Scope Management
Chapter 5
“Is the process of defining what work is required and making sure all of that work &
only that work is done successfully.”
• “Completion of the project scope is measured against the PMP.”
• “Completion of the product scope is measured against the product requirements.”
Process Process Group Key Deliverables
5.1 Plan Scope Management Planning Scope & Requirement
Management Plans
5.2 Collect Requirements Planning Requirements Document
5.3 Define Scope Planning Project Scope Statement
5.4 Create WBS Planning WBS, WBS Dictionary
5.5 Validate Scope Monitoring & Controlling Acceptance Deliverables
5.6 Control Scope Monitoring & Controlling Change Requests
Scope Management
Chapter 5
Plan Scope Management
Process 1
Key Points
 “Documents how the project scope is defined, validated, controlled & managed throughout the project”
 Process generates 2 management plans that both become part of the PMP
 “The plan helps to reduce the risk of project scope creep”
Scope Management
Chapter 5
Collect Requirements
Process 2
Key Points
 Is the process of determining & documenting stakeholder’s needs & requirements in detail
 Critical to project’s success as missed requirements could mean major changes & conflicts
Scope Management
Chapter 5
Collect Requirements
Process 2
Key Points
 Project manager chooses the best Tools & Techniques to gather info:
 Interviews, Focus Groups, Facilitated Workshops,
 Brainstorming; Nominal, Multicriteria Analysis, Affinity diagram, Mind Maps
 Group Decision; Unanimity/Delphi Tech, Majority, Plurality, Dictatorship, Consensus
 Questionnaires, Surveys, Observations, Prototypes, Benchmarking
 Context Diagrams, Document Analysis
 Requirements Documentation: Acceptance Criteria used to set Scope Baseline
 Requirements Traceability Matrix: “helps to ensure each req. adds value by linking to a
project objective”
Scope Management
Chapter 5
Define Scope
Process 3
Key Points
 The process of developing a detailed description of the project & product/deliverable
 Defines requirement boundaries – of those collected included or excluded from project scope
 Tools: Product Analysis, Alternatives Generation (different ways to do same work efficiently)
Scope Management
Chapter 5
Create WBS
Process 4
Key Points
 “Is the hierarchical decomposition of the total scope of the work to be done by the project…
into smaller more manageable parts/deliverables.”
 Is the process of subdividing, breaking down, decomposing the project scope into
manageable work packages that is a visual to the entire team.
 Scope baseline: comprised of WBS, WBS dictionary & Project Scope Statement
Scope Management
Chapter 5
Create WBS
Process 4
Key Points
 WBS is the most important process in Scope Management & foundation of the project
 must be graphical & can be organized by Phase or Category
 used as a basis to estimate costs & time at the work package level
 The entire project is represented in the WBS, if not, then it’s not part of the project
 Control Accounts: Unique accounting codes assigned to track completion of work
 Created with help of the team’s experience to be realistic
 Helps gain the team’s buy-in & builds the team
 Keeps up team momentum by letting ppl see their importance to complete their work
 Helps prevent Scope Creep: impact of an uncontrolled change to scope, time, cost
Scope Management
Chapter 5
Validate Scope
Process 5
Key Points
 “Is the process of formalizing acceptance of completed project deliverables.”
 Involves frequent formal meetings with sponsor /customer to gain formal acceptance of deliverables
 Recommended to validate scope at the end of each phase and/or multiple times in a project
 Validate Scope process: the customer checks & approves deliverables
 Control Quality process: the QC dept checks deliverables to see that requirements are met.
Scope Management
Chapter 5
Control Scope
Process 6
Key Points
 “Is the process of monitoring the project status (scope performance aka work completed) by managing
changes between the work performance data against the scope baseline.”
 Is a proactive process lead by the Project Manager to prevent project changes
 Incontrolled adjustments to project constraints lead to Scope Creep
Scope Management
Chapter 5
Schedule Management
Chapter 6
“… includes the processes required to manage the timely completion of the project.”
Process Process Group Key Deliverables
6.1 Plan Schedule Management Planning Schedule Management Plan
6.2 Define Activities Planning Activities List
6.3 Sequence Activities Planning Schedule Network Diagrams
6.4 Estimate Activity Durations Planning Activity Resource Requirements
6.5 Develop Schedule Planning Schedule Baseline
6.6 Control Schedule Monitoring & Controlling Change Requests
Schedule Management
Chapter 6
Plan Schedule Management
Process 1
Key Points
 “The process of policies, procedures & documentation for planning, developing, managing, executing & controlling
the project schedule.. throughout the project.”
 Defines units of measurements: Hrs/Days/Wks and Levels of Accuracy: +/- 10%
 Reporting formats: Status meetings ex. Weekly on Thursdays
Schedule Management
Chapter 6
Define Activities
Process 2
Key Points
 “The process of identifying & documenting the specific actions to be performed to produce the project deliverables.”
 Work packages are broken down (decomposed) into activities at a level small enough to estimate, schedule, execute,
monitor & control
 Rolling Wave Planning: used in large (Progressively Elaborated) projects, plan as you go, as milestones get closer
 Activity List: list of every activity required to complete project
 Activity Attributes: description of every activity with its’ Predecessor, Successor & Constraints
Schedule Management
Chapter 6
Sequence Activities
Process 3
Key Points
 “… is the process of identifying & documenting relationships among project activities.”
 Network diagramming how the logical sequence of activities & milestones will be performed to obtain the greatest
efficiency given all constraints
 Justifies time estimates, shows the workflow & interdependencies, identifies areas to compress schedule
Schedule Management
Chapter 6
Sequence Activities
Process 3 Key Points
 Precedence Diagramming (PDM) / Activity on Node (AON): Must common to show activities & their dependencies
 Types of Dependencies: Mandatory, Discretionary, External & Internal
 Identify: Predecessor & Successor activities, # of paths
 Finish-to-Start (FS): most commonly used relationship / SF dependency is rarely used
 Lead Time: gives the successor activity time to start before the predecessor finishes
 Lag Time: purposefully delays time between predecessor & successor activities
Schedule Management
Chapter 6
Schedule Management
Chapter 6
Estimate Activity Durations
Process 4
Key Points
 “Estimating the # of work periods needed to complete individual activities with estimated resources.”
 Provides the amount of time each activity will take to complete… is a major input to Develop Schedule process
 Resource Calendar: shows the availability, capabilities, skills of HR & quantity & availability of equipment
 Estimating Tools: Analogous (ave. similar projects), Parametric (historical), Three Point
Schedule Management
Chapter 6
Estimate Activity Durations
Process 4
Key Points
 Duration Estimating Tools:
 Analogous: (ave. of past similar projects)
 Three Point: Simple Average (P+O+M)/3 , Weighted Average (P+4M+O)/6
 Standard Deviation: (P – O)/6
 Group Decision: Most used as involving Team Members gets their Buy-In
 Reserve Analysis:
 Management Reserves – funds set aside for Unknown scheduling risks
 Contingency Reserves – funds set aside for Known project risks
Schedule Management
Chapter 6
Develop Schedule
Process 5
Key Points
 “… activity sequences, durations, resource requirements & schedule constraints are analyzed to generate a schedule
of planned start, finish & milestone dates.”
 Project Schedule is approved, realistic, iterative & serves as the baseline to track progress
 Team members confirm their assigned activities do not conflict with resource calendars or other projects
Schedule Management
Chapter 6
Develop Schedule
Process 5
Key Points
Tools - Critical Path Method:
 Is a string of activities that make up the longest path of durations for the project to be completed
 every single activity on the CP must finish on time for the project to finish on time
 A delay on the CP will delay the entire project
 Float/Slack – amount of time an activity can SLIP before it delays the project – Equals Zero on CP
 Total Float, Free Float, Project Float
 ES & EF – how much freedom PM can move Activity Start Dates wo/ causing problems
 LS & LF – How much “play” PM has in the schedule
 Schedule Compression – when a timeframe is unrealistic, compress the schedule wo/ changing the scope
 Fast Tracking or Crashing
 Resource Optimization – adjusting use of resources: Resource Leveling, Smoothing
 Critical Chain Method – assigning each activity to occur as late as possible
Schedule Management
Chapter 6
Control Schedule
Process 6
Key Points
 “Monitor status of project activities to update progress & manage changes to the schedule baseline.”
 PM stays in Control of the project by continuingly measuring the Schedule against the Plan
 Reviewing Work Performance Data & Schedule Performance
 Change Requests: are submitted to take corrective & preventative actions to minimize risks
Schedule Management
Chapter 6
CAPM Exam Prep
Group Exercise – PMP Subsidiary Plans

More Related Content

What's hot

Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
Talha Siddiqui
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
Serdar Temiz
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a Project
Meryem Yıldız
 

What's hot (19)

Project management
Project managementProject management
Project management
 
Project schedule Management - PMP/CAPM
Project schedule Management - PMP/CAPMProject schedule Management - PMP/CAPM
Project schedule Management - PMP/CAPM
 
Project time management
Project time managementProject time management
Project time management
 
2018 Project Management Workshop Schedule - Project Management Training - Dco...
2018 Project Management Workshop Schedule - Project Management Training - Dco...2018 Project Management Workshop Schedule - Project Management Training - Dco...
2018 Project Management Workshop Schedule - Project Management Training - Dco...
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
Project Time Management
Project Time Management Project Time Management
Project Time Management
 
Project time management
Project time managementProject time management
Project time management
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Managingtripleconstraint aam
Managingtripleconstraint aamManagingtripleconstraint aam
Managingtripleconstraint aam
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Management
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
6. Schedule Management
6. Schedule Management6. Schedule Management
6. Schedule Management
 
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
 
06 project time management
06  project time management06  project time management
06 project time management
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project schedule[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project schedule
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a Project
 

Similar to CAPM M Charles Week3 Chapter5-6

Similar to CAPM M Charles Week3 Chapter5-6 (20)

CAPM Week 2 Chapter 5
CAPM Week 2 Chapter 5CAPM Week 2 Chapter 5
CAPM Week 2 Chapter 5
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability framework
 
PMP Muzette Charles_Spring2019_Week3_Chapter6
PMP Muzette Charles_Spring2019_Week3_Chapter6PMP Muzette Charles_Spring2019_Week3_Chapter6
PMP Muzette Charles_Spring2019_Week3_Chapter6
 
schedule Management v4
 schedule Management v4 schedule Management v4
schedule Management v4
 
6.5 Develop Schedule
6.5 Develop Schedule6.5 Develop Schedule
6.5 Develop Schedule
 
CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4
 
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge AreaOnline PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
 
TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectively
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management area
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
Project Management @ Ektoo
Project Management @ EktooProject Management @ Ektoo
Project Management @ Ektoo
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
6396901
63969016396901
6396901
 
CAPM week 1 chapter 3
CAPM week 1 chapter 3CAPM week 1 chapter 3
CAPM week 1 chapter 3
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 

More from Muzette Charles, PMP

More from Muzette Charles, PMP (20)

PMP Muzette Charles_Sp19_Week6_Ethics Review
PMP Muzette Charles_Sp19_Week6_Ethics ReviewPMP Muzette Charles_Sp19_Week6_Ethics Review
PMP Muzette Charles_Sp19_Week6_Ethics Review
 
PMP Muzette Charles_Sp2019_Chapter12_13 Procurement_Stakeholder
PMP Muzette Charles_Sp2019_Chapter12_13 Procurement_StakeholderPMP Muzette Charles_Sp2019_Chapter12_13 Procurement_Stakeholder
PMP Muzette Charles_Sp2019_Chapter12_13 Procurement_Stakeholder
 
PMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
PMP Muzette Charles_Sp2019_Week5_Chapter11_RiskPMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
PMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
 
PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8
 
PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7
 
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
 
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
 
CAPM Muzette Charles Ethics_Review
CAPM Muzette Charles Ethics_ReviewCAPM Muzette Charles Ethics_Review
CAPM Muzette Charles Ethics_Review
 
CAPM Muzette Charles Chapter11-13
CAPM Muzette Charles Chapter11-13CAPM Muzette Charles Chapter11-13
CAPM Muzette Charles Chapter11-13
 
CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10
 
CAPM Muzette Charles_Week4_Chapter7-8
CAPM Muzette Charles_Week4_Chapter7-8CAPM Muzette Charles_Week4_Chapter7-8
CAPM Muzette Charles_Week4_Chapter7-8
 
CAPM Muzette Charles_Week1_Chapter1-2
CAPM Muzette Charles_Week1_Chapter1-2CAPM Muzette Charles_Week1_Chapter1-2
CAPM Muzette Charles_Week1_Chapter1-2
 
CAPM Week 6 Final Review
CAPM Week 6 Final ReviewCAPM Week 6 Final Review
CAPM Week 6 Final Review
 
CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13
 
CAPM Week 5 Chapter 12
CAPM Week 5 Chapter 12CAPM Week 5 Chapter 12
CAPM Week 5 Chapter 12
 
CAPM Week 4 Chapter 11
CAPM Week 4 Chapter 11CAPM Week 4 Chapter 11
CAPM Week 4 Chapter 11
 
CAPM Week 4 Chapter 10
CAPM Week 4 Chapter 10CAPM Week 4 Chapter 10
CAPM Week 4 Chapter 10
 
CAPM Week 3 Chapter 9
CAPM Week 3 Chapter 9CAPM Week 3 Chapter 9
CAPM Week 3 Chapter 9
 
CAPM Week 3 Chapter 8
CAPM Week 3 Chapter 8CAPM Week 3 Chapter 8
CAPM Week 3 Chapter 8
 

Recently uploaded

Recently uploaded (20)

The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Keeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesKeeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security Services
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 

CAPM M Charles Week3 Chapter5-6

  • 1. Certified Associate Project Management CAPM® Exam Prep – Week 3 Prof. Muzette Charles, PMP | mcharles2@pace.edu
  • 2. Scope Management Chapter 5 “Is the process of defining what work is required and making sure all of that work & only that work is done successfully.” • “Completion of the project scope is measured against the PMP.” • “Completion of the product scope is measured against the product requirements.” Process Process Group Key Deliverables 5.1 Plan Scope Management Planning Scope & Requirement Management Plans 5.2 Collect Requirements Planning Requirements Document 5.3 Define Scope Planning Project Scope Statement 5.4 Create WBS Planning WBS, WBS Dictionary 5.5 Validate Scope Monitoring & Controlling Acceptance Deliverables 5.6 Control Scope Monitoring & Controlling Change Requests
  • 3. Scope Management Chapter 5 Plan Scope Management Process 1 Key Points  “Documents how the project scope is defined, validated, controlled & managed throughout the project”  Process generates 2 management plans that both become part of the PMP  “The plan helps to reduce the risk of project scope creep”
  • 4. Scope Management Chapter 5 Collect Requirements Process 2 Key Points  Is the process of determining & documenting stakeholder’s needs & requirements in detail  Critical to project’s success as missed requirements could mean major changes & conflicts
  • 5. Scope Management Chapter 5 Collect Requirements Process 2 Key Points  Project manager chooses the best Tools & Techniques to gather info:  Interviews, Focus Groups, Facilitated Workshops,  Brainstorming; Nominal, Multicriteria Analysis, Affinity diagram, Mind Maps  Group Decision; Unanimity/Delphi Tech, Majority, Plurality, Dictatorship, Consensus  Questionnaires, Surveys, Observations, Prototypes, Benchmarking  Context Diagrams, Document Analysis  Requirements Documentation: Acceptance Criteria used to set Scope Baseline  Requirements Traceability Matrix: “helps to ensure each req. adds value by linking to a project objective”
  • 6. Scope Management Chapter 5 Define Scope Process 3 Key Points  The process of developing a detailed description of the project & product/deliverable  Defines requirement boundaries – of those collected included or excluded from project scope  Tools: Product Analysis, Alternatives Generation (different ways to do same work efficiently)
  • 7. Scope Management Chapter 5 Create WBS Process 4 Key Points  “Is the hierarchical decomposition of the total scope of the work to be done by the project… into smaller more manageable parts/deliverables.”  Is the process of subdividing, breaking down, decomposing the project scope into manageable work packages that is a visual to the entire team.  Scope baseline: comprised of WBS, WBS dictionary & Project Scope Statement
  • 8. Scope Management Chapter 5 Create WBS Process 4 Key Points  WBS is the most important process in Scope Management & foundation of the project  must be graphical & can be organized by Phase or Category  used as a basis to estimate costs & time at the work package level  The entire project is represented in the WBS, if not, then it’s not part of the project  Control Accounts: Unique accounting codes assigned to track completion of work  Created with help of the team’s experience to be realistic  Helps gain the team’s buy-in & builds the team  Keeps up team momentum by letting ppl see their importance to complete their work  Helps prevent Scope Creep: impact of an uncontrolled change to scope, time, cost
  • 9. Scope Management Chapter 5 Validate Scope Process 5 Key Points  “Is the process of formalizing acceptance of completed project deliverables.”  Involves frequent formal meetings with sponsor /customer to gain formal acceptance of deliverables  Recommended to validate scope at the end of each phase and/or multiple times in a project  Validate Scope process: the customer checks & approves deliverables  Control Quality process: the QC dept checks deliverables to see that requirements are met.
  • 10. Scope Management Chapter 5 Control Scope Process 6 Key Points  “Is the process of monitoring the project status (scope performance aka work completed) by managing changes between the work performance data against the scope baseline.”  Is a proactive process lead by the Project Manager to prevent project changes  Incontrolled adjustments to project constraints lead to Scope Creep
  • 12. Schedule Management Chapter 6 “… includes the processes required to manage the timely completion of the project.” Process Process Group Key Deliverables 6.1 Plan Schedule Management Planning Schedule Management Plan 6.2 Define Activities Planning Activities List 6.3 Sequence Activities Planning Schedule Network Diagrams 6.4 Estimate Activity Durations Planning Activity Resource Requirements 6.5 Develop Schedule Planning Schedule Baseline 6.6 Control Schedule Monitoring & Controlling Change Requests
  • 13. Schedule Management Chapter 6 Plan Schedule Management Process 1 Key Points  “The process of policies, procedures & documentation for planning, developing, managing, executing & controlling the project schedule.. throughout the project.”  Defines units of measurements: Hrs/Days/Wks and Levels of Accuracy: +/- 10%  Reporting formats: Status meetings ex. Weekly on Thursdays
  • 14. Schedule Management Chapter 6 Define Activities Process 2 Key Points  “The process of identifying & documenting the specific actions to be performed to produce the project deliverables.”  Work packages are broken down (decomposed) into activities at a level small enough to estimate, schedule, execute, monitor & control  Rolling Wave Planning: used in large (Progressively Elaborated) projects, plan as you go, as milestones get closer  Activity List: list of every activity required to complete project  Activity Attributes: description of every activity with its’ Predecessor, Successor & Constraints
  • 15. Schedule Management Chapter 6 Sequence Activities Process 3 Key Points  “… is the process of identifying & documenting relationships among project activities.”  Network diagramming how the logical sequence of activities & milestones will be performed to obtain the greatest efficiency given all constraints  Justifies time estimates, shows the workflow & interdependencies, identifies areas to compress schedule
  • 16. Schedule Management Chapter 6 Sequence Activities Process 3 Key Points  Precedence Diagramming (PDM) / Activity on Node (AON): Must common to show activities & their dependencies  Types of Dependencies: Mandatory, Discretionary, External & Internal  Identify: Predecessor & Successor activities, # of paths  Finish-to-Start (FS): most commonly used relationship / SF dependency is rarely used  Lead Time: gives the successor activity time to start before the predecessor finishes  Lag Time: purposefully delays time between predecessor & successor activities
  • 18. Schedule Management Chapter 6 Estimate Activity Durations Process 4 Key Points  “Estimating the # of work periods needed to complete individual activities with estimated resources.”  Provides the amount of time each activity will take to complete… is a major input to Develop Schedule process  Resource Calendar: shows the availability, capabilities, skills of HR & quantity & availability of equipment  Estimating Tools: Analogous (ave. similar projects), Parametric (historical), Three Point
  • 19. Schedule Management Chapter 6 Estimate Activity Durations Process 4 Key Points  Duration Estimating Tools:  Analogous: (ave. of past similar projects)  Three Point: Simple Average (P+O+M)/3 , Weighted Average (P+4M+O)/6  Standard Deviation: (P – O)/6  Group Decision: Most used as involving Team Members gets their Buy-In  Reserve Analysis:  Management Reserves – funds set aside for Unknown scheduling risks  Contingency Reserves – funds set aside for Known project risks
  • 20. Schedule Management Chapter 6 Develop Schedule Process 5 Key Points  “… activity sequences, durations, resource requirements & schedule constraints are analyzed to generate a schedule of planned start, finish & milestone dates.”  Project Schedule is approved, realistic, iterative & serves as the baseline to track progress  Team members confirm their assigned activities do not conflict with resource calendars or other projects
  • 21. Schedule Management Chapter 6 Develop Schedule Process 5 Key Points Tools - Critical Path Method:  Is a string of activities that make up the longest path of durations for the project to be completed  every single activity on the CP must finish on time for the project to finish on time  A delay on the CP will delay the entire project  Float/Slack – amount of time an activity can SLIP before it delays the project – Equals Zero on CP  Total Float, Free Float, Project Float  ES & EF – how much freedom PM can move Activity Start Dates wo/ causing problems  LS & LF – How much “play” PM has in the schedule  Schedule Compression – when a timeframe is unrealistic, compress the schedule wo/ changing the scope  Fast Tracking or Crashing  Resource Optimization – adjusting use of resources: Resource Leveling, Smoothing  Critical Chain Method – assigning each activity to occur as late as possible
  • 22. Schedule Management Chapter 6 Control Schedule Process 6 Key Points  “Monitor status of project activities to update progress & manage changes to the schedule baseline.”  PM stays in Control of the project by continuingly measuring the Schedule against the Plan  Reviewing Work Performance Data & Schedule Performance  Change Requests: are submitted to take corrective & preventative actions to minimize risks
  • 24. CAPM Exam Prep Group Exercise – PMP Subsidiary Plans