This document discusses resource planning and allocation for construction projects. It addresses the importance of managing resources like manpower, equipment, and materials. The key resources are labor, materials, and equipment. The document outlines different approaches to allocating resources based on whether resources are limited or unlimited, and how to level resource usage over time to improve efficiency and productivity.
Now-a-days whole world facing competition in every fields, including construction industry. Large construction companies carry out big projects, according to the need of that project, they uses different methods of construction and management. Critical Path Method (CPM), Linear Scheduling Method (LSM), and Line Of Balance (LOB) are the different methods of construction project management. All the construction companies utilize these methods according their utilities and requirement of project. In this report, Line of balance method is explained with its different component on the basis of some related works discussed different alternatives and strategies to sequence activities in the long run. This report contains a study carried out in a construction company in which LOB concept is used in the initial planning phase of a high-rise residential project. Based on the information provided by different LOBs, representing different scenarios, It is further discussed with projects managers, superintendents, and crews the advantages and disadvantages of each scenario regarding the project’s lead time, activities cycle time, gang sizes, batch sizes, buffers, sequencing and interferences between activities .
PMBoK 6 - Chapter 9 for Project Resource Management.
This presentation material is presented for CAPM students of Telkom University Bandung, Indonesia on 16 December 2018.
The role and responsibilities of the project manager ProofHub
For aspiring project managers, this slide brings an insight to the roles and responsibilities that a manager needs to perform. So let’s take a look at what it is about being a project manager:
Project scheduling and resource levelling_Construction Management A Makwana
At the time of preparing the network of any project, usually it is assumed that all resources needed for its execution are available in plenty and no consideration of resource constraints is taken into account.
In such situations the duration of the project may increase escalating the cost of the project.
Now-a-days whole world facing competition in every fields, including construction industry. Large construction companies carry out big projects, according to the need of that project, they uses different methods of construction and management. Critical Path Method (CPM), Linear Scheduling Method (LSM), and Line Of Balance (LOB) are the different methods of construction project management. All the construction companies utilize these methods according their utilities and requirement of project. In this report, Line of balance method is explained with its different component on the basis of some related works discussed different alternatives and strategies to sequence activities in the long run. This report contains a study carried out in a construction company in which LOB concept is used in the initial planning phase of a high-rise residential project. Based on the information provided by different LOBs, representing different scenarios, It is further discussed with projects managers, superintendents, and crews the advantages and disadvantages of each scenario regarding the project’s lead time, activities cycle time, gang sizes, batch sizes, buffers, sequencing and interferences between activities .
PMBoK 6 - Chapter 9 for Project Resource Management.
This presentation material is presented for CAPM students of Telkom University Bandung, Indonesia on 16 December 2018.
The role and responsibilities of the project manager ProofHub
For aspiring project managers, this slide brings an insight to the roles and responsibilities that a manager needs to perform. So let’s take a look at what it is about being a project manager:
Project scheduling and resource levelling_Construction Management A Makwana
At the time of preparing the network of any project, usually it is assumed that all resources needed for its execution are available in plenty and no consideration of resource constraints is taken into account.
In such situations the duration of the project may increase escalating the cost of the project.
for the subject offered in GTU in the final year (8th semester), construction management
final year
Module:- 5 project scheduling and resource leveling
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Resource planning and resource allocation
1. Presented by : VENUMADHAV.R.YEMUL
Guided by : MILIND.D.DARADE
Roll No : 5073
1
2. Manpower, equipment, and materials are
important project resources that require
management attention.
The basic objective of resource planning and
resource allocation is to supply and support
the field operations.
The term resource allocation is used in the
case where required resources are assigned
such that available resources are not
exceeded.
2
3. Resources are the means of production
needed to complete a project.
Most project managers would consider the
big three resources that will require your
attention to be:
• Material
• Labor
• Equipment
3
4. A. LABOUR
a. In the limited resource allocation case, there
are two assumptions:
(1) There are a fixed number of crews available
to perform the work and
(2) The project may be delayed as a result of
the limitation of crews.
The objective of the resource allocation
problem is to determine when the project will
be completed.
4
5. b. In the unlimited resource leveling case, there
are two assumptions:
(1) There are an unlimited number of crews
available to perform the work and
(2) The project may not be delayed.
The objective of the resource leveling
problem is to determine how to limit the
fluctuation in crews required on the job.
5
6. B. MATERIALS
Materials, for projects with sufficient on-site
storage, are delivered to the site and assumed
to be available to workers as needed.
A material-related concern for sites that have
sufficient space is that of optimizing the position
of materials on the site so that they require the
least travel time from the lay-down yard to the
work-face.
6
7. C. EQUIPMENTS
There are various types of equipment used on
construction sites.
Some of this equipment should be considered in
the project plan, some need not be included.
Workers, and their companies, are typically
required to provide the small tools needed to
complete their specific features of work.
There are some types of equipment, however, that
can affect the overall sequence and duration of the
project.
7
8. Resource allocation is used to assign the
available resources in an economic way.
It is part of resource management.
In project management, resource allocation
is the scheduling of activities and the
resources required by those activities while
taking into consideration both the resource
availability and the project time.
8
9. Resource planning cannot be accomplished
without four essential resources necessary
to accomplish the given scope of work:
• MATERIAL
• MAN POWER
• MACHINARY
• TIME
9
10. Human resources for construction planning
breaks down into three major categories as
follows:
• Home office personnel(Administrative
Persons)
• Construction personnel (field supervision
and labor)
• Construction subcontractors(Electrification,
Plumbing, etc)
10
11. The ideal form of a personnel loading curves
is a trapezoid.
The average personnel loading curve is a
straight line.
Actual practice loading curves take the
shape of a bell curve
11
13. The latter two result when the personnel
loading curves occur earlier or later than
planned on a project.
Front loaded curve- the work started as early
as possible.
Normal loaded curve- the work started at
normal time.
Back loaded curve- the work started as late
as possible.
13
14. The "S" curve for the ideally loaded project has
a gradual start and finish, which indicates
smooth starting and finishing conditions.
The forward loaded curve shows a rapid project
start up and an even more gradual than normal
phase out at the end.
The backward-loaded project indicates a more
relaxed start and a very steep finish slope on
the "S" curve.
14
17. Ensuring that the material resources for the
project arrive on time involves these
important planning areas:
• Long-delivery equipment
• Special materials and alloys
• Common materials in short supply
• Services and system requirements
• Transportation systems
17
18. Resource Limited: The project must be finished as
soon as possible, but without exceeding some
specific level of resource usage or some general
resource constraint
18
19. 1. When the schedule demands more workers
per day than are available or if we have
workers standing around without jobs, we
have a problem.
2. When a new hire is trained, there is loss of
productivity. So, if we can keep the trained
people and reduce the number of new hires,
we should be better off.
19
20. . As we know, every project suffers from start-up
problems of some sort. Superintendents and
project managers are very busy trying to get
everybody working in a productivity manner.
Therefore, if we can start with a small crew and
increase its size gradually, we will eliminate some
of the start-up problems.
. Most projects suffer from congestion around
project completion time because of reduced work
areas. Thus, if we can gradually reduce the crew
size as we approach project completion, we can
improve productivity by reducing congestion.
20
21. The leveling procedure are as follows:
• Scheduling all the critical jobs first.
• Starting the non-critical jobs whenever there
is a drop in scheduled man power upto the
point where the peak is reached.
• Starting the non-critical jobs whenever there
is a drop so that no ups and downs occur in
the resource profile.
21
22. › Time Limited: The project must be finished by a
certain time, using as few resources as possible.
But it is time, not resource usage, that is critical
22
23. Resource Histograms:
• A bar chart showing the amount of time
assigned to a resource for the time interval.
• Resource availability is depicted as a line for
comparison purposes.
• Resources assigned more work than
available hours are considered “over-allocated”.
23
24. INTRODUCTION
ERP is a business management software,
usually a suite of integrated applications, that a
company can use to store and manage data
from every stage of business, including:
Product planning, cost and development
Manufacturing
Marketing and sales
Inventory management
Shipping and payment
24
25. ERP systems could be used in the construction
industry for the following general purposes:
1. To improve responsibilities in relation to
customers.
2. To strength supply chain partnerships.
3. To enhance organizational flexibility.
4. To improve decision-making capabilities.
5. To reduce project completion time and cost.
25
28. Without the proper resource allocation, one will
pay the price for late job completions and cost
overruns.
The goal of resource leveling is to assign
resources to project activities in a manner that
will improve productivity and efficiency.
During the last two decades, the construction
industry has progressed in this trend of
improving resource allocation it merely out of
interest but as a means of survival in a more
competitive world.
28