE REVIEW
Existing data and literature on lean principles and its applications in construction industry around the world was collected.
This formed the reference for framing the questionnaire for survey.
A. Lean construction
According to Chick G. et al, waste is more than the physical wastes that are the focus of construction site activity [4].
In fact waste is any activity (or inactivity) that does not add value to the product or service.
Waste can be
 Value-adding (VA): is the work that the customer is willing to pay for. 
 Essential non-value adding: these are the tasks that must be completed to enable the value-adding activity to be
completed, but do not add value. For example, inspection is not that the customer pays for but is necessary. 
 Waste: Waste can be of two types. Waste in the work itself (e.g. excessive walking, looking for tools and
materials, poor quality). Introduced or enforced‘waste (e.g. waiting for information, materials not supplied),
which has prevented work activity from being carried out. 
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -2
According to Koskela and Howell, Lean Construction is a way to design to minimize waste of materials, time, and effort
in order to generate the maximum possible amount of value [5] According to Dulaimi and Tanamas, managing
construction under lean construction is different from typical contemporary practice [6] because it:
Has a clear set of objectives for the delivery process 

Is aimed at maximizing performance for the customer at the project level 
Designs concurrently product and process 

Applies production control throughout the life of the project 
B. Lean principles
Womack and Jones describe Lean thinking as a cycle of five guiding principles where the implementation of the first
four lead to achieving the fifth [7]. The ultimate goal is the elimination of waste. The principles are described below:
 Specify value 
Only what the customer considers as value should be taken into consideration, ―nothing more, and nothing
less”. In construction activities can be classified as 3 types: 
1. Value Adding (VA)
2. Non-value Adding (NVA)
3. Necessary Waste (NW)
 Identify the value stream 
This is about identifying all the steps in the value stream in order to determine activities that do not add value
and seek for their elimination.

 Make value flow without interruption 
This is done by minimizing delays, inventories, defects and downtime. 
 Use pull logistics 
All components and information are made and supplied at the necessary time to deliver the product or service to
the customer at exactly the time the customer wants it. 
 Pursue perfection 
Lean consists of continuously improving through collaboratively identifying and removing wastes to provide the
desired results.

C. Lean Project Delivery System (LPDS)
According to Ballard, the Lean Project Delivery System (LPDS) [8] consists of the following phases:
 project definition 
 lean design 
 lean supply 
 lean assembly 
 Use 

Essential features of LPDS include:
 the project is structured and managed as a value generating process 
 downstream stakeholders are involved in front end planning and design through cross functional teams 
 project control has the job of execution as opposed to reliance on after-the-fact variance detection 
 optimization efforts are focused on making work flow reliable as opposed to improving productivity 
 pull techniques are used to govern the flow of materials and information through networks of cooperating
specialists 
 feedback loops are incorporated at every level, dedicated to rapid system adjustment; i.e., learning. 
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -3
IV. METHODOLOGY
The main tool for the collection of data includes questionnaires. The target population for the data collection
includes project managers of building construction organizations.
Review existing Literature
Preparation of Questionnaire
Questionnaire survey
Analysis of data
Conclusions, Recommendations and
Suggestions
Fig. 1 Proposed methodology for the project
The questionnaire was uploaded to Google drive in the form of Google docs so that the survey details could be
collected online. The questionnaire was circulated as a link to the architects, civil engineers and project managers of
construction firms through emails. The questionnaire was circulated to about 50 companies. The representatives were
to fill the questionnaire and submit the data online. The questionnaire when submitted collects the data in an excel
sheet real- time in the Google drive database.
V. RESULTS AND DISCUSSIONS
To identify the barriers for successful implementation of lean construction, a questionnaire was prepared after
thorough literature study of barriers faced in other countries. Table 1 lists out the mean score of various barriers to
implementation of lean principles in India.
The main barriers to applying Lean principles in Construction industry in India have been identified as
 Lack of exposure on the need to adopt lean construction 
 Uncertainty in the supply chain 
 The tendency to apply traditional management 
 Culture & human attitudinal issues (Mindset issues) 
 Lack of commitment from top management 
 Non-participative management style for workforce 
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -4
Fig. 2 Barriers To Implementation Of Lean Principles In India
TABLE 1. MEAN SCORE OF BARRIERS TO IMPLEMENTATION OF LEAN PRINCIPLES IN INDIA
`BARRIERS TO IMPLEMENTATION OF LEAN PRINCIPLES IN INDIA MEAN SCORE
Lack of exposure on the need for lean Construction 3.88
Uncertainty in the supply chain 3.85
The tendency to apply traditional management 3.75
Culture & human attitudinal issues (Mindset issues) 3.70
Lack of commitment from top management 3.55
Non-participative management style for workforce 3.52
Attitude and ability to work in group 3.42
Difficulties in understanding the concept of lean construction 3.42
Lack of client and supplier involvement 3.33
Fragmentation and subcontracting 3.18
Lack of proper training 3.12
Lean construction principles are still a new concept in Indian construction sector. The benefits of lean construction has
been recognized by some of the leading construction firms like Larsen and Toubro, Tata Realty & Infrastructure,
Shapoorji Pallonji & Co., GMR Group and other such organizations, but it is yet to percolate down to the medium and
smaller construction firms. ―Lack of exposure on the benefits of adopting Lean constructionǁ is one of the main barriers
identified in the survey.
The next important barrier identified in the survey is the
Uncertainty in the supply chainǁ. The Lean Construction principles stress on waste minimization. This can be achieved
through maintaining the right inventory; there should be no over-ordering or under-ordering of materials. Lean principles
also stress on just-in-time supply. This does minimize waste but the risk involved is also high. Therefore the uncertainties
in the supply chain can prove to be a big risk and a barrier which can prevent the practitioners from adopting the Lean
principles.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -5
The third barrier identified is the ―Human attitudinal issues and cultural mindsetǁ and the tendency to apply the
traditional concepts of project management. Human beings are people of habits and there is a general tendency to resist
change. Construction industry is a huge and old industry. People are used to and are comfortable with the traditional style
of management and so do not want to disturb what is already working. But with the construction sector on the boom and
resources depleting at a fast pace, it is high time that the construction industry which has a big role in waste generation
and environment pollution, changes and adopts principles which will result in waste minimization and prevention of
environment pollution.
Lack of commitment from the top management and the Non-participative style of managementǁ is also a barrier in
implementing Lean concepts in construction. Indian construction industry is used to working as a bureaucratic style of
management, where orders are given by the managers and they are executed by the workers. Managers are resistant to
change, as they feel that workers would not work properly if they are included in the decision making process. Previously
workers in the construction sector were illiterate and learnt on the job, but with technological advances in construction, at
present the workforce consists of engineers and other educated and experienced personnel, who if given responsibility,
will be motivated and assume responsibility to provide better and faster results.
VI. CONCLUSION AND RECOMMENDATION
Most of the respondents who have not heard about lean management principles are from the public sector executing huge
projects along with big firms. Though the big firms are using lean principles, people from the government sector should
also be educated about the savings due to adopting lean principles, so that they can mandate it on all government
sponsored projects.
Individual practitioners can also be made aware of lean concepts by workshops, conferences, journals, and business
magazines.
Lack of exposure on the need to adopt lean construction can be overcome by communicating the benefits of Lean
construction through seminars and conferences to the construction practitioners. Also the government should enact
policies which appreciate the effort by firms which adopt Lean principles. Recommendation is to take companywide
initiative to apply Lean principles and it is not enough to send a few managers or personnel for workshops and seminars.
This way of working should eventually percolate to the lower levels. The sub contractors and suppliers should also be
made to attend these workshops and take initiatives to implement Lean management principles.
Barriers in uncertainty in the supply chain can be overcome by choosing proper suppliers who not quote less price, but
deliver good quality and who also have a proven track record. By working closely with suppliers and subcontractors,
problematic issues can be minimized by participative style of managing projects and establishing strategic alliances with
them. This can be done effectively if one works with the same supplier again and again
There is a tendency to apply traditional management principles. People generally do not want to disturb processes which
have been going on since a long time, but now with so much construction boom, it is high time the construction industry
gives cognizance to the fact that waste produced by industry is high and needs to be minimized. This can be achieved by
training all managers and workers in the firm on the benefits of Lean construction. Workshops on the comparisons on
Lean and traditional methods of construction, and how Lean is better should be conducted. Suitable metrics should be
developed so that practitioners apply Lean management principles.
Managers should promote lean construction, as it can bring considerable revenue savings for the firm. Managers should
change with times and new technology. This can be done by bringing about a change in organization culture by making
the adoption of lean principles mandatory, by enacting new policies for waste minimization, and by partnering with
suppliers and subcontractors to ensure that they follow Lean construction methods.
ACKNOWLEDGMENT
The authors record their appreciation for the time and effort taken by the project managers to complete the questionnaire
survey, in spite of their hectic schedule.
REFERENCES
[1]. Clough, R.H. & Sears, G.A. (1994) Construction Contracting. (6th
edition) John Wiley & Sons Inc., New York.
[2]. Hines, P., Jones, D. and Rich, N. (1998), Lean Logistics, Pergamon, London.
[3]. Josephson, P-E., and Saukkoriipi, L. (2005). Waste in construction projects. Call for a new approach. Report
0507. The centre for Management of the Built Environment, Building Economics and Management, Chalmers
University of Technology, Gøteborg.
[4]. Chick, G., Corfe, C., Dave, B., Fraser, N., Kiviniemi, A., Koskela, L.,
[5]. O‘Connor, R., Owen, R., Smith, S., Swain, B. and Patricia
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 01, Volume 3 (January 2016) www.ijirae.com
__________________________________________________________________________________________________
IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -6
[6]. Tzortzopoulous (2013), Implementing lean in construction, CIRIA, London, United Kingdom.
[7]. Koskela, L., Ballard, G., Howell, G., and Iris D. Tommelein (2002),
[8]. ‗The foundations of lean construction‘, Design and construction: building in value, Butterworth Heinemann,
Oxford, UK, pp. 211-226.
[9]. Dulaimi, M. F., and Tanamas, C. (2001), ‗The principles and application of lean construction in Singapore‘,
Proceedings of the 9th Annual
[10]. Conference of the International Group for Lean Construction, Singapore.
[11]. Womack, J. P. and Jones, D. T. (1996), Lean Thinking: Banish waste and create wealth in your corporation,
Simon and Schuster, New York, USA.
[12]. Ballard, G. (2000), Lean Project Delivery System, LCI White Paper – 8, Lean Construction Institute.

More Related Content

What's hot

IRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET Journal
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Murali Naidu
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity Dr Fereidoun Dejahang
 
Engineering Construction 4.0 Revolution
Engineering Construction 4.0 RevolutionEngineering Construction 4.0 Revolution
Engineering Construction 4.0 RevolutionFrancesco Legname
 
A Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summaryA Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summaryIJERA Editor
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET- Confluence of Lean and Offsite Construction
IRJET- Confluence of Lean and Offsite ConstructionIRJET- Confluence of Lean and Offsite Construction
IRJET- Confluence of Lean and Offsite ConstructionIRJET Journal
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction WebinarBMGI India
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...IOSR Journals
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 

What's hot (18)

IRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction Method
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 
Lean construction
Lean constructionLean construction
Lean construction
 
Om lean
Om leanOm lean
Om lean
 
Engineering Construction 4.0 Revolution
Engineering Construction 4.0 RevolutionEngineering Construction 4.0 Revolution
Engineering Construction 4.0 Revolution
 
A Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summaryA Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summary
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET- Confluence of Lean and Offsite Construction
IRJET- Confluence of Lean and Offsite ConstructionIRJET- Confluence of Lean and Offsite Construction
IRJET- Confluence of Lean and Offsite Construction
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
L1304018086
L1304018086L1304018086
L1304018086
 
ISS_6
ISS_6ISS_6
ISS_6
 
IJIDEM.Springer
IJIDEM.SpringerIJIDEM.Springer
IJIDEM.Springer
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 

Viewers also liked

Relevance of Higher Education. How to measure it? The case of masters of engi...
Relevance of Higher Education. How to measure it? The case of masters of engi...Relevance of Higher Education. How to measure it? The case of masters of engi...
Relevance of Higher Education. How to measure it? The case of masters of engi...AM Publications
 
Cosmic Adventure 2.09 Lorentz Contraction
Cosmic Adventure 2.09 Lorentz ContractionCosmic Adventure 2.09 Lorentz Contraction
Cosmic Adventure 2.09 Lorentz ContractionStephen Kwong
 
A study Report on Implementation of GIS in Solid Waste Management
A study Report on Implementation of GIS in Solid Waste ManagementA study Report on Implementation of GIS in Solid Waste Management
A study Report on Implementation of GIS in Solid Waste ManagementAM Publications
 
201506新進人員教育訓練全球資訊網講義
201506新進人員教育訓練全球資訊網講義201506新進人員教育訓練全球資訊網講義
201506新進人員教育訓練全球資訊網講義alex8122
 

Viewers also liked (8)

Tazobactam 89786-04-9 -api
Tazobactam 89786-04-9 -apiTazobactam 89786-04-9 -api
Tazobactam 89786-04-9 -api
 
Six_Sigma_Intro Vision
Six_Sigma_Intro VisionSix_Sigma_Intro Vision
Six_Sigma_Intro Vision
 
Resume
ResumeResume
Resume
 
Relevance of Higher Education. How to measure it? The case of masters of engi...
Relevance of Higher Education. How to measure it? The case of masters of engi...Relevance of Higher Education. How to measure it? The case of masters of engi...
Relevance of Higher Education. How to measure it? The case of masters of engi...
 
Cosmic Adventure 2.09 Lorentz Contraction
Cosmic Adventure 2.09 Lorentz ContractionCosmic Adventure 2.09 Lorentz Contraction
Cosmic Adventure 2.09 Lorentz Contraction
 
A study Report on Implementation of GIS in Solid Waste Management
A study Report on Implementation of GIS in Solid Waste ManagementA study Report on Implementation of GIS in Solid Waste Management
A study Report on Implementation of GIS in Solid Waste Management
 
Dissertation
DissertationDissertation
Dissertation
 
201506新進人員教育訓練全球資訊網講義
201506新進人員教育訓練全球資訊網講義201506新進人員教育訓練全球資訊網講義
201506新進人員教育訓練全球資訊網講義
 

Similar to Barriers to Implement Lean Principles in the Indian Construction Industry

The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...IRJET Journal
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewIRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsAnn Johnson
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner systemAnshi Verma
 
Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...IRJET Journal
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsIRJET Journal
 
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET Journal
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage SchedulingJessica Lopez
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIRJET Journal
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple ProjectsIRJET Journal
 
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET Journal
 

Similar to Barriers to Implement Lean Principles in the Indian Construction Industry (20)

The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A Review
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner system
 
Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage Scheduling
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building Construction
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
 
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
 

More from AM Publications

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...AM Publications
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...AM Publications
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNAM Publications
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...AM Publications
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...AM Publications
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESAM Publications
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS AM Publications
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...AM Publications
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONAM Publications
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...AM Publications
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...AM Publications
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...AM Publications
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...AM Publications
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNAM Publications
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTAM Publications
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTAM Publications
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...AM Publications
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...AM Publications
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY AM Publications
 

More from AM Publications (20)

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

Barriers to Implement Lean Principles in the Indian Construction Industry

  • 1. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -1 Barriers to Implement Lean Principles in the Indian Construction Industry S M Abdul Mannan Hussain1 Apoorva Mercy Nama2 Asra Fatima3 Research Scholar, GITAM University,Hyd B.Tech Final Year Student Research Scholar, GITAM University Assistant Professor ,Dept. of Civil Engg Malla Reddy Engineering College Assistant Professor, Civil Eng. Dept Malla Reddy Engineering College Department of Civil Engineering Muffakham Jah Engineering College Autonomous Campus, Secundrabad. Autonomous Campus, Secundrabad Banjara Hills, Hyderabad Abstract— Lean construction emerged from attempts of transferring and applying the Japanese Lean production philosophy to the construction industry. Lean construction is a confluence of ideas including continuous improvement, flattened organization structure, efficient usage of resources, elimination of waste, and cooperative supply chain. Based on the success of Lean Production in manufacturing and the development of Lean Construction in countries such as Brazil, Denmark and the USA, the application of Lean Construction is currently debated in India. The aim of the study is identification of barriers to successful implementation of lean construction in the Indian construction sector. The data was collected by questionnaire survey of project managers of building construction organizations and senior consultants of architectural and project management firms. The data collected was then analyzed to rank the main barriers and lean principles are suggested to overcome these barriers Keywords—Lean construction; waste; barriers; management; project INTRODUCTION Toyota was the first to bring the Lean principles into limelight. Toyota created a focus on eliminating waste and grew to be the world’s largest automotive industry by adopting seven principles of reducing waste. It believed in preserving value with less work and also improvement in efficiency by improving the workflow. Today Lean manufacturing is practiced by many leading auto makers. Lean principles have slowly made inroads into the construction industry because of its approach to waste elimination and providing value with less effort and time. Construction management is defined as the judicious allocation of resources to finish a project on time, at budget and at desired quality [1]. The biggest cost impact of the construction today is the way the whole process is managed and not the cost of labor and materials. Construction process consists of countless activities that add no value to the product. According to Hines and Rich, these non value adding activities (e.g. waiting time ,double handling, searching for material etc) are pure waste and should be eliminated completely [2]. In a study conducted by Josephson and Saukkorippi, a group of workers were followed around for 22 working days and it was noted that 33.4% of their time was waste [3]. I. NEED FOR STUDY India‘s rapid economic growth over the past few decades has placed a tremendous stress on its limited infrastructure. Construction industry is one of the largest industries which support the economy of a country. Since construction has a major and direct influence on many other industries reducing waste in construction can go a long way in helping the economy of the world. II. LITERATURE REVIEW Existing data and literature on lean principles and its applications in construction industry around the world was collected. This formed the reference for framing the questionnaire for survey. A. Lean construction According to Chick G. et al, waste is more than the physical wastes that are the focus of construction site activity [4]. In fact waste is any activity (or inactivity) that does not add value to the product or service. Waste can be  Value-adding (VA): is the work that the customer is willing to pay for.   Essential non-value adding: these are the tasks that must be completed to enable the value-adding activity to be completed, but do not add value. For example, inspection is not that the customer pays for but is necessary.   Waste: Waste can be of two types. Waste in the work itself (e.g. excessive walking, looking for tools and materials, poor quality). Introduced or enforced‘waste (e.g. waiting for information, materials not supplied), which has prevented work activity from being carried out. 
  • 2. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -2 According to Koskela and Howell, Lean Construction is a way to design to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value [5] According to Dulaimi and Tanamas, managing construction under lean construction is different from typical contemporary practice [6] because it: Has a clear set of objectives for the delivery process   Is aimed at maximizing performance for the customer at the project level  Designs concurrently product and process   Applies production control throughout the life of the project  B. Lean principles Womack and Jones describe Lean thinking as a cycle of five guiding principles where the implementation of the first four lead to achieving the fifth [7]. The ultimate goal is the elimination of waste. The principles are described below:  Specify value  Only what the customer considers as value should be taken into consideration, ―nothing more, and nothing less”. In construction activities can be classified as 3 types:  1. Value Adding (VA) 2. Non-value Adding (NVA) 3. Necessary Waste (NW)  Identify the value stream  This is about identifying all the steps in the value stream in order to determine activities that do not add value and seek for their elimination.   Make value flow without interruption  This is done by minimizing delays, inventories, defects and downtime.   Use pull logistics  All components and information are made and supplied at the necessary time to deliver the product or service to the customer at exactly the time the customer wants it.   Pursue perfection  Lean consists of continuously improving through collaboratively identifying and removing wastes to provide the desired results.  C. Lean Project Delivery System (LPDS) According to Ballard, the Lean Project Delivery System (LPDS) [8] consists of the following phases:  project definition   lean design   lean supply   lean assembly   Use   Essential features of LPDS include:  the project is structured and managed as a value generating process   downstream stakeholders are involved in front end planning and design through cross functional teams   project control has the job of execution as opposed to reliance on after-the-fact variance detection   optimization efforts are focused on making work flow reliable as opposed to improving productivity   pull techniques are used to govern the flow of materials and information through networks of cooperating specialists   feedback loops are incorporated at every level, dedicated to rapid system adjustment; i.e., learning. 
  • 3. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -3 IV. METHODOLOGY The main tool for the collection of data includes questionnaires. The target population for the data collection includes project managers of building construction organizations. Review existing Literature Preparation of Questionnaire Questionnaire survey Analysis of data Conclusions, Recommendations and Suggestions Fig. 1 Proposed methodology for the project The questionnaire was uploaded to Google drive in the form of Google docs so that the survey details could be collected online. The questionnaire was circulated as a link to the architects, civil engineers and project managers of construction firms through emails. The questionnaire was circulated to about 50 companies. The representatives were to fill the questionnaire and submit the data online. The questionnaire when submitted collects the data in an excel sheet real- time in the Google drive database. V. RESULTS AND DISCUSSIONS To identify the barriers for successful implementation of lean construction, a questionnaire was prepared after thorough literature study of barriers faced in other countries. Table 1 lists out the mean score of various barriers to implementation of lean principles in India. The main barriers to applying Lean principles in Construction industry in India have been identified as  Lack of exposure on the need to adopt lean construction   Uncertainty in the supply chain   The tendency to apply traditional management   Culture & human attitudinal issues (Mindset issues)   Lack of commitment from top management   Non-participative management style for workforce 
  • 4. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -4 Fig. 2 Barriers To Implementation Of Lean Principles In India TABLE 1. MEAN SCORE OF BARRIERS TO IMPLEMENTATION OF LEAN PRINCIPLES IN INDIA `BARRIERS TO IMPLEMENTATION OF LEAN PRINCIPLES IN INDIA MEAN SCORE Lack of exposure on the need for lean Construction 3.88 Uncertainty in the supply chain 3.85 The tendency to apply traditional management 3.75 Culture & human attitudinal issues (Mindset issues) 3.70 Lack of commitment from top management 3.55 Non-participative management style for workforce 3.52 Attitude and ability to work in group 3.42 Difficulties in understanding the concept of lean construction 3.42 Lack of client and supplier involvement 3.33 Fragmentation and subcontracting 3.18 Lack of proper training 3.12 Lean construction principles are still a new concept in Indian construction sector. The benefits of lean construction has been recognized by some of the leading construction firms like Larsen and Toubro, Tata Realty & Infrastructure, Shapoorji Pallonji & Co., GMR Group and other such organizations, but it is yet to percolate down to the medium and smaller construction firms. ―Lack of exposure on the benefits of adopting Lean constructionǁ is one of the main barriers identified in the survey. The next important barrier identified in the survey is the Uncertainty in the supply chainǁ. The Lean Construction principles stress on waste minimization. This can be achieved through maintaining the right inventory; there should be no over-ordering or under-ordering of materials. Lean principles also stress on just-in-time supply. This does minimize waste but the risk involved is also high. Therefore the uncertainties in the supply chain can prove to be a big risk and a barrier which can prevent the practitioners from adopting the Lean principles.
  • 5. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -5 The third barrier identified is the ―Human attitudinal issues and cultural mindsetǁ and the tendency to apply the traditional concepts of project management. Human beings are people of habits and there is a general tendency to resist change. Construction industry is a huge and old industry. People are used to and are comfortable with the traditional style of management and so do not want to disturb what is already working. But with the construction sector on the boom and resources depleting at a fast pace, it is high time that the construction industry which has a big role in waste generation and environment pollution, changes and adopts principles which will result in waste minimization and prevention of environment pollution. Lack of commitment from the top management and the Non-participative style of managementǁ is also a barrier in implementing Lean concepts in construction. Indian construction industry is used to working as a bureaucratic style of management, where orders are given by the managers and they are executed by the workers. Managers are resistant to change, as they feel that workers would not work properly if they are included in the decision making process. Previously workers in the construction sector were illiterate and learnt on the job, but with technological advances in construction, at present the workforce consists of engineers and other educated and experienced personnel, who if given responsibility, will be motivated and assume responsibility to provide better and faster results. VI. CONCLUSION AND RECOMMENDATION Most of the respondents who have not heard about lean management principles are from the public sector executing huge projects along with big firms. Though the big firms are using lean principles, people from the government sector should also be educated about the savings due to adopting lean principles, so that they can mandate it on all government sponsored projects. Individual practitioners can also be made aware of lean concepts by workshops, conferences, journals, and business magazines. Lack of exposure on the need to adopt lean construction can be overcome by communicating the benefits of Lean construction through seminars and conferences to the construction practitioners. Also the government should enact policies which appreciate the effort by firms which adopt Lean principles. Recommendation is to take companywide initiative to apply Lean principles and it is not enough to send a few managers or personnel for workshops and seminars. This way of working should eventually percolate to the lower levels. The sub contractors and suppliers should also be made to attend these workshops and take initiatives to implement Lean management principles. Barriers in uncertainty in the supply chain can be overcome by choosing proper suppliers who not quote less price, but deliver good quality and who also have a proven track record. By working closely with suppliers and subcontractors, problematic issues can be minimized by participative style of managing projects and establishing strategic alliances with them. This can be done effectively if one works with the same supplier again and again There is a tendency to apply traditional management principles. People generally do not want to disturb processes which have been going on since a long time, but now with so much construction boom, it is high time the construction industry gives cognizance to the fact that waste produced by industry is high and needs to be minimized. This can be achieved by training all managers and workers in the firm on the benefits of Lean construction. Workshops on the comparisons on Lean and traditional methods of construction, and how Lean is better should be conducted. Suitable metrics should be developed so that practitioners apply Lean management principles. Managers should promote lean construction, as it can bring considerable revenue savings for the firm. Managers should change with times and new technology. This can be done by bringing about a change in organization culture by making the adoption of lean principles mandatory, by enacting new policies for waste minimization, and by partnering with suppliers and subcontractors to ensure that they follow Lean construction methods. ACKNOWLEDGMENT The authors record their appreciation for the time and effort taken by the project managers to complete the questionnaire survey, in spite of their hectic schedule. REFERENCES [1]. Clough, R.H. & Sears, G.A. (1994) Construction Contracting. (6th edition) John Wiley & Sons Inc., New York. [2]. Hines, P., Jones, D. and Rich, N. (1998), Lean Logistics, Pergamon, London. [3]. Josephson, P-E., and Saukkoriipi, L. (2005). Waste in construction projects. Call for a new approach. Report 0507. The centre for Management of the Built Environment, Building Economics and Management, Chalmers University of Technology, Gøteborg. [4]. Chick, G., Corfe, C., Dave, B., Fraser, N., Kiviniemi, A., Koskela, L., [5]. O‘Connor, R., Owen, R., Smith, S., Swain, B. and Patricia
  • 6. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 01, Volume 3 (January 2016) www.ijirae.com __________________________________________________________________________________________________ IJIRAE: Impact Factor Value - ISRAJIF: 1.857 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -6 [6]. Tzortzopoulous (2013), Implementing lean in construction, CIRIA, London, United Kingdom. [7]. Koskela, L., Ballard, G., Howell, G., and Iris D. Tommelein (2002), [8]. ‗The foundations of lean construction‘, Design and construction: building in value, Butterworth Heinemann, Oxford, UK, pp. 211-226. [9]. Dulaimi, M. F., and Tanamas, C. (2001), ‗The principles and application of lean construction in Singapore‘, Proceedings of the 9th Annual [10]. Conference of the International Group for Lean Construction, Singapore. [11]. Womack, J. P. and Jones, D. T. (1996), Lean Thinking: Banish waste and create wealth in your corporation, Simon and Schuster, New York, USA. [12]. Ballard, G. (2000), Lean Project Delivery System, LCI White Paper – 8, Lean Construction Institute.