AS RUN ENERGY EFFICIENCY
        ASSESSMENT OF HEAT RECOVERY
        STEAM GENERATORS &TURBINES
        OBJECTIVE:
    •   TO ASSESS THE AS RUN PERFORMANCE
        OF HEAT RECOVERY STEAM GENERATORS
        TOWARDS MAINT.PLG. AND UPKEEP

    AS RUN MEASUREMENTS INVOLVED:

•   G.T. AND S.T . OUTPUT MW
•   Flue Gas TEMP AT HPSH INLET& OUTLET
•   Flue Gas TEMP AT HP ECONOMISER INLET&
    OUTLET
•   Flue Gas TEMP AT LPSH INLET& OUTLET
•   Flue Gas TEMP AT LP ECONOMISER INLET&
    OUTLET
•   Flue Gas TEMP AT LP EVAPORATOR INLET &
    OUTLET
•   Flue Gas TEMP AT COND.PREHEATER INLET&
    OUTLET
•   FEED WATER FLOW AND TEMP.
•   PRESSURE & SUPER HEAT AT LP SUPER
HEAT RECOVERY STEAM GENERATORS
                 (Illustrative as run values)
     S.No. ITEM REFERENCE                         VALUE


.      G.T.OUTPUT MW                             89.62
.      S.T.OUTPUT MW                            104.71
.      H.P.STEAM FLOW TPH                       161.00
.      L.P. STEAM FLOW TPH                       37.62
.      H.P. STEAM PRESSURE BAR                            64.75
.      L.P. STEAM PRESSURE BAR                    5.11
.      H.P.SUPER HEATER TEMP.oC                          517.00
.      H.P.SUPER HEATER STEAM                   827.00
       ENTHALPY kCal/kg
.      H.P. SATURATED STEAM                     663.70
       ENTHALPY kCal/kg
0.     Flue Gas TEMP. HP SUPER HTR.             527.00
       INLET oC
1.     Flue Gas TEMP TO HPSH OUT                435/451
2.     HEAT PICK-UP IN HPSH                     26.291
       (MkCal/hr)
       Item 3*103(Item 8 - Item 9)
HRSG PERFORMANCE FEATURES
              (Illustrative as run values)

     S.No. ITEM REFERENCE                        VALUE


3.     Flue Gas TEMP. AT HP EVAP.                      435/451
       INLET oC
4.     Flue Gas TEMP. AT HP EVAP.                  290/291
       OUTLET oC
5.     ECONOMISER-2 OUT WATER                280.90
       ENTHALPY
6.     HEAT PICK-UP IN H.P.                   61.63
       EVAPORATOR(MkCal/hr)
       Item 3*103(Item 9 - Item 15)
7.     Flue Gas TEMP @ HP ECON.-2            290/291
        INLET oC
8.     FG TEMP @ HP ECON.-2                  225.00
        OUTLET oC
9.     WATER TEMP & ENTHALPY                  106.90
        @ HP ECON.1 INLET
0.     HEAT PICK-UP IN H.P.                   28.01
       ECONOMISERS-1 &2
       (MkCal/hr)
       Item 3*103(Item 15 - Item 19)
HRSG PERFORMANCE FEATURES
          ((Illustrative as run values))

S.No. ITEM REFERENCE                       VALUE

21.    FG TEMP. AT LP SUPER HTR.           225.00
       INLET O C

22.    FG TEMP. AT LP SUPER HTR.           224.00
       OUTLET o C

23.    LP SUPER HTR. TEMP.O C              197.20

24.    ENTHALPY OF LP SUPER                680.00
       HEATER STEAM (kCal/kg)

25.    ENTHALPY OF LP SATURATED            650.50
       HEATER STEAM (kCal/kg)

26.    HEAT PICKUP IN LP SUPER              0.889
       HEATER ( MkCal/hr)
       item-4 * 103 (Item-24-Item-25)
HRSG PERFORMANCE FEATURES
          (Illustrative as run values)
S.No. ITEM REFERENCE                VALUE

27.    Fl.Gas TEMP. AT LP EVAP.
224.00
       INLET oC

28.     Fl.Gas TEMP. AT LP EVAP.        169.00
        OUTLET oC

29.     F.WATER ENTHALPY AT             160.70
        EVAP. INLET kCal/kg

30.     H. PICK-UP IN L.P.              18.727
        EVAP (Mkcal/hr)
        Item 4*103(Item 25 - Item 29)
HRSG PERFORMANCE FEATURES
            (Illustrative as run values)

S.No. ITEM REFERENCE                            VALUE


 31.   FG TEMP. AT LP/HP1                  169/169
       ECONOMISER INLET oC

 32.   FG TEMP. AT LP/HP1                  120/133
       ECONOMISER OUTLET oC

 33.   FG TEMP. AT LP ECONOMISER                 104.60
       INLET oC

 34.   HEAT PICK-UP IN L.P.                          0.889
       ECONOMISER-1
       (Mill.kcal/hr)
       (Item 4*103(Item 29 - Item 33)
HRSG PERFORMANCE FEATURES
           (Illustrative as run values)

  S.No. ITEM REFERENCE                      VALUE


35.   FG TEMP. AT CONDENSATE              120/133
      PRE HEATER INLET oC
36.   FG TEMP. AT CONDENSATE               105.00
      PRE HEATER OUTLET oC
37.   FLOW THROUGH CONDENSATE              190.62
      PRE HEATER TPH (Item3-Item4)
38.   FW TEMP. AT CONDENSATE                        47.00
      PRE HEATER INLET OC
39.   FW TEMP. AT CONDENSATE                        94.10
      PRE HEATER OUTLET OC


40.   HEAT PICKUP IN                       9.355
      CONDENSATE PREHEATER
      (MkCal/hour)

41.   TOTAL HEAT PICKUP BY                 47.00
      HRSG BY WATER & STEAM
      CIRCUIT (MkCal/hr)
BREAK UP OF HEAT PICKUP IN VARIOUS
    HEAT TRANSFER SURFACES

 S.No. ITEM REFERENCE                         VALUE

 1.     PERCENTAGE BREAKUP OF
        HEAT PICKUP IN VARIOUS HEAT
        TRANSFER SURFACES:

 A.     HP SUPER HEATER                          17.89
 B.     HP EVAP.                                 41.95
 C.     HP ECON. 1&2                             19.06
 D.     LP SUPER HEATER                           8.55
 E.     LP EVAP.                                 12.74
 F.     LP ECON.                                   1.42
 G.     CONDENSATE PREHEATER                       6.36

 2.     AMBIENT AIR TEMP. OC                     29.00

 3.     THERMAL EFFY. OF HRSG                      84.43
        (Item10 - Item36/
        (Item10 - Item43)*100
 Comparing the above as run values with design data
 Would serve as an audit and diagnostics tool for
 Improvements.
COMB.CYCLE STEAM TURBINES

  OBJECTIVE
• TO ASSESS THE AS RUN PERFORMANCE
  AND EFFICIENCY OF STEAM TURBINE SYSTEMS
    AS RUN MEASUREMENTS INVOLVED:
•   HRSG HP SUPER HEATED STEAM FLOW TO
    TURBINE IN MT/HR
•   HRSG LP SUPER HEATED STEAM FLOW TO
    TURBINE IN MT/HR
•   HP STEAM PRESSURE IN BAR
•   LP STEAM PRESSURE IN BAR
•   HP SUPER HEATED STEAM TEMPERATURE IN OC
•   LP SUPERHEATED STEAM TEMPERATURE IN OC
•   CONDENSER VACUUM (MILLI BAR)
•   STEAM TURBINE GENERATOR ACTIVE POWER
    IN MW
•   DRYNESS FRACTION OF TURBINE EXHAUST :
    ESTIMATED AS WARRANTED
STEAM TURBINE PERFORMANCE
          ASSESSMENT ILLUSTRATIVE
               CALCULATION
1)   Trial Duration          :   (As run Sample Reference)
2)   HP Steam Flow           : 350.26 TPH




3)   HP Steam Pressure & : 65.44 bar, 518 oC
     Temperature
4)   HP Steam Enthalpy : 3459.50
     kJ/KG
5)   LP Steam Flow in TPH : 79.58 TPH
6)   LP Steam Pressure & : 4.35 bar, 194.2 oC
     Temperature
7)   LP   Steam    Enthalpy : 2842.40
     kJ/KG
8)   Condenser Vacuum m : 93.50
     bar
9)   Condenser    Saturated : 44.5 oC and 186
     Temperature & Enthalpy
10) Exhaust            Steam : 2144.20
    Enthalpy      for    0.82
    Dryness     Fraction in
    kJ/KG
11) Condensate Enthalpy : 186.0
    kJ/KG
12) Heat Input to Steam : [(Total HP Steam Flow in TPH)
    Turbine 1000 * kJ/Hr. * (HP Steam Enthalpy – LP
                          Exhaust Enthalpy) + (Total LP
                          Steam Enthalpy - LP Exhaust
                          Enthalpy)]
                            : [(Item 2)(Item 4 - Item 10) +
                              (Item 5) (Item 7 - Item 10)]
                            : (350.26)(3459.5 - 2144.2) +
                              (79.58)(2842.40 - 2144.2)
                            : 460696.97 + 55562.76
                           : 516259.73
13) Theoretical Heat Input : Heat Input to Turbine in KJ/HR
    to Turbine in MW                  1000 * 3600

                            : Item 12/3600
                            : 143.40
14) Actual      Generator : 112.43
    Output (MW)
15) Turbine + Generator : Generator          Output/Turbine
    Efficiency              Input
                            : Item 14 / Item 13
                            : 78.40%
16) Turbine Heat Input with : [(Total HP Steam Flow in TPH)
    Reference            to   * (Heat Steam Enthalpy -
    condensate Enthalpy       Condensate Enthalpy) + (total
    (1000 * kJ/Hr)            LP Steam Flow in TPH) * (LP
                              Steam Enthalpy - Condensate
                              Enthalpy)]
                               : [(Item 2)(Item 4 - Item 11) +
                                 (Item 5)(Item 7 - Item 11)]
                               : [(350.26)(3459.5 - 186)          +
                                 (79.58)(2842.4 - 186)]
                               : 1146576.10 + 211396.30
                               : 1357972.40
17) Feed Water and Steam : (Turbine Heat Input w.r.t.
    Turbine System Heat    condensate     Enthalpy  in
    Rate in Kcal/kWh       Kcal)/(TG Output in kWh)
                               : (Item 16) / 4.18 * 1/(Item 14)
                           : 2889.56 Kcal/ kWh
18) TG Output as % of 100% : (Item 14) * 100 = (112.43) * 100
    Base Load Rating             115.69           115.69
                           : 97.18%

More Related Content

What's hot

Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
Nitin Patel
 
287649737 90325-presentation-hrsg
287649737 90325-presentation-hrsg287649737 90325-presentation-hrsg
287649737 90325-presentation-hrsg
Srikanth321
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSG
lorenzo Monasca
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
Nathan
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
BhimarajuKanireddy
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
Manohar Tatwawadi
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
Manohar Tatwawadi
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
SHIVAJI CHOUDHURY
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
VEERABHADRA SWAMY
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
Ashish Kumar Jain
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
anujkumarsingh79
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
Manohar Tatwawadi
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
SURAJ KUMAR
 
Condenser in Thermal Power Plant
Condenser in Thermal Power PlantCondenser in Thermal Power Plant
Condenser in Thermal Power Plant
Mihir Patel
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
SHIVAJI CHOUDHURY
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
Nitin Mahalle
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
Jahanzeb Khan
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Manohar Tatwawadi
 
Electrohydraulic governing system
Electrohydraulic governing systemElectrohydraulic governing system
Electrohydraulic governing system
Ashvani Shukla
 

What's hot (20)

Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
287649737 90325-presentation-hrsg
287649737 90325-presentation-hrsg287649737 90325-presentation-hrsg
287649737 90325-presentation-hrsg
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSG
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
Condenser in Thermal Power Plant
Condenser in Thermal Power PlantCondenser in Thermal Power Plant
Condenser in Thermal Power Plant
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Electrohydraulic governing system
Electrohydraulic governing systemElectrohydraulic governing system
Electrohydraulic governing system
 

Similar to Hrsg & turbine as run energy efficiency assessment

Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
Yuri Melliza
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
Yuri Melliza
 
Steam Power Cycle and Basics of Boiler
Steam Power Cycle and Basics of BoilerSteam Power Cycle and Basics of Boiler
Steam Power Cycle and Basics of Boiler
Mulugeta Wotango
 
Design Project Presentation
Design Project PresentationDesign Project Presentation
Design Project Presentation
Robert Cote
 
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
Centro Studi Galileo
 
Power cycles 1
Power cycles 1Power cycles 1
Power cycles 1
Nihal Senanayake
 
Ae32626632
Ae32626632Ae32626632
Ae32626632
IJMER
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
Kongkiert Tankayura
 
Lec 10-11 - Refrigeration cycle
Lec 10-11 - Refrigeration cycle Lec 10-11 - Refrigeration cycle
Lec 10-11 - Refrigeration cycle
Sijal Ahmed
 
thermal project 1
thermal project 1thermal project 1
thermal project 1
James Li
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
EPIS Inc
 
Turbin gas cal.
Turbin gas cal.Turbin gas cal.
Turbin gas cal.
M. Rio Rizky Saputra
 
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Antonio Geraldo de Paula Oliveira
 
project 2
project 2project 2
project 2
shahin tavakoli
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
Vaibhav Paydelwar
 
HdhdPM3125_Lectures_16to17_Evaporation.ppt
HdhdPM3125_Lectures_16to17_Evaporation.pptHdhdPM3125_Lectures_16to17_Evaporation.ppt
HdhdPM3125_Lectures_16to17_Evaporation.ppt
JENILPATEL919230
 
Fossil Fuel Steam Generator (Thermal Power Plant)
Fossil Fuel Steam Generator (Thermal Power Plant)Fossil Fuel Steam Generator (Thermal Power Plant)
Fossil Fuel Steam Generator (Thermal Power Plant)
Hashim Hasnain Hadi
 
Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2
Udhayakumar Venkataraman
 
Dynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.pptDynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.ppt
Murty Moguluru
 
Bidirectional syngas generator TSW work on advanced large scale non steady st...
Bidirectional syngas generator TSW work on advanced large scale non steady st...Bidirectional syngas generator TSW work on advanced large scale non steady st...
Bidirectional syngas generator TSW work on advanced large scale non steady st...
Steve Wittrig
 

Similar to Hrsg & turbine as run energy efficiency assessment (20)

Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
 
Steam Power Cycle and Basics of Boiler
Steam Power Cycle and Basics of BoilerSteam Power Cycle and Basics of Boiler
Steam Power Cycle and Basics of Boiler
 
Design Project Presentation
Design Project PresentationDesign Project Presentation
Design Project Presentation
 
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
Haitao Hu - NORWEGIAN UNIVERSITY OF SCIENCE AND TECHNOLOGY - POMPE DI CALORE ...
 
Power cycles 1
Power cycles 1Power cycles 1
Power cycles 1
 
Ae32626632
Ae32626632Ae32626632
Ae32626632
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Lec 10-11 - Refrigeration cycle
Lec 10-11 - Refrigeration cycle Lec 10-11 - Refrigeration cycle
Lec 10-11 - Refrigeration cycle
 
thermal project 1
thermal project 1thermal project 1
thermal project 1
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
 
Turbin gas cal.
Turbin gas cal.Turbin gas cal.
Turbin gas cal.
 
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...
 
project 2
project 2project 2
project 2
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
HdhdPM3125_Lectures_16to17_Evaporation.ppt
HdhdPM3125_Lectures_16to17_Evaporation.pptHdhdPM3125_Lectures_16to17_Evaporation.ppt
HdhdPM3125_Lectures_16to17_Evaporation.ppt
 
Fossil Fuel Steam Generator (Thermal Power Plant)
Fossil Fuel Steam Generator (Thermal Power Plant)Fossil Fuel Steam Generator (Thermal Power Plant)
Fossil Fuel Steam Generator (Thermal Power Plant)
 
Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2
 
Dynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.pptDynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.ppt
 
Bidirectional syngas generator TSW work on advanced large scale non steady st...
Bidirectional syngas generator TSW work on advanced large scale non steady st...Bidirectional syngas generator TSW work on advanced large scale non steady st...
Bidirectional syngas generator TSW work on advanced large scale non steady st...
 

More from D.Pawan Kumar

Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.
D.Pawan Kumar
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approach
D.Pawan Kumar
 
Water conservation opportunities.
Water conservation opportunities.Water conservation opportunities.
Water conservation opportunities.
D.Pawan Kumar
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
D.Pawan Kumar
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
D.Pawan Kumar
 
Energy efficient technology procurement
Energy efficient technology  procurementEnergy efficient technology  procurement
Energy efficient technology procurement
D.Pawan Kumar
 
Boiler ea case study 16 jan 2012 varanasi
Boiler ea case study  16 jan 2012 varanasiBoiler ea case study  16 jan 2012 varanasi
Boiler ea case study 16 jan 2012 varanasi
D.Pawan Kumar
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. system
D.Pawan Kumar
 
Ee opportunities
Ee opportunities Ee opportunities
Ee opportunities
D.Pawan Kumar
 
Training manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEsTraining manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEs
D.Pawan Kumar
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiency
D.Pawan Kumar
 
As run energy efficiency of cooling towers
As run energy efficiency of cooling towersAs run energy efficiency of cooling towers
As run energy efficiency of cooling towers
D.Pawan Kumar
 
Focus areas in economic operation of DG sets
Focus areas in economic operation of DG setsFocus areas in economic operation of DG sets
Focus areas in economic operation of DG sets
D.Pawan Kumar
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy audit
D.Pawan Kumar
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...
D.Pawan Kumar
 
As run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiencyAs run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiency
D.Pawan Kumar
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans ppt
D.Pawan Kumar
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
D.Pawan Kumar
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration system
D.Pawan Kumar
 

More from D.Pawan Kumar (19)

Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approach
 
Water conservation opportunities.
Water conservation opportunities.Water conservation opportunities.
Water conservation opportunities.
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
 
Energy efficient technology procurement
Energy efficient technology  procurementEnergy efficient technology  procurement
Energy efficient technology procurement
 
Boiler ea case study 16 jan 2012 varanasi
Boiler ea case study  16 jan 2012 varanasiBoiler ea case study  16 jan 2012 varanasi
Boiler ea case study 16 jan 2012 varanasi
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. system
 
Ee opportunities
Ee opportunities Ee opportunities
Ee opportunities
 
Training manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEsTraining manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEs
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiency
 
As run energy efficiency of cooling towers
As run energy efficiency of cooling towersAs run energy efficiency of cooling towers
As run energy efficiency of cooling towers
 
Focus areas in economic operation of DG sets
Focus areas in economic operation of DG setsFocus areas in economic operation of DG sets
Focus areas in economic operation of DG sets
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy audit
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...
 
As run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiencyAs run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiency
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans ppt
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration system
 

Recently uploaded

Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
sssourabhsharma
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 

Recently uploaded (20)

Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 

Hrsg & turbine as run energy efficiency assessment

  • 1. AS RUN ENERGY EFFICIENCY ASSESSMENT OF HEAT RECOVERY STEAM GENERATORS &TURBINES OBJECTIVE: • TO ASSESS THE AS RUN PERFORMANCE OF HEAT RECOVERY STEAM GENERATORS TOWARDS MAINT.PLG. AND UPKEEP AS RUN MEASUREMENTS INVOLVED: • G.T. AND S.T . OUTPUT MW • Flue Gas TEMP AT HPSH INLET& OUTLET • Flue Gas TEMP AT HP ECONOMISER INLET& OUTLET • Flue Gas TEMP AT LPSH INLET& OUTLET • Flue Gas TEMP AT LP ECONOMISER INLET& OUTLET • Flue Gas TEMP AT LP EVAPORATOR INLET & OUTLET • Flue Gas TEMP AT COND.PREHEATER INLET& OUTLET • FEED WATER FLOW AND TEMP. • PRESSURE & SUPER HEAT AT LP SUPER
  • 2. HEAT RECOVERY STEAM GENERATORS (Illustrative as run values) S.No. ITEM REFERENCE VALUE . G.T.OUTPUT MW 89.62 . S.T.OUTPUT MW 104.71 . H.P.STEAM FLOW TPH 161.00 . L.P. STEAM FLOW TPH 37.62 . H.P. STEAM PRESSURE BAR 64.75 . L.P. STEAM PRESSURE BAR 5.11 . H.P.SUPER HEATER TEMP.oC 517.00 . H.P.SUPER HEATER STEAM 827.00 ENTHALPY kCal/kg . H.P. SATURATED STEAM 663.70 ENTHALPY kCal/kg 0. Flue Gas TEMP. HP SUPER HTR. 527.00 INLET oC 1. Flue Gas TEMP TO HPSH OUT 435/451 2. HEAT PICK-UP IN HPSH 26.291 (MkCal/hr) Item 3*103(Item 8 - Item 9)
  • 3. HRSG PERFORMANCE FEATURES (Illustrative as run values) S.No. ITEM REFERENCE VALUE 3. Flue Gas TEMP. AT HP EVAP. 435/451 INLET oC 4. Flue Gas TEMP. AT HP EVAP. 290/291 OUTLET oC 5. ECONOMISER-2 OUT WATER 280.90 ENTHALPY 6. HEAT PICK-UP IN H.P. 61.63 EVAPORATOR(MkCal/hr) Item 3*103(Item 9 - Item 15) 7. Flue Gas TEMP @ HP ECON.-2 290/291 INLET oC 8. FG TEMP @ HP ECON.-2 225.00 OUTLET oC 9. WATER TEMP & ENTHALPY 106.90 @ HP ECON.1 INLET 0. HEAT PICK-UP IN H.P. 28.01 ECONOMISERS-1 &2 (MkCal/hr) Item 3*103(Item 15 - Item 19)
  • 4. HRSG PERFORMANCE FEATURES ((Illustrative as run values)) S.No. ITEM REFERENCE VALUE 21. FG TEMP. AT LP SUPER HTR. 225.00 INLET O C 22. FG TEMP. AT LP SUPER HTR. 224.00 OUTLET o C 23. LP SUPER HTR. TEMP.O C 197.20 24. ENTHALPY OF LP SUPER 680.00 HEATER STEAM (kCal/kg) 25. ENTHALPY OF LP SATURATED 650.50 HEATER STEAM (kCal/kg) 26. HEAT PICKUP IN LP SUPER 0.889 HEATER ( MkCal/hr) item-4 * 103 (Item-24-Item-25)
  • 5. HRSG PERFORMANCE FEATURES (Illustrative as run values) S.No. ITEM REFERENCE VALUE 27. Fl.Gas TEMP. AT LP EVAP. 224.00 INLET oC 28. Fl.Gas TEMP. AT LP EVAP. 169.00 OUTLET oC 29. F.WATER ENTHALPY AT 160.70 EVAP. INLET kCal/kg 30. H. PICK-UP IN L.P. 18.727 EVAP (Mkcal/hr) Item 4*103(Item 25 - Item 29)
  • 6. HRSG PERFORMANCE FEATURES (Illustrative as run values) S.No. ITEM REFERENCE VALUE 31. FG TEMP. AT LP/HP1 169/169 ECONOMISER INLET oC 32. FG TEMP. AT LP/HP1 120/133 ECONOMISER OUTLET oC 33. FG TEMP. AT LP ECONOMISER 104.60 INLET oC 34. HEAT PICK-UP IN L.P. 0.889 ECONOMISER-1 (Mill.kcal/hr) (Item 4*103(Item 29 - Item 33)
  • 7. HRSG PERFORMANCE FEATURES (Illustrative as run values) S.No. ITEM REFERENCE VALUE 35. FG TEMP. AT CONDENSATE 120/133 PRE HEATER INLET oC 36. FG TEMP. AT CONDENSATE 105.00 PRE HEATER OUTLET oC 37. FLOW THROUGH CONDENSATE 190.62 PRE HEATER TPH (Item3-Item4) 38. FW TEMP. AT CONDENSATE 47.00 PRE HEATER INLET OC 39. FW TEMP. AT CONDENSATE 94.10 PRE HEATER OUTLET OC 40. HEAT PICKUP IN 9.355 CONDENSATE PREHEATER (MkCal/hour) 41. TOTAL HEAT PICKUP BY 47.00 HRSG BY WATER & STEAM CIRCUIT (MkCal/hr)
  • 8. BREAK UP OF HEAT PICKUP IN VARIOUS HEAT TRANSFER SURFACES S.No. ITEM REFERENCE VALUE 1. PERCENTAGE BREAKUP OF HEAT PICKUP IN VARIOUS HEAT TRANSFER SURFACES: A. HP SUPER HEATER 17.89 B. HP EVAP. 41.95 C. HP ECON. 1&2 19.06 D. LP SUPER HEATER 8.55 E. LP EVAP. 12.74 F. LP ECON. 1.42 G. CONDENSATE PREHEATER 6.36 2. AMBIENT AIR TEMP. OC 29.00 3. THERMAL EFFY. OF HRSG 84.43 (Item10 - Item36/ (Item10 - Item43)*100 Comparing the above as run values with design data Would serve as an audit and diagnostics tool for Improvements.
  • 9. COMB.CYCLE STEAM TURBINES OBJECTIVE • TO ASSESS THE AS RUN PERFORMANCE AND EFFICIENCY OF STEAM TURBINE SYSTEMS AS RUN MEASUREMENTS INVOLVED: • HRSG HP SUPER HEATED STEAM FLOW TO TURBINE IN MT/HR • HRSG LP SUPER HEATED STEAM FLOW TO TURBINE IN MT/HR • HP STEAM PRESSURE IN BAR • LP STEAM PRESSURE IN BAR • HP SUPER HEATED STEAM TEMPERATURE IN OC • LP SUPERHEATED STEAM TEMPERATURE IN OC • CONDENSER VACUUM (MILLI BAR) • STEAM TURBINE GENERATOR ACTIVE POWER IN MW • DRYNESS FRACTION OF TURBINE EXHAUST : ESTIMATED AS WARRANTED
  • 10. STEAM TURBINE PERFORMANCE ASSESSMENT ILLUSTRATIVE CALCULATION 1) Trial Duration : (As run Sample Reference) 2) HP Steam Flow : 350.26 TPH 3) HP Steam Pressure & : 65.44 bar, 518 oC Temperature 4) HP Steam Enthalpy : 3459.50 kJ/KG 5) LP Steam Flow in TPH : 79.58 TPH 6) LP Steam Pressure & : 4.35 bar, 194.2 oC Temperature 7) LP Steam Enthalpy : 2842.40 kJ/KG 8) Condenser Vacuum m : 93.50 bar 9) Condenser Saturated : 44.5 oC and 186 Temperature & Enthalpy 10) Exhaust Steam : 2144.20 Enthalpy for 0.82 Dryness Fraction in kJ/KG
  • 11. 11) Condensate Enthalpy : 186.0 kJ/KG 12) Heat Input to Steam : [(Total HP Steam Flow in TPH) Turbine 1000 * kJ/Hr. * (HP Steam Enthalpy – LP Exhaust Enthalpy) + (Total LP Steam Enthalpy - LP Exhaust Enthalpy)] : [(Item 2)(Item 4 - Item 10) + (Item 5) (Item 7 - Item 10)] : (350.26)(3459.5 - 2144.2) + (79.58)(2842.40 - 2144.2) : 460696.97 + 55562.76 : 516259.73 13) Theoretical Heat Input : Heat Input to Turbine in KJ/HR to Turbine in MW 1000 * 3600 : Item 12/3600 : 143.40 14) Actual Generator : 112.43 Output (MW) 15) Turbine + Generator : Generator Output/Turbine Efficiency Input : Item 14 / Item 13 : 78.40%
  • 12. 16) Turbine Heat Input with : [(Total HP Steam Flow in TPH) Reference to * (Heat Steam Enthalpy - condensate Enthalpy Condensate Enthalpy) + (total (1000 * kJ/Hr) LP Steam Flow in TPH) * (LP Steam Enthalpy - Condensate Enthalpy)] : [(Item 2)(Item 4 - Item 11) + (Item 5)(Item 7 - Item 11)] : [(350.26)(3459.5 - 186) + (79.58)(2842.4 - 186)] : 1146576.10 + 211396.30 : 1357972.40 17) Feed Water and Steam : (Turbine Heat Input w.r.t. Turbine System Heat condensate Enthalpy in Rate in Kcal/kWh Kcal)/(TG Output in kWh) : (Item 16) / 4.18 * 1/(Item 14) : 2889.56 Kcal/ kWh 18) TG Output as % of 100% : (Item 14) * 100 = (112.43) * 100 Base Load Rating 115.69 115.69 : 97.18%