This document proposes a cross-layered model for congestion prediction and management in mobile ad hoc networks that aims to efficiently distribute network resources. The model incorporates two algorithms: Group-level Congestion Prediction (GCP) that predicts congestion levels at relay nodes with high accuracy, and Group-level Egress Permanence (GEP) that works sequentially with GCP for congestion detection and management. The document discusses related work on multicast routing protocols and energy-efficient multicasting. It then describes the proposed congestion control mechanism under constrained energy utilization and outlines the proposed model with relevant notations before focusing on the GCP and GEP algorithms.