Introduction about Hydrology.
Planning any project by scientific method.
Understand how Ground Water Wells Drilled.
Types of Pumping Test.
How you can Write the daily Report.
Geological sample preparation is a vital stage in the analytical process, given the highly variable nature of mineral samples. The purpose of sample preparation is the production of homogeneous sub-sample, representative of the material submitted to the laboratory.
Geological sample preparation is a vital stage in the analytical process, given the highly variable nature of mineral samples. The purpose of sample preparation is the production of homogeneous sub-sample, representative of the material submitted to the laboratory.
The fourth presentation of a series of presentations on Operations Geology. Very basic, just to introduce beginners to operations geology. I hope the end users will find this and the following presentations very helpful.
This presentation is all about Petroleum Engineering, Prospecting oil and gas, drilling and various drilling methods, logs and its types, different Drive Mechanisms, etc......
It covers seismic method, gravity method, electromagnetic method, magnetic method and radiometric method. all these methods help in mineral exploration
Acoustic Attenuation Specfroscope (AAS) as Process Spectroscope for Drilling Mud
With the new redundant Ultrasonic sensors from IBJ technology (www.ibj-technology.com) powerful process-spectroscope can be built up. Beneficial is to use multiple devices to monitor the process of drilling in deepwater drilling.
The sound spectroscpe are very helpful in finding oil and gas in deeper formations. Particularly useful is use in pressurized drilling muds. The study of nonlinear vibrations in the sound and ultrasonic range is a very practical and high resolution methods to identify the flow of liquids or gases, preferably hydrocarbons in the well bore in real time during the drilling.
The sound pressure is the function to ensure enough also in gas. All muds, regardless of whether oil based or water based lb/gal can be safely monitored with the highest densities of up to about 20 lb / gal on inflow.
Furthermore, changes in the turbulence or the profile of the flow can be detected in the pipes immediately.
Evaluation of sound velocity is so high resolution, even the smallest tributaries are recognized by gaseous or liquid hydrocarbons.
Each process is customizable by the sampling rate and the FFT analysis.
With multiple devices along the mud riser an expansion can be detected in a timely manner by gas.
The Ultrasonic sensors developed by IBJ technology robust designed for use in the deep sea. Universally, these sensors can be fitted in all types of marine riser or mud lines. The Drilling Mud Spectroscopes can be with all solutions to the early gas kick detection and combine with the inflow control devices.
IBJ technology offers its solutions to all interested parties to use.
The fourth presentation of a series of presentations on Operations Geology. Very basic, just to introduce beginners to operations geology. I hope the end users will find this and the following presentations very helpful.
This presentation is all about Petroleum Engineering, Prospecting oil and gas, drilling and various drilling methods, logs and its types, different Drive Mechanisms, etc......
It covers seismic method, gravity method, electromagnetic method, magnetic method and radiometric method. all these methods help in mineral exploration
Acoustic Attenuation Specfroscope (AAS) as Process Spectroscope for Drilling Mud
With the new redundant Ultrasonic sensors from IBJ technology (www.ibj-technology.com) powerful process-spectroscope can be built up. Beneficial is to use multiple devices to monitor the process of drilling in deepwater drilling.
The sound spectroscpe are very helpful in finding oil and gas in deeper formations. Particularly useful is use in pressurized drilling muds. The study of nonlinear vibrations in the sound and ultrasonic range is a very practical and high resolution methods to identify the flow of liquids or gases, preferably hydrocarbons in the well bore in real time during the drilling.
The sound pressure is the function to ensure enough also in gas. All muds, regardless of whether oil based or water based lb/gal can be safely monitored with the highest densities of up to about 20 lb / gal on inflow.
Furthermore, changes in the turbulence or the profile of the flow can be detected in the pipes immediately.
Evaluation of sound velocity is so high resolution, even the smallest tributaries are recognized by gaseous or liquid hydrocarbons.
Each process is customizable by the sampling rate and the FFT analysis.
With multiple devices along the mud riser an expansion can be detected in a timely manner by gas.
The Ultrasonic sensors developed by IBJ technology robust designed for use in the deep sea. Universally, these sensors can be fitted in all types of marine riser or mud lines. The Drilling Mud Spectroscopes can be with all solutions to the early gas kick detection and combine with the inflow control devices.
IBJ technology offers its solutions to all interested parties to use.
Ever wondered exactly what we offer for geothermal heat pumps? Check out this slide show for an in depth introduction to our residential product line, along with our history, a tour of the plant, and more!
This paper discusses the operation principle of a geothermal system followed by details of the drilling rig and further extends to costs, limitations and future technologies.
see more on : thanosparaschos.com
Hazardous waste drilling mud management – A case study on remediation technol...Hesam Hassan Nejad
Speaking title: Hazardous waste drilling mud management – A case study on remediation technologies
Oil Industry and the Environment Seminar
(NOTES 2015), Delta Hotel, St. John's, Newfoundland and Labrador
April 27, 2015
Drilling Operations of Ground Water Wells AAPG-TUSC Tanta Univ 05-09-2016Mohamed _el_shora
Introduction about Hydrology.
Planning any project by scientific method.
Understand how Ground Water Wells Drilled.
Types of Pumping Test.
How you can Write the daily Report.
Course Content:
Why do we need geoscientist ?
What we do in the Energy Industry ?
Basic Rig Types& Rig components
The Well-Site Personnel
Drilling Fluids
Mud Logging
Well site geologist duties and responsibilities
1. Site Investgation.pptxDebre Markos University Technology College Departmen...teseraaddis1
Soil Exploration
“ The process of exploring to characterize or define small scale properties of substrata at construction sites is unique to geotechnical engineering.
In other engineering disciplines, material properties are specified during design, or before construction or manufacture, and then controlled to meet the specification. Unfortunately, subsurface properties cannot be specified; they must be deduced through exploration.” Charles H. Dowding (1979).
Foundation and its functions
Essential requirements
Sub soil exploration and Site exploration
Methods of site exploration
Settlement of foundations
Causes of failure of foundation and remedial measures
This presentation is A Short Notes about Meteorites in North Africa Countries such as "Egypt, Libya, Algeria, Morocco and Tunisia"
Submitted By
Mohamed Mahmoud Ahmed El-shora
M.Sc. Student, Geology Department, Faculty of Science, Tanta University, Tanta 31527, Egypt.
Mobile: +2- 0111 20 789 26
Email: geomohamedelshora@yahoo.com
Supervised By
Prof. Dr. Mohamed Th.S. Heikal
Geology Department, Faculty of Science, Tanta University, Tanta 31527, Egypt
Email: mtheikal@tu.edu.eg & mohamed.heikal2010@yahoo.com
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-09-2016
1. Zagazig University
Faculty of Science
Geologist Up Team
Submitted by
Mohamed Mahmoud El-Shora
Mud Engineer @ National Egyption Drilling and
Petroleum Services Co. (DASCO)
2. Introduce Myself
• Mud Engineer at National Egyptian Drilling and Petroleum Services
Co. DASCO.
• Well site Geologist at National Egyptian Drilling and Petroleum
Services Co. DASCO.
• Advanced Diploma, Alexandria University, Geophysics, 2013.
• BSC, Tanta University, Special Geology, 2012.
• Founder & President of AAPG_TUSC, 2011.
3. Audiences Expectations
• At the first page of your notebook write down the following:
• Your expectations from this presentation.
• At the end of the course evaluate the deliverable against your
expectations.
4. Session Goals
• As a result of participating in this presentation, attendees will
• Introduction about Hydrology.
• Planning any project by scientific method.
• Understand how Ground Water Wells Drilled.
• Types of Pumping Test.
• How you can Write the daily Report.
5. Introduction
• When a person meets another Person. He asks, Do you speak English,
Arabic or French….etc.? In Geology you have to forget the language!!
This collections of slides are The language of geologist.
#You_Will_Learn_Geologists_Language!!
• At recent days you’ve heard many advertisements by ground water
companies wanting to hire you, so you should be knowing more and
more about ground water wells.
• In this session we will introduce important topics about ground water
Wells.
• Firstly you should be known ground water terminology to
#Speak_The_Same_Language.
6. Ground Water Wells
• Definition: A water well is a
hole, shaft, or excavation used
for the purpose of extracting
ground water from the
subsurface.
• Types of Production ground
water wells:
• 1st Type: Artesian wells.
• 2nd Type: Flowing Artesian Wells.
• 3rd Type: Water Table Wells.
7. Ground Water Wells
• What’s the difference between Artesian Well, Flowing Artesian Wells and
Water Table Wells?
• Note That: All flowing wells are artesian, but not all artesian wells are
flowing wells.
Now we need to know
How we can drill a well???
Let’s Go to Know
8. Drilling
• Is a cutting process that uses a drill bit to cut or enlarge a hole of
circular cross-section in earth layers.
• The hole is drilled by simultaneously applying weight to the drill bit
and rotating the bit.
• Before Starting Drilling You Need Data.
• Surface Geological Study.
• Subsurface Mapping.
• Identification of Structures e.g. Anticlines, Salt Domes, Faults Traps, and Sand
Bodies Lenses.
Geological Data
• Logging Data.
• Seismic Data.
Geophysical Data
10. Why & where We Drill?
• To know The Sub-Surface (Rocks – Structures – Fossils - …etc.).
• To Get The Black Gold (Oil – Natural Gas) (Onshore & Offshore).
• To Get Under Ground Water (Onshore).
• Exploration of Minerals as (Gold – Silver – Iron - ….etc.) (Onshore).
Now we need a Rig!!!!!
11. Rotary Drilling Rig Components
• We are Live and working day and night in location, so we need
electricity source.
• To reach the TD we need Series of pipes connected together (Drill
String).
• Raising and Lowering of the Drill string (Hoisting System).
• Drilling as we know is applying weight to the drill bit and rotating the
Bit, So we need rotating source or rotating system.
• When we drill we need fluid to carrying the cutting from the bottom
of hole to surface so we need circulation system.
12. Rotary Drilling Rig Components
Power & Prime Movers
Drill String
Hoisting Component
Rotating Component
Circulation Component
13. Rotary Drilling Rig Components
• Internal combustion engine or a turbine that is the source of
power for driving equipment on the Rig.
Power & Prime Movers
14. Rotary Drilling Rig Components
• Series of pipes connected together called the Bottom Hole Assembly
(BHA). from the surface to the bit.
• Mainly Composed of (Bit & Tubular and Tubular Handling
Equipment ).
Drill String
• Together they perform the following functions:
• Lower the bit into the hole and withdraw it.
• Place weight on the Bit so it can penetrate the formations more
effectively.
• Transmit a rotating action to the Bit.
• Conduct the Mud under pressure from the surface to the Bit.
BHA
Bit
Bit Sub
Stabilizer & Reamer
Drill Collar
Cross Over Sub
Heavy Weight Drill Pipe
Drill Pipe
Kelly Saver Sub
Kelly
• Series of pipes connected together called the
Bottom Hole Assembly (BHA). from the surface to the
bit.
• Mainly Composed of (Bit & Tubular and Tubular
Handling Equipment ).
Drill String
15. Rotary Drilling Rig Components
• The Rig Equipment responsible for the raising and lowering of the
Drill string.
Hoisting Component
• Consist of the following:
• (Drawworks – Crown Block – Traveling Block – Drilling Line – Hook -
Elevator)
16. Rotary Drilling Rig Components
• The Rig Equipment responsible for rotating the Drill string. Consist
of the following:
Rotating Component
• Consist of the following: (Swivel – Kelly – Kelly Bushing – Master
Bushing – Rotary Table)
17. Rotary Drilling Rig Components
• Circulation Component responsible the movement of drilling fluid
within the well as well as solids removal incurred by the drilling
fluid.
• Normally the circulation would start from the mud pits, down the
drill stem, up the annulus and back to the mud pits.
Circulation Component
1. Mud
Pit
2. Mud
Pump
3. Pump
Manifold
4.
Standpip
e
5. Swivel
6. Drill
String
7.
Annulus
8.
Return
Line
9. Shale
Shaker
10.
Desande
r &
Desilter
11.
Degasser
19. What Hydrologists Do?
• May be involved in both field investigations and office work.
• Persons trained in hydrology may have a wide variety of job titles.
• (Well Site Geologist (Site Engineer) - Mud Engineer- Tool Pusher)
• Job Descriptions:
• Making development & pumping tests for the groundwater s’ wells
and Daily Reports.
• Supervision of the drilling process & Sample description.
• Supervision of the drilling fluid s’ characteristics.
• Concomitant for using E-log system.
20. The Well Life Cycle
• Design:
• Agree the well objectives, schedule, cost, order equipment, place contracts for the rig and
services, prepare the Location.
• Construction:
• Drilling: The well is created by drilling a hole, isolating with casing and cementing job and
repeating this process until reach TD.
• Wireline Logging: (Electric Logging and interpret this log).
• Design of Well: (End Point of Intermediate Casing and Design of Filters).
• Installing Filters: According to design of well.
• Washing & Development: wash the well by clear water then development using compressor and
pump.
• Pump Test: (Step Pump Test – Long Duration Pump Test – Recovery Test).
• Commission:
• The well is handed over to operations and connected to the process facilities.
21. Drop Pin
• Input Latitude and Longitude of your location on GPS.
• Detect the locations of wells and roads.
• Then Prepare the site roads and wells locations.
23. Drilling Fluid
• The understanding of the uses of drilling fluid can make a drilling operation
successful.
• Functions of Drilling Fluid:
• Remove the cuttings from the bottom of the hole and carry them to the
surface.
• Cool and lubricate the drill string and bit.
• Control formation pressure.
• Seal permeable formations.
• Minimize settling of cuttings and weight material in suspension when
circulation is temporarily stopped.
• Support and protect the walls of the hole.
• Facilitate cementing and completion.
24. Types of Drilling Fluid
• Water + Inert Solids + Reactive Solids
Water Base Mud
• Emulsion (oil/water) System: diesel or crude oil is dispersed in a continuous phase of water.
• Invert Emulsion (water/oil) System: water is dispersed in a continuous phase of diesel/crude
oil.
Oil Base Mud
• Used as a drilling fluid (at times with a foaming agent to improve carrying capacity), but its
use is applicable only in areas where there is little formation water.
Compressed Gases
29. From The Memory
• On the beach do you remember when you try to drill a hole with your
hands.
30. Annulus
• The space around a pipe in a well bore, sometimes termed the
annular space.
Well Bore
Pipe
31. Casing
• Definition: Steel pipe placed in an oil, gas and Ground Water wells to
prevent the wall of the hole from caving in, to prevent movement of
fluids from one formation to another and to aid in well control.
• The Zones which need to seal off by Casing Pipe: (high-pressured
zones, weak and fractured formations, unconsolidated formations
and sloughing shales).
32. Conductor Casing
• The outermost casing.
• The main purpose: Hold back
the unconsolidated surface
formations and prevent them
from falling into the hole.
• The conductor pipe is cemented
back to the surface.
• The conductor pipe size is from
16 - 20” in diameter.
33. Surface Casing (Pump House)
• The principal functions:
• Hold back unconsolidated shallow
formations that can slough into the hole
and cause problems.
• It is generally set in competent rocks,
such as hard limestone or dolomite, so
that it can hold any pressure that may be
encountered between the surface casing
seat and the next casing seat.
• Cemented back to the surface.
• Sizes of the surface casing vary from 7 to
16” in diameter. The Most Common Sizes
is 11 3/4” and 13 3/8” in diameter.
34. Intermediate Casing
• Is set at a depth between the surface and
production casings.
• The main reason for setting intermediate
casing is to case off the formations that
prevent the well from being drilled to the
total depth.
• Troublesome zones encountered include
those with abnormal formation
pressures, lost circulation, unstable shales
and salt sections.
• Intermediate casing varies in size from 7
to 11 3/8” in outside diameter.
• It is commonly cemented to top of
overlap between intermediate casing and
surface casing.
35. Production Casing (Filters)
• Filters (Screen and Blanks) may be
Stainless Steel or PVC in type.
• Production casing is set through the
prospective productive zones except in
the case of open-hole wells.
• According to design of well using log
interpretation and sample descriptions.
• Screen designed to set in front of
production zones.
• Blanks designed to isolate troublesome
zones such as unstable shale.
• Filters Common Size 6 5/8” and 8 5/8” in
diameter.
38. Setting Casing & Cementing Job
• Once casing is set and circulation has been assured.
• The bottom plug is released, which is immediately
followed by the cement.
• The top plug is released when all the cement has
been pumped. It is dropped on top of the cement,
followed by drilling mud, to displace the cement
from the casing.
• When the bottom plug reaches the float collar, the
diaphragm in the plug ruptures to permit the
cement to proceed down the casing and up the
annulus.
• This plug causes a complete shut-off when it reaches
the float collar.
• Pumping is stopped as soon as there is a positive
indication (pressure increase) that the top plug has
reached the float collar.
40. Cementing Job Purpose
• Bonds the casing to the formation.
• Protects the producing formations.
• Helps in the control of blowouts from high-pressure zones.
• Seals off troublesome zones (i.e. lost circulation zones – Unstable
Shale).
• Forms a seal in the event of a kick during drilling.
42. Drilling Well Operations
Drilling for Conductor Casing and Cementing Job
Drilling to Target Depth
Wireline Logging and interpretation
Drilling for Surface Casing and Cementing Job
Drilling For Intermediate Casing and Cementing Job
Drilling for Production Casing “Filters” (Blank – Screen)
43. Bit Program
• A plan for the expected number and types of bits that are to be used
in drilling a well.
8 ½” 12 ¼” 17 ½” 26”
Casing Size in. Hole Size in.
20 (22 - 24 - 26)
13 3/8 (16 - 17 ½)
11 ¾ (12 ¼ - 13 3/8 - 13 ½ - 13 ¾ - 14 ¾ - 15 ½)
9 5/8 (11 5/8 - 12 ¼ - 13 3/8 -13 ¾)
8 5/8 (9 5/8 - 10 5/8 - 11 5/8 – 12 ¼)
6 5/8 (8 ½ - 9 5/8)
44. Drilling for Conductor Casing
• After we finished from preparing of site, starting Drilling
Operations.
• Drilling with Bit size 8 ½” to reach setting depths of the
conductor casing which is vary from 200 to 900 m
according to contract and well design.
• Then opening (enlarge) of hole with Bit size 12 ¼” then
Bit size 17 ½” and finally with Bit size 26”.
• Reaming a hole with stabilizer size 26”.
• Preparing Conductor casing for installation in Hole.
• Run In Hole Casing size 20” and Complete Cementing Job.
• W.O.C (Duration of Waiting is 36 hours).
45. Drilling to Target Depth
• After duration of W.O.C is completed we start to
drilling Float Collar, Cement in last casing pipe & Guide
Shoe.
• Check properties of Mud and maintain it, Mixing New
Volume of Drilling Fluid.
• Run In Hole Drill String With Bit Size 8 ½” and
Continuous drilling of Well until reach the TD.
47. Sample Description
• Rock Name: Color, Gain Size, Hardness, Any Accessories.
• Rock Name (Sand Stone - Lime Stone - Dolomitic Lime Stone –
Dolomite – Shale – Clay – Chert – Coal - Fossiliferous Lime Stone -
Calcareous Shale - Calcareous S.S…..Etc).
• Color When determining the color of a sample, inspect the rock when
wet. A color chart is useful, Useful indicator of Depositional
Environment, especially in argillaceous rocks (Clay Stone & Shale).
• Gain Size (V. Fine – Fine – Medium – Course – V. Course).
• Hardness (Hard - V. Hard).
• Accessories (Silt - Chert - Coal…..Etc).
Red & Brown
•ferric iron, an oxidizing environment
Green & Grey
•ferrous iron, a reducing environment
Dark Brown
•Organic material, possible source rock
Black
•An anaerobic environment
49. Wireline Logging (Electric Log)
• Logging is one of most important step in
well life cycle.
• Tools are run in the hole on the end of a
wireline.
• Information is relayed back to the surface
via the wireline.
• Tools of Logging: ( NGR – R 16 – R 64 – SP).
• Purpose of Logging:
• Identify the underling layers.
• Detect zones of Aquifer.
• Use to determine casing Point.
• Making a design of well (Filters & Blanks).
50. Drilling for Surface Casing
• After we finished from step of wireline logging and
interpretation of log, starting Drilling for surface
Casing Operations as the following procedures:
• Opening (enlarge) of hole with Bit size 12 ¼” then Bit
size 17 ½”.
• Reaming a hole with stabilizer size 17 ½”.
• Preparing Surface casing for installation in Hole.
• Run In Hole Casing size 13 3/8” and Complete
Cementing Job.
• (W.O.C).
51. Drilling For Intermediate Casing
• After duration of W.O.C is completed we start to drilling
Float Collar, Cement in last casing pipe & Guide Shoe.
• Check properties of Mud and maintain it, Mixing New
Volume of Drilling Fluid.
• Run In Hole Drill String With Bit Size 12 ¼” and
Continuous drilling of Well until reach the end point of
Intermediate Casing.
• Reaming a hole with stabilizer size 12 ¼”.
• Preparing Intermediate casing for installation in Hole.
• Run In Hole Casing size 9 5/8” and Complete Cementing
Job.
• (W.O.C).
52. Drilling for Production Casing “Filters” (Blank –
Screen)
• After duration of W.O.C is completed we start to drilling
Float Collar, Cement in last casing pipe & Guide Shoe.
• Check properties of Mud and maintain it, Mixing New
Volume of Drilling Fluid.
• Run In Hole Drill String With Bit Size 8 ½” and Continuous
drilling of Well until reach the TD of well.
• Reaming a hole with stabilizer size 8 ½”.
• Preparing Screen and Blank for installation in Hole.
• Run In Hole Casing size 6 5/8” and hanged it using Liner
Hangar.
53. Groundwater Wells Design
• Area: East Owinat.
• Total Depth: 300 or 350 m.
• Casing Size / Type :
• 12” / Galvanized Iron – 10” 280 mm / PVC
(polyvinyl chloride) or ST. ST (Stainless
Steel).
• The Connection Between the two types
of casing is called (Reducer 12”/10”).
• Annulus Fill With Gravel Pack except at
least 2 m from surface.
• When we installation of Gravel Pack into
the Annulus of well, start Circulation Mud
to remove the smallest size grains of
gravel pack and make it well sorted.
54. Gravel Pack
• Gravel pack settle around the well
screen.
• Size from 5 mm to 7 mm.
• Purpose of it; keeps fine sediments
“Fine Sand & Silt” out of the well
and provides a clean and
unrestricted flow path for ground
water.
• Gravel Pack Installation:
• 1st Original “Manual” Method.
• 2nd Conversely Cycle.
55. Groundwater Wells Design
• Area: Alfarafra Oasis.
• Total Depth: 750 or 850 m.
• Casing Size / Type :
• Conductor Casing Size 20” / Steel.
• Surface Casing Size 13 3/8” / Steel.
• Intermediate Casing Size 9 5/8” / Steel.
• Production Casing (Blank & Screen) Size 6
5/8” / Stainless Steel.
• Finally Sand Trap Size 6 5/8” / Stainless
Steel.
• Annulus Around All casing Type and Size
Fill With Cement; except Production
casing size 6 5/8”.
9 5/8”
20”
6 5/8”
6 5/8”
6 5/8”
6 5/8”
6 5/8”
13 3/8”
56. Groundwater Wells Design
• Area: Sinai.
• Total Depth: 1150 m.
• Casing Size / Type :
• Conductor Casing Size 20” / Steel.
• Surface Casing Size 11 3/4” / Steel.
• Production Casing (Blank & Screen)
Size 8 5/8” / Stainless Steel.
• Finally Sand Trap Size 8 5/8” /
Stainless Steel.
• Annulus Around All casing Type and
Size Fill With Cement; except
Production casing size 8 5/8”.
20”
8 5/8”
8 5/8”
8 5/8”
8 5/8”
8 5/8”
11 3/4”
8 5/8”
8 5/8”
8 5/8”
57. Groundwater Wells Design
• Area: Any Drinking Water Company.
• Total Depth: 200 m.
• Casing Size / Type :
• Conductor Casing Size 20” / Steel.
• Production Casing (Blank & Screen) Size
12” / Stainless Steel.
• Finally Sand Trap Size 12” / Stainless
Steel.
• Annulus Around Conductor casing Size
20” and Annulus Around Fill With
Cement; except Production casing size
12” fill with gravel pack and there is an
over lap between Conductor Casing and
Production Casing fill with Granular
Bentonite (3 – 5)m.
20”
12”
12”
12”
12”
12”
12”
12”
12”
12”
12”
12”
12”
58. Washing
• Using clear water (fresh water) and Liquid Soap.
• By injection of fresh water in the well by using pump.
• Then connect Air compressor to starting the 1st development stage.
• And we can add soup in stage of development using Air Compressor.
59. Groundwater Wells Development
• After the well Casing, well Screen, and gravel pack have been
installed, the well is developed to clean the borehole and casing of
drilling fluid and to properly settle the gravel pack around the well
screen.
• Development Procedures:
• Adding Chemicals as (Sodium Hexameta Phosphate - HCl).
• Compressor Development.
• Pump Development.
60. Development Procedures:
• 1st Step Adding Chemicals as (Sodium Hexameta Phosphate):
• Adding 1 sack from Hexameta for 1 m^3 of water according to the volume
of filters e.g. ( Volume of mud in filters = 8 m^3, So; No. of Hexameta Sacks
equal 8 sacks added to 8 m^3 of water).
• Then still (24 hours) for complete reaction between Sodium Hexameta
Phosphate and drilling mud in Aquifer and Gravel Pack.
• Applications/Functions:
• Can disperse mud, sediment and clay from the producing formation and
gravel pack in the screened interval.
• Can reduce viscosity and gel strength of drilling fluids.
• Helps reduce development time.
• Helps increase well yield and capacity.
61. Development Procedures:
• 1st Step Adding Chemicals as (HCl):
• Acidize : to treat formations with acid for the purpose of increasing production.
• Acid Concentration: 10 %
• Add HCl to Water with percentage 1 m^3 HCl : 2 m^3 water.
• Pump this soln. in the well against the Filters.
• Then still (24 hours) for complete reaction between HCl and Lime Stone FM.
• Applications/Functions:
• Open fractures in limestone formations.
• Helps reduce development time.
• Helps increase well yield and capacity.
62. Development Procedures:
• 2nd Step Compressor Development:
• Run In Hole Compressor Pipe String to certain depth then turn on compressor for
certain duration as (1 hr.) then turn off compressor for (½ hr.) and repeat this step
for several times until water be clear then reach to another depths and repeat
the previous steps for each depths.
• Note the pressure of Compressor as (20/18) bar; 20 mean the reading of
compressor pressure on Starting Compressor, while 18 mean the reading of
compressor pressure after constancy.
• Note that: when the different between the two readings small the well will be
have a small Draw Down because the good recharge.
• Applications/Functions:
• (A typical method for well development) to surge or jet air in and out of the well
screen openings, This procedure may take several days or perhaps longer,
depending on the size and depth of the well.
63. Development Procedures:
• 3rd Step Pump Development:
• Run In Hole Electrical or mechanical submersible pump, Then Starting
Development by starting with small discharge then stop for several
times until water be clear then progressively increasing the flow rate
(Q) in intervals until reach the maximum discharge and reach clear
water in each discharge.
• Applications/Functions:
• Clear water from residual mud and fine sand progressively.
• Increase well yield and capacity.
64. Pumping Test Unit
• This Unit composed of the following:
• Generator.
• Electrical or mechanical submersible pump.
• Solar Tank.
• Pipe size 4 ½”, 5 ½”, 7 ½”.
• Check Valve “Non Return Valve”.
• Measuring Discharge Tool with its components.
• Water level Measurement Tool: water level rope (Deep Meter “Sounder”)
and sounding tube.
• Level Logger “Diver” (if available).
65. Discharge Measurement Tools
• Manometer (Orifice Pipe) and Orifice Table.
• Flow Meter (Normal – Digital) and stop watch.
• Ultrasonic Flow Meter (Digital).
• A Five Gallon Bucket (20 liters) and a stop watch can be used to
estimate low pumping rates.
• Oil Barrel and stop watch.
66. Water Level Measurement Tools
• Manual Measurement: Using Water Level Probe (Deep Meter) and Sounding Tube.
• Automatic Measurement: Pressure Transducer (Diver) by recording water level and
temperature.
68. Pumping Test (Aquifer Test)
• Pumping test is about discharging water using an electrical or
mechanical submersible pump, this test provides results that are
more representative of aquifer characteristics including hydraulic
conductivity, transmissivity, and specific capacity.
• There are three types of pumping tests:
• Step Draw Down Pumping Test.
• Long Duration (continuous) Pumping Test.
• Recovery Test.
69. Step Draw Down Pumping Test
• To Provide certain parameters including the specific capacity,
well loss and formation loss.
• The test shall be performed by progressively increasing the flow
rate (Q) in intervals with measuring the drawdown along with
time of each step.
• The pumping test data interpreted by using the Jacobi method
by plotting specific drawdown (s/Q) versus flow rate (Q) to obtain
well loss and formation loss parameters to calculate the specific
capacity from the equation:
• Δs = B Q + C Q2
• Where:
• Δs: drawdown at any flow rate (m).
• B: Formation loss (hr/m2)
• C: Well loss (hr2/m5)
• Q: Flow rate (m3/hr)
70. Long Duration Pumping Test & Recovery Test
• Another type of pumping test is long duration or continuous test
where the flow rate is constant and test time from 12 to 24 hours.
• This test is followed by recovery test that measures the restoration of
the static water level inside the well.
• Purpose of Both of these tests provide a full data to calculate
aquifer’s Transmissivity (T).
71. Pumping Phase & Recovery Phase
• This Graph showing the different
phases of constant rate pumping
test – the pumping phase and
the recovery phase.
74. Development Report
• R.I.H.E.S Pump: simply stands for Run In Hole Electric Submersible Pump.
• Starting Development:
S.W.L= ???m,
Q=150m³/h – D.D= ???m
Q=200m³/h – D.D= ???m
Q=270m³/h – D.D= ???m
• Continuous Development: S.W.L= ???m, Q=270m³/h – D.D= ???m
• P.O.O.H.E.S Pump: simply stands for Pull Out Of Hole Electric Submersible Pump.
• Moving to New Well Site: ????
75. Step Draw Down Test Report
• Step Draw Down Test:
S.W.L= ???m
Q=150m³/h – D.D= ???m
Q=200m³/h – D.D= ???m
Q=270m³/h – D.D= ???m
• Long Duration Pumping Test:
S.W.L= ???m
Duration= 24 Hours
Q=270m³/h – D.D= ???m
• Recovery Test:
Collect Recovery Data
S.W.L reach to the original Level after ??? Hours.
76. Mohamed M Elshora
Mud Engineer @ National Egyption Drilling
and Petroleum Services Co. (DASCO)
Phone (+2)01024817020
Email : geomohamedelshora@yahoo.com
Editor's Notes
The driller can place the bit onto the bottom of the well and apply weight using the lifting system.
bit n: the cutting or boring element used in drilling oil and gas wells.
bit programn: a plan for the expected number and types of bits that
are to be used in drilling a well.
bit sub n: a sub inserted between the drill collar and the bit.
Apply scientific knowledge and mathematical principles to:
Find water supplies for cities or irrigated farms, or controlling river flooding or soil erosion.
Solve water-related problems in society: problems of quantity, quality and availability.
Or, they may work in environmental protection: preventing or cleaning up pollution or locating sites for safe disposal of hazardous wastes.
Hydrologists play a vital role in finding solutions to water problems, and interesting and challenging careers are available to those who choose to study hydrology.
Scientists and engineers in hydrology may be involved in both field investigations and office work.
This is the major type of mud system.
It consists of a continuous liquid phase of water in which clay materials are suspended.
A number of reactive and nonreactive solids are added to obtain special properties.
Measure of the hydrostatic pressure of the mud column.
Density is reported also in pounds per gallon, specific gravity, and pounds per cubic foot.
Viscosity is a measure of the internal resistance of a drilling fluid. This internal resistance, or inertia, is a result of the attractions of molecules in a liquid, and is a measure of the combined effects of these attractions and the natural cohesion of suspended particles. The greater the internal resistance, the greater the viscosity.
The Marsh Funnel is an instrument used to measure what is commonly called "Funnel Viscosity."
The Marsh Funnel viscosity is reported as the number of seconds required for a given fluid to flow 1 quart of fluid through the calibrated orifice at the end of the funnel.
annular pressure n:
pressure in an annular space.
Consequently, wells are drilled and cased in several steps to seal off these troublesome zones and to allow drilling to the total depth.
Different casing sizes are required for different depths, the five general casings used to complete a well are: (Conductor Casing, Surface casing, Intermediate casing and Production casing (Blank and Screen).
On offshore platforms, conductor pipe is usually 20 in. in diameter and is cemented across its entire length.
Generally. a 16-in. pipe is used in shallow wells and a 20-in. in deep wells.
and it is either used to support subsequent casings and wellhead equipment or the pipe is cut off at the surface after setting the surface casing
Where shallow water or gas flow is expected, the conductor pipe is fitted with a diverter system above the flowline outlet.
This device permits the diversion of drilling fluid or gas flow away from the rig in the event of a surface blowout.
The conductor pipe is not shut-in in the event of fluid or gas flow, because it is not set in deep enough to provide any holding force.
The conductor pipe, which varies in length from 40 to 500 ft. (12.192 to 152.4 m) onshore and up to 1,000 ft (304.8 m) offshore, is 7 to 20 in. in diameter.
Isolate the Surface water-bearing formations Because we need the Deep water-bearing formations.
Setting depths of the surface casing vary from 200 to 900 m .
On land. surface casing is usually cemented to the surface.
For offshore wells, the cement column is frequently limited to the kickoff point.
When abnormal formation pressures are present in a deep section of the well. intermediate casing is set to protect formations below the surface casing from the pressures created by the drilling fluid specific weight required to balance the abnormal pore pressure.
Similarly, when normal pore pressures are found below sections having abnormal pore pressure, an additional intermediate casing may be set to allow for the use of more economical, lower specific weight, drilling fluids in the subsequent sections.
After a troublesome lost circulation, unstable shale or salt section is penetrated, intermediate casing is required to prevent well problems while drilling below these sections.
Longer cement columns are sometimes necessary to prevent casing buckling.
Cement plugs consist of an aluminum body encased in molded rubber.
Two plugs are usually contained in the cementing head to facilitate the operations.
The following procedures are conducted when completing a primary cement job.
Once casing is set and circulation has been assured, is to pump a 10 to 15 barrel “spacer” ahead of the bottom plug, which is immediately followed by the cement.
The spacer serves as a flushing agent and provides a spacer between the mud and cement and removal of wall cake and flushes the mud ahead of the cement, thereby lessening contamination.
The top plug, which is solidly constructed, is released when all the cement has been pumped. It is dropped on top of the cement, followed by drilling mud, to displace the cement from the casing
Cement plugs consist of an aluminum body encased in molded rubber.
Two plugs are usually contained in the cementing head to facilitate the operations.
Record of the circulating pressures while mixing and displacing from the casing to the annulus. To ensure good cement circulation and drilling mud displacement, movement of the casing, either by reciprocation or rotation, may be continued throughout the pumping and displacement operations.
bit program n: a plan for the expected number and types of bits that
are to be used in drilling a well.
Claystone/Shale:
The major difference between these rocks is fissility.
A claystone is a structure less mass of clay minerals.
A shale is finely laminated clay minerals exhibiting fissility and showing strong parallelism.
casing point n: the depth in a well at which casing is set, generally the depth at which the casing shoe
rests.
The most widely used method of formation evaluation is wireline logging.
Tools are run in the hole on the end of a wireline.
Information is relayed back to the surface via the wireline.
Logs can interpret lithology, porosity, permeability, fluid type and sometimes even the best parts of the Aquifer.
Log also measure pressures, temperatures, and hole size.
casing point n: the depth in a well at which casing is set, generally the depth at which the casing shoe
rests.
casing hanger n: a circular device with a frictional gripping arrangement of slips and packing rings used
to suspend casing from a casing head in a well.
cased hole n: a wellbore in which casing has been run.
settle the gravel pack around the well screen.
settle the gravel pack around the well screen.
settle the gravel pack around the well screen.
settle the gravel pack around the well screen.
acid fracture v: to part or open fractures in limestone formations by using fluid under hydraulic pressure.
Orifice with its components “Elbow – Gate Valve – Pipe – Orifice Ring”
The ability of the aquifer to transmit groundwater throughout its entire saturated thickness.
Transmissivity is measured as the rate at which groundwater can flow through an aquifer section of unit width under a unit hydraulic gradient.
Transmissivity can be determined from a pumping test using the time-drawdown data.
T=b*K
Recommended Minimum Intervals for water level measurements for pumping testes