This document provides an overview of a course on Estimation, Costing and Valuation Engineering. The course covers topics such as quantity estimation for buildings, rate analysis and cost estimation, specifications and tenders, contracts, and valuation. The objectives are for students to learn how to prepare estimates, call for tenders, and execute construction works. Key outcomes include estimating quantities, rate analysis, understanding contract types and specifications, and evaluating property valuation. The course is divided into 5 units covering these various topics and their applications to estimating costs for structures like buildings, roads, and culverts.
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Standard Data – Observed Data – Schedule of rates – Market rates – Standard Data for Man Hours and Machineries for common civil works – Rate Analysis for all Building works, canals, and Roads– Cost Estimates
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Standard Data – Observed Data – Schedule of rates – Market rates – Standard Data for Man Hours and Machineries for common civil works – Rate Analysis for all Building works, canals, and Roads– Cost Estimates
Repair, rehabilitation and retrofitting of structures - RRSShanmugasundaram N
Strengthening of Structural elements, Repair of structures distressed due to corrosion, fire, Leakage, earthquake – DEMOLITION TECHNIQUES - Engineered demolition methods - Case studies.
Properties of Fresh and Hardened ConcreteRishabh Lala
Properties of Fresh (Workability)
Hardened Concrete (Workability,Permiablitiy,Durablility)
Thermal properties
Micro-cracking of concrete
Mix Design
Rheology
Causes of Damage of Concrete
The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour.
The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required.
Repair, rehabilitation and retrofitting of structures - RRSShanmugasundaram N
Strengthening of Structural elements, Repair of structures distressed due to corrosion, fire, Leakage, earthquake – DEMOLITION TECHNIQUES - Engineered demolition methods - Case studies.
Properties of Fresh and Hardened ConcreteRishabh Lala
Properties of Fresh (Workability)
Hardened Concrete (Workability,Permiablitiy,Durablility)
Thermal properties
Micro-cracking of concrete
Mix Design
Rheology
Causes of Damage of Concrete
The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour.
The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required.
Strength and durability of concrete - Repair and rehabilitation of structures...Shanmugasundaram N
Quality assurance for concrete – Strength, Durability and Thermal properties, of concrete - Cracks, different types, causes – Effects due to climate, temperature, Sustained elevated temperature, Corrosion - Effects of cover thickness.
Maintenance and repair strategies - Repair and rehabilitation of structures(RRS)Shanmugasundaram N
Maintenance, Repair and Rehabilitation, Facets of Maintenance, importance of Maintenance, Various aspects of Inspection, Assessment procedure for evaluating a damaged structure, causes of deterioration.
Valuation - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Definitions – Various types of valuations – Valuation methods - Necessity – Capitalised value – Depreciation – Escalation – Valuation of land – Buildings – Calculation of Standard rent – Mortgage – Lease
Contracts - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Contract – Types of contracts – Formation of contract – Contract conditions – Contract for labour, material, design, construction – Drafting of contract documents based on IBRD / MORTH Standard bidding documents – Construction contracts – Contract problems – Arbitration and legal requirements.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Estimation introduction - Estimation, Costing and Valuation (ECV)
1. SNS COLLEGE OF ENGINEERING & TECHNOLOGY
An Autonomous Institutions
Accredited by NBA – AICTE and Accredited by NAAC – UGC with ‘A’ & ‘A+’Grade
Approved by AICTE, New Delhi & Affiliated to Anna University, Chennai
DEPARTMENT OF CIVIL ENGINEERING
COURSE NAME:
CE8701 - ESTIMATION, COSTING AND VALUATION ENGINEERING (SNSCE)
16CE402 - ESTIMATION, COSTING AND VALUATION (SNSCT)
IV YEAR / VII SEMESTER
Topic 1 : Introduction
2. 4-Dec-20
2/23
What is Estimation
An estimate is a calculation of the quantities of various items of work,
and the expenses likely to be incurred there on.
The total of these probable expenses to be incurred on the work is
known as estimated cost of the work.
3. 4-Dec-20 3/23
Objective of ECV
.
The students will acquire knowledge in estimation, tender practices,
contract procedures, and valuation and will be able to prepare
estimates, call for tenders and execute works.
4. 4-Dec-20
4/23
Outcomes of ECV
The student will be able to
Estimate the quantities for buildings.
Rate Analysis for all Building works, canals, and Roads and Cost Estimate.
Understand types of specifications, principles for report preparation,
tender notices types.
Gain knowledge on types of contracts.
Evaluate valuation for building and land.
6. 4-Dec-20
6/23
Important of ECV
Estimating in construction is important because almost everyone has a
budget they have to meet for a project.
Almost everyone wants to know how much it will cost before they are
willing to start.
Estimates are also used to narrow down a choice in a contractor.
7. 4-Dec-20
7/23
Placement opportunities
.
Valuer
Valuers can work under the following area,
Real Estate, Building Construction, Town Planning, Land
Development, Etc,.
A) Qualifications and Experience
Qualification Experience
B.E./B.Tech. (Civil Engineering,
Architecture or Town Planning)
10-years experience in Building
Construction, Town Planning etc.
M.E./ M.Tech in valuation 2-years experience
8. 4-Dec-20
8/23
Placement opportunities
B ) Categories of Valuers
Empanelment of valuers by the Bank shall be in the following
categories:
PSB- Public Sector Banks
Category Work Experience Valuation limit
A
Min. 10 years + already empanelled
with at least 2 PSBs
* No limit
B
Between 5 to 10 years + already
empanelled with at least 1 PSB
* Up to Rs. 50 crore
14. 4-Dec-20 14/23
UNIT I - QUANTITY ESTIMATION / ESTIMATE OF
BUILDINGS
Philosophy – Purpose – Methods of estimation – Types of estimates –
Approximate estimates –Detailed estimate – Estimation of quantities for
buildings, bituminous and cement concrete roads, septic tank, soak pit,
retaining walls – culverts (additional practice in class room using
computer softwares)
Load bearing and framed structures – Calculation of quantities of brick
work, RCC, PCC,Plastering, white washing, colour washing and painting /
varnishing for shops, rooms,residential building with flat and pitched roof
– Various types of arches – Calculation of brick work and RCC works in
arches – Estimate of joineries for panelled and glazed doors, windows,
ventilators, handrails etc.
15. 4-Dec-20 15/23
UNIT II - RATE ANALYSIS AND COSTING / ESTIMATE OF
OTHER STRUCTURES
Standard Data – Observed Data – Schedule of rates – Market rates –
Standard Data for Man Hours and Machineries for common civil works –
Rate Analysis for all Building works, canals, and Roads– Cost Estimates
(additional practice in class room using Computer softwares) - (Analysis of
rates for the item of work asked, the data regarding labour, rates of material
and rates of labour to be given in the Examination Question Paper)
Estimating of septic tank, soak pit – sanitary and water supply installations
– water supply pipe line– sewer line – tube well – open well – estimate of
bituminous and cement concrete roads –estimate of retaining walls –
culverts.
16. 4-Dec-20 16/23
UNIT III - SPECIFICATIONS, REPORTS AND TENDERS /
SPECIFICATION AND TENDERS
Specifications – Detailed and general specifications – Constructions –
Sources – Types of specifications – Principles for report preparation –
report on estimate of residential building – Culvert – Roads – TTT Act 2000
– Tender notices – types – tender procedures – Drafting model tenders , E-
tendering-Digital signature certificates- Encrypting -Decrypting – Reverse
auctions.
Data – Schedule of rates – Analysis of rates – Specifications – sources –
Preparation of detailed and general specifications – Tenders – TTT Act – e-
tender – Preparation of Tender Notice and Document – Contracts – Types
of contracts – Drafting of contract documents – Arbitration and legal
requirements.
17. 4-Dec-20 17/23
UNIT IV – CONTRACTS / VALUATION
Contract – Types of contracts – Formation of contract – Contract
conditions – Contract for labour, material, design, construction – Drafting
of contract documents based on IBRD / MORTH Standard bidding
documents – Construction contracts – Contract problems – Arbitration
and legal requirements.
Necessity – Basics of value engineering – Capitalised value – Depreciation –
Escalation – Value of building – Calculation of Standard rent – Mortgage –
Lease
18. 4-Dec-20 18/23
UNIT V – VALUATION / REPORT PREPARATION
Definitions – Various types of valuations – Valuation methods - Necessity –
Capitalised value – Depreciation – Escalation – Valuation of land –
Buildings – Calculation of Standard rent – Mortgage – Lease
Principles for report preparation – report on estimate of residential
building – Culvert – Roads – Water supply and sanitary installations.
19. 4-Dec-20 19/23
Books
TEXTBOOKS:
1.B.N Dutta ‘Estimating and Costing in Civil
Engineering’, UBS Publishers & Distributors (P)
Ltd, 2010.
2. B.S.Patil, ‘Civil Engineering Contracts and
Estimates’, University Press, 2006
3.D.N. Banerjee, ‘Principles and Practices of
Valuation’, V Edition, Eastern Law House, 1998.
4. Rangwala. S.C “Estimating and Costing in
Civil Engineering”, Charotar Publishing
House, 2006. .(UNIT I,II,III,IV,V)
20. 4-Dec-20 20/23
Books and Web links
REFERENCES:
1. Hand Book of Consolidated Data – 8/2000, Vol.1, TNPWD
2. Tamil Nadu Transparencies in Tenders Act, 1998
3. Arbitration and Conciliation Act, 1996
4.Standard Bid elevation From, procurement of Good or works, The
world bank, April 1996.
5. Standard Data Book for Analysis and Rates, IRC, New Delhi, 2003.
WEB RESOURCES
http://nptel.ac.in/courses/105103023/35