1. Sudarshan Arcade, Flat No. 204, 2nd Floor,Sudarshan Arcade, Flat No. 204, 2nd Floor, Mob.Mob. :: +91 9833509106+91 9833509106
MANGESH B. CHAUREMANGESH B. CHAURE Atali, Ambivali (West), Tal. - Kalyan,Atali, Ambivali (West), Tal. - Kalyan, Email:Email: chauremangesh@gmail.comchauremangesh@gmail.com
Dist. - Thane, Pin: 421 102Dist. - Thane, Pin: 421 102. PASSPORT NO:PASSPORT NO: M7732115M7732115
S U M M A R Y :S U M M A R Y :
Have sound experience in Quality Control & Quality Assurance field with other professional qualifications of NDT
Level II as well Piping Engg. Having excellent problem solving & team management skills.
C A R E E R O B J E C T I V E :C A R E E R O B J E C T I V E :
Looking for a position as an Senior Quality personnel in an organization where my engineering, managing and
supervising skills will support to provide quality services and also a golden chance to explore my career in this field.
W O R K E X P E R I E N C E :W O R K E X P E R I E N C E :
FULL TIMEFULL TIME Urban Transit Pvt. Ltd. (Mumbai Monorail Project)Urban Transit Pvt. Ltd. (Mumbai Monorail Project)
May 2010 to PresentMay 2010 to Present QA/QC EngineerQA/QC Engineer
Managing Internal Audits for Process, Product & System
Prepare Inspection & Test Plan (ITP) as per client requirements when required.
Inspect and verify fabrication work for layout / dimensional / fit-up and visual inspection as per drawing &
specification and performed NDT for the same.
Performing Inspection of Rolling Stock with Client or PMC personnel.
Lab Testing at NABL Approved Laboratories as per Client/PMC requirement to verify compliance to
specifications as per Standards.
Ensuring Compliance & Interfaces of following Subsystems comprises in Mumbai Monorail as per Contract &
Standard requirements.
1) Civil 2) Rolling Stock 3) Signaling
4) Communication 5) Switch beams 6) Depot equipments
Documentation of SOP’s, Quality reports, approvals for - installation, T&C & Operating.
Review of all project plans as well FAI (First Article Inspection) & FAT (Factory Acceptance test) procedures &
reports.
Rejection reporting & analysis through FRACAS. (Failure Reporting and Corrective Action System).
Monitoring, recording & Verification of DCR’s (Design Change Request)
Responsible for activities of Calibration of Various gauges & equipments used for assembly, Installation &
Testing.
FULL TIMEFULL TIME Saint Gobain Abrasives- Grindwell Norton Ltd.Saint Gobain Abrasives- Grindwell Norton Ltd.
April 2006- May 2010April 2006- May 2010 (ISO 9001:2008 & ISO 14001 & ISO 18001)(ISO 9001:2008 & ISO 14001 & ISO 18001)
Asst. Quality ControlAsst. Quality Control
Routine & Development of inspection facility at pre & Final inspection. For all SBU’s
Managed (QA/QC)inspection activities preparation of reports
2. Maintaining Inspection data in MIS system.
Monthly Rejection, rework & Customer complaint analysis for ensuring CAPA using QC Tools, FMEA.
Performed Process & product Audits as per schedule.
QMS- Activities of ISO 9001:2008
Data recording in MIS system.
Worked on World Class Manufacturing with the aid of 5S, EHS, KAIZEN, TPM, Visual Displays
Calibration & Verification of Measuring Instruments, Gauges & testing machines.
ACHIEVEMENTS:ACHIEVEMENTS:
40% rework reduction with various improvements & process changes.
Improve utilization by 40% of Frequency testing by implementing DEPA (Dynamic Elastic Properties Analyzer)
System
Got certification for Individual department for 1S & 2S by external agency. (Qualicon Services, Pune)
Reduced risk index & improve ergonomics in Dept. at different stations.
Lead-time improvement & energy saving with DEPA (Dynamic Elastic Properties Analyzer)
Implemented 7 Kaizens.
FULL TIMEFULL TIME Am Flow Technologies (ISO 9001:2000)Am Flow Technologies (ISO 9001:2000)
Sept.2004 – April 2006Sept.2004 – April 2006 Trainee Production & Quality ControlTrainee Production & Quality Control
Played a key role in production as per customer requirement.
Inspection of all incoming material coming from vendors.
Responsibility of Hydro testing of all valves as per IS & AWWA Standards.
Maintain all ISO documentation.
Collected and collated data for generating periodic reports to monitor plan vs. actual production and delivery
schedules.
Arranged third party inspection of valves as per customer requirement.
ACHIEVEMENTS:ACHIEVEMENTS:
Have got included in the Vendor’s list of BMC, MIDC, KUWS as well as MJP for Kinetic Air Valves which was
inspected by Third party inspectors from Bearou Veritas, SGS, and RITES.
Also developed Sewage Air Relief Valve for Sewage Water lines of CETP
Hydro Testing of Air relief Valves as per IS & AWWA standards
P R O F E S S I O N A L Q U A L I F I C A T I O N :P R O F E S S I O N A L Q U A L I F I C A T I O N :
Pursuing Bachelor Degree of Industrial Engg. From Indian Institute Of Industrial Engg.
ASNT NDT Level II course in UT, RT, MPT, DPT from Academy of Welding & NDT Technology
Post Graduate Diploma In Piping Engg. From Elixir Institute Of Piping Engg. & Technology
Diploma in Mechanical Engg. from Govt. Polytechnic Thane.
3. C O M P U T E R S K I L L S :C O M P U T E R S K I L L S :
CAD Software: AutoCAD
MS- OFFICE (Word, Excel, PowerPoint).