INVENTORY SYSTEM
Submitted
by
B.SAI PRAKASH
Bachelors of Computer science
SYNOPSIS
 The project Inventory Management System is developed for Anglo
French Textiles, Pondicherry.This project will take care of all
related activities in the departments of Cotton, Weaving and
Spinning
 Cotton is the main raw material involved
 project enables to reduce manpower and provides a clear picture of
the Raw material stock available.
 The project gives a detailed report of the total stock maintained of
cotton and yarn
MODULE DESRIPTION
The project involves two major modules:
 Cotton Inventory
 Yarn Inventory
The Cotton Inventory module involves four sub modules:
Purchase
Add New Item
Issues
Daily Expenses.
View
EXISTING SYSTEM
 In the existing system the details about the Inventory
System like material details, customer details are maintained in
FoxPro
 Consumes more time and effort for updating
 Reports are not in attractive manner
 Efficiency and accuracy cannot be expected
 Quick and timely services are not provided
 Slow processing speed
 Readymade data retrieval is difficult
PROPOSED SYSTEM
 The proposed system can be utilized for easy documenting and
accessing various data carriers such as forms, reports, records etc.
 Automation makes the system to be user-friendly
 Accuracy and security of data will be more comfortable for the
organization.
 The proposed system must be menu oriented and should provide
user-friendly environment by including GUI tools
SYSTEM CONFIGURATION
HARDWARE REQUIREMENTS
 PROCESSOR : Pentium III – 1.2GH
 HARDDISK : 40GB
 RAM : 512 MB
 CD ROM DRIVE : 16X
 KEY BOARD : 104 Keys
SOFTWARE REQUIREMENTS
 Front-End Design : Visual basic 6.0
 Back-End Database : Oracle 9i
 Operating System : Windows XP
CONCLUSION
 The system was mainly designed to reduce the manual work of
updating and tracking and also make it easier for the user.
 It also provides flexible and powerful reports regarding customer
details, issue details and stock details.
 Thus inventory system was implemented successfully
FUTURE ENHANCEMENT
 There is always a room for improvement in any software package,
however good and efficient it may be.
 But the improvement thing is that the system should be flexible
enough for further modifications.
 Considering this important factor, the system is designed in such a
way that provisions can be given for further enhancement without
affecting the system presently developed.
SCREEN SHOTS
Inventory system
Inventory system
Inventory system
Inventory system
Inventory system
Inventory system
Inventory system
Inventory system

Inventory system

  • 1.
  • 2.
    SYNOPSIS  The projectInventory Management System is developed for Anglo French Textiles, Pondicherry.This project will take care of all related activities in the departments of Cotton, Weaving and Spinning  Cotton is the main raw material involved  project enables to reduce manpower and provides a clear picture of the Raw material stock available.  The project gives a detailed report of the total stock maintained of cotton and yarn
  • 3.
    MODULE DESRIPTION The projectinvolves two major modules:  Cotton Inventory  Yarn Inventory The Cotton Inventory module involves four sub modules: Purchase Add New Item Issues Daily Expenses. View
  • 4.
    EXISTING SYSTEM  Inthe existing system the details about the Inventory System like material details, customer details are maintained in FoxPro  Consumes more time and effort for updating  Reports are not in attractive manner  Efficiency and accuracy cannot be expected  Quick and timely services are not provided  Slow processing speed  Readymade data retrieval is difficult
  • 5.
    PROPOSED SYSTEM  Theproposed system can be utilized for easy documenting and accessing various data carriers such as forms, reports, records etc.  Automation makes the system to be user-friendly  Accuracy and security of data will be more comfortable for the organization.  The proposed system must be menu oriented and should provide user-friendly environment by including GUI tools
  • 6.
    SYSTEM CONFIGURATION HARDWARE REQUIREMENTS PROCESSOR : Pentium III – 1.2GH  HARDDISK : 40GB  RAM : 512 MB  CD ROM DRIVE : 16X  KEY BOARD : 104 Keys
  • 7.
    SOFTWARE REQUIREMENTS  Front-EndDesign : Visual basic 6.0  Back-End Database : Oracle 9i  Operating System : Windows XP
  • 8.
    CONCLUSION  The systemwas mainly designed to reduce the manual work of updating and tracking and also make it easier for the user.  It also provides flexible and powerful reports regarding customer details, issue details and stock details.  Thus inventory system was implemented successfully
  • 9.
    FUTURE ENHANCEMENT  Thereis always a room for improvement in any software package, however good and efficient it may be.  But the improvement thing is that the system should be flexible enough for further modifications.  Considering this important factor, the system is designed in such a way that provisions can be given for further enhancement without affecting the system presently developed.
  • 10.