Instructor: Laura Gerold, PE
                Catalog #10614113
       Class # 22784, 24113, 24136, & 24138
Class Start: January 18, 2012 Class End: May 16,
                       2012
“Jefferson had a precise and detailed sense
   of geography. Had he not been so busy
       with all of his other interests and
  obligations, one might imagine him as an
 important mapmaker, with his passion for
 accurate representation, his draftsmanship
and devotion to the study of land.” Lions of
      the West by Robert Morgan (2011)
   Create a set of hand-sketched plans that
    include the following:
     Drawing Border
     Scale
     Six Orthographic Standard Views (page 165 text)
     Auxiliary Views (If Needed)
     Section View(s)
     Dimensions
The system of views is called multiview projection. Each view provides
certain definite information (Chapter 5).
   Items Appropriate for the Project
   Items Not Appropriate for the Project
   2/22/12 – Project Proposal Due (10 Points)
       Write a brief memo describing the object you plan on
        drawing including plans for how to scale the object.
       Memo should include the following information in
        the header:
         To: Laura Gerold
         From: Thomas Jefferson
         Date: February 22, 2012
         Subject: Teakettle Project Plans for 2D Essentials
       Memo should also include a photo or a freehand
        sketch of your item.
   4/4/12 – 50% Project Plans Due (30 points)
    Turn in what you have drawn so far and
    comments will be added to your plans on Post-
    it notes.
   Plans at this point should include:
       scale
       drawing border
       three views
   5/9/12 – Final Plans Due including all
    elements (100 points)
   5/16/12 – Plans returned with score (140
    points total including proposal, 50% plans, and
    final)
Thick and Thin Drawing Lines




Freehand line technique




Line styles
ALPHABET OF LINES

•   Visible Line – The line that you can see when viewing
    an object. It should indicate all visible edges of an
    object. They should stand out clearly in contrast to
    other lines so the shape of an object is apparent to the
    eye.
•   Hidden Line - Used to show surfaces, edges, or
    corners of an object that are hidden from view
ALPHABET OF LINES
•   Section Line – Used to indicate the surface in the
    section view imagined to have been cut along the
    cutting plane line.
•   Centerline – Centerlines are used to show
    symmetrical features. Examples are the center of
    holes or roads.
•   Symmetry – Symmetry lines are used when partial
    views of symmetrical parts are drawn.
ALPHABET OF LINES

•   Dimension and Extension Lines– Used when
    dimensioning an object.
•   Leaders – Used to indicate the part of the drawing
    to which the note or description refers.
    Arrowheads should touch the object lines.
ALPHABET OF LINES

•   Cutting-plane Lines– Used to designate where an
    imaginary cutting took place.
•   Viewing-plane lines – Used to indicate direction
    of sight when a partial view is used.
•   Same lines used for both.
ALPHABET OF LINES

•   Short-break Line– Used when it is desirable to
    shorten the view of a long part.
•   Long-break Line– Same definition as short-break
    line
ALPHABET OF LINES
•   Phantom Line – Used to indicate alternate position of moving
    parts, adjacent position of moving parts, adjacent position of
    related parts, and repetitive detail. It represents a feature or
    component that is not part of the specified part or assembly.
    E.g. billet ends that may be used for testing, or the machined
    product that is the focus of a tooling drawing.
•   Stitch Line – Used for indicating a sewing or stitching process.
•   Chain Line - Used to indicate that a surface or zone to receive
    additional treatment or considerations.
   Coffee Mug Project (Freehand Draw)
     Visible Lines
     Hidden Lines
     Centerline
     Symmetry Line
     Dimension Line (make up a dimension!)
     Leader
     Cutting-plane Line
     Short-break Line
The main difference between an instrument or CAD drawing and a freehand
sketch is in the appearance of the lines. A good freehand line is not expected to
be precisely straight or exactly uniform, as is a CAD or instrument-drawn line.
Freehand lines show freedom and variety.




       Freehand construction lines are very light, rough lines. All
       other lines should be dark and clean.
U.S. Customary Units




               The Metric System




Dual-Dimensioned
• Drawing scale is the reduction or enlargement of the drawn
  object relative to the real object.
• On a scale of 1:2, the first number, 1 represents the size of
  the object on the drawing. The second number, 2,
  represents the size of the object in the real world.




Reduced and Enlarged Scale. Many drawings must be shown at reduced scale for the
object to fit on the paper.
For a part that is shown
on the paper at half its
actual size, the scale is
listed in one of these three
ways:
       SCALE: 1:2
       SCALE: 1/2
       SCALE: .5


Architectural drawings list
the scale based on the
number of fractions of an
inch on the drawing that
represent one foot on the
actual object. Example:        List the predominant drawing scale in the title
                               block. (Courtesy of Dynojet Research, Inc.)
      SCALE: 1/8" 1'
Scales are measuring
tools used to quickly
enlarge or reduce
Drawing
measurements.




                        Types of Scales
An engineers’ scale (also called a civil engineers’ scales) is a decimal
scale graduated in units of 1 inch divided into 10, 20, 30, 40, 50, and 60
parts.




 Because the engineers’ scale divides inches into decimal units, it is
 convenient in machine drawing to set off inch dimensions expressed in
 decimals.
   Engineers scales are usually used for large areas
    that you are trying to “scale down” for use on
    large scale plans or maps
   Use Decimals
   1:10 Scale, 1” = 1’, then each division is equal to 0.1
    ft.
   1:10 scale is equal to 1” = 10’, 100’, 1000’
   10 Scale can be used as a ruler and can be used to
    set off inch dimensions as decimals
   To make a half size drawing from an original
    drawing that used a 10 scale, use a 20 scale
   Measure Pipe and Stone Drains Length on
    Bioretention Plan
   Apply an engineer scale to an object
   Draw a 62.5’ x 84.8’ Room
Full Size 1:1 scale




The triangular scales have
one full-size scale and five
reduced-size scales, all
fully divided.
Using these scales, a
drawing can be made full
size, enlarged sized, or
reduced sized.




               Half Size 1:2 scale
   Similar to engineer scale, but using metric
    system
   Full Size is 1:1 scale
       Division is 1 mm in width with calibrations at 10
        mm intervals
   Half Size is 1:2 Scale
       Division is 2 mm in width with calibrations at 20
        mm intervals
   Used for maps, force diagrams, graphical
    constructions with scales such as 1 mm = 1 kg
The architects’ scale is intended primarily for drawings of buildings, piping
systems, and other large structures that must be drawn to a reduced scale
to fit on a sheet of paper.




                                                AutoCAD software users sometimes
                                                become confused using architectural
                                                units. When selecting architectural
                                                units and entering lengths, keep in mind
                                                that a value of 1 is one inch, not one foot.




 How To Architect - Scale
   On an architect scale, 1/8” = 1’
   Full Size
       16 Scale – Sixteen divisions per inch
   Half Size
       To create half size plans, use the full size scale and
        divide every dimension by two
       Do not use the ½ scale, which is ½ = 1”
   Double Size
       Use your full size scale and multiply everything by
        two
   1/16 or 1/8 scale is typically used for overall
    building plan dimensions
   ¼ is used for detail plans
   3/8, ½, 1 are used for large details (building
    sections)
   ¾ and 1 ½ are used for details
   Measure Plans
   Apply an architect scale to an object
   Draw a 15’-2” x 25’-4” Room
Mechanical engineers’ scales are divided into units representing inches
to full size, half size, quarter size, or eighth size.




To draw an object to a scale of half size, for example, use the mechanical
engineers’ scale marked half size, which is graduated so that ever ½”
represents 1". In other words, the half-size scale is simply a full-size scale
compressed to half size.

                                               Triangular combination scales are available that
                                               include full- and half-size mechanical engineers’
                                               scales, several architects’ scales, and an
                                               engineers’ scale all on one stick.
Lettered text is often necessary to completely describe an object or to
provide detailed specifications. Lettering should be legible, be easy to
create, and use styles acceptable for traditional drawing and CAD drawing.



                                      Engineering drawings use single-stroke
                                      sans serif letters because they are
                                      highly legible and quick to draw.


                                             Sans serif means without
                                             serifs, or spurs
• Most hand-drawn notes use lettering
                                       about 3 mm (1/8") high.

                                     • CAD notes are set using the
                                       keyboard and sized to be in the
                                       range of 3 mm (1/8") tall according
                                       to the plotted size of the drawing.
An Example of Lettering and Titles
          Using CAD
                                     • CAD drawings typically use a
                                       Gothic lettering style but often use
When adding lettering to a
                                       a Roman style for titles.
CAD drawing, a good rule of
thumb is not to use more than
two fonts within the same
drawing.
The proportions
of vertical capital
letters and numbers
are shown
Lowercase letters are rarely used in engineering sketches except for
lettering large volumes of notes. Vertical lowercase letters are used on
map drawings, but very seldom on machine drawings.




                 When large and small capitals
                 are combined, the small
                 capitals should be three fifths
                 to two thirds the height of the
                 large capitals.
Inclined (italic)
capital letters and
numerals, are
similar to vertical
characters, except
for the slope. The
slope of the letters is
about 68° from the
horizontal.
Do’s & Don’t

• Never let numerals touch the fraction bar.
• Center the denominator under the numerator.
• Avoid using an inclined fraction bar, except when lettering
  in a narrow space, as in a parts list.
• Make the fraction bar slightly longer than the widest part
  of the fraction.
Use extremely light horizontal guidelines to keep letter height uniform…


                                                                Do not use vertical
                                                                guidelines to space the
                                                                distance from one
                                                                letter to the next within
                                                                a word or sentence.




For even freehand letters:
• Use 1/8" gridded paper for drawing to make lettering easy.
• Use a scale and set off a series of spaces, making both the
  letters and the spaces between lines of letters 1/8" high.
• Use a guideline template like the Berol Rapidesign 925
• For whole numbers and fractions, draw five equally
  spaced guidelines.
Spacing between Letters
Uniform spacing between letters is done by
eye. Contrary to what might seem logical,
putting equal distances from letter to letter
causes them to appear unequally spaced.

Spacing between Words
Space letters closely within words to
make each word a compact unit, but
space words well enough apart to clearly
separate them from adjacent words.

Spacing between Rows
Be sure to leave space between rows of
lettering, usually equal to the letter height.
In most cases, the title and
related information are
lettered in title boxes or title
strips




When lettering by hand,
arrange the title symmetrically
about an imaginary centerline
   How to Write Like an Architect
   Use a Ruler for even lines
   Use the Ames Lettering Guide
   Lettering Example (Worksheet 2)
   Lettering Example (Finish Plan)
High-quality drawing pencils help produce good quality
 technical sketches and drawings.

Hard                       Medium                          Soft
The hard leads in this     These grades are for            These leads are too
group (left) are used      general-purpose work in         soft to be useful in
where extreme              technical drawing. The          mechanical drafting.
accuracy is required,      softer grades (right) are       They tend to produce
as on graphical            used for technical sketching,   smudged, rough lines
computations and           lettering, arrowheads,          that are hard to erase,
charts and diagrams.       and other freehand work         and the lead must be
The softer leads in this   on mechanical drawings.         sharpened continually.
group (right) are          The harder leads (left) are     These grades are used
sometimes used for         used for line work on           for artwork of various
line work on               machine drawings and            kinds, and for full-size
engineering drawings,      architectural drawings. The     details in architectural
but their use is limited   H and 2H leads are widely       drawing.
because the lines are      used on pencil tracings for
apt to be too light.       reproduction.
You might be surprised how much your drawings benefit from finding a style of pencil
that suits your use. Soft pencils, such as HB or F, are mainly used in freehand
sketching.
Choose a pencil that:
• Is soft enough to produce clear black lines, but hard enough not to
   smudge too easily.
• Is not so soft that the point breaks
   easily.
• Feels comfortable in your hand.
• Grips the lead without slipping.
Many choices of media (paper and other) are available for particular
sketching or drawing purposes. Whether you are sketching or are plotting
a drawing from a CAD workstation, choose the type of sheet and size that
suits your needs.

Small notebooks or sketch pads
are useful when working at a site
or when it is necessary to quickly
record information.


Graph paper can be helpful in
making neat sketches




                                            Sketch on Graph Paper
There are ANSI/ASME standards for international and U.S. sheet
sizes. Note that drawing sheet size is given as height width. Most
standard sheets use what is called a “landscape” orientation.




          * May also be used as a vertical sheet size at 11" tall by 8.5" wide.
• Margins and Borders
• Zones
The title block is located in the lower right corner of the format.
Standard areas in the title block provide the information as
shown below.
When laying out a drawing sheet, you will
need to consider:
• the size and scale of the object you will
   show
• the sheet size
• the measurement system (units) for the
   drawing
• the space necessary for standard notes
   and title block.


The object you are drawing is the “star” of the sketch. Keep the object
near the center of the sheet. It should be boldly drawn, using
thick visible lines. Make it large enough to fill most of the sheet and so that
details show clearly

Class 2 presentation posted

  • 1.
    Instructor: Laura Gerold,PE Catalog #10614113 Class # 22784, 24113, 24136, & 24138 Class Start: January 18, 2012 Class End: May 16, 2012
  • 2.
    “Jefferson had aprecise and detailed sense of geography. Had he not been so busy with all of his other interests and obligations, one might imagine him as an important mapmaker, with his passion for accurate representation, his draftsmanship and devotion to the study of land.” Lions of the West by Robert Morgan (2011)
  • 4.
    Create a set of hand-sketched plans that include the following:  Drawing Border  Scale  Six Orthographic Standard Views (page 165 text)  Auxiliary Views (If Needed)  Section View(s)  Dimensions
  • 5.
    The system ofviews is called multiview projection. Each view provides certain definite information (Chapter 5).
  • 6.
    Items Appropriate for the Project  Items Not Appropriate for the Project
  • 7.
    2/22/12 – Project Proposal Due (10 Points)  Write a brief memo describing the object you plan on drawing including plans for how to scale the object.  Memo should include the following information in the header:  To: Laura Gerold  From: Thomas Jefferson  Date: February 22, 2012  Subject: Teakettle Project Plans for 2D Essentials  Memo should also include a photo or a freehand sketch of your item.
  • 8.
    4/4/12 – 50% Project Plans Due (30 points)  Turn in what you have drawn so far and comments will be added to your plans on Post- it notes.  Plans at this point should include:  scale  drawing border  three views
  • 9.
    5/9/12 – Final Plans Due including all elements (100 points)  5/16/12 – Plans returned with score (140 points total including proposal, 50% plans, and final)
  • 10.
    Thick and ThinDrawing Lines Freehand line technique Line styles
  • 11.
    ALPHABET OF LINES • Visible Line – The line that you can see when viewing an object. It should indicate all visible edges of an object. They should stand out clearly in contrast to other lines so the shape of an object is apparent to the eye. • Hidden Line - Used to show surfaces, edges, or corners of an object that are hidden from view
  • 12.
    ALPHABET OF LINES • Section Line – Used to indicate the surface in the section view imagined to have been cut along the cutting plane line. • Centerline – Centerlines are used to show symmetrical features. Examples are the center of holes or roads. • Symmetry – Symmetry lines are used when partial views of symmetrical parts are drawn.
  • 13.
    ALPHABET OF LINES • Dimension and Extension Lines– Used when dimensioning an object. • Leaders – Used to indicate the part of the drawing to which the note or description refers. Arrowheads should touch the object lines.
  • 14.
    ALPHABET OF LINES • Cutting-plane Lines– Used to designate where an imaginary cutting took place. • Viewing-plane lines – Used to indicate direction of sight when a partial view is used. • Same lines used for both.
  • 15.
    ALPHABET OF LINES • Short-break Line– Used when it is desirable to shorten the view of a long part. • Long-break Line– Same definition as short-break line
  • 16.
    ALPHABET OF LINES • Phantom Line – Used to indicate alternate position of moving parts, adjacent position of moving parts, adjacent position of related parts, and repetitive detail. It represents a feature or component that is not part of the specified part or assembly. E.g. billet ends that may be used for testing, or the machined product that is the focus of a tooling drawing. • Stitch Line – Used for indicating a sewing or stitching process. • Chain Line - Used to indicate that a surface or zone to receive additional treatment or considerations.
  • 17.
    Coffee Mug Project (Freehand Draw)  Visible Lines  Hidden Lines  Centerline  Symmetry Line  Dimension Line (make up a dimension!)  Leader  Cutting-plane Line  Short-break Line
  • 18.
    The main differencebetween an instrument or CAD drawing and a freehand sketch is in the appearance of the lines. A good freehand line is not expected to be precisely straight or exactly uniform, as is a CAD or instrument-drawn line. Freehand lines show freedom and variety. Freehand construction lines are very light, rough lines. All other lines should be dark and clean.
  • 19.
    U.S. Customary Units The Metric System Dual-Dimensioned
  • 20.
    • Drawing scaleis the reduction or enlargement of the drawn object relative to the real object. • On a scale of 1:2, the first number, 1 represents the size of the object on the drawing. The second number, 2, represents the size of the object in the real world. Reduced and Enlarged Scale. Many drawings must be shown at reduced scale for the object to fit on the paper.
  • 21.
    For a partthat is shown on the paper at half its actual size, the scale is listed in one of these three ways: SCALE: 1:2 SCALE: 1/2 SCALE: .5 Architectural drawings list the scale based on the number of fractions of an inch on the drawing that represent one foot on the actual object. Example: List the predominant drawing scale in the title block. (Courtesy of Dynojet Research, Inc.) SCALE: 1/8" 1'
  • 22.
    Scales are measuring toolsused to quickly enlarge or reduce Drawing measurements. Types of Scales
  • 23.
    An engineers’ scale(also called a civil engineers’ scales) is a decimal scale graduated in units of 1 inch divided into 10, 20, 30, 40, 50, and 60 parts. Because the engineers’ scale divides inches into decimal units, it is convenient in machine drawing to set off inch dimensions expressed in decimals.
  • 24.
    Engineers scales are usually used for large areas that you are trying to “scale down” for use on large scale plans or maps  Use Decimals  1:10 Scale, 1” = 1’, then each division is equal to 0.1 ft.  1:10 scale is equal to 1” = 10’, 100’, 1000’  10 Scale can be used as a ruler and can be used to set off inch dimensions as decimals  To make a half size drawing from an original drawing that used a 10 scale, use a 20 scale
  • 25.
    Measure Pipe and Stone Drains Length on Bioretention Plan  Apply an engineer scale to an object  Draw a 62.5’ x 84.8’ Room
  • 26.
    Full Size 1:1scale The triangular scales have one full-size scale and five reduced-size scales, all fully divided. Using these scales, a drawing can be made full size, enlarged sized, or reduced sized. Half Size 1:2 scale
  • 27.
    Similar to engineer scale, but using metric system  Full Size is 1:1 scale  Division is 1 mm in width with calibrations at 10 mm intervals  Half Size is 1:2 Scale  Division is 2 mm in width with calibrations at 20 mm intervals  Used for maps, force diagrams, graphical constructions with scales such as 1 mm = 1 kg
  • 28.
    The architects’ scaleis intended primarily for drawings of buildings, piping systems, and other large structures that must be drawn to a reduced scale to fit on a sheet of paper. AutoCAD software users sometimes become confused using architectural units. When selecting architectural units and entering lengths, keep in mind that a value of 1 is one inch, not one foot. How To Architect - Scale
  • 29.
    On an architect scale, 1/8” = 1’  Full Size  16 Scale – Sixteen divisions per inch  Half Size  To create half size plans, use the full size scale and divide every dimension by two  Do not use the ½ scale, which is ½ = 1”  Double Size  Use your full size scale and multiply everything by two
  • 30.
    1/16 or 1/8 scale is typically used for overall building plan dimensions  ¼ is used for detail plans  3/8, ½, 1 are used for large details (building sections)  ¾ and 1 ½ are used for details
  • 31.
    Measure Plans  Apply an architect scale to an object  Draw a 15’-2” x 25’-4” Room
  • 32.
    Mechanical engineers’ scalesare divided into units representing inches to full size, half size, quarter size, or eighth size. To draw an object to a scale of half size, for example, use the mechanical engineers’ scale marked half size, which is graduated so that ever ½” represents 1". In other words, the half-size scale is simply a full-size scale compressed to half size. Triangular combination scales are available that include full- and half-size mechanical engineers’ scales, several architects’ scales, and an engineers’ scale all on one stick.
  • 33.
    Lettered text isoften necessary to completely describe an object or to provide detailed specifications. Lettering should be legible, be easy to create, and use styles acceptable for traditional drawing and CAD drawing. Engineering drawings use single-stroke sans serif letters because they are highly legible and quick to draw. Sans serif means without serifs, or spurs
  • 34.
    • Most hand-drawnnotes use lettering about 3 mm (1/8") high. • CAD notes are set using the keyboard and sized to be in the range of 3 mm (1/8") tall according to the plotted size of the drawing. An Example of Lettering and Titles Using CAD • CAD drawings typically use a Gothic lettering style but often use When adding lettering to a a Roman style for titles. CAD drawing, a good rule of thumb is not to use more than two fonts within the same drawing.
  • 35.
    The proportions of verticalcapital letters and numbers are shown
  • 36.
    Lowercase letters arerarely used in engineering sketches except for lettering large volumes of notes. Vertical lowercase letters are used on map drawings, but very seldom on machine drawings. When large and small capitals are combined, the small capitals should be three fifths to two thirds the height of the large capitals.
  • 37.
    Inclined (italic) capital lettersand numerals, are similar to vertical characters, except for the slope. The slope of the letters is about 68° from the horizontal.
  • 38.
    Do’s & Don’t •Never let numerals touch the fraction bar. • Center the denominator under the numerator. • Avoid using an inclined fraction bar, except when lettering in a narrow space, as in a parts list. • Make the fraction bar slightly longer than the widest part of the fraction.
  • 39.
    Use extremely lighthorizontal guidelines to keep letter height uniform… Do not use vertical guidelines to space the distance from one letter to the next within a word or sentence. For even freehand letters: • Use 1/8" gridded paper for drawing to make lettering easy. • Use a scale and set off a series of spaces, making both the letters and the spaces between lines of letters 1/8" high. • Use a guideline template like the Berol Rapidesign 925 • For whole numbers and fractions, draw five equally spaced guidelines.
  • 40.
    Spacing between Letters Uniformspacing between letters is done by eye. Contrary to what might seem logical, putting equal distances from letter to letter causes them to appear unequally spaced. Spacing between Words Space letters closely within words to make each word a compact unit, but space words well enough apart to clearly separate them from adjacent words. Spacing between Rows Be sure to leave space between rows of lettering, usually equal to the letter height.
  • 41.
    In most cases,the title and related information are lettered in title boxes or title strips When lettering by hand, arrange the title symmetrically about an imaginary centerline
  • 42.
    How to Write Like an Architect  Use a Ruler for even lines  Use the Ames Lettering Guide  Lettering Example (Worksheet 2)  Lettering Example (Finish Plan)
  • 43.
    High-quality drawing pencilshelp produce good quality technical sketches and drawings. Hard Medium Soft The hard leads in this These grades are for These leads are too group (left) are used general-purpose work in soft to be useful in where extreme technical drawing. The mechanical drafting. accuracy is required, softer grades (right) are They tend to produce as on graphical used for technical sketching, smudged, rough lines computations and lettering, arrowheads, that are hard to erase, charts and diagrams. and other freehand work and the lead must be The softer leads in this on mechanical drawings. sharpened continually. group (right) are The harder leads (left) are These grades are used sometimes used for used for line work on for artwork of various line work on machine drawings and kinds, and for full-size engineering drawings, architectural drawings. The details in architectural but their use is limited H and 2H leads are widely drawing. because the lines are used on pencil tracings for apt to be too light. reproduction.
  • 44.
    You might besurprised how much your drawings benefit from finding a style of pencil that suits your use. Soft pencils, such as HB or F, are mainly used in freehand sketching. Choose a pencil that: • Is soft enough to produce clear black lines, but hard enough not to smudge too easily. • Is not so soft that the point breaks easily. • Feels comfortable in your hand. • Grips the lead without slipping.
  • 45.
    Many choices ofmedia (paper and other) are available for particular sketching or drawing purposes. Whether you are sketching or are plotting a drawing from a CAD workstation, choose the type of sheet and size that suits your needs. Small notebooks or sketch pads are useful when working at a site or when it is necessary to quickly record information. Graph paper can be helpful in making neat sketches Sketch on Graph Paper
  • 46.
    There are ANSI/ASMEstandards for international and U.S. sheet sizes. Note that drawing sheet size is given as height width. Most standard sheets use what is called a “landscape” orientation. * May also be used as a vertical sheet size at 11" tall by 8.5" wide.
  • 47.
    • Margins andBorders • Zones
  • 48.
    The title blockis located in the lower right corner of the format. Standard areas in the title block provide the information as shown below.
  • 49.
    When laying outa drawing sheet, you will need to consider: • the size and scale of the object you will show • the sheet size • the measurement system (units) for the drawing • the space necessary for standard notes and title block. The object you are drawing is the “star” of the sketch. Keep the object near the center of the sheet. It should be boldly drawn, using thick visible lines. Make it large enough to fill most of the sheet and so that details show clearly