Electrical Bus-Bar and its Types
• Definition: An electrical bus bar is defined as a conductor or a
group of conductor used for collecting electric power from the
incoming feeders and distributes them to the outgoing feeders. In
other words, it is a type of electrical junction in which all the
incoming and outgoing electrical current meets. Thus, the electrical
bus bar collects the electric power at one location.
• The bus bar system consists the isolator and the circuit breaker. On
the occurrence of a fault, the circuit breaker is tripped off and the
faulty section of the busbar is easily disconnected from the circuit.
• The electrical bus bar is available in rectangular, cross-sectional,
round and many other shapes. The rectangular bus bar is mostly
used in the power system. The copper and aluminium are used for
the manufacturing of the electrical bus bar.
• The most common of the bus-bars are 40×4mm (160 mm2);
40×5 mm (200 mm2) ; 50×6 mm (300mm2) ; 60×8 mm (480
mm2) ; 80×8 (640 mm2) and 100×10 mm (1000 mm2).
• The various types of busbar arrangement are used in the
power system. The selection of the bus bar is depended on
the different factor likes reliability, flexibility, cost etc. The
following are the electrical considerations governing the
selection of any one particular arrangement.
 The bus bar arrangement is simple and easy in
maintenance.
 The maintenance of the system did not affect their
continuity.
 The installation of the bus bar is cheap.
The small substation where continuity of the supply is not essential uses the single bus
bar. But in a large substation, the additional busbar is used in the system so that the
interruption does not occur in their supply. Single Bus-Bar Arrangement
The arrangement of such type of system is very simple and easy. The system has only
one bus bar along with the switch. All the substation equipment like the transformer,
generator, the feeder is connected to this bus bar only. The advantages of single bus bar
arrangements are
• It has low initial cost.
• It requires less maintenance
• It is simple in operation
Drawbacks of Single Bus-Bars Arrangement
• The only disadvantage of such type of arrangement is that the complete supply is
disturbed on the occurrence of the fault.
• The arrangement provides the less flexibility and hence used in the small substation
where continuity of supply is not essential.
Single Bus-Bar Arrangement With Bus Sectionalized
In this type of busbar arrangement, the circuit breaker and isolating switches are used.
The isolator disconnects the faulty section of the busbar, hence protects the system
from complete shutdown. This type of arrangement uses one addition circuit breaker
which does not much increase the cost of the system.
Advantage of single Bus-bar Arrangement with Bus
Sectionalization
• The faulty section is removed without affecting the continuity of
the supply.
• The maintenance of the individual section can be done without
disturbing the system supply.
• The system has a current limiting reactor which decreases the
occurrence of the fault.
Disadvantages of Single Bus-Bar Arrangement with
Sectionalization
The system uses the additional circuit breaker and isolator which
increases the cost of the system.
Main and Transfer Bus Arrangement
Such type of arrangement uses two type of busbar namely, main busbar
and the auxiliary bus bar. The busbar arrangement uses bus coupler which
connects the isolating switches and circuit breaker to the busbar. The bus
coupler is also used for transferring the load from one bus to another in
case of overloading.
The following are the steps of transferring the load from one bus to
another.
1. The potential of both the bus bar kept same by closing the bus coupler.
2. The bus bar on which the load is transferred is kept close.
3. Open the main bus bar.
4. Thus, the load is transferred from the main bus to reserve bus.
Advantages of Main and Transfer Bus Arrangement
• The continuity of the supply remains same even in the fault. When the fault
occurs on any of the buses the entire load is shifted to the another bus.
• The repair and maintenance can easily be done on the busbar without
disturbing their continuity.
• The maintenance cost of the arrangement is less.
• The potential of the bus is used for the operation of the relay.
• The load can easily be shifted on any of the buses.
Disadvantages of Main and Transfer Bus Arrangement
• In such type of arrangements, two bus bars are used which increases the cost of
the system.
• The fault on any of the bus would cause the complete shutdown on the whole
substation.
Double Bus Double Breaker Arrangement
This type of arrangement requires two bus bar and two circuit breakers. It
does not require any additional equipment like bus coupler and switch.
Advantages of Double Bus Double Breaker
1. This type of arrangement provides the maximum reliability and
flexibility in the supply. Because the fault and maintenance would not
disturb their continuity.
2. The continuity of the supply remains same because the load is
transferrable from one bus to another on the occurrence of the fault.
Disadvantages of double bus Double breaker
1. In such type of arrangement two buses and two circuit breakers are
used which increases the cost of the system.
2. Their maintenance cost is very high.
3. Because of its higher cost, such type of bus-bars is seldom used in
substations.
Sectionalized Double Bus Bar Arrangement.
In this type of bus arrangement, the sectionalized main bus bar is used along with the
auxiliary bus bar. Any section of the busbar removes from the circuit for maintenance
and it is connected to any of the auxiliary bus bars. But such type of arrangement
increases the cost of the system. Sectionalization of the auxiliary bus bar is not
required because it would increase the cost of the system.
One and a Half Breaker Arrangement
In this arrangement, three circuit breakers are required for two circuits. The each
circuit of the bus bar uses the one and a half circuit breaker. Such type of arrangement
is preferred in large stations where power handled per circuit is large.
1. Advantages of One and a Half Breaker Arrangement
It protects the arrangement against the loss of supply.
The potential of the bus bar is used for operating the relay.
In such type of arrangement, the additional circuits are easily added to the system.
1. Disadvantages of One and a Half Breaker Arrangement
The circuit becomes complicated because of the relaying system.
Their maintenance cost is very high.
Ring Main Arrangement
In such type of arrangement, the end of the bus bar is connected back to the starting
point of the bus to form a ring.
Advantages of Ring Main Arrangement
1. Such type of arrangement will provide two paths for the supply. Thus the fault
will not affect their working.
2. The fault is localized for the particular section. Hence the complete circuit is
not affected by the fault.
3. In this arrangement, a circuit breaker can be maintained without interrupting
the supply.
Disadvantages of Ring Main Arrangement
1. Difficulties occur in the addition of the new circuit.
2. Overloading occurs on the system if any of the circuit breakers is opened.
Mesh Arrangement
In such type of arrangement, the circuit breakers are installed in the mesh formed
by the buses. The circuit is tapped from the node point of the mesh. Such type of
bus arrangement is controlled by four circuit breakers.
When a fault occurs on any section, two circuit breakers have to open,
resulting in the opening of the mesh. Such type of arrangement provides
security against bus-bar fault but lacks switching facility. It is preferred for
substations having a large number of circuits.

More Related Content

What's hot

FUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONFUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTION
Power System Operation
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
Towfiqur Rahman
 

What's hot (20)

SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Distribution systems
Distribution systemsDistribution systems
Distribution systems
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
 
FUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONFUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTION
 
Substations
Substations Substations
Substations
 
ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Electrical protective devices ec
Electrical protective devices ecElectrical protective devices ec
Electrical protective devices ec
 
Electrical wiring system
Electrical wiring systemElectrical wiring system
Electrical wiring system
 
Substation and It's Equipment
Substation and It's Equipment Substation and It's Equipment
Substation and It's Equipment
 
Distribution boards and Protection devices ppt
Distribution boards and Protection devices  pptDistribution boards and Protection devices  ppt
Distribution boards and Protection devices ppt
 
Earthing
EarthingEarthing
Earthing
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical power
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Wiring systems
Wiring systemsWiring systems
Wiring systems
 
Structure of power system
Structure of power systemStructure of power system
Structure of power system
 
Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)
 

Similar to Electrical bus bar and its types

14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf
satish20012310
 
Substation Layouts - electrical power system that transforms voltage levels, ...
Substation Layouts - electrical power system that transforms voltage levels, ...Substation Layouts - electrical power system that transforms voltage levels, ...
Substation Layouts - electrical power system that transforms voltage levels, ...
ssuser9e9be71
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptx
LoitaFredy
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
Mohit Kothari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
Mohit Kothari
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
Mohit Kothari
 

Similar to Electrical bus bar and its types (20)

0000.000
0000.0000000.000
0000.000
 
Template ppt power engg.
Template ppt power engg.Template ppt power engg.
Template ppt power engg.
 
Substation
SubstationSubstation
Substation
 
14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf
 
Substation Layouts - electrical power system that transforms voltage levels, ...
Substation Layouts - electrical power system that transforms voltage levels, ...Substation Layouts - electrical power system that transforms voltage levels, ...
Substation Layouts - electrical power system that transforms voltage levels, ...
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Single breaker
Single breakerSingle breaker
Single breaker
 
Troubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsTroubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation Equipments
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptx
 
LEC #01 INTRODUCTION to power distribution system
LEC #01 INTRODUCTION to power distribution systemLEC #01 INTRODUCTION to power distribution system
LEC #01 INTRODUCTION to power distribution system
 
transformer substation
transformer substation transformer substation
transformer substation
 
عرض تقديمي1
عرض تقديمي1عرض تقديمي1
عرض تقديمي1
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
 
Electrical power distribution and utilization
Electrical power distribution and utilizationElectrical power distribution and utilization
Electrical power distribution and utilization
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
 
BUS BAR CONFIGURATIONS.pptx
BUS BAR CONFIGURATIONS.pptxBUS BAR CONFIGURATIONS.pptx
BUS BAR CONFIGURATIONS.pptx
 
Basic power distribution system007
Basic power distribution system007Basic power distribution system007
Basic power distribution system007
 

More from Jay Ranvir

More from Jay Ranvir (20)

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Open access mp
Open access mpOpen access mp
Open access mp
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyre
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading Process
 
Ch21
Ch21Ch21
Ch21
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges Rajasthan
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draft
 
Notified f &s regulations 2018
Notified f &s  regulations 2018Notified f &s  regulations 2018
Notified f &s regulations 2018
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plant
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sources
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligation
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentation
 

Recently uploaded

Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 

Recently uploaded (20)

Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 

Electrical bus bar and its types

  • 1. Electrical Bus-Bar and its Types • Definition: An electrical bus bar is defined as a conductor or a group of conductor used for collecting electric power from the incoming feeders and distributes them to the outgoing feeders. In other words, it is a type of electrical junction in which all the incoming and outgoing electrical current meets. Thus, the electrical bus bar collects the electric power at one location. • The bus bar system consists the isolator and the circuit breaker. On the occurrence of a fault, the circuit breaker is tripped off and the faulty section of the busbar is easily disconnected from the circuit. • The electrical bus bar is available in rectangular, cross-sectional, round and many other shapes. The rectangular bus bar is mostly used in the power system. The copper and aluminium are used for the manufacturing of the electrical bus bar.
  • 2.
  • 3. • The most common of the bus-bars are 40×4mm (160 mm2); 40×5 mm (200 mm2) ; 50×6 mm (300mm2) ; 60×8 mm (480 mm2) ; 80×8 (640 mm2) and 100×10 mm (1000 mm2). • The various types of busbar arrangement are used in the power system. The selection of the bus bar is depended on the different factor likes reliability, flexibility, cost etc. The following are the electrical considerations governing the selection of any one particular arrangement.  The bus bar arrangement is simple and easy in maintenance.  The maintenance of the system did not affect their continuity.  The installation of the bus bar is cheap.
  • 4. The small substation where continuity of the supply is not essential uses the single bus bar. But in a large substation, the additional busbar is used in the system so that the interruption does not occur in their supply. Single Bus-Bar Arrangement The arrangement of such type of system is very simple and easy. The system has only one bus bar along with the switch. All the substation equipment like the transformer, generator, the feeder is connected to this bus bar only. The advantages of single bus bar arrangements are • It has low initial cost. • It requires less maintenance • It is simple in operation Drawbacks of Single Bus-Bars Arrangement • The only disadvantage of such type of arrangement is that the complete supply is disturbed on the occurrence of the fault. • The arrangement provides the less flexibility and hence used in the small substation where continuity of supply is not essential.
  • 5.
  • 6. Single Bus-Bar Arrangement With Bus Sectionalized In this type of busbar arrangement, the circuit breaker and isolating switches are used. The isolator disconnects the faulty section of the busbar, hence protects the system from complete shutdown. This type of arrangement uses one addition circuit breaker which does not much increase the cost of the system.
  • 7. Advantage of single Bus-bar Arrangement with Bus Sectionalization • The faulty section is removed without affecting the continuity of the supply. • The maintenance of the individual section can be done without disturbing the system supply. • The system has a current limiting reactor which decreases the occurrence of the fault. Disadvantages of Single Bus-Bar Arrangement with Sectionalization The system uses the additional circuit breaker and isolator which increases the cost of the system.
  • 8. Main and Transfer Bus Arrangement Such type of arrangement uses two type of busbar namely, main busbar and the auxiliary bus bar. The busbar arrangement uses bus coupler which connects the isolating switches and circuit breaker to the busbar. The bus coupler is also used for transferring the load from one bus to another in case of overloading. The following are the steps of transferring the load from one bus to another. 1. The potential of both the bus bar kept same by closing the bus coupler. 2. The bus bar on which the load is transferred is kept close. 3. Open the main bus bar. 4. Thus, the load is transferred from the main bus to reserve bus.
  • 9.
  • 10. Advantages of Main and Transfer Bus Arrangement • The continuity of the supply remains same even in the fault. When the fault occurs on any of the buses the entire load is shifted to the another bus. • The repair and maintenance can easily be done on the busbar without disturbing their continuity. • The maintenance cost of the arrangement is less. • The potential of the bus is used for the operation of the relay. • The load can easily be shifted on any of the buses. Disadvantages of Main and Transfer Bus Arrangement • In such type of arrangements, two bus bars are used which increases the cost of the system. • The fault on any of the bus would cause the complete shutdown on the whole substation.
  • 11. Double Bus Double Breaker Arrangement This type of arrangement requires two bus bar and two circuit breakers. It does not require any additional equipment like bus coupler and switch.
  • 12. Advantages of Double Bus Double Breaker 1. This type of arrangement provides the maximum reliability and flexibility in the supply. Because the fault and maintenance would not disturb their continuity. 2. The continuity of the supply remains same because the load is transferrable from one bus to another on the occurrence of the fault. Disadvantages of double bus Double breaker 1. In such type of arrangement two buses and two circuit breakers are used which increases the cost of the system. 2. Their maintenance cost is very high. 3. Because of its higher cost, such type of bus-bars is seldom used in substations.
  • 13. Sectionalized Double Bus Bar Arrangement. In this type of bus arrangement, the sectionalized main bus bar is used along with the auxiliary bus bar. Any section of the busbar removes from the circuit for maintenance and it is connected to any of the auxiliary bus bars. But such type of arrangement increases the cost of the system. Sectionalization of the auxiliary bus bar is not required because it would increase the cost of the system.
  • 14.
  • 15. One and a Half Breaker Arrangement In this arrangement, three circuit breakers are required for two circuits. The each circuit of the bus bar uses the one and a half circuit breaker. Such type of arrangement is preferred in large stations where power handled per circuit is large.
  • 16. 1. Advantages of One and a Half Breaker Arrangement It protects the arrangement against the loss of supply. The potential of the bus bar is used for operating the relay. In such type of arrangement, the additional circuits are easily added to the system. 1. Disadvantages of One and a Half Breaker Arrangement The circuit becomes complicated because of the relaying system. Their maintenance cost is very high.
  • 17. Ring Main Arrangement In such type of arrangement, the end of the bus bar is connected back to the starting point of the bus to form a ring.
  • 18. Advantages of Ring Main Arrangement 1. Such type of arrangement will provide two paths for the supply. Thus the fault will not affect their working. 2. The fault is localized for the particular section. Hence the complete circuit is not affected by the fault. 3. In this arrangement, a circuit breaker can be maintained without interrupting the supply. Disadvantages of Ring Main Arrangement 1. Difficulties occur in the addition of the new circuit. 2. Overloading occurs on the system if any of the circuit breakers is opened.
  • 19. Mesh Arrangement In such type of arrangement, the circuit breakers are installed in the mesh formed by the buses. The circuit is tapped from the node point of the mesh. Such type of bus arrangement is controlled by four circuit breakers. When a fault occurs on any section, two circuit breakers have to open, resulting in the opening of the mesh. Such type of arrangement provides security against bus-bar fault but lacks switching facility. It is preferred for substations having a large number of circuits.