PROJECT MANAGEMENT
CONCEPTS
Lt Col L Shri Harsha,
PMP
OBJECTIVES
• Create awareness of the concepts of Project
Management and its importance
• Understand the various tools available to a
Project Manager to perform his duties
effectively
• Highlight the areas of the application of these
concepts during the execution of projects
Importance of Project Management
• Getting things done in the correct manner
• Planned and prioritized work distribution and
accomplishment
• Identification of key process bottlenecks and
suggested preventive actions
• Project management process improvement
• Improved risk management
• Standardized reports, templates, processes
and lexicon
What is a Project ?
 Has a defined objective
 Has a deadline
 Requires integration of
knowledge and experience
from various organizations
When task(s),
How Temporary?
 Has a definite beginning and end, not an on-going effort
 Ceases when objectives have been attained
 Team is disbanded upon project completion
Unique?
 The product or service is different in some way from other
product or services
 Product characteristics are progressively elaborated
What is a Project ?
Project Characteristics
 Goal (measurable/verifiable) Oriented
 Finite duration with a beginning and end
 Uniqueness to a great extent and related uncertainties
 Coordinated undertaking of interrelated activities
 Performing the activities involve resources
 Resources cost money
How are Projects different from Operations?
– Create own charter,
organization,
– and goals
– Catalyst for change
– Unique product or
service
– Heterogeneous teams
– Start and end date
Semi-permanent
charter, organization,
and goals
Maintains status quo
Standard product or
service
Homogeneous teams
Ongoing
Projects Operations
 Poor communication
 Insufficient resource planning
 Unrealistic schedules & poor duration estimation
 Poor project requirements
 Lack of stakeholder buy-in & no accountability
 Undefined project success / closure criteria
 Unrealistic budgets
 No risk planning
 Lack of change control process
 Lack of executive support
 Resource attrition
 Lack of synchronization
Project Failure
 Executive management support
 User involvement (optimum)
 Realistic expectations
 Clear statement of requirements
 Proper documentation
 Public exposure
 Competitive & Budgetary pressure
Project Success
Project Life Cycle
• Each phase is marked by one or more tangible verification
work product referred to as deliverable
• The conclusion of a project phase is generally marked by a
review
• The phase reviews are often called phase exits, stage gates,
or kill points
PROJECT
PHASE 1 PHASE 2 PHASE 3… PHASE ‘n’
Level
Of
Activity
Initiating
Processes
Planning
Processes
Executing
Processes
Closing
Processes
Controlling Processes
Phase
Finish
Phase
Start
Time
Typical Life Cycle of Project
Life Cycle of Project (Time)
High
Low Cost to make change
Opportunity to add Value
Characteristics of a Life Cycle
Balancing SCOPE, COST and
TIME within the frame work of
QUALITY*
* meeting customer requirements
Harold Kerzner
Risk and customer satisfaction are also
factors that often gets included in the
perspective.
Triple Constraint Theorem
The application of knowledge, skills, tools, and techniques
to project activities in order to meet or exceed
stakeholder needs and expectations
Project Management
• Project Manager
• Customer/User
• Performing Organization
• Project Team Members
• Project Management Team
• Sponsors
• Influencers
Key Stakeholders : Generic
• Project Manager
• Customer / User
• Project Team Members
• Functional Departments
• Sales, BSG, Finance
• Business Partners
• Subsidiaries & Sister Concerns
• Vendors and Suppliers
Key Stakeholders : X Firm
Project Stakeholders
Individuals and organizations Involved in or affected by the
project outcome
 Program – Consists of a group of projects supporting
broad, general goals and managed in a coordinated way
 Project Portfolio Management
Collection of projects or programs and other work that are
grouped together to facilitate effective management of
that work to meet strategic business objectives
 Subprojects – Components of a project that are often
contracted out
 Project Management Office (PMO)
 A PMO sometimes also referred as Program Management
Office is an organization to centralize and coordinate the
management of projects under its domain
Project Management Concept
 Shared and coordinated resources
 Identification and development of project management
methodology, best practices, and standards
 Clearinghouse and management for project policies,
procedures, templates, and other shared documentation
 Central office for operation and management of project
tools
 Central coordination of communication management
across projects
 Coordination of overall project quality standards
Project Management Office Support
Project Management Philosophy
The “Golden Rule” of Project Management is three
words:
-Plan
-Organize
-Control
Project Initiation
Project Initiation
 Conduct Project Selection Methods
 Define Scope
 Document Project Risks, Assumptions, and
Constraints
 Identify and Perform Stakeholder Analysis
 Develop Project Charter
 Obtain Project Charter Approval
Responsibilities
• Define goals, objective, milestones
• Determine requirements
• Determine ground rules and assumptions
• Identify time, cost and performance constraints
• Determine operating procedures, administrative policies
• Identify reporting requirements
Project Charter – Project Managers
Goals vs. Objective
Goals are broad Objectives are narrow
Goals are general intentions Objectives are precise
Goals are intangible Objectives are tangible
Goals are abstract Objectives are concrete
Goals can't be validated as is Objectives can be validated
Objectives are SMART
•Specific
•Measurable
•Assignable
•Realistic
•Time related
Expectations
Stakeholder
Shareholder
Employee
What is my role and the job/task specifications in this project?
What learning opportunity/new skill will I get from this project?
Organization
When can I get the product out?
What is the quantum of work involved?
How many people would this project need (skill level)?
What would be their utilization/availability on this project?
How much would the cost/ investment for resources be?
When can I get the product?
What are the features that exists (that I want eliminated now)?
What are the additional feature desired?
How much I would have to pay?
Customer
What is the company doing to minimize overheads & maximize profits?
What are the efforts and direction for new avenues of business this year?
How does this company compare with and stay ahead of competition?
Managing Stakeholder Expectations
Project Planning
• Develop Project Scope
• Define Project Phases
• Develop WBS
• Define Activity List & Sequence Activities
• Create Project Network Diagram
• Perform Critical Path Analysis
• Perform Cost Estimation
• Perform Resource Planning
Project Planning
• Plan Project Team Organization
• Create RAM
• Identify Project Risks and develop Risk Reponses
• Develop Project Management Plan
• Baseline the Project Management Plan
• Setting up Change Control Mechanism
Key Tasks
Plan Do/Undo/Redo
Start
Complete
Plan Execute
Start
Complete
Benefit of Planning
Benefit of Planning
Project Scope
What is the WORK we are supposed to do to
deliver the final service / product to the
customer?
Product Scope
The features and functionalities that categorize
a product or service
4 Commandments for Good Project Scope
Written
Well defined
Clearly understood
Achievable
1. Highest level: refers to the entire project
2. Second level: breaks the project into its major
sub- projects/phases
3. Third level:
 Identify the deliverables for each subproject/phase
 Identify the activities and tasks that are required to produce
each deliverables
 Lowest level breakup called work packages can be
scheduled, cost estimated, monitored and controlled
 Identifies track able units of work which are assigned to
individual members of the project team
Create Work Breakdown Structure
WBS Example
Schedule Management
 Create the Activity List
 State the Activity Relationships
 State the Resource Requirements
 Estimate the Activity Duration
 Create Project Schedule
Prepare Network Diagram
Project schedule network diagrams are schematic displays
of the project’s schedule activities and the logical
relationships among them, also referred to as
dependencies.
Precedence Diagramming Method (PDM)
Also known as Activity on Nodes (AON)
Arrow Diagramming Method (ADM)
Also known as Activity on Arrow (AOA)
Developing an
approximation of the costs
of the resources needed to
complete project activities.
Cost Estimating
Analogous estimating
Bottom Up Estimating
Parametric Estimating
Cost Estimating
Customer Relations
 Develop Communication
 Ensure Timely Participation
 Include the Customer on the
Project Team
 Develop Trust and Confidence
Team Requirements
•Skills needed ?
•Individuals identified ?
•When are they needed ?
•Where are they ?
•Training needed ?
•Interpersonal compatibility ?
Risk Identification
Financial
Socio-Economic
Contractual
Project management
Technical
Risk Response Plan
 Avoid
 Mitigate
 Transfer
 Accept
 with contingency
 without contingency
 Share
 Enhance
 Exploit
Project Management Plan
 Project scope management plan
 Schedule management plan
 Staffing management plan
 Communication management plan
 Risk management plan
 Procurement management plan
 Milestone list
 Resource calendar
 Schedule baseline
 Cost baseline
 Risk register
Project Execution
Project Execution process requires
the project manager and the
project team to perform multiple
actions to execute the project
management plan to accomplish
the work defined in the project
scope statement.
Project Execution
 Expend effort and spend funds to accomplish the project objectives
 Staff, train, and manage the project team members assigned to the
project
 Obtain quotations, bids, offers, or proposals as appropriate
 Select sellers by choosing from among potential sellers
 Obtain, manage, and use resources including materials, tools,
equipment, and facilities
 Implement the planned methods and standards
Project Execution -
Major Activities
• Create, control, verify, and validate project deliverables
• Manage sellers
• Adapt approved changes into the project’s scope, plans, and
environment
• Establish and manage project communication channels, both
external and internal to the project team
• Collect project data and report cost, schedule, technical and quality
progress, and status information to facilitate forecasting
• Collect and document lessons learned, and implement approved
process improvement activities
Project Execution -
Major Activities (Cont)
Project Controlling
The Monitor and Control Project Work process is
performed to monitor project processes
associated with initiating, planning, executing,
and closing.
Project Controlling
• Data Collection & Status Reporting
• Project Monitoring & Tracking
• Earned Value Analysis
• Variance Analysis
Project Controlling
 Provides clear indication of progress
 Keeps everyone informed
 Encourages the addressing of
problems
 Provides credible completion
estimates
Benefits of Tracking the Project
Basic Elements of Control System
 A project plan: Scope, schedule, estimates
 A monitoring system which measures performance against
plan
 A reporting system which identifies deviations from the plan
 A system which communicates deviations to the right people
 Corrective actions
 Forecasting the project outcome
Elements of Schedule Control
 Establish the baseline (estimate)
Measure variation from baseline
Take corrective action
4 Key Questions to be asked
 Did the task start?
 If yes, on what date?
 What date will the task finish?
 If finished, on what date did it
finish?
Schedule Tracking
Project Closure
The Close Project process involves
performing the project closure portion of
the project management plan
Project Closure
 Obtain Client Acceptance
 Shut down project operations
 Create Project Closure Document
 Learn from the project experience – Lessons
Learned
 Release resources
 Handover to the Support / Operations Team
Project Closure – Major Activities
 A close out review should highlight both what
went right and what went wrong
Both are essential for continuous
improvement
Exploit the successes and identify the
elements which contributed to the success
Avoid the problems in the future and identify
processes that need to be defined,
redefined and improved
 Key Learning's can be valuable for the next
project
Perform a Closeout Review
 Less overall project cost
 Timely project completion
 Effective use of resources
 Improved risk management
 Identification of key process bottlenecks
and suggested preventive actions
 Higher quality of the final product
 Standardized reports, templates,
processes and lexicon
Project Management - Getting Things
Done
Thank you

6396901

  • 1.
  • 2.
    OBJECTIVES • Create awarenessof the concepts of Project Management and its importance • Understand the various tools available to a Project Manager to perform his duties effectively • Highlight the areas of the application of these concepts during the execution of projects
  • 3.
    Importance of ProjectManagement • Getting things done in the correct manner • Planned and prioritized work distribution and accomplishment • Identification of key process bottlenecks and suggested preventive actions • Project management process improvement • Improved risk management • Standardized reports, templates, processes and lexicon
  • 4.
    What is aProject ?  Has a defined objective  Has a deadline  Requires integration of knowledge and experience from various organizations When task(s),
  • 5.
    How Temporary?  Hasa definite beginning and end, not an on-going effort  Ceases when objectives have been attained  Team is disbanded upon project completion Unique?  The product or service is different in some way from other product or services  Product characteristics are progressively elaborated What is a Project ?
  • 6.
    Project Characteristics  Goal(measurable/verifiable) Oriented  Finite duration with a beginning and end  Uniqueness to a great extent and related uncertainties  Coordinated undertaking of interrelated activities  Performing the activities involve resources  Resources cost money
  • 7.
    How are Projectsdifferent from Operations? – Create own charter, organization, – and goals – Catalyst for change – Unique product or service – Heterogeneous teams – Start and end date Semi-permanent charter, organization, and goals Maintains status quo Standard product or service Homogeneous teams Ongoing Projects Operations
  • 8.
     Poor communication Insufficient resource planning  Unrealistic schedules & poor duration estimation  Poor project requirements  Lack of stakeholder buy-in & no accountability  Undefined project success / closure criteria  Unrealistic budgets  No risk planning  Lack of change control process  Lack of executive support  Resource attrition  Lack of synchronization Project Failure
  • 9.
     Executive managementsupport  User involvement (optimum)  Realistic expectations  Clear statement of requirements  Proper documentation  Public exposure  Competitive & Budgetary pressure Project Success
  • 10.
    Project Life Cycle •Each phase is marked by one or more tangible verification work product referred to as deliverable • The conclusion of a project phase is generally marked by a review • The phase reviews are often called phase exits, stage gates, or kill points PROJECT PHASE 1 PHASE 2 PHASE 3… PHASE ‘n’
  • 11.
  • 12.
    Life Cycle ofProject (Time) High Low Cost to make change Opportunity to add Value Characteristics of a Life Cycle
  • 13.
    Balancing SCOPE, COSTand TIME within the frame work of QUALITY* * meeting customer requirements Harold Kerzner Risk and customer satisfaction are also factors that often gets included in the perspective. Triple Constraint Theorem
  • 14.
    The application ofknowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations Project Management
  • 15.
    • Project Manager •Customer/User • Performing Organization • Project Team Members • Project Management Team • Sponsors • Influencers Key Stakeholders : Generic • Project Manager • Customer / User • Project Team Members • Functional Departments • Sales, BSG, Finance • Business Partners • Subsidiaries & Sister Concerns • Vendors and Suppliers Key Stakeholders : X Firm Project Stakeholders Individuals and organizations Involved in or affected by the project outcome
  • 16.
     Program –Consists of a group of projects supporting broad, general goals and managed in a coordinated way  Project Portfolio Management Collection of projects or programs and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives  Subprojects – Components of a project that are often contracted out  Project Management Office (PMO)  A PMO sometimes also referred as Program Management Office is an organization to centralize and coordinate the management of projects under its domain Project Management Concept
  • 17.
     Shared andcoordinated resources  Identification and development of project management methodology, best practices, and standards  Clearinghouse and management for project policies, procedures, templates, and other shared documentation  Central office for operation and management of project tools  Central coordination of communication management across projects  Coordination of overall project quality standards Project Management Office Support
  • 18.
    Project Management Philosophy The“Golden Rule” of Project Management is three words: -Plan -Organize -Control
  • 19.
  • 20.
    Project Initiation  ConductProject Selection Methods  Define Scope  Document Project Risks, Assumptions, and Constraints  Identify and Perform Stakeholder Analysis  Develop Project Charter  Obtain Project Charter Approval
  • 21.
    Responsibilities • Define goals,objective, milestones • Determine requirements • Determine ground rules and assumptions • Identify time, cost and performance constraints • Determine operating procedures, administrative policies • Identify reporting requirements Project Charter – Project Managers
  • 22.
    Goals vs. Objective Goalsare broad Objectives are narrow Goals are general intentions Objectives are precise Goals are intangible Objectives are tangible Goals are abstract Objectives are concrete Goals can't be validated as is Objectives can be validated
  • 23.
  • 24.
    Expectations Stakeholder Shareholder Employee What is myrole and the job/task specifications in this project? What learning opportunity/new skill will I get from this project? Organization When can I get the product out? What is the quantum of work involved? How many people would this project need (skill level)? What would be their utilization/availability on this project? How much would the cost/ investment for resources be? When can I get the product? What are the features that exists (that I want eliminated now)? What are the additional feature desired? How much I would have to pay? Customer What is the company doing to minimize overheads & maximize profits? What are the efforts and direction for new avenues of business this year? How does this company compare with and stay ahead of competition? Managing Stakeholder Expectations
  • 25.
  • 26.
    • Develop ProjectScope • Define Project Phases • Develop WBS • Define Activity List & Sequence Activities • Create Project Network Diagram • Perform Critical Path Analysis • Perform Cost Estimation • Perform Resource Planning Project Planning
  • 27.
    • Plan ProjectTeam Organization • Create RAM • Identify Project Risks and develop Risk Reponses • Develop Project Management Plan • Baseline the Project Management Plan • Setting up Change Control Mechanism Key Tasks
  • 28.
  • 29.
    Project Scope What isthe WORK we are supposed to do to deliver the final service / product to the customer?
  • 30.
    Product Scope The featuresand functionalities that categorize a product or service
  • 31.
    4 Commandments forGood Project Scope Written Well defined Clearly understood Achievable
  • 32.
    1. Highest level:refers to the entire project 2. Second level: breaks the project into its major sub- projects/phases 3. Third level:  Identify the deliverables for each subproject/phase  Identify the activities and tasks that are required to produce each deliverables  Lowest level breakup called work packages can be scheduled, cost estimated, monitored and controlled  Identifies track able units of work which are assigned to individual members of the project team Create Work Breakdown Structure
  • 33.
  • 34.
    Schedule Management  Createthe Activity List  State the Activity Relationships  State the Resource Requirements  Estimate the Activity Duration  Create Project Schedule
  • 35.
    Prepare Network Diagram Projectschedule network diagrams are schematic displays of the project’s schedule activities and the logical relationships among them, also referred to as dependencies.
  • 36.
    Precedence Diagramming Method(PDM) Also known as Activity on Nodes (AON)
  • 37.
    Arrow Diagramming Method(ADM) Also known as Activity on Arrow (AOA)
  • 38.
    Developing an approximation ofthe costs of the resources needed to complete project activities. Cost Estimating
  • 39.
    Analogous estimating Bottom UpEstimating Parametric Estimating Cost Estimating
  • 40.
    Customer Relations  DevelopCommunication  Ensure Timely Participation  Include the Customer on the Project Team  Develop Trust and Confidence
  • 41.
    Team Requirements •Skills needed? •Individuals identified ? •When are they needed ? •Where are they ? •Training needed ? •Interpersonal compatibility ?
  • 42.
  • 43.
    Risk Response Plan Avoid  Mitigate  Transfer  Accept  with contingency  without contingency  Share  Enhance  Exploit
  • 44.
    Project Management Plan Project scope management plan  Schedule management plan  Staffing management plan  Communication management plan  Risk management plan  Procurement management plan  Milestone list  Resource calendar  Schedule baseline  Cost baseline  Risk register
  • 45.
  • 46.
    Project Execution processrequires the project manager and the project team to perform multiple actions to execute the project management plan to accomplish the work defined in the project scope statement. Project Execution
  • 47.
     Expend effortand spend funds to accomplish the project objectives  Staff, train, and manage the project team members assigned to the project  Obtain quotations, bids, offers, or proposals as appropriate  Select sellers by choosing from among potential sellers  Obtain, manage, and use resources including materials, tools, equipment, and facilities  Implement the planned methods and standards Project Execution - Major Activities
  • 48.
    • Create, control,verify, and validate project deliverables • Manage sellers • Adapt approved changes into the project’s scope, plans, and environment • Establish and manage project communication channels, both external and internal to the project team • Collect project data and report cost, schedule, technical and quality progress, and status information to facilitate forecasting • Collect and document lessons learned, and implement approved process improvement activities Project Execution - Major Activities (Cont)
  • 49.
  • 50.
    The Monitor andControl Project Work process is performed to monitor project processes associated with initiating, planning, executing, and closing. Project Controlling
  • 51.
    • Data Collection& Status Reporting • Project Monitoring & Tracking • Earned Value Analysis • Variance Analysis Project Controlling
  • 52.
     Provides clearindication of progress  Keeps everyone informed  Encourages the addressing of problems  Provides credible completion estimates Benefits of Tracking the Project
  • 53.
    Basic Elements ofControl System  A project plan: Scope, schedule, estimates  A monitoring system which measures performance against plan  A reporting system which identifies deviations from the plan  A system which communicates deviations to the right people  Corrective actions  Forecasting the project outcome
  • 54.
    Elements of ScheduleControl  Establish the baseline (estimate) Measure variation from baseline Take corrective action
  • 55.
    4 Key Questionsto be asked  Did the task start?  If yes, on what date?  What date will the task finish?  If finished, on what date did it finish? Schedule Tracking
  • 56.
  • 57.
    The Close Projectprocess involves performing the project closure portion of the project management plan Project Closure
  • 58.
     Obtain ClientAcceptance  Shut down project operations  Create Project Closure Document  Learn from the project experience – Lessons Learned  Release resources  Handover to the Support / Operations Team Project Closure – Major Activities
  • 59.
     A closeout review should highlight both what went right and what went wrong Both are essential for continuous improvement Exploit the successes and identify the elements which contributed to the success Avoid the problems in the future and identify processes that need to be defined, redefined and improved  Key Learning's can be valuable for the next project Perform a Closeout Review
  • 60.
     Less overallproject cost  Timely project completion  Effective use of resources  Improved risk management  Identification of key process bottlenecks and suggested preventive actions  Higher quality of the final product  Standardized reports, templates, processes and lexicon Project Management - Getting Things Done