SECTION 1 : WELL PLANNING
BASIC DRILLING TECHNOLOGY AND EQUIPMENT
1 -2
1.2 Drilling Program - Initial Information
De ning well objectives
•	 exploration
•	 appraisal
•	 development	/	production
Obtaining Consent
•	 permission	from	relevant	authorities
Collection of data
•	 well	pressure	data,	seismic	etc.
Establish subsurface pressure regimes
•	 differing	pressure	regimes
Establish formation fracture gradients
•	 forecast	of	fracture	gradients	or	effective	casing	design
Well Plan Basics
Porosity
•	 Sedimentary	rock	has	pores	(small	openings)
Permeability
•	 Connected	pores	allow	 uid	to	 ow
Pore Pressure
•	 Normal,	abnormal	or	subnormal	pore	 uid	pressure
Rock Stress
•	 Force	imposed	to	the	rock
Balance
•	 Mud	weight	must	balance	pore	pressure	and	rock	stress
SECTION 1 : WELL PLANNING
BASIC DRILLING TECHNOLOGY AND EQUIPMENT
1 -3
1.3 Drilling Program Preparation
	
Well Details
	 	
	 •	 location
	 •	 type
	 •	 depth
	 •	 operator	/	owner
	 •	 designation
	 •	 target	size	and	depth
	 •	 contractor	and	rig	name
Well Objectives
	
	 •	 to	establish	objectives	at	TD
Casing Design
	
	 •	 conductor
	 •	 surface	casing
	 •	 intermediate	casing
	 •	 production	casing
	 •	 liners
	 •	 pressure	pro le	chart
	 •	 initial	design
	 •	 setting	depth
	 •	 reservoir	 uid	gradient
	 •	 casing	shoe	setting	depth
	 •	 burst,	collapse,	tension,	compressional	effects
	 •	 tensile	failure
	 •	 shock	loading
	 •	 overpull
	 •	 cement	force
	 •	 position	of	packer
	 •	 centralisation
	 •	 running	procedures
	 	
Well Head Selection
	 •	 correct	pressure	rating
	 •	 ease	of	operation
	 •	 cost
	 •	 operator	preferences
SECTION 1 : WELL PLANNING
BASIC DRILLING TECHNOLOGY AND EQUIPMENT
1 -4
BOP Requirements
	 •	 bottom	hole	pressures
	 •	 company	policy
	 •	 stack	up	con guration
Cementing Program
	 •	 volumes	required
	 •	 bottom	hole	temperatures
	 •	 mud	type
	 •	 formation	type
	 •	 stinger	technique
	 •	 liner	cementing
	 •	 yield
	 •	 density
	 •	 thickening	time
	 •	 mix	water
	 •	 compressive	strength
	 •	 uid	loss
	 •	 ow	characteristics
Deviation Program
	 	
	 •	 need	for	deviation
	 •	 realistic	target	needs
	 •	 extent	of	drift
	 •	 kick	off	point
	 •	 range	of	hole	angles
	 •	 abrupt	angle	changes
	 •	 jetting	techniques
	 •	 whipstocks
	 	
Survey Requirements
	 	
	 •	 minimum	requirements
	 •	 totcos
	 •	 magnetic	single	shots
	 •	 magnetic	multi	shots
	 •	 electronic	multi	shots
	 •	 directional	MWD
Mud Program
	 •	 mud	weight	requirements	for	primary	control
	 •	 suitable	trip	margin
	 •	 con rm	mud	weight	does	not	exceed	formation	strength
SECTION 1 : WELL PLANNING
BASIC DRILLING TECHNOLOGY AND EQUIPMENT
1 -5
	 •	 reaction	of	formations	to	drilling	 uid	alternatives	
	 •	 selection	of	mud	type		
	 •	 uid	loss	requirements
	 •	 pH	requirements
	 •	 viscosity
	 •	 temperature/	stability
	 •	 analysis	of	mud	treatment	equipment
Bits and Hydraulic Program
	
	 •	 bit	selection
	 •	 formation	drillability
	 •	 mud	systems	in	use
	 •	 directional	implications
	 •	 bit	drive	methods
	 •	 annular	velocity
	 •	 bit	and	hole	cleaning
Drill String Design
	 •	 drill	collars
	 •	 drill	pipe
	 •	 speciality	drilling	tools
	 •	 cross-overs
	
Evaluation Requirements
	 •	 drilling	log
	 •	 mud	logging
	 •	 coring
	 •	 MWD	(measurements	while	drilling)
	 •	 electric	log
	 •	 testing
	 •	 plug	and	abandon
Operational Procedures and Time Graph Construction
	 •	 company	policy
	 •	 contractor	policy
	 •	 bridging	document
	 •	 time	graph	
Site Plan
	 •	 license	area
	 •	 position	of	well	relative	to	other	features
	 •	 obstructions
	 •	 pipelines
SECTION 1 : WELL PLANNING
BASIC DRILLING TECHNOLOGY AND EQUIPMENT
1 -6
Reporting Requirements
	
	 •	 what	reports	required
	 •	 frequency
	 •	 recipients/addresses
Completion Equipment
	 •		 Support	Structure
	 •		 Wellhead
	 •		 Downhole	Completion
	 •		 Tubing	Hanger
	 •		 Xmas	Tree
	 •		 Flowlines
	 •		 Control	Systems
	 •		 Manifolds
	 •		 Production	Risers
	 •		 Surface	Production/	Processing	Facility
	 •		 Export	Facilities
Summary:
Drilling Program Preparation:
	 •		 Well	Details	
	 •		 Well	Objectives
	 •		 Casing	Design
	 •		 Wellhead	Selection
	 •		 BOP	Requirements
	 •		 Cementing	Program
	 •		 Deviation	Program
	 •		 Survey	Requirements
	 •		 Mud	Program
	 •		 Bits	and	Hydraulic	Program
	 •		 Drill	String	design
	 •		 Evaluation	Requirements
	 •		 Operational	Procedures	and	Time	Graph	Construction
	 •		 Site	Plan
	 •		 Reporting	Requirements

Drilling program

  • 1.
    SECTION 1 :WELL PLANNING BASIC DRILLING TECHNOLOGY AND EQUIPMENT 1 -2 1.2 Drilling Program - Initial Information De ning well objectives • exploration • appraisal • development / production Obtaining Consent • permission from relevant authorities Collection of data • well pressure data, seismic etc. Establish subsurface pressure regimes • differing pressure regimes Establish formation fracture gradients • forecast of fracture gradients or effective casing design Well Plan Basics Porosity • Sedimentary rock has pores (small openings) Permeability • Connected pores allow uid to ow Pore Pressure • Normal, abnormal or subnormal pore uid pressure Rock Stress • Force imposed to the rock Balance • Mud weight must balance pore pressure and rock stress
  • 2.
    SECTION 1 :WELL PLANNING BASIC DRILLING TECHNOLOGY AND EQUIPMENT 1 -3 1.3 Drilling Program Preparation Well Details • location • type • depth • operator / owner • designation • target size and depth • contractor and rig name Well Objectives • to establish objectives at TD Casing Design • conductor • surface casing • intermediate casing • production casing • liners • pressure pro le chart • initial design • setting depth • reservoir uid gradient • casing shoe setting depth • burst, collapse, tension, compressional effects • tensile failure • shock loading • overpull • cement force • position of packer • centralisation • running procedures Well Head Selection • correct pressure rating • ease of operation • cost • operator preferences
  • 3.
    SECTION 1 :WELL PLANNING BASIC DRILLING TECHNOLOGY AND EQUIPMENT 1 -4 BOP Requirements • bottom hole pressures • company policy • stack up con guration Cementing Program • volumes required • bottom hole temperatures • mud type • formation type • stinger technique • liner cementing • yield • density • thickening time • mix water • compressive strength • uid loss • ow characteristics Deviation Program • need for deviation • realistic target needs • extent of drift • kick off point • range of hole angles • abrupt angle changes • jetting techniques • whipstocks Survey Requirements • minimum requirements • totcos • magnetic single shots • magnetic multi shots • electronic multi shots • directional MWD Mud Program • mud weight requirements for primary control • suitable trip margin • con rm mud weight does not exceed formation strength
  • 4.
    SECTION 1 :WELL PLANNING BASIC DRILLING TECHNOLOGY AND EQUIPMENT 1 -5 • reaction of formations to drilling uid alternatives • selection of mud type • uid loss requirements • pH requirements • viscosity • temperature/ stability • analysis of mud treatment equipment Bits and Hydraulic Program • bit selection • formation drillability • mud systems in use • directional implications • bit drive methods • annular velocity • bit and hole cleaning Drill String Design • drill collars • drill pipe • speciality drilling tools • cross-overs Evaluation Requirements • drilling log • mud logging • coring • MWD (measurements while drilling) • electric log • testing • plug and abandon Operational Procedures and Time Graph Construction • company policy • contractor policy • bridging document • time graph Site Plan • license area • position of well relative to other features • obstructions • pipelines
  • 5.
    SECTION 1 :WELL PLANNING BASIC DRILLING TECHNOLOGY AND EQUIPMENT 1 -6 Reporting Requirements • what reports required • frequency • recipients/addresses Completion Equipment • Support Structure • Wellhead • Downhole Completion • Tubing Hanger • Xmas Tree • Flowlines • Control Systems • Manifolds • Production Risers • Surface Production/ Processing Facility • Export Facilities Summary: Drilling Program Preparation: • Well Details • Well Objectives • Casing Design • Wellhead Selection • BOP Requirements • Cementing Program • Deviation Program • Survey Requirements • Mud Program • Bits and Hydraulic Program • Drill String design • Evaluation Requirements • Operational Procedures and Time Graph Construction • Site Plan • Reporting Requirements