SlideShare a Scribd company logo
1 of 30
CLUSTER MEMBERS
L.K. Auto Engineering, Noida
Tuff Engineering, Noida
Minda Wire Links Pvt. Ltd., Noida
Mayank Engineering, Noida
Mars Industries, Gurgaon
Minda Instruments Ltd. Pune,
Sylea, Chennai
Sylea, Pondichery
Sylea, Pithampur
Sylea, Murbad (Mumbai)
PROJECT PERIOD
24 Months
MISSION
World Class Manufacturing of Products through World Class Processes and achieve
Global Competitiveness.
COMMON GOALS
Build exactness in operation to achieve a strong foundation by ensuring
basic conditions.
Build Infrastructure for Continuous Improvement through retaining of
improvements and consistency.
Build capabilities for breakthroughs to achieve breakthroughs & Lean for
Competitiveness.
APPROCH :
 Cluster approach is the best way to learn together, progress together
and achieve together.
 Draw a roadmap (Annexure – A) for the cluster in line with that of MHL.
 Current status will be identified based on the audit of these companies as
per audit system of MHL.
 Implementation methodology will include following :
i) Training for the various parameters covered by the roadmap.
ii) Master Action Plan for implementation of parameters.
iii) Implementation of the processes and techniques in the plants.
iv) Review and Monitoring of the implementations in the plant.
v) Report effectiveness of the implementations.
vi) Horizontal Deployment of the implementation in the plant.
 The monitoring will be through internal audits and internal review meetings which will
be conducted weekly/fortnightly.
 An external review in the form of monthly review meeting (MRM) will be conducted once
in a month, in rotation at different plants. Mr. Ashok Minda and Mr. Ram Mohan will
participate in these MRMs.
TRAINING
Training of Key personnel will be conducted by the Teams from MHL& external experts. The
training of all employees of plants will be conducted by local faculty . Training Material will be
provided by MHL.
PROJECT REVIEW & MONITORING
This will be done through Plant Review Meeting (PRM) which will be conducted every fortnight
and Monthly Review Meeting (MRM) which will be conducted every month. The review meeting
will cover following aspects.:
I) Details on Training Completed : Topic, Level Covered, No. of Employees Trained and
feedback on training.
II) Projects implemented and their effectiveness/benefits. Horizontal Deployment of the
projects. Presentation of the best project as identified by the local team. The presentation
should bring out clearly the improvements/changes in the form of “before” and “After”
situation.
III) Details of future projects (next 15 days for PRM and Next one month for MRM) including
training planned.
SL.NO. PARAMETER MEASURE BENCHMARK
1 Quality Customer Rejection 50 PPM
In – House Rejection 100 PPM
Vendor Rejection 100 PPM
Handling/Transit/Storage Rejection 100 PPM
2. Inventory Inventory Turn Ratio 35
3. SMED <10 Minutes 100%
4. Value Addition Value Added to Employee Cost 6
5. Safety Accident Severity 0
Accident Frequency 0
6. 5’S’ Audit Score 75% (Min.)
7. Absenteeism Total (including Leave) 5%
8. Direct to Indirect Employee Ratio 1:0.5
SL.NO. PARAMETER MEASURE BENCHMARK
9. Kaizen No. of Kaizen / Employee/Year,
Employee Participation
12
100%
10. Quality of Inventory Green (Required Today) 96%
Grey (Required Later Than Today) 3%
Red ( Not Required) 1%
11. Process Capability Cpk >1.67
12. VSM Processing Time as a % of Lead Time 25%
13. OEE 80%
Details on benchmark parameters are given in Annexure-B. The local team will work out their
targets based on the present status and their action plan to achieve the required improvement
rate to reach the benchmarks.
GRAPHS AND VISUAL DISPLAYS
Photographs of “Before” and “After” for each parameter, as applicable.
Worst Point Photography.
Graphs as per enclosures CN FORMAT
ANNEXURE – B : KEY BENCHMARK PARAMETERS
1) CUSTOMER REJECTION = Material Returned (Qty.) X10 PPM
Material Shipped (Qty.)
2) IN-HOUSE REJECTION = Material Rejected (Qty.) x 10 PPM
Material Produced (Qty.)
3) VENDOR REJECTION = Material Rejected (Qty) X 10 PPM
(IN COMING REJECTION) Material Received (Qty.)
4) REJECTION DUE = Material Rejected due to damages (Qty.) X 10 PPM
TO DAMAGES Material Produced (Qty.)
5) INVENTORY TURN RATIO(ITR) = Material Cost of Sale (Annualized)
RM+WIP+FG Inventory
6
6
6
6
ANNEXURE – B : KEY BENECHMARK PARAMETERS
6) SMED = Status of SMED X 100 %
Total Critical Machines
7) VALUE ADDED TO = Sales – Variable Cost (Annualized in Rs. Lacs)
EMPLOYEE COST Employee Cost (Annualized Salaries,Wages &Benefits)
8) ACCIDENT SEVERITY RATE = Total Man-hours Lost x 10
Total Man-hours
9) ACCIDENT FREQUENCY RATE = Total Number of Accidents X10
Total Man-hours
10) 5”S” Audit Score = Actual Score X 100 %
Maximum Score
11) ABSENTEEISM = Total Absent Man days X 100 %
Total available Man days
6
6
ANNEXURE – B : KEY BENCHMARK PARAMETERS
12) EMPLOYEE RATIO = Direct Manpower (Nos.)
Indirect Manpower (Nos.)
13) NUMBER OF KAIZENS = Number of Kaizens (Cumulative)
PER EMPLOYEE No. of Employees
14) VALUE ADDED RATIO = Value Adding Time X 100 %
Total lead time
15) OVERALL EQUIPMENT = Machine Availability X Performance Efficiency X %
Efficiency (OEE) Rate of Quality x 100
Machine Availability = Planned Time – Down time
Planned Time
Performance Efficiency = Theoretical Cycle Time
Actual Cycle Time
Rate of Quality = Good Parts (Qty.)
Parts Produced (Qty.)
1. Identify Plant Coordinator for
Improvement activities
2. Define Responsibilities of Plant
Co-ordinator.
3. 5’S’ Activity
3.1 Identify coordinator for 5’S’
3.2 Training of Key-personnel.
3.3 Training of Employees in line
with the training of key personnel.
3.4 Divide the unit into number of
Zones & Sub-Zones.
3.5 Define Organisation comprising
following members for
implementation
- Coordinator for 5’S’
- Zonal Heads
- Sub-Zonal Heads
- Sub-Zonal Members
3.6 Define responsibilities of
coordinator, Zonal – Head & Sub-
Zonal Head.
3.7 Presentation of best case study
of MHL to key personnel.
3.8 Conduct Red-Tag Campaign
across the plant (2 Rounds)- 1’S’
ACTION
JULY,
03
AUG,
03
SEP,
03
OCT,
03
NOV,
03
DEC,
03
JAN,
04
MAR,
04
APR,
04
MAY,
04
FEB,
04
JUNE
04
PERIOD
3.9 2’S’ & 3’S’
3.10 Weekly Internal Audit by
Respective Sub-Zonal Heads.
3.11 Monthly External Audit by
Teams comprising Coordinator
and Zonal Heads.
3.12 Bi-Monthly External Audit
Comprising Unit Head, Corporate
Rep. & Coordinator.
4. 3’M’ Activity
4.1 Identify coordinator for 3’M’
4.2 Training of Key personnel.
4.3 Training of employees in line
with the training imparted to key
personnel.
4.4 Define organization
comprising coordinator for 3’M’
and Section Heads.
4.5 Define roles and
responsibilities of coordinator and
Section Heads.
4.6 Identification of about 500 –
3M’s (MUDA – 7 TYPES, MURA &
MURI).
ACTION
JULY,
03
AUG,
03
SEP,
03
OCT,
03
NOV,
03
DEC,
03
JAN,
04
MAR,
04
APR,
04
MAY,
04
FEB,
04
JUNE
04
PERIOD
4.7 Elimination and Horizontal
deployment.
4.8 Weekly review by coordinator.
4.9 Fortnightly review by Unit
Head.
5. My Machine Campaign
5.1 Identify number of Machines
for “My machine Campaign”
5.2 Form dedicated cross
functional Teams (CFTs)
Comprising Managers and people
from office area, Production,
Quality, Prodn. Eng. And Maint.
5.3 Training of the Team on
concept and importance of the
Campaign.
5.4 Weekly “My Machine” Activity
by each Team.
5.5 Identification and elimination
of small defects.
ACTION
JULY,
03
AUG,
03
SEP,
03
OCT,
03
NOV,
03
DEC,
03
JAN,
04
MAR,
04
APR,
04
MAY,
04
FEB,
04
JUNE
04
PERIOD
5.6 Achieve Zero Breakdowns
continuously for 3 months.
5.7 Prepare Standards for handing
over the Machine to the operator
and Maint. Dept. with a clear
preventive maintenance schedule.
5.8 Horizontal Deployment to other
machines.
ACTION
JULY,
03
AUG,
03
SEP,
03
OCT,
03
NOV,
03
DEC,
03
JAN,
04
MAR,
04
APR,
04
MAY,
04
FEB,
04
JUNE
04
PERIOD
Road Map of Minda Cluster
Input Process Result Impact
Takt Time
Kanban linkage
Logistics Lean &
Inventory
Management
Product
Development
Development
Capability
Lean
Thinking
In-house Self-reliant
Product Development
Product Engineering
Standards
Value Engineering
CAD/CAM
Containerization
Process capability
Standards
Poka Yoke
5’S’
5S
3M
My machine
campaign
Period
Phase-4
Jan,05
To
June,05
Red Tag
SMED
DCS
Stability In Process
Reduced Lead Time
Customer Satisfaction
High ITR
Working Capital Mgmt.
Just-in Time Delivery.
Reliability
Ready to Use (RTU)
Quality
Management
Reduced Customer Rejection
Reduced Customer
Complaints
Reduced Warranty Claims
Reduced Vendor Rejection
Reduced In-house Rejection
Quality
Excellence
Multi - Skilling
Daily Management Discipline
Waste Elimination
Operator Ownership
Job Enlargement /
Enrichment
Culture
Improvement
Phase-3
July,04
To
Dec,04
Phase-2
Jan,04
To
June,04
Phase-1
July,03
To
Dec,03
Direct on Line (DOL)
JULY,
03
AUG,
03
SEP,
03
OCT,
03
NOV,
03
DEC,
03
1’S’
2’S’
3’S’
4’S’
5’S’
1’S’-SORTING, 2’S’-SYSTEMATIC ARRANGEMENT, 3’S’ -SPIC & SPAN, 4’S’- STANDARDISE, 5’S’-
SUSTAIN
1. Overall responsibility for Group wise Coordination of the Minda Cluster
Project for Quality & Productivity Improvement.
2. Formulate Strategies and plans for continuous improvement.
3. Ensuring Group-wide dissemination of learning of the Minda Cluster
Project.
4. Coordinating with external consultants for project related activities.
5. Coordinating with unit head and coordinators of cluster members for
the smooth and faster implementation of this project.
6. Supporting and facilitating the unit head and coordinators of cluster
members in accomplishing Benchmark Parameter.
7. Coordination and preparation of monthly cluster review meetings and
other such meetings/seminars scheduled to be held at MHL or other
plants.
8. Presenting and reporting progress of the cluster in monthly review
meeting.
1. Exposure to Japanese manufacturing management practices
implemented at MHL – Noida under ACT-CII Project.
2. Sharing of issues, problems, difficulties and knowledge with people of
MHL-Noida who have implemented these concepts.
3. Structured system of monitoring and feed back with the help of cluster
Coordinator.
4. All these leading to much easier implementation of change process in
the company.
HOME WORK TO BE PRESENTED BY CLUSTER MEMBERS IN
FIRST MONTHLY REVIEW MEETING TO BE HELD
AT MHL-NOIDA ON 28TH JULY, 2003
1. MINDA WIRE LINKS LTD. , MINDA INSTRUMENTS, MARS INDUSTRIES,
MAYANK ENGG., L.K. AUTO & TUFF ENGG. WILL PRESENT COVERING DETAILS
GIVEN BELOW:
 5’S’ TRAINING : 100% COVERAGE
 SCRAP YARD PHOTOGRAPHS
 WORST POINT PHOTOGRAPHS
 3’M’ TRAINING : 100% COVERAGE
 10 IDENTIFIED MUDAS ALONG WITH ONE SHINING EXAMPLE
5’S ACTIVITY
- Creation of Zones and Sub-Zones
- 5’S’ Organization Structure
- Roles and Responsibilities of Coordinator, Zonal Heads, and Sub-Zonal Heads.
- Red – Tag Campaign : 2 Rounds. Please present quantified list of items Red-Tagged,
their value and details of red-tagged items disposed by you.
THE PRESENTATION WILL BE MADE BY RESPECTIVE UNIT HEADS
2. FOR SYLEA GROUP MEMBERS : THE RESPECTIVE UNIT HEAD WILL PRESENT
FOLLOWING DETAILS :
• 5’S’ TRAINING STATUS AND COVERAGE ACHIEVED
• 5’S’ ORGANISATION CREATED
• Creation of Zones and Sub-Zones
• 5’S’ Organization Structure
• Roles and Responsibilities of Coordinator, Zonal Heads, and Sub-Zonal Heads.
• Red – Tag Campaign : 2 Rounds. Please present quantified list of items Red-Tagg
their value and details of red-tagged items disposed by you.
• Scrap Yard Photographs
• Worst Point Photographs
3.COMMENTS ON :
(a) Proposed Gantt chart for 5’S’ implementation, &
(b) Master action plan
NOTE : The members are requested to bring their presentation in soft copy form on
re-writable CD.
1. TIPS ON PHOTOGRAPHS & PRESENTATION
(a) Follow the MHL Presentation Standards
(b) Photographs, “before” & “after” should be always from the same position.
(c) Focus must be on the spot that you want to show as changes. If necessary use
arrow to indicate.
(d) Title the photographs
(e) Always date the photographs
(f) Always print “before” in red on left and “after” in green on right
(g) Presentation will be on double screens. On one screen there will be main
Microsoft Power Point Presentation. On OHP, there will be supporting slides to
illustrate examples of any point being made.
2. TIPS ON 5’S’ ACTIVITY
(a) The first batch for training of 5’S’ should comprise the 5’S’ organisation team.
(b) The zones should be created keeping following considerations:
- Physical Locations.
- Number of Employees.
- Area
- Ensure that one function does not fall in two zones
(c) 5’S’ ORGANISATION :
COORDINATOR
ZONAL HEAD - 1 ZONAL HEAD -2 ZONAL HEAD - 3
Sub-Zonal Head -A Sub-Zonal Head -B Sub-Zonal Head -C
(d) Roles and Responsibilities : Refer to 5’S’ Presentation by Dr. S.Shekhar.
3. TIPS ON “RED-TAG” COMPAIGN
(a) The red tag strategy is a simple method for identifying potentially unneeded
items in the factory, evaluating their usefulness and dealing with them
appropriately.
(b) An item with red-tag is asking three questions.
- Is this item needed ?
- If it is needed, is it needed in this quantity ?
- If it is needed, does it need to be located here?
(c) Once these items are identified, they can be evaluated and dealt with
appropriately as given below
- Held in a “ Red-tag holding area” for a period of time to see whether they are
needed.
- Disposed off.
- Relocated
- Left exactly where they are.
(d) Red – Tag Holding Area :
- A company-wide red tagging effort needs to establish a central red-tag holding
area. This area is used to manage the following items that can not or should
not be disposed off by individual departments or production areas.
3. TIPS ON “RED-TAG” COMPAIGN
- Each department or production area that participates in red-tag campaign also
needs a local red-tag holding area. The local area is used to mange the flow
of red-tagged items within a department or production area.
(e) Red-Tagging process involves following steps
(i) Launching of the Red-Tag Campaign.
- Organizing a team.
- Organizing supplies.
- Organizing a time or schedule to perform red-tagging (2 days)
- Setting aside a red-tag holding area (Central Location to start with)
- Planning for disposal of red-tagged items.
(ii) Identifying Red-Tag Targets :
- The specific types of items to evaluate are inventory, equipment, tools, jigs,
and space.
- It is better to define a smaller area and evaluate the items fully in available
time.
- As per normal Experience, we can expect 4 red tags per shop floor
employee. That is, a work shop with 50 employees should target 200 red-
tagged items.
(iii) Set Red-Tag Criteria
The most common criterion followed is the next month’s production schedule.
The items needed for that schedule are kept in their location. Items, not
needed for that schedule or moved to a separate location or disposed off.
Following factors determine whether an item is needed or not.
- The usefulness of the item to perform the work on hand.
- The frequency with which the item is needed.
- The quantity of the item needed to perform this work.
Each company must establish its red-tagging criteria.
(iv) Make Red-Tags : 200 Nos. of Red-tag are given to each members to start
the process. Further quantity of Red-tags are to be organised locally by
members.
(v) Arrange the Red-Tag : You should red-tag all identified items without
evaluating what to do with them.
(vi )Evaluate the Red-Tagged Items: The various options are given below.
- Keep the Item where it is.
- Move the Item to a new location in the work area.
- Store the Item away from the work area.
- Hold the Item in the Red –Tag holding area for evaluation. Allow one week to
people to take the Items required.
- dispose off the Items.
Disposal Methods may include following .Disposal should take place within a week.
Make a CFT to decide on disposal.
- Return it to the vendor.
- Distribute it to a different part of the company.
- Lend it out .
- Sell it.
- Throw it away.
(vii) Document the results of Red-Tagging :
Each company need to create their own system for logging and tracking
necessary information as Red-tagging takes place. The system may involve a
written Log Book in the red-tag holding area. It may involve entering data from
the tag into a computer system. Documenting the results of red-Tagging process
allow the company to measure the improvements and saving produced.
Minda Huf Limited
Name of Presentation Chart
Date
17.5 mm 29.5 mm 38.5 mm
6 mm
34.5 mm
1.5mm
17 mm
30 mm
8 mm
13.5 mm
21.5 mm
•Only ARIAL Typography is to be adopted
•Use a minimum of 19 points for headlines and 14 points for main text.
•The background color has to be white for external presentations to customers. However for Internal presentations within the
departments, colored backgrounds can be used.
•The Headline colour has to be BLACK
Starting kick   off meeting

More Related Content

What's hot

Dr Gloria Hillr5
Dr Gloria Hillr5Dr Gloria Hillr5
Dr Gloria Hillr5ghill5709
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23Avinash Wadaskar
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
Implementation of Lean - Case Study
Implementation of Lean - Case StudyImplementation of Lean - Case Study
Implementation of Lean - Case StudyAmeer Hasan Malik
 
Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm) Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm) Rakheeb Basha
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )Jehanzeb Hakim
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM LkdnANUJ Varshney
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingIRJET Journal
 

What's hot (16)

resume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shineresume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shine
 
Vinay 2016
Vinay  2016Vinay  2016
Vinay 2016
 
HARISH1 (1)
HARISH1 (1)HARISH1 (1)
HARISH1 (1)
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
dapski042116
dapski042116dapski042116
dapski042116
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Dr Gloria Hillr5
Dr Gloria Hillr5Dr Gloria Hillr5
Dr Gloria Hillr5
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
Implementation of Lean - Case Study
Implementation of Lean - Case StudyImplementation of Lean - Case Study
Implementation of Lean - Case Study
 
Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm) Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm)
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM Lkdn
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and Scheduling
 
MHCCV_02-08-16
MHCCV_02-08-16MHCCV_02-08-16
MHCCV_02-08-16
 

Similar to Starting kick off meeting

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSomrita Ghatak
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015Daryl Wirges
 
Design of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost ModelDesign of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost ModelTennelli Industries (Pty) Ltd
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS ProjectsJohn Smith
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picshaganone
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecardssanolan
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing CompanyIRJET Journal
 

Similar to Starting kick off meeting (20)

Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Sathishkumar_ Updated
Sathishkumar_ UpdatedSathishkumar_ Updated
Sathishkumar_ Updated
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - Revised
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
amol thakare -
amol thakare -amol thakare -
amol thakare -
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015
 
Design of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost ModelDesign of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost Model
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Resume 1
Resume 1Resume 1
Resume 1
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecards
 
Rajiv cv 170816
Rajiv cv 170816 Rajiv cv 170816
Rajiv cv 170816
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
Diener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - CurriculumDiener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - Curriculum
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

Starting kick off meeting

  • 1.
  • 2.
  • 3. CLUSTER MEMBERS L.K. Auto Engineering, Noida Tuff Engineering, Noida Minda Wire Links Pvt. Ltd., Noida Mayank Engineering, Noida Mars Industries, Gurgaon Minda Instruments Ltd. Pune, Sylea, Chennai Sylea, Pondichery Sylea, Pithampur Sylea, Murbad (Mumbai) PROJECT PERIOD 24 Months MISSION World Class Manufacturing of Products through World Class Processes and achieve Global Competitiveness.
  • 4. COMMON GOALS Build exactness in operation to achieve a strong foundation by ensuring basic conditions. Build Infrastructure for Continuous Improvement through retaining of improvements and consistency. Build capabilities for breakthroughs to achieve breakthroughs & Lean for Competitiveness.
  • 5. APPROCH :  Cluster approach is the best way to learn together, progress together and achieve together.  Draw a roadmap (Annexure – A) for the cluster in line with that of MHL.  Current status will be identified based on the audit of these companies as per audit system of MHL.  Implementation methodology will include following : i) Training for the various parameters covered by the roadmap. ii) Master Action Plan for implementation of parameters. iii) Implementation of the processes and techniques in the plants. iv) Review and Monitoring of the implementations in the plant. v) Report effectiveness of the implementations. vi) Horizontal Deployment of the implementation in the plant.
  • 6.  The monitoring will be through internal audits and internal review meetings which will be conducted weekly/fortnightly.  An external review in the form of monthly review meeting (MRM) will be conducted once in a month, in rotation at different plants. Mr. Ashok Minda and Mr. Ram Mohan will participate in these MRMs. TRAINING Training of Key personnel will be conducted by the Teams from MHL& external experts. The training of all employees of plants will be conducted by local faculty . Training Material will be provided by MHL. PROJECT REVIEW & MONITORING This will be done through Plant Review Meeting (PRM) which will be conducted every fortnight and Monthly Review Meeting (MRM) which will be conducted every month. The review meeting will cover following aspects.: I) Details on Training Completed : Topic, Level Covered, No. of Employees Trained and feedback on training. II) Projects implemented and their effectiveness/benefits. Horizontal Deployment of the projects. Presentation of the best project as identified by the local team. The presentation should bring out clearly the improvements/changes in the form of “before” and “After” situation. III) Details of future projects (next 15 days for PRM and Next one month for MRM) including training planned.
  • 7. SL.NO. PARAMETER MEASURE BENCHMARK 1 Quality Customer Rejection 50 PPM In – House Rejection 100 PPM Vendor Rejection 100 PPM Handling/Transit/Storage Rejection 100 PPM 2. Inventory Inventory Turn Ratio 35 3. SMED <10 Minutes 100% 4. Value Addition Value Added to Employee Cost 6 5. Safety Accident Severity 0 Accident Frequency 0 6. 5’S’ Audit Score 75% (Min.) 7. Absenteeism Total (including Leave) 5% 8. Direct to Indirect Employee Ratio 1:0.5
  • 8. SL.NO. PARAMETER MEASURE BENCHMARK 9. Kaizen No. of Kaizen / Employee/Year, Employee Participation 12 100% 10. Quality of Inventory Green (Required Today) 96% Grey (Required Later Than Today) 3% Red ( Not Required) 1% 11. Process Capability Cpk >1.67 12. VSM Processing Time as a % of Lead Time 25% 13. OEE 80% Details on benchmark parameters are given in Annexure-B. The local team will work out their targets based on the present status and their action plan to achieve the required improvement rate to reach the benchmarks. GRAPHS AND VISUAL DISPLAYS Photographs of “Before” and “After” for each parameter, as applicable. Worst Point Photography. Graphs as per enclosures CN FORMAT
  • 9. ANNEXURE – B : KEY BENCHMARK PARAMETERS 1) CUSTOMER REJECTION = Material Returned (Qty.) X10 PPM Material Shipped (Qty.) 2) IN-HOUSE REJECTION = Material Rejected (Qty.) x 10 PPM Material Produced (Qty.) 3) VENDOR REJECTION = Material Rejected (Qty) X 10 PPM (IN COMING REJECTION) Material Received (Qty.) 4) REJECTION DUE = Material Rejected due to damages (Qty.) X 10 PPM TO DAMAGES Material Produced (Qty.) 5) INVENTORY TURN RATIO(ITR) = Material Cost of Sale (Annualized) RM+WIP+FG Inventory 6 6 6 6
  • 10. ANNEXURE – B : KEY BENECHMARK PARAMETERS 6) SMED = Status of SMED X 100 % Total Critical Machines 7) VALUE ADDED TO = Sales – Variable Cost (Annualized in Rs. Lacs) EMPLOYEE COST Employee Cost (Annualized Salaries,Wages &Benefits) 8) ACCIDENT SEVERITY RATE = Total Man-hours Lost x 10 Total Man-hours 9) ACCIDENT FREQUENCY RATE = Total Number of Accidents X10 Total Man-hours 10) 5”S” Audit Score = Actual Score X 100 % Maximum Score 11) ABSENTEEISM = Total Absent Man days X 100 % Total available Man days 6 6
  • 11. ANNEXURE – B : KEY BENCHMARK PARAMETERS 12) EMPLOYEE RATIO = Direct Manpower (Nos.) Indirect Manpower (Nos.) 13) NUMBER OF KAIZENS = Number of Kaizens (Cumulative) PER EMPLOYEE No. of Employees 14) VALUE ADDED RATIO = Value Adding Time X 100 % Total lead time 15) OVERALL EQUIPMENT = Machine Availability X Performance Efficiency X % Efficiency (OEE) Rate of Quality x 100 Machine Availability = Planned Time – Down time Planned Time Performance Efficiency = Theoretical Cycle Time Actual Cycle Time Rate of Quality = Good Parts (Qty.) Parts Produced (Qty.)
  • 12. 1. Identify Plant Coordinator for Improvement activities 2. Define Responsibilities of Plant Co-ordinator. 3. 5’S’ Activity 3.1 Identify coordinator for 5’S’ 3.2 Training of Key-personnel. 3.3 Training of Employees in line with the training of key personnel. 3.4 Divide the unit into number of Zones & Sub-Zones. 3.5 Define Organisation comprising following members for implementation - Coordinator for 5’S’ - Zonal Heads - Sub-Zonal Heads - Sub-Zonal Members 3.6 Define responsibilities of coordinator, Zonal – Head & Sub- Zonal Head. 3.7 Presentation of best case study of MHL to key personnel. 3.8 Conduct Red-Tag Campaign across the plant (2 Rounds)- 1’S’ ACTION JULY, 03 AUG, 03 SEP, 03 OCT, 03 NOV, 03 DEC, 03 JAN, 04 MAR, 04 APR, 04 MAY, 04 FEB, 04 JUNE 04 PERIOD
  • 13. 3.9 2’S’ & 3’S’ 3.10 Weekly Internal Audit by Respective Sub-Zonal Heads. 3.11 Monthly External Audit by Teams comprising Coordinator and Zonal Heads. 3.12 Bi-Monthly External Audit Comprising Unit Head, Corporate Rep. & Coordinator. 4. 3’M’ Activity 4.1 Identify coordinator for 3’M’ 4.2 Training of Key personnel. 4.3 Training of employees in line with the training imparted to key personnel. 4.4 Define organization comprising coordinator for 3’M’ and Section Heads. 4.5 Define roles and responsibilities of coordinator and Section Heads. 4.6 Identification of about 500 – 3M’s (MUDA – 7 TYPES, MURA & MURI). ACTION JULY, 03 AUG, 03 SEP, 03 OCT, 03 NOV, 03 DEC, 03 JAN, 04 MAR, 04 APR, 04 MAY, 04 FEB, 04 JUNE 04 PERIOD
  • 14. 4.7 Elimination and Horizontal deployment. 4.8 Weekly review by coordinator. 4.9 Fortnightly review by Unit Head. 5. My Machine Campaign 5.1 Identify number of Machines for “My machine Campaign” 5.2 Form dedicated cross functional Teams (CFTs) Comprising Managers and people from office area, Production, Quality, Prodn. Eng. And Maint. 5.3 Training of the Team on concept and importance of the Campaign. 5.4 Weekly “My Machine” Activity by each Team. 5.5 Identification and elimination of small defects. ACTION JULY, 03 AUG, 03 SEP, 03 OCT, 03 NOV, 03 DEC, 03 JAN, 04 MAR, 04 APR, 04 MAY, 04 FEB, 04 JUNE 04 PERIOD
  • 15. 5.6 Achieve Zero Breakdowns continuously for 3 months. 5.7 Prepare Standards for handing over the Machine to the operator and Maint. Dept. with a clear preventive maintenance schedule. 5.8 Horizontal Deployment to other machines. ACTION JULY, 03 AUG, 03 SEP, 03 OCT, 03 NOV, 03 DEC, 03 JAN, 04 MAR, 04 APR, 04 MAY, 04 FEB, 04 JUNE 04 PERIOD
  • 16. Road Map of Minda Cluster Input Process Result Impact Takt Time Kanban linkage Logistics Lean & Inventory Management Product Development Development Capability Lean Thinking In-house Self-reliant Product Development Product Engineering Standards Value Engineering CAD/CAM Containerization Process capability Standards Poka Yoke 5’S’ 5S 3M My machine campaign Period Phase-4 Jan,05 To June,05 Red Tag SMED DCS Stability In Process Reduced Lead Time Customer Satisfaction High ITR Working Capital Mgmt. Just-in Time Delivery. Reliability Ready to Use (RTU) Quality Management Reduced Customer Rejection Reduced Customer Complaints Reduced Warranty Claims Reduced Vendor Rejection Reduced In-house Rejection Quality Excellence Multi - Skilling Daily Management Discipline Waste Elimination Operator Ownership Job Enlargement / Enrichment Culture Improvement Phase-3 July,04 To Dec,04 Phase-2 Jan,04 To June,04 Phase-1 July,03 To Dec,03 Direct on Line (DOL)
  • 18. 1. Overall responsibility for Group wise Coordination of the Minda Cluster Project for Quality & Productivity Improvement. 2. Formulate Strategies and plans for continuous improvement. 3. Ensuring Group-wide dissemination of learning of the Minda Cluster Project. 4. Coordinating with external consultants for project related activities. 5. Coordinating with unit head and coordinators of cluster members for the smooth and faster implementation of this project.
  • 19. 6. Supporting and facilitating the unit head and coordinators of cluster members in accomplishing Benchmark Parameter. 7. Coordination and preparation of monthly cluster review meetings and other such meetings/seminars scheduled to be held at MHL or other plants. 8. Presenting and reporting progress of the cluster in monthly review meeting.
  • 20. 1. Exposure to Japanese manufacturing management practices implemented at MHL – Noida under ACT-CII Project. 2. Sharing of issues, problems, difficulties and knowledge with people of MHL-Noida who have implemented these concepts. 3. Structured system of monitoring and feed back with the help of cluster Coordinator. 4. All these leading to much easier implementation of change process in the company.
  • 21. HOME WORK TO BE PRESENTED BY CLUSTER MEMBERS IN FIRST MONTHLY REVIEW MEETING TO BE HELD AT MHL-NOIDA ON 28TH JULY, 2003 1. MINDA WIRE LINKS LTD. , MINDA INSTRUMENTS, MARS INDUSTRIES, MAYANK ENGG., L.K. AUTO & TUFF ENGG. WILL PRESENT COVERING DETAILS GIVEN BELOW:  5’S’ TRAINING : 100% COVERAGE  SCRAP YARD PHOTOGRAPHS  WORST POINT PHOTOGRAPHS  3’M’ TRAINING : 100% COVERAGE  10 IDENTIFIED MUDAS ALONG WITH ONE SHINING EXAMPLE 5’S ACTIVITY - Creation of Zones and Sub-Zones - 5’S’ Organization Structure - Roles and Responsibilities of Coordinator, Zonal Heads, and Sub-Zonal Heads. - Red – Tag Campaign : 2 Rounds. Please present quantified list of items Red-Tagged, their value and details of red-tagged items disposed by you. THE PRESENTATION WILL BE MADE BY RESPECTIVE UNIT HEADS
  • 22. 2. FOR SYLEA GROUP MEMBERS : THE RESPECTIVE UNIT HEAD WILL PRESENT FOLLOWING DETAILS : • 5’S’ TRAINING STATUS AND COVERAGE ACHIEVED • 5’S’ ORGANISATION CREATED • Creation of Zones and Sub-Zones • 5’S’ Organization Structure • Roles and Responsibilities of Coordinator, Zonal Heads, and Sub-Zonal Heads. • Red – Tag Campaign : 2 Rounds. Please present quantified list of items Red-Tagg their value and details of red-tagged items disposed by you. • Scrap Yard Photographs • Worst Point Photographs 3.COMMENTS ON : (a) Proposed Gantt chart for 5’S’ implementation, & (b) Master action plan NOTE : The members are requested to bring their presentation in soft copy form on re-writable CD.
  • 23. 1. TIPS ON PHOTOGRAPHS & PRESENTATION (a) Follow the MHL Presentation Standards (b) Photographs, “before” & “after” should be always from the same position. (c) Focus must be on the spot that you want to show as changes. If necessary use arrow to indicate. (d) Title the photographs (e) Always date the photographs (f) Always print “before” in red on left and “after” in green on right (g) Presentation will be on double screens. On one screen there will be main Microsoft Power Point Presentation. On OHP, there will be supporting slides to illustrate examples of any point being made. 2. TIPS ON 5’S’ ACTIVITY (a) The first batch for training of 5’S’ should comprise the 5’S’ organisation team. (b) The zones should be created keeping following considerations: - Physical Locations. - Number of Employees. - Area - Ensure that one function does not fall in two zones
  • 24. (c) 5’S’ ORGANISATION : COORDINATOR ZONAL HEAD - 1 ZONAL HEAD -2 ZONAL HEAD - 3 Sub-Zonal Head -A Sub-Zonal Head -B Sub-Zonal Head -C (d) Roles and Responsibilities : Refer to 5’S’ Presentation by Dr. S.Shekhar.
  • 25. 3. TIPS ON “RED-TAG” COMPAIGN (a) The red tag strategy is a simple method for identifying potentially unneeded items in the factory, evaluating their usefulness and dealing with them appropriately. (b) An item with red-tag is asking three questions. - Is this item needed ? - If it is needed, is it needed in this quantity ? - If it is needed, does it need to be located here? (c) Once these items are identified, they can be evaluated and dealt with appropriately as given below - Held in a “ Red-tag holding area” for a period of time to see whether they are needed. - Disposed off. - Relocated - Left exactly where they are. (d) Red – Tag Holding Area : - A company-wide red tagging effort needs to establish a central red-tag holding area. This area is used to manage the following items that can not or should not be disposed off by individual departments or production areas.
  • 26. 3. TIPS ON “RED-TAG” COMPAIGN - Each department or production area that participates in red-tag campaign also needs a local red-tag holding area. The local area is used to mange the flow of red-tagged items within a department or production area. (e) Red-Tagging process involves following steps (i) Launching of the Red-Tag Campaign. - Organizing a team. - Organizing supplies. - Organizing a time or schedule to perform red-tagging (2 days) - Setting aside a red-tag holding area (Central Location to start with) - Planning for disposal of red-tagged items. (ii) Identifying Red-Tag Targets : - The specific types of items to evaluate are inventory, equipment, tools, jigs, and space. - It is better to define a smaller area and evaluate the items fully in available time. - As per normal Experience, we can expect 4 red tags per shop floor employee. That is, a work shop with 50 employees should target 200 red- tagged items.
  • 27. (iii) Set Red-Tag Criteria The most common criterion followed is the next month’s production schedule. The items needed for that schedule are kept in their location. Items, not needed for that schedule or moved to a separate location or disposed off. Following factors determine whether an item is needed or not. - The usefulness of the item to perform the work on hand. - The frequency with which the item is needed. - The quantity of the item needed to perform this work. Each company must establish its red-tagging criteria. (iv) Make Red-Tags : 200 Nos. of Red-tag are given to each members to start the process. Further quantity of Red-tags are to be organised locally by members. (v) Arrange the Red-Tag : You should red-tag all identified items without evaluating what to do with them. (vi )Evaluate the Red-Tagged Items: The various options are given below. - Keep the Item where it is. - Move the Item to a new location in the work area. - Store the Item away from the work area. - Hold the Item in the Red –Tag holding area for evaluation. Allow one week to people to take the Items required. - dispose off the Items.
  • 28. Disposal Methods may include following .Disposal should take place within a week. Make a CFT to decide on disposal. - Return it to the vendor. - Distribute it to a different part of the company. - Lend it out . - Sell it. - Throw it away. (vii) Document the results of Red-Tagging : Each company need to create their own system for logging and tracking necessary information as Red-tagging takes place. The system may involve a written Log Book in the red-tag holding area. It may involve entering data from the tag into a computer system. Documenting the results of red-Tagging process allow the company to measure the improvements and saving produced.
  • 29. Minda Huf Limited Name of Presentation Chart Date 17.5 mm 29.5 mm 38.5 mm 6 mm 34.5 mm 1.5mm 17 mm 30 mm 8 mm 13.5 mm 21.5 mm •Only ARIAL Typography is to be adopted •Use a minimum of 19 points for headlines and 14 points for main text. •The background color has to be white for external presentations to customers. However for Internal presentations within the departments, colored backgrounds can be used. •The Headline colour has to be BLACK