SlideShare a Scribd company logo
1 of 3
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1747
DISPOSITION OF DEFECTIVE MATERIALS BY IMPLEMENTING VARIOUS
JAPANESE TECHNIQUES
Sonal Darekar1, Vikram Chillal2, Bhaktipriya Kale3, Anuja Auchare4
1 B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India.
2B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India.
3B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India.
4B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Today in these rapid growing world, the
Industrial sector is developing vastly. Various issues may
occur due to many valid reasons. But in caseif duetoimproper
handling and no tag on the defective material; then there are
more chances of affecting the quality and customer
dissatisfaction.
Non Confirming Material is a term which means segregation
of defective materials according to various issues. A proper
decision making is done and then the material’s disposition is
done. Decision is taken on daily basis and a DFR i.e Defect
Feedback Report is completed daily to keep the record in the
system.
In our project we are going to implement various techniques
like 5s, Kaizen, JIT etc for proper segregation and disposition.
We are going to design a layout for defective materials. This
implementation of NCM will help the production line to
disposed the material properly.
Key Words: NCM (NON CONFORMING MATERIAL),
Kaizen, JIT (Just In Time), 5s, DFR (Defective Feedback
Report), BIS (before In Service).
1.INTRODUCTION:
During adherence of production line of cylinder head
and cylinder block we came to know about various
quality issues, which are as follows:
 Supplier issues.
 Blow hole in various parts.
 Rust issues.
 Excess/Less materials.
 Crack, Scratch on material.
 Notch missing on connecting rod.
 Bar code issue.
 Component number missing or wrong.
 Ergonomic issues.
 Thread missing.
 Fitment issue.
 Sand inclusion in various part.
 Machining surface uneven.
All those mentioned issues further affects the
quality andmay lead to increase the B.I.Sissue,
also sometimes if these defective head and
block are further moved ahead to customer i.e.
here in this case the customer of production is
assembly area; if these defective material is
moved to assembly then there are lots of
chances of breakdown, failure, customer
dissatisfaction also it can tend to affect the
reputation of company which is a severe
problems.
1.1 Objective :
The main aim of our project is disposition of
defective materials properly and segregate
them according to their issues.Thiswillreduce
the quality problems and also the customer
dissatisfaction.WehaveintroducedtheNCMto
overcome on the issues.
1.2 Non Confirming Materials:
 The basic definition of NCM is that,“anypartor
product which has been identified as not
confirming to any product or process
specification. This will be identified through
pre determined location,tags,stickersorbinas
required.”
 In quality management, nonconformity is a
deviation fromaspecification,astandard,oran
expectation. Nonconformities are classified as
critical, major, or minor.
 In software engineering, ISO/IEC 9126
distinguishes between a defect and a
nonconformity; a defect is the non fulfillment
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1748
of intended usage requirements, whereas a
nonconformity is the non fulfillment of a
requirement. A similar distinction is made
between validation and verification.
 The NCM is further classified in three
parameters of segregation, they are as follows:
1. Rework
2. Scrap
3. RTV (Return to Vendor)
1.2.1 Description:
1. Rework: Action taken on non confirming
product so that it will meet the specified
requirements. Basicallyitistheworkdone
to correct the defects found associated
with a deliverable product plus any root
cause analysis, effort to identify thetaskto
be re-performed.
2. Scrap: The material which is of no further
use is categorized under scrap. It is
identifiedasandetachedmaterialfromthe
flow of production due to various un
solved issues or those issues which can’t
be reworked or rectified.
3. RTV: RTV means Return to Vendor. The
material which is supposedtoreverttothe
vendor due to their issue. In this case the
material found defective and the issue is
due to the supplier itself then the action of
reverting the material to the vendor is
executed and for these process there is a
online system transaction through which
the number of materials are booked and
return back to vendor.
Image1:-Tag of Non Conforming Material
2. WORK INSTRUCTION (STEPS)
The material which is found defective on production
line then it is term as non conformingmaterialthenthe
identification of issue tag is tie on the material and the
material is shifted to NCM area.
 Jointly review with MIW, Quality and
purchasing a decision is taken on the defected
parts and the execution of decisioniscarried.A
quality point leader is supposed to look after
whether the segregation is carried properly or
not. All these information of the defective part
is stored in a system.
 Identification will be given for NCM part. A
proper tagging is done which makes the
operator or the employee easy to identify the
NCM parts. The tag includes part name, part
number, quantity, defectfound,anddecisionto
get implemented and signature of the quality
point leader.
Following are the steps to be followed for NCM
process:
1. Reject and scrap part will be painted with
red & RTV or Scrap is written on NCM tag.
Following are the area where the tag is
tied:
i) In case of cylinder block on front and rear
side of block the tag is tied.
ii) On air intake for head.
RTV or scrap part will be move to RTV or scrap area.
1 Rework will be written on tag for rework
component.
i) After rework quality person will give
decision either the part is ok or not
2 Ok will be written and sign by quality person on
ok part NCM tag. Ok component will be moved to
MIW.
Before After
NCM area was not there
for defective materials.
NCM area was
designed.
No proper segregation of
defective materials.
Proper segregation of
defective material.
No tagging. Tagging is there.
No color coding. Color coding is used.
Daily meeting was not
carried on defective
materials.
Daily meeting is
carried.
Online System
transaction is not there.
Online System
transaction is used.
Daily meeting was not
carried on defective
materials.
Daily meeting is
carried.
No proper segregation of
defective materials.
NCM area was
designed.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1749
3. EXECUTION OF JAPANESE TECNIQUES IN NCM
Now a days the Japanese techniques are implemented
in various industries to make the process more
effective. Westudied various techniques like 5 ‘s’,Poka
yoke, Kaizen ,Just In Time, Jidoka and one western
technique Six Sigma too. After proper study and
comparison of all the techniques on basis of various
parameters we decided to execute these three
mentioned techniques:
 5 ‘s’
 Kaizen
 Just In Time
We found it beneficial after executing these
techniques. This helped the process become more
effective, easier as well as full proof.
4. CONCLUSIONS
After executing the NCM, the process became easyand
effective too. Proper disposition of material is done
with less usage of time. Less number of workers are
needed to carry the process. As the online system
transactionis used in NCM , the Return to Vendorissue
is carried in least time.Alsoaswestudiedandexecuted
the Japanese technique. This made the process full
proof. Due to this execution the NCM area is neat and
clean.
REFERENCES
[1]. Andrea Shiffauerovas, Department of mechanical
engineering, Mcgill university, Montreal university,
Canada.(2011).
[2] General Services Administration, Department of
Defense, National Aeronautics and Space
Administration: Federal Acquisition Regulation, March
2005.
[3] A Text Book ofMechanicalSystemDesign,Farazdak
Haideri, Third Edition, Chapter 2, Page No. 149 – 241.
[4] Mark Hammar (November 18) 2014) ISO 9001
section oncontrol of nonconformingproductidentifies
four ways that you can deal with the nonconforming
products.

More Related Content

What's hot

Challenges in Technology Transfers of API Manufacturing
Challenges in Technology Transfers of API ManufacturingChallenges in Technology Transfers of API Manufacturing
Challenges in Technology Transfers of API ManufacturingMutyala Naidu G
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaPANDYA PULKIT
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
incoming inspection reduction
incoming inspection reductionincoming inspection reduction
incoming inspection reductionRupesh Nayak
 
Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) courseramakrishna333
 
Chetan QA & MR resume
Chetan QA & MR resumeChetan QA & MR resume
Chetan QA & MR resumechetan naidu
 
BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015CHANDRA SHEKHAR KUMAR
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET Journal
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 

What's hot (20)

Callibration
CallibrationCallibration
Callibration
 
Challenges in Technology Transfers of API Manufacturing
Challenges in Technology Transfers of API ManufacturingChallenges in Technology Transfers of API Manufacturing
Challenges in Technology Transfers of API Manufacturing
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit Pandya
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
incoming inspection reduction
incoming inspection reductionincoming inspection reduction
incoming inspection reduction
 
Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) course
 
RAVI QUALITY
RAVI QUALITYRAVI QUALITY
RAVI QUALITY
 
Chetan QA & MR resume
Chetan QA & MR resumeChetan QA & MR resume
Chetan QA & MR resume
 
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
 
Deven Resume
Deven ResumeDeven Resume
Deven Resume
 
BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
Nikhil paduvilan resume
Nikhil paduvilan resumeNikhil paduvilan resume
Nikhil paduvilan resume
 
TQM Zamil Steel 12345
TQM Zamil Steel 12345TQM Zamil Steel 12345
TQM Zamil Steel 12345
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
hari resume 1
hari resume 1hari resume 1
hari resume 1
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
kshitij_resume_Ln
kshitij_resume_Lnkshitij_resume_Ln
kshitij_resume_Ln
 

Similar to Disposition of Defective Materials by Implementing Various Japanese Techniques

IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET Journal
 
Improvement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and PatternImprovement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and PatternIRJET Journal
 
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...IRJET Journal
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyIRJET Journal
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...IRJET Journal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET Journal
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineIRJET Journal
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolIRJET Journal
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET Journal
 
IRJET- Quality Improvement of Adaptors using Kaizen Technique
IRJET- Quality Improvement of Adaptors using Kaizen TechniqueIRJET- Quality Improvement of Adaptors using Kaizen Technique
IRJET- Quality Improvement of Adaptors using Kaizen TechniqueIRJET Journal
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meetingJitesh Gaurav
 

Similar to Disposition of Defective Materials by Implementing Various Japanese Techniques (20)

IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Improvement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and PatternImprovement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and Pattern
 
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
Ijtra150166
Ijtra150166Ijtra150166
Ijtra150166
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
IRJET- Destiny
IRJET- DestinyIRJET- Destiny
IRJET- Destiny
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
IRJET- Quality Improvement of Adaptors using Kaizen Technique
IRJET- Quality Improvement of Adaptors using Kaizen TechniqueIRJET- Quality Improvement of Adaptors using Kaizen Technique
IRJET- Quality Improvement of Adaptors using Kaizen Technique
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Disposition of Defective Materials by Implementing Various Japanese Techniques

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1747 DISPOSITION OF DEFECTIVE MATERIALS BY IMPLEMENTING VARIOUS JAPANESE TECHNIQUES Sonal Darekar1, Vikram Chillal2, Bhaktipriya Kale3, Anuja Auchare4 1 B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India. 2B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India. 3B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India. 4B.E (Mechannical), Department Of Mechanical Engineering, NBN Sinhgad School Of Engineering, Pune, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Today in these rapid growing world, the Industrial sector is developing vastly. Various issues may occur due to many valid reasons. But in caseif duetoimproper handling and no tag on the defective material; then there are more chances of affecting the quality and customer dissatisfaction. Non Confirming Material is a term which means segregation of defective materials according to various issues. A proper decision making is done and then the material’s disposition is done. Decision is taken on daily basis and a DFR i.e Defect Feedback Report is completed daily to keep the record in the system. In our project we are going to implement various techniques like 5s, Kaizen, JIT etc for proper segregation and disposition. We are going to design a layout for defective materials. This implementation of NCM will help the production line to disposed the material properly. Key Words: NCM (NON CONFORMING MATERIAL), Kaizen, JIT (Just In Time), 5s, DFR (Defective Feedback Report), BIS (before In Service). 1.INTRODUCTION: During adherence of production line of cylinder head and cylinder block we came to know about various quality issues, which are as follows:  Supplier issues.  Blow hole in various parts.  Rust issues.  Excess/Less materials.  Crack, Scratch on material.  Notch missing on connecting rod.  Bar code issue.  Component number missing or wrong.  Ergonomic issues.  Thread missing.  Fitment issue.  Sand inclusion in various part.  Machining surface uneven. All those mentioned issues further affects the quality andmay lead to increase the B.I.Sissue, also sometimes if these defective head and block are further moved ahead to customer i.e. here in this case the customer of production is assembly area; if these defective material is moved to assembly then there are lots of chances of breakdown, failure, customer dissatisfaction also it can tend to affect the reputation of company which is a severe problems. 1.1 Objective : The main aim of our project is disposition of defective materials properly and segregate them according to their issues.Thiswillreduce the quality problems and also the customer dissatisfaction.WehaveintroducedtheNCMto overcome on the issues. 1.2 Non Confirming Materials:  The basic definition of NCM is that,“anypartor product which has been identified as not confirming to any product or process specification. This will be identified through pre determined location,tags,stickersorbinas required.”  In quality management, nonconformity is a deviation fromaspecification,astandard,oran expectation. Nonconformities are classified as critical, major, or minor.  In software engineering, ISO/IEC 9126 distinguishes between a defect and a nonconformity; a defect is the non fulfillment
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1748 of intended usage requirements, whereas a nonconformity is the non fulfillment of a requirement. A similar distinction is made between validation and verification.  The NCM is further classified in three parameters of segregation, they are as follows: 1. Rework 2. Scrap 3. RTV (Return to Vendor) 1.2.1 Description: 1. Rework: Action taken on non confirming product so that it will meet the specified requirements. Basicallyitistheworkdone to correct the defects found associated with a deliverable product plus any root cause analysis, effort to identify thetaskto be re-performed. 2. Scrap: The material which is of no further use is categorized under scrap. It is identifiedasandetachedmaterialfromthe flow of production due to various un solved issues or those issues which can’t be reworked or rectified. 3. RTV: RTV means Return to Vendor. The material which is supposedtoreverttothe vendor due to their issue. In this case the material found defective and the issue is due to the supplier itself then the action of reverting the material to the vendor is executed and for these process there is a online system transaction through which the number of materials are booked and return back to vendor. Image1:-Tag of Non Conforming Material 2. WORK INSTRUCTION (STEPS) The material which is found defective on production line then it is term as non conformingmaterialthenthe identification of issue tag is tie on the material and the material is shifted to NCM area.  Jointly review with MIW, Quality and purchasing a decision is taken on the defected parts and the execution of decisioniscarried.A quality point leader is supposed to look after whether the segregation is carried properly or not. All these information of the defective part is stored in a system.  Identification will be given for NCM part. A proper tagging is done which makes the operator or the employee easy to identify the NCM parts. The tag includes part name, part number, quantity, defectfound,anddecisionto get implemented and signature of the quality point leader. Following are the steps to be followed for NCM process: 1. Reject and scrap part will be painted with red & RTV or Scrap is written on NCM tag. Following are the area where the tag is tied: i) In case of cylinder block on front and rear side of block the tag is tied. ii) On air intake for head. RTV or scrap part will be move to RTV or scrap area. 1 Rework will be written on tag for rework component. i) After rework quality person will give decision either the part is ok or not 2 Ok will be written and sign by quality person on ok part NCM tag. Ok component will be moved to MIW. Before After NCM area was not there for defective materials. NCM area was designed. No proper segregation of defective materials. Proper segregation of defective material. No tagging. Tagging is there. No color coding. Color coding is used. Daily meeting was not carried on defective materials. Daily meeting is carried. Online System transaction is not there. Online System transaction is used. Daily meeting was not carried on defective materials. Daily meeting is carried. No proper segregation of defective materials. NCM area was designed.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1749 3. EXECUTION OF JAPANESE TECNIQUES IN NCM Now a days the Japanese techniques are implemented in various industries to make the process more effective. Westudied various techniques like 5 ‘s’,Poka yoke, Kaizen ,Just In Time, Jidoka and one western technique Six Sigma too. After proper study and comparison of all the techniques on basis of various parameters we decided to execute these three mentioned techniques:  5 ‘s’  Kaizen  Just In Time We found it beneficial after executing these techniques. This helped the process become more effective, easier as well as full proof. 4. CONCLUSIONS After executing the NCM, the process became easyand effective too. Proper disposition of material is done with less usage of time. Less number of workers are needed to carry the process. As the online system transactionis used in NCM , the Return to Vendorissue is carried in least time.Alsoaswestudiedandexecuted the Japanese technique. This made the process full proof. Due to this execution the NCM area is neat and clean. REFERENCES [1]. Andrea Shiffauerovas, Department of mechanical engineering, Mcgill university, Montreal university, Canada.(2011). [2] General Services Administration, Department of Defense, National Aeronautics and Space Administration: Federal Acquisition Regulation, March 2005. [3] A Text Book ofMechanicalSystemDesign,Farazdak Haideri, Third Edition, Chapter 2, Page No. 149 – 241. [4] Mark Hammar (November 18) 2014) ISO 9001 section oncontrol of nonconformingproductidentifies four ways that you can deal with the nonconforming products.