SlideShare a Scribd company logo
1 of 3
Sudarshan Arcade, Flat No. 204, 2nd Floor,Sudarshan Arcade, Flat No. 204, 2nd Floor, Mob.Mob. :: +91 9833509106+91 9833509106
MANGESH B. CHAUREMANGESH B. CHAURE Atali, Ambivali (West), Tal. - Kalyan,Atali, Ambivali (West), Tal. - Kalyan, Email:Email: chauremangesh@gmail.comchauremangesh@gmail.com
Dist. - Thane, Pin: 421 102Dist. - Thane, Pin: 421 102. PASSPORT NO:PASSPORT NO: M7732115M7732115
S U M M A R Y :S U M M A R Y :
Have sound experience in Quality Control & Quality Assurance field with other professional qualifications of NDT
Level II as well Piping Engg. Having excellent problem solving & team management skills.
C A R E E R O B J E C T I V E :C A R E E R O B J E C T I V E :
Looking for a position as an Senior Quality personnel in an organization where my engineering, managing and
supervising skills will support to provide quality services and also a golden chance to explore my career in this field.
W O R K E X P E R I E N C E :W O R K E X P E R I E N C E :
FULL TIMEFULL TIME Urban Transit Pvt. Ltd. (Mumbai Monorail Project)Urban Transit Pvt. Ltd. (Mumbai Monorail Project)
May 2010 to PresentMay 2010 to Present QA/QC EngineerQA/QC Engineer
 Managing Internal Audits for Process, Product & System
 Prepare Inspection & Test Plan (ITP) as per client requirements when required.
 Inspect and verify fabrication work for layout / dimensional / fit-up and visual inspection as per drawing &
specification and performed NDT for the same.
 Performing Inspection of Rolling Stock with Client or PMC personnel.
 Lab Testing at NABL Approved Laboratories as per Client/PMC requirement to verify compliance to
specifications as per Standards.
 Ensuring Compliance & Interfaces of following Subsystems comprises in Mumbai Monorail as per Contract &
Standard requirements.
1) Civil 2) Rolling Stock 3) Signaling
4) Communication 5) Switch beams 6) Depot equipments
 Documentation of SOP’s, Quality reports, approvals for - installation, T&C & Operating.
 Review of all project plans as well FAI (First Article Inspection) & FAT (Factory Acceptance test) procedures &
reports.
 Rejection reporting & analysis through FRACAS. (Failure Reporting and Corrective Action System).
 Monitoring, recording & Verification of DCR’s (Design Change Request)
 Responsible for activities of Calibration of Various gauges & equipments used for assembly, Installation &
Testing.
FULL TIMEFULL TIME Saint Gobain Abrasives- Grindwell Norton Ltd.Saint Gobain Abrasives- Grindwell Norton Ltd.
April 2006- May 2010April 2006- May 2010 (ISO 9001:2008 & ISO 14001 & ISO 18001)(ISO 9001:2008 & ISO 14001 & ISO 18001)
Asst. Quality ControlAsst. Quality Control
 Routine & Development of inspection facility at pre & Final inspection. For all SBU’s
 Managed (QA/QC)inspection activities preparation of reports
 Maintaining Inspection data in MIS system.
 Monthly Rejection, rework & Customer complaint analysis for ensuring CAPA using QC Tools, FMEA.
 Performed Process & product Audits as per schedule.
 QMS- Activities of ISO 9001:2008
 Data recording in MIS system.
 Worked on World Class Manufacturing with the aid of 5S, EHS, KAIZEN, TPM, Visual Displays
 Calibration & Verification of Measuring Instruments, Gauges & testing machines.
ACHIEVEMENTS:ACHIEVEMENTS:
 40% rework reduction with various improvements & process changes.
 Improve utilization by 40% of Frequency testing by implementing DEPA (Dynamic Elastic Properties Analyzer)
System
 Got certification for Individual department for 1S & 2S by external agency. (Qualicon Services, Pune)
 Reduced risk index & improve ergonomics in Dept. at different stations.
 Lead-time improvement & energy saving with DEPA (Dynamic Elastic Properties Analyzer)
 Implemented 7 Kaizens.
FULL TIMEFULL TIME Am Flow Technologies (ISO 9001:2000)Am Flow Technologies (ISO 9001:2000)
Sept.2004 – April 2006Sept.2004 – April 2006 Trainee Production & Quality ControlTrainee Production & Quality Control
 Played a key role in production as per customer requirement.
 Inspection of all incoming material coming from vendors.
 Responsibility of Hydro testing of all valves as per IS & AWWA Standards.
 Maintain all ISO documentation.
 Collected and collated data for generating periodic reports to monitor plan vs. actual production and delivery
schedules.
 Arranged third party inspection of valves as per customer requirement.
ACHIEVEMENTS:ACHIEVEMENTS:
 Have got included in the Vendor’s list of BMC, MIDC, KUWS as well as MJP for Kinetic Air Valves which was
inspected by Third party inspectors from Bearou Veritas, SGS, and RITES.
 Also developed Sewage Air Relief Valve for Sewage Water lines of CETP
 Hydro Testing of Air relief Valves as per IS & AWWA standards
P R O F E S S I O N A L Q U A L I F I C A T I O N :P R O F E S S I O N A L Q U A L I F I C A T I O N :
 Pursuing Bachelor Degree of Industrial Engg. From Indian Institute Of Industrial Engg.
 ASNT NDT Level II course in UT, RT, MPT, DPT from Academy of Welding & NDT Technology
 Post Graduate Diploma In Piping Engg. From Elixir Institute Of Piping Engg. & Technology
 Diploma in Mechanical Engg. from Govt. Polytechnic Thane.
C O M P U T E R S K I L L S :C O M P U T E R S K I L L S :
 CAD Software: AutoCAD
 MS- OFFICE (Word, Excel, PowerPoint).

More Related Content

What's hot (17)

Resume
ResumeResume
Resume
 
Yeucau ve giamsat nhamay
Yeucau ve giamsat nhamayYeucau ve giamsat nhamay
Yeucau ve giamsat nhamay
 
CV_Sankar01072014
CV_Sankar01072014CV_Sankar01072014
CV_Sankar01072014
 
Callibration
CallibrationCallibration
Callibration
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
PQC & Testing
PQC & TestingPQC & Testing
PQC & Testing
 
Resume_Laxmikant
Resume_LaxmikantResume_Laxmikant
Resume_Laxmikant
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
TOM ALLAN CV
TOM ALLAN CVTOM ALLAN CV
TOM ALLAN CV
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
Karthik
KarthikKarthik
Karthik
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) course
 
SUPERVISOR-QC INSPECTOR BASHEER CV
SUPERVISOR-QC INSPECTOR BASHEER CVSUPERVISOR-QC INSPECTOR BASHEER CV
SUPERVISOR-QC INSPECTOR BASHEER CV
 
Callibration
CallibrationCallibration
Callibration
 
Senthilkumar CV
Senthilkumar CVSenthilkumar CV
Senthilkumar CV
 

Similar to Mangesh-Resume (20)

CVDEC14
CVDEC14CVDEC14
CVDEC14
 
jayam
jayamjayam
jayam
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Nanthakumar_SQA (1)
Nanthakumar_SQA (1)Nanthakumar_SQA (1)
Nanthakumar_SQA (1)
 
Sanjiv Mehta_QA.CV
Sanjiv Mehta_QA.CVSanjiv Mehta_QA.CV
Sanjiv Mehta_QA.CV
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Qa,qc
Qa,qcQa,qc
Qa,qc
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
CV.SMK
CV.SMKCV.SMK
CV.SMK
 
CV (1)
CV (1)CV (1)
CV (1)
 
Pavan-CV
Pavan-CVPavan-CV
Pavan-CV
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
cv- L
cv- Lcv- L
cv- L
 
3Q INSPECTION PROFILE
3Q INSPECTION PROFILE3Q INSPECTION PROFILE
3Q INSPECTION PROFILE
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
AKW CV MOD-1
AKW CV MOD-1AKW CV MOD-1
AKW CV MOD-1
 
Engg.Muhammad-ali
Engg.Muhammad-aliEngg.Muhammad-ali
Engg.Muhammad-ali
 
Resume
ResumeResume
Resume
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 

Mangesh-Resume

  • 1. Sudarshan Arcade, Flat No. 204, 2nd Floor,Sudarshan Arcade, Flat No. 204, 2nd Floor, Mob.Mob. :: +91 9833509106+91 9833509106 MANGESH B. CHAUREMANGESH B. CHAURE Atali, Ambivali (West), Tal. - Kalyan,Atali, Ambivali (West), Tal. - Kalyan, Email:Email: chauremangesh@gmail.comchauremangesh@gmail.com Dist. - Thane, Pin: 421 102Dist. - Thane, Pin: 421 102. PASSPORT NO:PASSPORT NO: M7732115M7732115 S U M M A R Y :S U M M A R Y : Have sound experience in Quality Control & Quality Assurance field with other professional qualifications of NDT Level II as well Piping Engg. Having excellent problem solving & team management skills. C A R E E R O B J E C T I V E :C A R E E R O B J E C T I V E : Looking for a position as an Senior Quality personnel in an organization where my engineering, managing and supervising skills will support to provide quality services and also a golden chance to explore my career in this field. W O R K E X P E R I E N C E :W O R K E X P E R I E N C E : FULL TIMEFULL TIME Urban Transit Pvt. Ltd. (Mumbai Monorail Project)Urban Transit Pvt. Ltd. (Mumbai Monorail Project) May 2010 to PresentMay 2010 to Present QA/QC EngineerQA/QC Engineer  Managing Internal Audits for Process, Product & System  Prepare Inspection & Test Plan (ITP) as per client requirements when required.  Inspect and verify fabrication work for layout / dimensional / fit-up and visual inspection as per drawing & specification and performed NDT for the same.  Performing Inspection of Rolling Stock with Client or PMC personnel.  Lab Testing at NABL Approved Laboratories as per Client/PMC requirement to verify compliance to specifications as per Standards.  Ensuring Compliance & Interfaces of following Subsystems comprises in Mumbai Monorail as per Contract & Standard requirements. 1) Civil 2) Rolling Stock 3) Signaling 4) Communication 5) Switch beams 6) Depot equipments  Documentation of SOP’s, Quality reports, approvals for - installation, T&C & Operating.  Review of all project plans as well FAI (First Article Inspection) & FAT (Factory Acceptance test) procedures & reports.  Rejection reporting & analysis through FRACAS. (Failure Reporting and Corrective Action System).  Monitoring, recording & Verification of DCR’s (Design Change Request)  Responsible for activities of Calibration of Various gauges & equipments used for assembly, Installation & Testing. FULL TIMEFULL TIME Saint Gobain Abrasives- Grindwell Norton Ltd.Saint Gobain Abrasives- Grindwell Norton Ltd. April 2006- May 2010April 2006- May 2010 (ISO 9001:2008 & ISO 14001 & ISO 18001)(ISO 9001:2008 & ISO 14001 & ISO 18001) Asst. Quality ControlAsst. Quality Control  Routine & Development of inspection facility at pre & Final inspection. For all SBU’s  Managed (QA/QC)inspection activities preparation of reports
  • 2.  Maintaining Inspection data in MIS system.  Monthly Rejection, rework & Customer complaint analysis for ensuring CAPA using QC Tools, FMEA.  Performed Process & product Audits as per schedule.  QMS- Activities of ISO 9001:2008  Data recording in MIS system.  Worked on World Class Manufacturing with the aid of 5S, EHS, KAIZEN, TPM, Visual Displays  Calibration & Verification of Measuring Instruments, Gauges & testing machines. ACHIEVEMENTS:ACHIEVEMENTS:  40% rework reduction with various improvements & process changes.  Improve utilization by 40% of Frequency testing by implementing DEPA (Dynamic Elastic Properties Analyzer) System  Got certification for Individual department for 1S & 2S by external agency. (Qualicon Services, Pune)  Reduced risk index & improve ergonomics in Dept. at different stations.  Lead-time improvement & energy saving with DEPA (Dynamic Elastic Properties Analyzer)  Implemented 7 Kaizens. FULL TIMEFULL TIME Am Flow Technologies (ISO 9001:2000)Am Flow Technologies (ISO 9001:2000) Sept.2004 – April 2006Sept.2004 – April 2006 Trainee Production & Quality ControlTrainee Production & Quality Control  Played a key role in production as per customer requirement.  Inspection of all incoming material coming from vendors.  Responsibility of Hydro testing of all valves as per IS & AWWA Standards.  Maintain all ISO documentation.  Collected and collated data for generating periodic reports to monitor plan vs. actual production and delivery schedules.  Arranged third party inspection of valves as per customer requirement. ACHIEVEMENTS:ACHIEVEMENTS:  Have got included in the Vendor’s list of BMC, MIDC, KUWS as well as MJP for Kinetic Air Valves which was inspected by Third party inspectors from Bearou Veritas, SGS, and RITES.  Also developed Sewage Air Relief Valve for Sewage Water lines of CETP  Hydro Testing of Air relief Valves as per IS & AWWA standards P R O F E S S I O N A L Q U A L I F I C A T I O N :P R O F E S S I O N A L Q U A L I F I C A T I O N :  Pursuing Bachelor Degree of Industrial Engg. From Indian Institute Of Industrial Engg.  ASNT NDT Level II course in UT, RT, MPT, DPT from Academy of Welding & NDT Technology  Post Graduate Diploma In Piping Engg. From Elixir Institute Of Piping Engg. & Technology  Diploma in Mechanical Engg. from Govt. Polytechnic Thane.
  • 3. C O M P U T E R S K I L L S :C O M P U T E R S K I L L S :  CAD Software: AutoCAD  MS- OFFICE (Word, Excel, PowerPoint).