Generation of Mobile Networks
Presented by
Rajat Soni
140291
Introduction
• Mobile communication is an important aspect in
communication technology and mobile phone has become the
most common tool of communication over the recent years.
• Several innovative improvements regarding mobile
communication technologies have been made by developing
various multiple-access schemes used for wireless
communication (such as TDMA, FDMA, CDMA, WCDMA)
etc..
• The big challenge is to select the right technology for the
applications and systematically identify the factors that
influence the overall performance
2
 The first generation was introduced in the early 1980s. 1G wireless
was analog cell phones with the speeds up to 2.4kbps.
 The second generation fielded in the late 1980s.It was planned
mainly for voice transmission with digital signal speeds up to
64kbps.
 The third generation was developed in the late 1990s .3G provided
the transmission speeds from 125kbps to 2Mbps
 The fourth generation raised in 2002. The speeds of 4G can
theoretically be promised up to 1Gbps.
 The beyond will be 5G with incredible transmission speed with no
3
Time-line from 1G to 4G and beyond
4
Evolution of mobile Networks
5
1st Generation
• Analog cell phones.
• A voice call gets modulated to a higher frequency of about
150MHz
• speed up to 2.4kbps
• Allows users to make voice calls only
Access method:
FDMA (Frequency Division Multiple Access)
Providers
NMT (Nordic Mobile Telephone)
AMPS (Advanced Mobile Phone System)
• Poor voice quality
• Poor battery life
• Large phone size
• No security
• Frequent call drops
• Limited capacity and poor handoff reliability.
6
7
2nd Generation
• 2G is the digital system that we are using even today
• the speeds up to 64kbps
• 2.5G, with packet switching supports data transmission over GPRS
• 2G system uses TDMA and few uses CDMA
8
Digital cell phones
Speed: 10kbits/sec
Time to download a 3min MP3 song:
31-41 min
Different Services :
digital voice calling
short message service (SMS)
Standards:
GSM
CDMA
9
• Digital systems
• Technology to increase capacity
• Speech compression; digital signal processing
• “Intelligent Network” concepts
• Improve fraud prevention
• 2G Data Transmission Capacity
With GPRS transfer speed of max. 50 kbit/s .
With EDGE transfer speed of max. 1 Mbit/s
10
Benefits:
• consume less battery power
• improves the voice clarity
• reduces noise in the line
• secrecy and safety to the data and voice calls
 circuit switched
 inefficiency in usage of bandwidth
 Reduce range of sound.
 Weaker digital signal.
11
3rd Generation
2G networks were built mainly for voice data and slow
transmission. Due to rapid changes in user expectation, they do not
meet today's wireless needs.
3G networks provide the ability to transfer voice data and non-voice
data over the same network simultaneously.
Developed in the late 1990s until present day
Japan is the first country having introduced 3G nationally, and in
Japan the transition to 3G is being largely completed during
2005/2006.
Applications :
Internet, e-mail, fax, e-commerce, music,
video clips, and videoconferencing
12
Features includes:
- Phone calls
- Global roaming
- Send/receive large email messages
- High-speed Web
- Videoconferencing
- TV streaming
-GPS
Speed: 144kb/sec-3mb/sec
Time to download a 3min MP3 song:
11sec-1.5min
13
Advantages
 More bandwidth , security & reliability.
 Inter-portability between services providers.
 High data rates.
 Rich multimedia services.
 Always online devices.
Disadvantages
 Expensive input fees for the 3G service licenses.
 Numerous differences in the licensing terms.
 It is a challenge to build the necessary infrastructure for 3G
 high at cost
14
3.5G (HSPA)
HSPA is an amalgamation of two mobile telephony protocols,
High Speed Downlink Packet Access (HSDPA) and High Speed
Uplink Packet Access (HSUPA), that extends and improves the
performance of existing WCDMA protocols
3.5G introduces many new features that will enhance the UMTS
technology in future. These include:
- Adaptive Modulation and Coding
- Fast Scheduling
- Backward compatibility with 3G
- Enhanced Air Interface
15
4th Generation
• 4G development focuses around achieving ultra-broadband speeds,
competing with and in some cases outstripping the speeds provided by
your home internet connection.
• 4G average speeds are targeted to be in the 100Mbps to 1Gbps range
• LTE stands for Long Term Evolution
• Promises data transfer rates of 100 Mbps
• Based on UMTS 3G technology
• Optimized for All-IP traffic
16
Characteristics
Faster and more reliable – 100 Mbps
 Lower cost than previous generations.
 Multi-standard wireless system
 Coverage of wide area.
 Wide Variety of services capability.
 IPv6 core
 Potentially IEEE standards 802.11
 Only packet switching used unlike previous generations.
17
• Uses OFDM for downlink
• Uses SC-FDMA for uplink
• Uses MIMO
• Reduced power consumption
• Higher RF power amplifier efficiency
Advantages
• High usability
• Low transmission cost.
• Higher bandwidth
• High network security.
Disadvantages
• very expensive implementation.
18
• One of the basic term used to describe 4G is MAGIC.
MAGIC:
Mobile Multimedia
Anytime Anywhere
Global Mobility Support
Integrated Wireless Solution
Customized Personal Services
• Also known as Mobile Broadband Everywhere.
19
5th Generation
• 5G is a is a technology used in research papers and projects to
denote the next major phase of mobile telecommunication
standards.It is a Real wireless world that is a complete WWWW:
World Wide Wireless Web. 5G technology has changed the means
to use cell phones within very high bandwidth. A user would
never have experienced such a high value technology.
• 5G technology is going to be a new mobile revolution in mobile
market.5G technology has extraordinary data capabilities and has
ability to tie together unrestricted call volumes and infinite data
broadcast within latest mobile operating system.
20
 Real wireless world with no more limitations with access &
zone issues
 Wearable devices
 IPv6, where a visiting care of mobile IP address is assigned
according to location & connected network
 One unified global standard
 Smart radio
 The user can simultaneously be connected with several
wireless access technology
 Multiple concurrent data transfer path
21
Comparison chart
22
23
We have seen how the technology has progressed through the
years.
4G mobile technologies will stimulate subscriber interest in
broadband wireless applications because of its ability and
flexibility towards the world of wireless mobile
communications.
4G just right started from 2002 and there are many standards
and technologies, which are still in developing process.
4G is the evolution based on 3G’s limitation and it will fulfil
the idea of WWWW(5G), World Wide Wireless Web, offering
more services and smooth global roaming with inexpensive
cost
Since 3G mobile is still in the market, 4G reduces the market
Conclusion
24
References
Generations of mobile wireless technology: A survey
By mudit ratana bhalla & anand vardhan bhalla
International journal of computer applications (0975 – 8887)
Volume 5– no.4, august 2010
Evolution and development towards 4th generation (4g) mobile
communication systems
By M. Junaid arshad, amjad farooq, abad shah Journal of american
science
25
Thank you

Generation of mobile networks

  • 1.
    Generation of MobileNetworks Presented by Rajat Soni 140291
  • 2.
    Introduction • Mobile communicationis an important aspect in communication technology and mobile phone has become the most common tool of communication over the recent years. • Several innovative improvements regarding mobile communication technologies have been made by developing various multiple-access schemes used for wireless communication (such as TDMA, FDMA, CDMA, WCDMA) etc.. • The big challenge is to select the right technology for the applications and systematically identify the factors that influence the overall performance 2
  • 3.
     The firstgeneration was introduced in the early 1980s. 1G wireless was analog cell phones with the speeds up to 2.4kbps.  The second generation fielded in the late 1980s.It was planned mainly for voice transmission with digital signal speeds up to 64kbps.  The third generation was developed in the late 1990s .3G provided the transmission speeds from 125kbps to 2Mbps  The fourth generation raised in 2002. The speeds of 4G can theoretically be promised up to 1Gbps.  The beyond will be 5G with incredible transmission speed with no 3 Time-line from 1G to 4G and beyond
  • 4.
  • 5.
    5 1st Generation • Analogcell phones. • A voice call gets modulated to a higher frequency of about 150MHz • speed up to 2.4kbps • Allows users to make voice calls only Access method: FDMA (Frequency Division Multiple Access) Providers NMT (Nordic Mobile Telephone) AMPS (Advanced Mobile Phone System)
  • 6.
    • Poor voicequality • Poor battery life • Large phone size • No security • Frequent call drops • Limited capacity and poor handoff reliability. 6
  • 7.
    7 2nd Generation • 2Gis the digital system that we are using even today • the speeds up to 64kbps • 2.5G, with packet switching supports data transmission over GPRS • 2G system uses TDMA and few uses CDMA
  • 8.
    8 Digital cell phones Speed:10kbits/sec Time to download a 3min MP3 song: 31-41 min Different Services : digital voice calling short message service (SMS) Standards: GSM CDMA
  • 9.
    9 • Digital systems •Technology to increase capacity • Speech compression; digital signal processing • “Intelligent Network” concepts • Improve fraud prevention • 2G Data Transmission Capacity With GPRS transfer speed of max. 50 kbit/s . With EDGE transfer speed of max. 1 Mbit/s
  • 10.
    10 Benefits: • consume lessbattery power • improves the voice clarity • reduces noise in the line • secrecy and safety to the data and voice calls  circuit switched  inefficiency in usage of bandwidth  Reduce range of sound.  Weaker digital signal.
  • 11.
    11 3rd Generation 2G networkswere built mainly for voice data and slow transmission. Due to rapid changes in user expectation, they do not meet today's wireless needs. 3G networks provide the ability to transfer voice data and non-voice data over the same network simultaneously. Developed in the late 1990s until present day Japan is the first country having introduced 3G nationally, and in Japan the transition to 3G is being largely completed during 2005/2006. Applications : Internet, e-mail, fax, e-commerce, music, video clips, and videoconferencing
  • 12.
    12 Features includes: - Phonecalls - Global roaming - Send/receive large email messages - High-speed Web - Videoconferencing - TV streaming -GPS Speed: 144kb/sec-3mb/sec Time to download a 3min MP3 song: 11sec-1.5min
  • 13.
    13 Advantages  More bandwidth, security & reliability.  Inter-portability between services providers.  High data rates.  Rich multimedia services.  Always online devices. Disadvantages  Expensive input fees for the 3G service licenses.  Numerous differences in the licensing terms.  It is a challenge to build the necessary infrastructure for 3G  high at cost
  • 14.
    14 3.5G (HSPA) HSPA isan amalgamation of two mobile telephony protocols, High Speed Downlink Packet Access (HSDPA) and High Speed Uplink Packet Access (HSUPA), that extends and improves the performance of existing WCDMA protocols 3.5G introduces many new features that will enhance the UMTS technology in future. These include: - Adaptive Modulation and Coding - Fast Scheduling - Backward compatibility with 3G - Enhanced Air Interface
  • 15.
    15 4th Generation • 4Gdevelopment focuses around achieving ultra-broadband speeds, competing with and in some cases outstripping the speeds provided by your home internet connection. • 4G average speeds are targeted to be in the 100Mbps to 1Gbps range • LTE stands for Long Term Evolution • Promises data transfer rates of 100 Mbps • Based on UMTS 3G technology • Optimized for All-IP traffic
  • 16.
    16 Characteristics Faster and morereliable – 100 Mbps  Lower cost than previous generations.  Multi-standard wireless system  Coverage of wide area.  Wide Variety of services capability.  IPv6 core  Potentially IEEE standards 802.11  Only packet switching used unlike previous generations.
  • 17.
    17 • Uses OFDMfor downlink • Uses SC-FDMA for uplink • Uses MIMO • Reduced power consumption • Higher RF power amplifier efficiency Advantages • High usability • Low transmission cost. • Higher bandwidth • High network security. Disadvantages • very expensive implementation.
  • 18.
    18 • One ofthe basic term used to describe 4G is MAGIC. MAGIC: Mobile Multimedia Anytime Anywhere Global Mobility Support Integrated Wireless Solution Customized Personal Services • Also known as Mobile Broadband Everywhere.
  • 19.
    19 5th Generation • 5Gis a is a technology used in research papers and projects to denote the next major phase of mobile telecommunication standards.It is a Real wireless world that is a complete WWWW: World Wide Wireless Web. 5G technology has changed the means to use cell phones within very high bandwidth. A user would never have experienced such a high value technology. • 5G technology is going to be a new mobile revolution in mobile market.5G technology has extraordinary data capabilities and has ability to tie together unrestricted call volumes and infinite data broadcast within latest mobile operating system.
  • 20.
    20  Real wirelessworld with no more limitations with access & zone issues  Wearable devices  IPv6, where a visiting care of mobile IP address is assigned according to location & connected network  One unified global standard  Smart radio  The user can simultaneously be connected with several wireless access technology  Multiple concurrent data transfer path
  • 21.
  • 22.
  • 23.
    23 We have seenhow the technology has progressed through the years. 4G mobile technologies will stimulate subscriber interest in broadband wireless applications because of its ability and flexibility towards the world of wireless mobile communications. 4G just right started from 2002 and there are many standards and technologies, which are still in developing process. 4G is the evolution based on 3G’s limitation and it will fulfil the idea of WWWW(5G), World Wide Wireless Web, offering more services and smooth global roaming with inexpensive cost Since 3G mobile is still in the market, 4G reduces the market Conclusion
  • 24.
    24 References Generations of mobilewireless technology: A survey By mudit ratana bhalla & anand vardhan bhalla International journal of computer applications (0975 – 8887) Volume 5– no.4, august 2010 Evolution and development towards 4th generation (4g) mobile communication systems By M. Junaid arshad, amjad farooq, abad shah Journal of american science
  • 25.

Editor's Notes

  • #6 Advanced Mobile Phone Service (AMPS) Advance mobile phone system (AMPS) was used in the North America and Australia 800 MHz frequency range — two 20 MHz bands Nordic Mobile Telephony (NMT) Sweden, Norway, Demark & Finland Launched 1981; now largely retired 450 MHz; later at 900 MHz (NMT900)
  • #8 the voice itself during a call is encoded to digital signals in 2G
  • #10 Digital systems Technology to increase capacity Speech compression; digital signal processing “Intelligent Network” concepts Improve fraud prevention Add new services There are a wide diversity of 2G systems IS(Interim Standard)-54/ IS-136 North American TDMA; PDC (Japan) iDEN (Integrated Digital Enhanced Network ) DECT(Digital European Cordless Telephony) and PHS(Personal Handiphone Service) IS-95 North American CDMA (cdmaOne) GSM; GPRS With GPRS (General Packet Radio Service), you have a theoretical transfer speed of max. 50 kbit/s (40 kbit/s in practice). With EDGE (Enhanced Data Rates for GSM Evolution), you have a theoretical transfer speed of max. 1 Mbit/s (500 kbit/s in practice). An interim stage that is taken between 2G and 3G that is 2.5G Services include: speed: 64-144 kb/sec Time to download a 3 min MP3 song: 6-9 min Global roaming Superior voice quality and video conference Data always, add–on services (e-mail, personal organizer, etc.) Information for web surfing, music, news, corporate intranet, transportation service etc. Purchasing – on-line shopping / banking, ticketing, gambling, games, etc.
  • #11 The GSM is a circuit switched , connection oriented technology, where the end systems are dedicated for the entire call session.This causes inefficiency in usage of bandwidth and resources.The GSM enabled systems do not support high data rates. They are unable to handle complex data such as video. Reduce range of sound. Weaker digital signal.
  • #16 roughly 10 to 100 times (dependent on location) faster than 3G networks. At that rate, that 4-minute MP3 download would take you mere seconds.
  • #18 Uses Orthogonal Frequency Division Multiplexing (OFDM) for downlink Uses Single Carrier Frequency Division Multiple Access (SC-FDMA) for uplink Uses Multi-input Multi-output(MIMO) for enhanced throughput Reduced power consumption Higher RF power amplifier efficiency (less battery power used by handsets) Advantages of 4g High usability: anytime, anywhere and with any technology. Support for multimedia services at low transmission cost. Higher bandwidth , high network security. Disadvantages of 4g The equipment required to implement a next generation network is still very expensive. Carriers and providers have to plan carefully to make sure that expenses are kept realistic.