CASE STUDIES : FLOOD
THE MAHARAJA SAYAJIRAO UNIVERSITY OF BARODA
Submitted to :
Prof. NATWAR SHARMA
Submitted by :
Bhensdadia Umang V. (01)
Patel Abhi R. (15)
Vagadia Neel J. (23)
INDEX
• OBJECTIVES
• INRTODUCTION
-LOCATON OF SURAT AND UKAI
-SALIENT FEATURES OF UKAI DAM
• VARIOUS DATA RELATED SURAT FLOOD-2006
-FLOOD HISTORY AT SURAT
-SCENARIO OF FLOOD DURING AUGUST-2006
-FLOOD PREVENTION PLANS
• IT WAS A PREVENTABLE DISASTER
-REASONS FOR FLOOD-2006
-WHAT COULD HAVE BEEN DONE..?
- WHY UKAI AUTHORITIES DID NOT RELEASE 3 LAKH CUSECS FROM 1ST AUGUST..?
• CONCLUSION
INTRODUCTION
-Surat city is situated at the delta region of river Tapi
(India).
-The river Tapi is originating from a mountain Satpuda
and flowing through three states Maharastra, Madhya
Pradesh and Gujarat.
-The river Tapi is merging to the Arabian Sea at about
15 kms away from Surat city.
-Ukai dam controls the flow of water and water level in
the river Tapi, which is 100 kms away from Surat city.
-The dam is constructed at Ukai, Tal: Songadh, Dist:
Surat. It is constructed for irrigation purpose mainly
and also served the purpose of flood control,
generation of hydropower and supply of industrial and
drinking water.
SALIENT FEATURES OF UKAI RESERVOIR
-Location : Songadh, Surat district
-River : Tapi
-Catchment Area : 62 225 sq km
Gujarat : 1 337 sq km (2.15 %)
Maharashtra 51 254 sq km (82.37 %)
Madhya Pradesh 9 634 sq km (15.48%)
-Design flood discharge : 49 490 cumecs (1.75
million cusecs)
-Year of completion : 1972
-Gross storage capacity : 8.511 BCM
-Live storage capacity : 7.092 BCM
-FRL : 105.16 m (345 ft)
-Riverbed level : 47.87 m (157.05 ft)
-Installed power generation capacity : 905 MW
SURAT FLOOD-2006
1) Flood history at Surat
FLOOD
EVENT
DISCHARGE
(LAC CUSECS)
WATER LEVEL AT
HOPE BRIDGE
PERIOD
1883 10.5 11.05 JULY
1884 8.46 10.05 SEPTEMBER
1894 8.01 10.33 JULY
1942 8.60 10.56 AUGUST
1944 11.84 11.32 AUGUST
1945 10.24 11.09 AUGUST
1949 8.42 10.49 SEPTEMBER
1959 12.94 11.55 SEPTEMBER
1968 15.5 12.08 AUGUST
1994 5.25 10.10 AUG.-SEPT.
1998 7.0 11.40 SEPTEMBER
2006 9.09 12.40 AUGUST
2) Scenario of flood during August-2006
DATE LEVEL AT UKAI
(FT.)
INFLOW AT
UKAI
(CUSECS)
DISCHARGE
FROM
UKAI
(CUSECS)
WATER LEVEL AT WIER
CUM CAUSE WAY (m)
WATER LEVEL AT
HOPE BRIDGE (m)
DANGER LEVEL
345 FT.
DANGER LEVEL
6m
DANGER LEVEL
9.5 m
01/08/200
6
331.54 62903 1200 6.71 2.30
02/08/200
6
333.09 75263 1200 6.88 2.36
03/08/200
6
334.44 73715 23784 7.20 1.90
04/08/200
6
335.06 73413 23680 7.02 2.20
05/08/200
6
335.42 150047 125464 6.97 0.90
06/08/200
6
337.12 503027 352056 9.70 6.90
07/08/200 342.98 1166390 829829 - 11.90
REASONS FOR SURAT FLOOD 2006:
1) Heavy rainfall in upstream catchment area
2) Ukai reservoir level
When we compared the Ukai reservoir levels just before the monsoon and at the end
of July for the last four years, we were surprised to find that the levels at Ukai dam
were the highest this year in last four years, both with respect to the level just before
the monsoon and also at the end of July, as is clear from the table below.
YEAR LOWEST LEVEL BEFORE MONSOON LEVEL AT THE
END OF JULYLEVEL (m) DATE
2003 89.91 JUNE 17 94.56
2004 88.02 JULY 25 88.16
2005 85.37 JUNE 24 94.26
2006 90.71 JUNE 29 97.8
3) Water released from Ukai reservoir
It is disturbing to know that even as late
as on Aug 6 evening, the water releases
from Ukai reservoir were just 254780
cusecs when the level had already built up
to 102.57 m, that is reservoir was 83.6%
full at 5.528 BCM live storage. A day
earlier the releases were shockingly low
at 23640 cusecs. This was when during
the eight days preceding this, all the
talukas of Nandurbar district had received
over 25 mm rainfall at least for 4-5 days
including an instance of 260 mm rainfall
in a day and seven instances when rainfall
was over 100 mm. Surgana taluka in
Nashik was also getting similar pattern of
rainfall.
DATE TIME INFLOWS
(CUSECS)
OUTFLOW
(CUSECS)
WATER
LEVEL
(m)
AUGUST 5 8 AM 85958 26664 102.20
8 PM 48554 23640 102.26
AUGUST 6 8 AM 75087 124920 102.14
8 PM 330216 254780 102.57
AUGUST 7 8 AM 853679 409004 103.46
8 PM 1072680 816036 104.22
AUGUST 8 8 AM 1053133 844092 104.97
8 PM 961466 907316 105.33
AUGUST 9 8 AM 856000 850000 105.34
8 PM 711757 650000 105.38
0.4 MILLION CUSECS
0.7 MILLION CUSECS0.6 MILLION CUSECS
0.5 MILLION CUSECS
WHAT COULD HAVE BEEN DONE AT DAM AUTHORITY
LEVEL?
Had the Ukai dam authorities released 300000 cusecs of water
starting from Aug 1, the reservoir level at Ukai would have been
reduced by over 3 BCM by the morning of Aug 6 and the level of
water at the dam would have been 94.2 m (about 2.34 BCM
storage). After this even with all the additional water coming in,
continued outflow of 3-4 lakh cusecs would have been sufficient
to ensure that reservoir does not get full and there would have
been no big flood disaster in SURAT district.
CASE STUDY :
BANGLADESH FLOOD 1998
• Bangladesh is a country in SE Asia
that suffers annual Flooding.
• The floodwaters bring alluvial
sediment which makes the delta and
floodplains very fertile.
• Floods frequently severe causing loss
of life and economic damage.
• Extreme poverty and geographic
pressure increase the suffering.
• Much of the country´s budget must be
used for recovery.
• The flood hazard is due to its
geography: the country is one
huge delta.
• Floodplain contains 250
perennial rivers, of which 56
originate outside the country
(Tibet, Bhutan, India and
Nepal).
• Only 7,5% of the total
catchment area is within the
country and 90% of discharge
originates Elsewhere.
There are Three main rivers in Bangladesh
• The Ganges, whose lower course is known as the Padma / basin
area 1,1 million km, length 2478 km, average maximum
discharge 299 000 cumecs.
• The Brahmaputra, whose lower reaches are known as the
Jamuna / basin area 0,9 km, length 2900 km, average discharge
317 000 cumecs.
• The Meghna, east of the Padma-Jumuna area, length 800 km,
half of which lies in Bangladesh.
Types of Floods in Bangladesh
• Flash floods carry a heavy sediment load, raising the level of river beds, and
are caused by heavy monsoon rains falling on mountains and hill next to the
floodplain.
• River floods occur between May and September as a result of heavy regional
storms or melting of the Himalayan snowpack's.
• Rainfall floods result from localized precipitation during the monsoon rains,
mostly in low-lying areas.
• Cyclonic floods are sea floods and occur when cyclones from the Bay of
Bengal create a storm surge which moves inland.
Causes
• Himalaya snow melt, deforestation leads to soil erosion from increased
surface run-off.
• Silt builds up in rivers, raising water level.
• Monsoon season, tropical storms.
• 80% of Bangladesh is a flood plain.
The Human Causes of the Floods
• Deforestation.
• Dam building.
• Urbanization.
• Global warming.
Deforestation: - The forests play a major role in the hydrology off the upland drainage basins absorbing
water from the ground,, binding the soil particles and reducing the impact off rain droplets on the ground
surface. The removal off the forest cover has reduced interception and increased landslides, soil erosion
and overland flow. It has been estimated that soil is being lost 400 times faster in deforested areas and is
raising the river bed off the Brahmaputra by 5cm per Year.
Dam building: - The building off the Famaka Dam in India in 1971 is blamed for the raising off the river bed
off the Hughley River, a tributary off the Ganges. During the dry season the dam reduces the discharge off
the river encouraging sedimentation on the river bed and increasing the risk off flooding.
Urbanization: - In Bangladesh recent development schemes involving the construction off the networks off
roads and embankments have probably added obstacles to the free drainage off water from the land.
Global warming: - Some people attach considerable blame to global warming and a rise in sea level.. The
Bangladesh floods in 1998 were notable for their long duration off 56 days. This was blamed by some on
the higher sea levels which meant that the surface water on the floodplain took longer to infiltrate. The
same people also attribute the especially high rainfalls in the Himalayas in 1998 to the increased global
temperature.
Effects
• Half the countries surface affected, people dead/injured.
• Families suffering without food, shelter, fresh water, medicines.
• Trying to save livestock.
• Having to live on boats-cramped conditions.
• Transport routes destroyed.
• Disease and reliance on aid.
Influence on inhabitants
• Flooding is part off the normal life for the people in Bangladesh.
• Farming is finely tuned to sessional variations in discharge, and
damage only occurs by natural disasters such as floods and cyclones,
which are unexpected.
Background/Key Facts 1998 flood
• Over 1300 people killed.
• 25 million made homeless.
• The Govt. began work on a Flood Action Plan (FAP) It was hoped the scheme would
provide a long term solution to the countries flooding problems.
Why does Bangladesh flood?
• Split answers into Physical and Human causes.
Source: BBC
Bangladesh is a delta. The
low level of the delta land
means that the country is
prone to flooding. 75% of
Bangladesh is at or below
just 10 metres in height.
Bangladesh also suffers
regularly from
substantial flooding
caused by monsoon rains
and melting snows from
the Himalayas.
Source: World
Infozone.com
Freshwater floods occur when a watershed receives so much water that it
cannot drain into the soil quickly enough to take the water away.
Bangladesh has three mighty rivers, the Ganges, the Jamuna and the
Meghna.
Most floods follow heavy rain or melting snow, frozen ground and already
high river levels. The floods in Bangladesh begin through a combination
of heavy monsoon rains flooding the rivers and abnormally high tides in
the Bay of Bengal preventing floodwater from running off the land and
into the sea.
The likelihood of flooding can be increased by human activities too, such
as too many trees being cut down, stripping the land bare of the vital top
soil which slows and drains water. Also, In built-up areas with a lot of
concrete roads and houses, there are fewer places for water to go and less
soil for water to drain into. So planners in cities prone to flooding have to
develop ways of channelling water to cope with potential floods.
Source: Global Express.org
Where does the flooding occur?
• Identify specific regions that are worst hit.
What are the effects of the floods?
• Split answers into positive and negative.
Bangladesh-Floods
More than 450 people have died and more than 30 million
people in Bangladesh are affected by the recent floods. Of the
country's 64 districts, 43 are affected by the rising waters.
Around 40 per cent of the county's capital, Dhaka, is covered
in water and Government figures report more than 150,000
homes have been destroyed and more than half a million
acres of crops destroyed.
Floodwaters place the population at risk from a range of
water-borne diseases, including diarrhoea, dysentery, typhoid
and cholera. Outbreaks of diarrhoea have already been
reported, especially in the capital, where sewers mix with
floodwater and water supplies are contaminated.
Although Bangladesh is used to floods, this year levels and
coverage has been far worse than normal and the monsoon
season has only just started.
World Vision UK
The deltas of the Ganges and Brahmaputra
rivers in South Asia flood on a seasonal
basis. The flooding keeps the soil fertile
because the rivers deposit silt which forms
fertile soil each year. Partly because of the
flooding, it is one of the most densely
populated areas of the world with millions
of people in Nepal, Northern India and
Bangladesh depending on the rivers and
fertile soils for their livelihoods.
Tear Fund UK
The Flood Action Plan (FAP) was set up in 1990 supported by several wealthy countries and the World Bank. Its aim
was to reduce the impact of the floods that occurred annually in Bangladesh. The FAP’s objectives were to set up
regional planning groups to study and monitor local river processes, followed by the construction of huge
embankments to protect the land, initially from river flooding. It was intended to construct coastal embankments to
protect from storm surges brought by cyclones but these have not been completed. As a result the FAP is not
considered to have been a complete success. Over 3 million people have been killed by coastal flooding in the last 30
years.
The first findings of the FAP in 1995 stated that, while the flood protection scheme was economically desirable for
urban areas, it was not a good idea in rural areas, which are dependent upon fishing and farming.
How have decision makers respond to the flooding?
What issues are faced in implementing strategies in countries like Bangladesh?
Whilst the embankments have been strengthened, increased in height and extended in many
places, the FAP has come across several problems, such as:
1. The Bangladeshi Government cannot afford the high maintenance costs of the scheme
2. The embankments are at risk of erosion from the rivers
3. River channelization by FAP embankments has increased the risk of flood damage for downstream areas
4. An estimated 8 million people were forced to move due to the FAP. These were people who relied on
farming and fishing to support themselves.
5. Today, smaller, more sustainable projects tend to be favoured such as flood embankments to protect
important urban areas (like Dhaka), improved forecasting and early warning systems and the building of
flood shelters (areas of raised land to provide a save haven for people in times of flood).
BBC Bite size
Solutions to the Flood Hazard
Flood action plan 1990-1995 sponsored by World Bank involving:
• Surveying all main rivers and flood areas.
• Raising embankments on west bank of the Brahmaputra.
• Upgrading of embankments on the east bank.
• Five projects using mathematical models and remote sensing to model drainage basin flows.
• Studies of economic, environmental and social problems.
Flood Forecasting
• Increase radar stations in the hills and developing links to a flood forecasting centre.
• Controlled flooding where land can receive flood waters through sluice gates.
• Coastal embankments and polders (low-lying tract of land enclosed by embankments ).
• Self-help “flood-proofing“ which means the development of
irrigated agriculture during the dry season to avoid the monsoon
risk , plus escape centers o high ground, specially designed school
buildings, elevated roads and market-places.
• Dredging the channels- but this is too expensive and the channels
would soon become choked again in one season.
• Special bunds (embankment) to protect the capital city Dhaka.
• Dam construction upstream and groundwater abstraction to
create storage in the soil for monsoon rains.
The Impacts and Responses
• The flooding in 1998 flooded over 57% off the land area.
• Over 1000 people were killed and millions made homeless.
• In Assam in the north-east more than one million people lost their homes in the
Nalbari district 240 village's were submerged.
• Large amounts off farmland and many properties were washed Away.
• An embankment protecting Sandwip, a large coastal island, was breached by a high
tide marooning 1200 families.
• Acute shortages off drinking water and food.
• Infections affected large numbers off people along with outbreaks off diamhoea and
other diseases.
The short-term response to the floods:
The Impacts and Responses
By the Bangladesh government
• Distributed money and 400 tones of rice.
• Provided relief supplies of fresh water and sanitation services.
• Appealed for national unity and calm in the wake of the disaster and the general strike which took
place in response to the flooding and accusations that the government failed to get basic goods to
the people Affected.
By the governments of other countries
Many countries around the world gave aid to Bangladesh during the flood disaster.
Some of the donors included:
• The UK with steel bridge materials and 100 000 million tones of wheat.
• Canada with 12500 million tones of wheat and money for medicines, water tablets, house repair, sanitation
and for rehabilitation of farming and fishing.
• Egypt with money for medicine.
• Saudi Arabia sent two cargo planes with food, medicines, blankets and Tents.
By The Disaster Forum (a network of aid agencies)
• Provided boats to rescue people and
move them and their belongings to
higher land.
• Supplied medicines to treat and
prevent the spread of diseases.
• Médecins Sans Frontières use six
mobile teams in boats to travel
around in one district where the
population was literally living on the
water.
• Supplied clean drinking water by
repairing wells.
• Monitored the health situation and
set up a medical treatment centre.
• Distributed fodder for livestock.
• Distributed food, plastic sheeting and
water purification tablets.
• Planned a rehabilitation programmed
to repair and construct housing and
sanitation.
Conclusion
• Managing the flood hazard is a challenge for government and hydraulic
engineers. In Bangladesh there is still uncertainty over the main causes of the
flood hazard, and further research is required to identify important factors and
the effects of proposed structural solutions. Building embankments and bunds is
particularly controversial: they can prevent floodwaters draining from fields and
back into rivers, and they have an impact on fish stocks, a vital resource in a
country where 5 million depend on fishing for their livelihood.
• Bangladesh faces triple problems in the future: sea level rises, delta subsidence
and reduced delta growth. The net effect by 2100 could be a 3 meter rise of the
sea level and a 2 km retreat of the shore, resulting in a 26% reduction of habitat
land with 27% of the population displaced and GDP reduced by two-thirds.
What planners can do?
 SHORT TERM MEASURES :
• Every reservoir is operated as per the rule book prescribed. It is essential to
follow the rule book without any deviation, to manage the water quantities of the
reservoir. Unnecessary storing the excess water towards the end of the monsoon
season reduces the flood absorption capacity of the reservoir and poses a
potential flood hazard.
• A network of warning sirens is to be installed in the flood prone areas of the
region. These should be able to warn the public at large, giving at least 5 hours
time to act for protection. This should have linkage with releases from Reservoir.
• Detailed contour map (levels) of the city should be properly marked on the
distinct objects in the city with colour codes indicating different water levels
during different intensities of floods.
• River training works and flood control works should be completed on priority.
 LONG TERM MEASURES :
• In order to reduce the releases from the Ukai
Reservoir, diversion canals at the appropriate
locations on its upstream should be provided.
• It is necessary to develop a mathematical model for
flood routing for the entire River Channel Network.
• The encroachments along the banks of the river
have to be removed.
• The present rule book for Reservoir can be
reviewed and can be transformed to
comprehensive guidelines encompassing the
alternatives and their scope of operation during
emergency situations and at the same time
providing the water optimally so as to support the
socio-economic life of City.
• Provide partial flood embankments.
• Create flood plains and overflow
areas of river :
There was a time when
floodplains covered large stretches
along European rivers. Today,
because of urban sprawl, less than
half remain. We need to restore
these floodplains because of their
significant role in flood protection,
water management and nature
conservation. Essentially, what
floodplains do is retain and absorb
water, thereby shielding nearby
towns from the effects of heavy
rainfall.
FLOOD REDUCTION PLAN
1) Desilting from Reservoir
Due to silting in the reservoir the dead storage capacity of dam has been reduced. The
average rate of silting is 1 ft. per year. It is difficult to completely remove mud and silt
from the reservoir, however silt removal devices can be installed to minimize the
silting effects.
2) Increasing the carrying capacity of river.
The effective waterway of river has been reduced over years due to silting. The
dredging of river in certain reaches and other suitable measures can be implemented
to increase the carrying capacity of the river.
3) Construction of flood protection wall
It is necessary to provide flood protection wall on both the banks of river to protect
the residential areas. The existing flood protection wall may not be sufficient in
respect of length and height as well as it is in a damaged condition.
4) Recharge of groundwater
It is necessary to construct widely spread groundwater recharge wells after proper
planning and design in the flood affected area, which can absorb some portion of
the flood water. The recharged water will also be useful for increasing the
groundwater storage, improving the quality of groundwater and control of sea
water intrusion.
5) Spreading of flood water on saline Soil
It is also proposed to divert the floodwater to the existing saline soil areas outside
the city. Such a diversion is possible by construction of suitable diversion channels.
The diverted water will serve the purpose of reclamation of saline soil through
leaching.
 STRUCTURAL MITIGATION MEASURES :
1. Levees:
A levee is an embankment constructed by engineers
out of organic materials such as earth and stone, in order
to prevent the flooding from a free flowing body of water
in a specific location such as a residential community.
2. Flood walls:
Flood walls are constructed out of materials such as
concrete or steel in order to control the flow of
flood waters and prevent the flooding of specific areas.
3. Dams:
The primary purpose of this structure unlike a levee is
to retain water, not to manage flood water. A dam can
produce hydroelectricity as well as regulate water
levels by opening and closing the retaining doors.
Flood walls:
Levees:
 STRUCTURAL MITIGATION MEASURES :
4. Reservoirs:
The man-made lakes produced as a result of the creation
of a dam which can slow the flow of the river
downstream. Furthermore, a reservoir can be used for
fresh water for a community as well as a preserve for fish
and wildlife.
5. Reducing bed roughness:
This method of mitigation smooths the bed of the river,
which allows for the river to flow faster and reduces
the likelihood of a flood.
6. Altering stream channels:
This strategy is similar to reducing the river bed's
roughness. It additionally creates a "V" in the river's
bottom. This deepens, as well as increases, the speed of
the river, reducing the risk of flooding because the water
flows away from the floodplain areas quicker.
Reducing bed roughness:
 NON-STRUCTURAL MITIGATION MEASURES :
1. Land use planning and zoning tools:
Local municipalities can institute zoning laws
in their comprehensive plans in order to
prevent development of residential and
commercial properties in high risk flood
prone areas. This planning can further
restrict where buildings can be constructed,
as well as if these buildings must be flood-
proofed. Flood-proofing is a process that
involves raising the foundation of the
building, berms, flood walls, and/or sealant
in order to prevent or reduce the damages
inflicted from flood waters. Lastly,
local municipalities can
impose eminent domain upon a landowner if
their property has been deemed as a
high recurrence property.
Reducing bed roughness:
 NON-STRUCTURAL MITIGATION MEASURES :
2. Environmentally sensitive area protection:
Areas such as wetlands can be protected by local municipalities by preventing development in
those areas. Furthermore, through the use of eminent domain, a local municipality can reclaim
areas and return them to their natural states.
3. Flood forecasting and warning methods:
By using methods, such as a stream gauge, local officials can determine whether or not a river or
creek will flood based on the level of the water and how quickly it is rising.
4. Planning:
By a local municipality creating a comprehensive and all hazard mitigation plan, communities
can reduce the risk of flood damages to property and life.
DISASTER MITIGATION &MANAGEMENT: Case study of SURAT Flood As national & Bangladesh Flood As International

More Related Content

What's hot

Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
Prasad Thanthratey
 
Water supply demand and Water Quality
Water supply demand and Water Quality Water supply demand and Water Quality
Water supply demand and Water Quality
biometrust
 
urban transformation and planning intervention-1999
 urban transformation and planning intervention-1999 urban transformation and planning intervention-1999
urban transformation and planning intervention-1999
Surajit Bhattacharya
 
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Arun Chandra Babu
 
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
Prerna Jasuja
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
harshilshah546931
 
Kochi city form new
Kochi city form newKochi city form new
Kochi city form new
Prajna Shetty
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
Geeva Chandana
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
liquorstud
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
Fabiha Rahman
 
history of urban spaces-panaji
history of urban spaces-panajihistory of urban spaces-panaji
history of urban spaces-panajiAnjith Augustine
 
Janwani - LAPP JM Rd
Janwani - LAPP JM RdJanwani - LAPP JM Rd
Janwani - LAPP JM Rd
CEPT University
 
Engaging with lakes in Bangalore
Engaging with lakes in BangaloreEngaging with lakes in Bangalore
Engaging with lakes in Bangalore
biometrust
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
Nitish Kumar
 
UDAIPUR TOWN PLANNING
UDAIPUR TOWN PLANNINGUDAIPUR TOWN PLANNING
UDAIPUR TOWN PLANNING
Dipesh Jain
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
Lakshman R
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
misschand
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
ADDA
 

What's hot (20)

Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Water supply demand and Water Quality
Water supply demand and Water Quality Water supply demand and Water Quality
Water supply demand and Water Quality
 
urban transformation and planning intervention-1999
 urban transformation and planning intervention-1999 urban transformation and planning intervention-1999
urban transformation and planning intervention-1999
 
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
 
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
Research paper PLANNING STRATEGIES FOR STORMWATER MANAGEMENT FOR URBAN AREAS:...
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
 
ppp final dpr_02.12.15
ppp final dpr_02.12.15ppp final dpr_02.12.15
ppp final dpr_02.12.15
 
Kochi city form new
Kochi city form newKochi city form new
Kochi city form new
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
history of urban spaces-panaji
history of urban spaces-panajihistory of urban spaces-panaji
history of urban spaces-panaji
 
Janwani - LAPP JM Rd
Janwani - LAPP JM RdJanwani - LAPP JM Rd
Janwani - LAPP JM Rd
 
Engaging with lakes in Bangalore
Engaging with lakes in BangaloreEngaging with lakes in Bangalore
Engaging with lakes in Bangalore
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
 
UDAIPUR TOWN PLANNING
UDAIPUR TOWN PLANNINGUDAIPUR TOWN PLANNING
UDAIPUR TOWN PLANNING
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
Mattachery heritage
Mattachery heritageMattachery heritage
Mattachery heritage
 

Viewers also liked

Disaster management A case Study: How to fight the inevitable
Disaster management A case Study:  How to fight the inevitableDisaster management A case Study:  How to fight the inevitable
Disaster management A case Study: How to fight the inevitable
Asalan Ahmed Malik
 
Disaster management
Disaster management Disaster management
Disaster management
Chetan Ganteppanavar
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai flood
madhura92
 
Part6 disaster-management-risk-mitigation
Part6 disaster-management-risk-mitigationPart6 disaster-management-risk-mitigation
Part6 disaster-management-risk-mitigation
zaffar abbasi
 
Part3 disaster-management-risk-mitigation
Part3 disaster-management-risk-mitigationPart3 disaster-management-risk-mitigation
Part3 disaster-management-risk-mitigation
zaffar abbasi
 
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
UN-SPIDER
 
Part4 disaster-management-risk-mitigation
Part4 disaster-management-risk-mitigationPart4 disaster-management-risk-mitigation
Part4 disaster-management-risk-mitigation
zaffar abbasi
 
Disaster management and mitigation
Disaster management and mitigationDisaster management and mitigation
Disaster management and mitigation
Rubash Sinam
 
Part5 disaster-management-risk-mitigation
Part5 disaster-management-risk-mitigationPart5 disaster-management-risk-mitigation
Part5 disaster-management-risk-mitigation
zaffar abbasi
 
Disaster mitigation and management a futuristic approach
Disaster mitigation and management   a futuristic approachDisaster mitigation and management   a futuristic approach
Disaster mitigation and management a futuristic approach
pavan kumar arigela
 
Part2 disaster-management-risk-mitigation
Part2 disaster-management-risk-mitigationPart2 disaster-management-risk-mitigation
Part2 disaster-management-risk-mitigation
zaffar abbasi
 
SPACE-BASED INFORMATION FOR DISASTER MANAGEMENT AND MITIGATION IN INPE-BRASIL
SPACE-BASED INFORMATION FOR DISASTER  MANAGEMENT AND MITIGATION IN INPE-BRASIL  SPACE-BASED INFORMATION FOR DISASTER  MANAGEMENT AND MITIGATION IN INPE-BRASIL
SPACE-BASED INFORMATION FOR DISASTER MANAGEMENT AND MITIGATION IN INPE-BRASIL
UN-SPIDER
 
Disaster management and case study ppt
Disaster management and case study pptDisaster management and case study ppt
Disaster management and case study ppt
Akash Rana
 
Disaster management cycle, mitigation and preparedness
Disaster management cycle, mitigation and preparednessDisaster management cycle, mitigation and preparedness
Disaster management cycle, mitigation and preparedness
Shivani Khandelwal
 
Disaster Mitigation and Management
Disaster Mitigation and ManagementDisaster Mitigation and Management
Disaster Mitigation and ManagementJNTU
 
Disaster Risk Reduction and Management
Disaster Risk Reduction and ManagementDisaster Risk Reduction and Management
Disaster Risk Reduction and Management
Ryann Castro
 
DRR basic concepts and terminologies of disaster risk reduction DRR
DRR basic concepts and terminologies of disaster risk reduction  DRRDRR basic concepts and terminologies of disaster risk reduction  DRR
DRR basic concepts and terminologies of disaster risk reduction DRR
rizwan81
 
PPT on 10th disaster management
PPT on 10th disaster managementPPT on 10th disaster management
PPT on 10th disaster management
Aniruddha Kawade
 
Disaster Management
Disaster ManagementDisaster Management
Disaster ManagementNc Das
 

Viewers also liked (20)

Disaster management A case Study: How to fight the inevitable
Disaster management A case Study:  How to fight the inevitableDisaster management A case Study:  How to fight the inevitable
Disaster management A case Study: How to fight the inevitable
 
Disaster management
Disaster management Disaster management
Disaster management
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai flood
 
Part6 disaster-management-risk-mitigation
Part6 disaster-management-risk-mitigationPart6 disaster-management-risk-mitigation
Part6 disaster-management-risk-mitigation
 
Part3 disaster-management-risk-mitigation
Part3 disaster-management-risk-mitigationPart3 disaster-management-risk-mitigation
Part3 disaster-management-risk-mitigation
 
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
 
Part4 disaster-management-risk-mitigation
Part4 disaster-management-risk-mitigationPart4 disaster-management-risk-mitigation
Part4 disaster-management-risk-mitigation
 
Disaster management and mitigation
Disaster management and mitigationDisaster management and mitigation
Disaster management and mitigation
 
Part5 disaster-management-risk-mitigation
Part5 disaster-management-risk-mitigationPart5 disaster-management-risk-mitigation
Part5 disaster-management-risk-mitigation
 
Disaster mitigation and management a futuristic approach
Disaster mitigation and management   a futuristic approachDisaster mitigation and management   a futuristic approach
Disaster mitigation and management a futuristic approach
 
Part2 disaster-management-risk-mitigation
Part2 disaster-management-risk-mitigationPart2 disaster-management-risk-mitigation
Part2 disaster-management-risk-mitigation
 
SPACE-BASED INFORMATION FOR DISASTER MANAGEMENT AND MITIGATION IN INPE-BRASIL
SPACE-BASED INFORMATION FOR DISASTER  MANAGEMENT AND MITIGATION IN INPE-BRASIL  SPACE-BASED INFORMATION FOR DISASTER  MANAGEMENT AND MITIGATION IN INPE-BRASIL
SPACE-BASED INFORMATION FOR DISASTER MANAGEMENT AND MITIGATION IN INPE-BRASIL
 
Disaster management and case study ppt
Disaster management and case study pptDisaster management and case study ppt
Disaster management and case study ppt
 
Disaster management cycle, mitigation and preparedness
Disaster management cycle, mitigation and preparednessDisaster management cycle, mitigation and preparedness
Disaster management cycle, mitigation and preparedness
 
Disaster Mitigation and Management
Disaster Mitigation and ManagementDisaster Mitigation and Management
Disaster Mitigation and Management
 
floods
floodsfloods
floods
 
Disaster Risk Reduction and Management
Disaster Risk Reduction and ManagementDisaster Risk Reduction and Management
Disaster Risk Reduction and Management
 
DRR basic concepts and terminologies of disaster risk reduction DRR
DRR basic concepts and terminologies of disaster risk reduction  DRRDRR basic concepts and terminologies of disaster risk reduction  DRR
DRR basic concepts and terminologies of disaster risk reduction DRR
 
PPT on 10th disaster management
PPT on 10th disaster managementPPT on 10th disaster management
PPT on 10th disaster management
 
Disaster Management
Disaster ManagementDisaster Management
Disaster Management
 

Similar to DISASTER MITIGATION &MANAGEMENT: Case study of SURAT Flood As national & Bangladesh Flood As International

Presentation on flood
Presentation on floodPresentation on flood
Presentation on flood
Kathan Sindhvad
 
Floods.ppt
Floods.pptFloods.ppt
Floods.ppt
ProfPGAgnihotri
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Global Risk Forum GRFDavos
 
Flooding 5 Bangladesh Gcse Aqa A
Flooding 5  Bangladesh Gcse Aqa AFlooding 5  Bangladesh Gcse Aqa A
Flooding 5 Bangladesh Gcse Aqa Atudorgeog
 
Flood.pptx
Flood.pptxFlood.pptx
Flood.pptx
ShashiBala79
 
Bangladesh Flooding
Bangladesh FloodingBangladesh Flooding
Bangladesh Floodingsamuel valko
 
Lecture 1 flood
Lecture 1 floodLecture 1 flood
Lecture 1 flood
Dr. H.M.A. Mahzuz
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladesh
James Foster
 
All about godavari river
All about godavari riverAll about godavari river
All about godavari river
E Venkatesh
 
Essential resource of Life- WATER
Essential resource of Life- WATEREssential resource of Life- WATER
Essential resource of Life- WATER
Lovely Singla
 
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).pptDM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
SikanderZulkarnain1
 
Climate Change In Pakistan
Climate Change In Pakistan Climate Change In Pakistan
Climate Change In Pakistan
Zulfiqar Lashari
 
L9 Bangladesh Gcse Aqa A
L9 Bangladesh Gcse Aqa AL9 Bangladesh Gcse Aqa A
L9 Bangladesh Gcse Aqa Atudorgeog
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladeshwhiskeyhj
 
Floods
FloodsFloods
10 a
10 a10 a
Landforms of bangladesh and their relation to natural hazards
Landforms of bangladesh and their relation to natural hazardsLandforms of bangladesh and their relation to natural hazards
Landforms of bangladesh and their relation to natural hazards
Jahangir Alam
 

Similar to DISASTER MITIGATION &MANAGEMENT: Case study of SURAT Flood As national & Bangladesh Flood As International (20)

Presentation on flood
Presentation on floodPresentation on flood
Presentation on flood
 
Floods.ppt
Floods.pptFloods.ppt
Floods.ppt
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
 
Flooding 5 Bangladesh Gcse Aqa A
Flooding 5  Bangladesh Gcse Aqa AFlooding 5  Bangladesh Gcse Aqa A
Flooding 5 Bangladesh Gcse Aqa A
 
Bangladesh floods
Bangladesh floodsBangladesh floods
Bangladesh floods
 
Flood.pptx
Flood.pptxFlood.pptx
Flood.pptx
 
Bangladesh Flooding
Bangladesh FloodingBangladesh Flooding
Bangladesh Flooding
 
Floods
FloodsFloods
Floods
 
Lecture 1 flood
Lecture 1 floodLecture 1 flood
Lecture 1 flood
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladesh
 
All about godavari river
All about godavari riverAll about godavari river
All about godavari river
 
Essential resource of Life- WATER
Essential resource of Life- WATEREssential resource of Life- WATER
Essential resource of Life- WATER
 
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).pptDM presentation for Planning Institute 11 TH Sep 19 (1).ppt
DM presentation for Planning Institute 11 TH Sep 19 (1).ppt
 
Climate Change In Pakistan
Climate Change In Pakistan Climate Change In Pakistan
Climate Change In Pakistan
 
L9 Bangladesh Gcse Aqa A
L9 Bangladesh Gcse Aqa AL9 Bangladesh Gcse Aqa A
L9 Bangladesh Gcse Aqa A
 
floods
floodsfloods
floods
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladesh
 
Floods
FloodsFloods
Floods
 
10 a
10 a10 a
10 a
 
Landforms of bangladesh and their relation to natural hazards
Landforms of bangladesh and their relation to natural hazardsLandforms of bangladesh and their relation to natural hazards
Landforms of bangladesh and their relation to natural hazards
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

DISASTER MITIGATION &MANAGEMENT: Case study of SURAT Flood As national & Bangladesh Flood As International

  • 1. CASE STUDIES : FLOOD THE MAHARAJA SAYAJIRAO UNIVERSITY OF BARODA Submitted to : Prof. NATWAR SHARMA Submitted by : Bhensdadia Umang V. (01) Patel Abhi R. (15) Vagadia Neel J. (23)
  • 2.
  • 3. INDEX • OBJECTIVES • INRTODUCTION -LOCATON OF SURAT AND UKAI -SALIENT FEATURES OF UKAI DAM • VARIOUS DATA RELATED SURAT FLOOD-2006 -FLOOD HISTORY AT SURAT -SCENARIO OF FLOOD DURING AUGUST-2006 -FLOOD PREVENTION PLANS • IT WAS A PREVENTABLE DISASTER -REASONS FOR FLOOD-2006 -WHAT COULD HAVE BEEN DONE..? - WHY UKAI AUTHORITIES DID NOT RELEASE 3 LAKH CUSECS FROM 1ST AUGUST..? • CONCLUSION
  • 4. INTRODUCTION -Surat city is situated at the delta region of river Tapi (India). -The river Tapi is originating from a mountain Satpuda and flowing through three states Maharastra, Madhya Pradesh and Gujarat. -The river Tapi is merging to the Arabian Sea at about 15 kms away from Surat city. -Ukai dam controls the flow of water and water level in the river Tapi, which is 100 kms away from Surat city. -The dam is constructed at Ukai, Tal: Songadh, Dist: Surat. It is constructed for irrigation purpose mainly and also served the purpose of flood control, generation of hydropower and supply of industrial and drinking water.
  • 5. SALIENT FEATURES OF UKAI RESERVOIR -Location : Songadh, Surat district -River : Tapi -Catchment Area : 62 225 sq km Gujarat : 1 337 sq km (2.15 %) Maharashtra 51 254 sq km (82.37 %) Madhya Pradesh 9 634 sq km (15.48%) -Design flood discharge : 49 490 cumecs (1.75 million cusecs) -Year of completion : 1972 -Gross storage capacity : 8.511 BCM -Live storage capacity : 7.092 BCM -FRL : 105.16 m (345 ft) -Riverbed level : 47.87 m (157.05 ft) -Installed power generation capacity : 905 MW
  • 6. SURAT FLOOD-2006 1) Flood history at Surat FLOOD EVENT DISCHARGE (LAC CUSECS) WATER LEVEL AT HOPE BRIDGE PERIOD 1883 10.5 11.05 JULY 1884 8.46 10.05 SEPTEMBER 1894 8.01 10.33 JULY 1942 8.60 10.56 AUGUST 1944 11.84 11.32 AUGUST 1945 10.24 11.09 AUGUST 1949 8.42 10.49 SEPTEMBER 1959 12.94 11.55 SEPTEMBER 1968 15.5 12.08 AUGUST 1994 5.25 10.10 AUG.-SEPT. 1998 7.0 11.40 SEPTEMBER 2006 9.09 12.40 AUGUST
  • 7. 2) Scenario of flood during August-2006 DATE LEVEL AT UKAI (FT.) INFLOW AT UKAI (CUSECS) DISCHARGE FROM UKAI (CUSECS) WATER LEVEL AT WIER CUM CAUSE WAY (m) WATER LEVEL AT HOPE BRIDGE (m) DANGER LEVEL 345 FT. DANGER LEVEL 6m DANGER LEVEL 9.5 m 01/08/200 6 331.54 62903 1200 6.71 2.30 02/08/200 6 333.09 75263 1200 6.88 2.36 03/08/200 6 334.44 73715 23784 7.20 1.90 04/08/200 6 335.06 73413 23680 7.02 2.20 05/08/200 6 335.42 150047 125464 6.97 0.90 06/08/200 6 337.12 503027 352056 9.70 6.90 07/08/200 342.98 1166390 829829 - 11.90
  • 8. REASONS FOR SURAT FLOOD 2006: 1) Heavy rainfall in upstream catchment area 2) Ukai reservoir level When we compared the Ukai reservoir levels just before the monsoon and at the end of July for the last four years, we were surprised to find that the levels at Ukai dam were the highest this year in last four years, both with respect to the level just before the monsoon and also at the end of July, as is clear from the table below. YEAR LOWEST LEVEL BEFORE MONSOON LEVEL AT THE END OF JULYLEVEL (m) DATE 2003 89.91 JUNE 17 94.56 2004 88.02 JULY 25 88.16 2005 85.37 JUNE 24 94.26 2006 90.71 JUNE 29 97.8
  • 9. 3) Water released from Ukai reservoir It is disturbing to know that even as late as on Aug 6 evening, the water releases from Ukai reservoir were just 254780 cusecs when the level had already built up to 102.57 m, that is reservoir was 83.6% full at 5.528 BCM live storage. A day earlier the releases were shockingly low at 23640 cusecs. This was when during the eight days preceding this, all the talukas of Nandurbar district had received over 25 mm rainfall at least for 4-5 days including an instance of 260 mm rainfall in a day and seven instances when rainfall was over 100 mm. Surgana taluka in Nashik was also getting similar pattern of rainfall. DATE TIME INFLOWS (CUSECS) OUTFLOW (CUSECS) WATER LEVEL (m) AUGUST 5 8 AM 85958 26664 102.20 8 PM 48554 23640 102.26 AUGUST 6 8 AM 75087 124920 102.14 8 PM 330216 254780 102.57 AUGUST 7 8 AM 853679 409004 103.46 8 PM 1072680 816036 104.22 AUGUST 8 8 AM 1053133 844092 104.97 8 PM 961466 907316 105.33 AUGUST 9 8 AM 856000 850000 105.34 8 PM 711757 650000 105.38
  • 10.
  • 11. 0.4 MILLION CUSECS 0.7 MILLION CUSECS0.6 MILLION CUSECS 0.5 MILLION CUSECS
  • 12. WHAT COULD HAVE BEEN DONE AT DAM AUTHORITY LEVEL? Had the Ukai dam authorities released 300000 cusecs of water starting from Aug 1, the reservoir level at Ukai would have been reduced by over 3 BCM by the morning of Aug 6 and the level of water at the dam would have been 94.2 m (about 2.34 BCM storage). After this even with all the additional water coming in, continued outflow of 3-4 lakh cusecs would have been sufficient to ensure that reservoir does not get full and there would have been no big flood disaster in SURAT district.
  • 14. • Bangladesh is a country in SE Asia that suffers annual Flooding. • The floodwaters bring alluvial sediment which makes the delta and floodplains very fertile. • Floods frequently severe causing loss of life and economic damage. • Extreme poverty and geographic pressure increase the suffering. • Much of the country´s budget must be used for recovery.
  • 15. • The flood hazard is due to its geography: the country is one huge delta. • Floodplain contains 250 perennial rivers, of which 56 originate outside the country (Tibet, Bhutan, India and Nepal). • Only 7,5% of the total catchment area is within the country and 90% of discharge originates Elsewhere.
  • 16. There are Three main rivers in Bangladesh • The Ganges, whose lower course is known as the Padma / basin area 1,1 million km, length 2478 km, average maximum discharge 299 000 cumecs. • The Brahmaputra, whose lower reaches are known as the Jamuna / basin area 0,9 km, length 2900 km, average discharge 317 000 cumecs. • The Meghna, east of the Padma-Jumuna area, length 800 km, half of which lies in Bangladesh.
  • 17. Types of Floods in Bangladesh • Flash floods carry a heavy sediment load, raising the level of river beds, and are caused by heavy monsoon rains falling on mountains and hill next to the floodplain. • River floods occur between May and September as a result of heavy regional storms or melting of the Himalayan snowpack's. • Rainfall floods result from localized precipitation during the monsoon rains, mostly in low-lying areas. • Cyclonic floods are sea floods and occur when cyclones from the Bay of Bengal create a storm surge which moves inland.
  • 18. Causes • Himalaya snow melt, deforestation leads to soil erosion from increased surface run-off. • Silt builds up in rivers, raising water level. • Monsoon season, tropical storms. • 80% of Bangladesh is a flood plain. The Human Causes of the Floods • Deforestation. • Dam building. • Urbanization. • Global warming.
  • 19. Deforestation: - The forests play a major role in the hydrology off the upland drainage basins absorbing water from the ground,, binding the soil particles and reducing the impact off rain droplets on the ground surface. The removal off the forest cover has reduced interception and increased landslides, soil erosion and overland flow. It has been estimated that soil is being lost 400 times faster in deforested areas and is raising the river bed off the Brahmaputra by 5cm per Year. Dam building: - The building off the Famaka Dam in India in 1971 is blamed for the raising off the river bed off the Hughley River, a tributary off the Ganges. During the dry season the dam reduces the discharge off the river encouraging sedimentation on the river bed and increasing the risk off flooding. Urbanization: - In Bangladesh recent development schemes involving the construction off the networks off roads and embankments have probably added obstacles to the free drainage off water from the land. Global warming: - Some people attach considerable blame to global warming and a rise in sea level.. The Bangladesh floods in 1998 were notable for their long duration off 56 days. This was blamed by some on the higher sea levels which meant that the surface water on the floodplain took longer to infiltrate. The same people also attribute the especially high rainfalls in the Himalayas in 1998 to the increased global temperature.
  • 20. Effects • Half the countries surface affected, people dead/injured. • Families suffering without food, shelter, fresh water, medicines. • Trying to save livestock. • Having to live on boats-cramped conditions. • Transport routes destroyed. • Disease and reliance on aid.
  • 21. Influence on inhabitants • Flooding is part off the normal life for the people in Bangladesh. • Farming is finely tuned to sessional variations in discharge, and damage only occurs by natural disasters such as floods and cyclones, which are unexpected.
  • 22. Background/Key Facts 1998 flood • Over 1300 people killed. • 25 million made homeless. • The Govt. began work on a Flood Action Plan (FAP) It was hoped the scheme would provide a long term solution to the countries flooding problems.
  • 23.
  • 24. Why does Bangladesh flood? • Split answers into Physical and Human causes. Source: BBC Bangladesh is a delta. The low level of the delta land means that the country is prone to flooding. 75% of Bangladesh is at or below just 10 metres in height. Bangladesh also suffers regularly from substantial flooding caused by monsoon rains and melting snows from the Himalayas. Source: World Infozone.com Freshwater floods occur when a watershed receives so much water that it cannot drain into the soil quickly enough to take the water away. Bangladesh has three mighty rivers, the Ganges, the Jamuna and the Meghna. Most floods follow heavy rain or melting snow, frozen ground and already high river levels. The floods in Bangladesh begin through a combination of heavy monsoon rains flooding the rivers and abnormally high tides in the Bay of Bengal preventing floodwater from running off the land and into the sea. The likelihood of flooding can be increased by human activities too, such as too many trees being cut down, stripping the land bare of the vital top soil which slows and drains water. Also, In built-up areas with a lot of concrete roads and houses, there are fewer places for water to go and less soil for water to drain into. So planners in cities prone to flooding have to develop ways of channelling water to cope with potential floods. Source: Global Express.org
  • 25. Where does the flooding occur? • Identify specific regions that are worst hit.
  • 26. What are the effects of the floods? • Split answers into positive and negative. Bangladesh-Floods More than 450 people have died and more than 30 million people in Bangladesh are affected by the recent floods. Of the country's 64 districts, 43 are affected by the rising waters. Around 40 per cent of the county's capital, Dhaka, is covered in water and Government figures report more than 150,000 homes have been destroyed and more than half a million acres of crops destroyed. Floodwaters place the population at risk from a range of water-borne diseases, including diarrhoea, dysentery, typhoid and cholera. Outbreaks of diarrhoea have already been reported, especially in the capital, where sewers mix with floodwater and water supplies are contaminated. Although Bangladesh is used to floods, this year levels and coverage has been far worse than normal and the monsoon season has only just started. World Vision UK The deltas of the Ganges and Brahmaputra rivers in South Asia flood on a seasonal basis. The flooding keeps the soil fertile because the rivers deposit silt which forms fertile soil each year. Partly because of the flooding, it is one of the most densely populated areas of the world with millions of people in Nepal, Northern India and Bangladesh depending on the rivers and fertile soils for their livelihoods. Tear Fund UK
  • 27.
  • 28. The Flood Action Plan (FAP) was set up in 1990 supported by several wealthy countries and the World Bank. Its aim was to reduce the impact of the floods that occurred annually in Bangladesh. The FAP’s objectives were to set up regional planning groups to study and monitor local river processes, followed by the construction of huge embankments to protect the land, initially from river flooding. It was intended to construct coastal embankments to protect from storm surges brought by cyclones but these have not been completed. As a result the FAP is not considered to have been a complete success. Over 3 million people have been killed by coastal flooding in the last 30 years. The first findings of the FAP in 1995 stated that, while the flood protection scheme was economically desirable for urban areas, it was not a good idea in rural areas, which are dependent upon fishing and farming. How have decision makers respond to the flooding?
  • 29. What issues are faced in implementing strategies in countries like Bangladesh? Whilst the embankments have been strengthened, increased in height and extended in many places, the FAP has come across several problems, such as: 1. The Bangladeshi Government cannot afford the high maintenance costs of the scheme 2. The embankments are at risk of erosion from the rivers 3. River channelization by FAP embankments has increased the risk of flood damage for downstream areas 4. An estimated 8 million people were forced to move due to the FAP. These were people who relied on farming and fishing to support themselves. 5. Today, smaller, more sustainable projects tend to be favoured such as flood embankments to protect important urban areas (like Dhaka), improved forecasting and early warning systems and the building of flood shelters (areas of raised land to provide a save haven for people in times of flood). BBC Bite size
  • 30. Solutions to the Flood Hazard Flood action plan 1990-1995 sponsored by World Bank involving: • Surveying all main rivers and flood areas. • Raising embankments on west bank of the Brahmaputra. • Upgrading of embankments on the east bank. • Five projects using mathematical models and remote sensing to model drainage basin flows. • Studies of economic, environmental and social problems. Flood Forecasting • Increase radar stations in the hills and developing links to a flood forecasting centre. • Controlled flooding where land can receive flood waters through sluice gates. • Coastal embankments and polders (low-lying tract of land enclosed by embankments ).
  • 31. • Self-help “flood-proofing“ which means the development of irrigated agriculture during the dry season to avoid the monsoon risk , plus escape centers o high ground, specially designed school buildings, elevated roads and market-places. • Dredging the channels- but this is too expensive and the channels would soon become choked again in one season. • Special bunds (embankment) to protect the capital city Dhaka. • Dam construction upstream and groundwater abstraction to create storage in the soil for monsoon rains.
  • 32. The Impacts and Responses • The flooding in 1998 flooded over 57% off the land area. • Over 1000 people were killed and millions made homeless. • In Assam in the north-east more than one million people lost their homes in the Nalbari district 240 village's were submerged. • Large amounts off farmland and many properties were washed Away. • An embankment protecting Sandwip, a large coastal island, was breached by a high tide marooning 1200 families. • Acute shortages off drinking water and food. • Infections affected large numbers off people along with outbreaks off diamhoea and other diseases.
  • 33. The short-term response to the floods: The Impacts and Responses By the Bangladesh government • Distributed money and 400 tones of rice. • Provided relief supplies of fresh water and sanitation services. • Appealed for national unity and calm in the wake of the disaster and the general strike which took place in response to the flooding and accusations that the government failed to get basic goods to the people Affected. By the governments of other countries Many countries around the world gave aid to Bangladesh during the flood disaster. Some of the donors included: • The UK with steel bridge materials and 100 000 million tones of wheat. • Canada with 12500 million tones of wheat and money for medicines, water tablets, house repair, sanitation and for rehabilitation of farming and fishing. • Egypt with money for medicine. • Saudi Arabia sent two cargo planes with food, medicines, blankets and Tents.
  • 34. By The Disaster Forum (a network of aid agencies) • Provided boats to rescue people and move them and their belongings to higher land. • Supplied medicines to treat and prevent the spread of diseases. • Médecins Sans Frontières use six mobile teams in boats to travel around in one district where the population was literally living on the water. • Supplied clean drinking water by repairing wells. • Monitored the health situation and set up a medical treatment centre. • Distributed fodder for livestock. • Distributed food, plastic sheeting and water purification tablets. • Planned a rehabilitation programmed to repair and construct housing and sanitation.
  • 35. Conclusion • Managing the flood hazard is a challenge for government and hydraulic engineers. In Bangladesh there is still uncertainty over the main causes of the flood hazard, and further research is required to identify important factors and the effects of proposed structural solutions. Building embankments and bunds is particularly controversial: they can prevent floodwaters draining from fields and back into rivers, and they have an impact on fish stocks, a vital resource in a country where 5 million depend on fishing for their livelihood. • Bangladesh faces triple problems in the future: sea level rises, delta subsidence and reduced delta growth. The net effect by 2100 could be a 3 meter rise of the sea level and a 2 km retreat of the shore, resulting in a 26% reduction of habitat land with 27% of the population displaced and GDP reduced by two-thirds.
  • 36. What planners can do?  SHORT TERM MEASURES : • Every reservoir is operated as per the rule book prescribed. It is essential to follow the rule book without any deviation, to manage the water quantities of the reservoir. Unnecessary storing the excess water towards the end of the monsoon season reduces the flood absorption capacity of the reservoir and poses a potential flood hazard. • A network of warning sirens is to be installed in the flood prone areas of the region. These should be able to warn the public at large, giving at least 5 hours time to act for protection. This should have linkage with releases from Reservoir. • Detailed contour map (levels) of the city should be properly marked on the distinct objects in the city with colour codes indicating different water levels during different intensities of floods. • River training works and flood control works should be completed on priority.
  • 37.  LONG TERM MEASURES : • In order to reduce the releases from the Ukai Reservoir, diversion canals at the appropriate locations on its upstream should be provided. • It is necessary to develop a mathematical model for flood routing for the entire River Channel Network. • The encroachments along the banks of the river have to be removed. • The present rule book for Reservoir can be reviewed and can be transformed to comprehensive guidelines encompassing the alternatives and their scope of operation during emergency situations and at the same time providing the water optimally so as to support the socio-economic life of City. • Provide partial flood embankments.
  • 38. • Create flood plains and overflow areas of river : There was a time when floodplains covered large stretches along European rivers. Today, because of urban sprawl, less than half remain. We need to restore these floodplains because of their significant role in flood protection, water management and nature conservation. Essentially, what floodplains do is retain and absorb water, thereby shielding nearby towns from the effects of heavy rainfall.
  • 39. FLOOD REDUCTION PLAN 1) Desilting from Reservoir Due to silting in the reservoir the dead storage capacity of dam has been reduced. The average rate of silting is 1 ft. per year. It is difficult to completely remove mud and silt from the reservoir, however silt removal devices can be installed to minimize the silting effects. 2) Increasing the carrying capacity of river. The effective waterway of river has been reduced over years due to silting. The dredging of river in certain reaches and other suitable measures can be implemented to increase the carrying capacity of the river. 3) Construction of flood protection wall It is necessary to provide flood protection wall on both the banks of river to protect the residential areas. The existing flood protection wall may not be sufficient in respect of length and height as well as it is in a damaged condition.
  • 40. 4) Recharge of groundwater It is necessary to construct widely spread groundwater recharge wells after proper planning and design in the flood affected area, which can absorb some portion of the flood water. The recharged water will also be useful for increasing the groundwater storage, improving the quality of groundwater and control of sea water intrusion. 5) Spreading of flood water on saline Soil It is also proposed to divert the floodwater to the existing saline soil areas outside the city. Such a diversion is possible by construction of suitable diversion channels. The diverted water will serve the purpose of reclamation of saline soil through leaching.
  • 41.  STRUCTURAL MITIGATION MEASURES : 1. Levees: A levee is an embankment constructed by engineers out of organic materials such as earth and stone, in order to prevent the flooding from a free flowing body of water in a specific location such as a residential community. 2. Flood walls: Flood walls are constructed out of materials such as concrete or steel in order to control the flow of flood waters and prevent the flooding of specific areas. 3. Dams: The primary purpose of this structure unlike a levee is to retain water, not to manage flood water. A dam can produce hydroelectricity as well as regulate water levels by opening and closing the retaining doors. Flood walls: Levees:
  • 42.  STRUCTURAL MITIGATION MEASURES : 4. Reservoirs: The man-made lakes produced as a result of the creation of a dam which can slow the flow of the river downstream. Furthermore, a reservoir can be used for fresh water for a community as well as a preserve for fish and wildlife. 5. Reducing bed roughness: This method of mitigation smooths the bed of the river, which allows for the river to flow faster and reduces the likelihood of a flood. 6. Altering stream channels: This strategy is similar to reducing the river bed's roughness. It additionally creates a "V" in the river's bottom. This deepens, as well as increases, the speed of the river, reducing the risk of flooding because the water flows away from the floodplain areas quicker. Reducing bed roughness:
  • 43.  NON-STRUCTURAL MITIGATION MEASURES : 1. Land use planning and zoning tools: Local municipalities can institute zoning laws in their comprehensive plans in order to prevent development of residential and commercial properties in high risk flood prone areas. This planning can further restrict where buildings can be constructed, as well as if these buildings must be flood- proofed. Flood-proofing is a process that involves raising the foundation of the building, berms, flood walls, and/or sealant in order to prevent or reduce the damages inflicted from flood waters. Lastly, local municipalities can impose eminent domain upon a landowner if their property has been deemed as a high recurrence property. Reducing bed roughness:
  • 44.  NON-STRUCTURAL MITIGATION MEASURES : 2. Environmentally sensitive area protection: Areas such as wetlands can be protected by local municipalities by preventing development in those areas. Furthermore, through the use of eminent domain, a local municipality can reclaim areas and return them to their natural states. 3. Flood forecasting and warning methods: By using methods, such as a stream gauge, local officials can determine whether or not a river or creek will flood based on the level of the water and how quickly it is rising. 4. Planning: By a local municipality creating a comprehensive and all hazard mitigation plan, communities can reduce the risk of flood damages to property and life.