RESOURCE LEVELLING
Resource Leveling is a process that
Project Manager follows to schedule how
each resource is allocated to activities in
order to accomplish work with the
scheduled start and Finish dates of the
Activity. The Scheduled start and Finish
dates of every Activity are constrained by
the Project Plan to lie entirely within their
ES-LF window.
Resource Scheduling Problem
Resource- Leveling Strategies
You can use three approaches
to level project resources.
1. Utilizing available Slack.
2. Shifting the Project Finish
Date.
3. Smoothing.
WORK PACKAGE
It is a written document which
describes the work (task) to be
done in an Activity. Each work
package is assigned to a single
individual called an activity
Manager or work Package
Manager. The Manager is
responsible for completing the
Activity on Time.
FORMAT OF A WORK
PACKAGE
1. Work Package Assignment
Sheet.
2. Work Package Description
Report.
WORK PACKAGE
ASSIGNMENT SHEET
WORK PACKAGE
DESCRIPTION REPORT

Chapt7 slides

  • 1.
    RESOURCE LEVELLING Resource Levelingis a process that Project Manager follows to schedule how each resource is allocated to activities in order to accomplish work with the scheduled start and Finish dates of the Activity. The Scheduled start and Finish dates of every Activity are constrained by the Project Plan to lie entirely within their ES-LF window.
  • 2.
  • 3.
    Resource- Leveling Strategies Youcan use three approaches to level project resources. 1. Utilizing available Slack. 2. Shifting the Project Finish Date. 3. Smoothing.
  • 4.
    WORK PACKAGE It isa written document which describes the work (task) to be done in an Activity. Each work package is assigned to a single individual called an activity Manager or work Package Manager. The Manager is responsible for completing the Activity on Time.
  • 5.
    FORMAT OF AWORK PACKAGE 1. Work Package Assignment Sheet. 2. Work Package Description Report.
  • 6.
  • 7.