PREPARED BY 
Er. Kashmir Dass 
M.E. (Hons.) Civil 
Sr. Lecturer in Civil Engineering, 
Govt. Polytechnic College, Badbar
ANALYSIS OF RATES 
• To determine the rate of a particular item 
of work from a quantities of materials and 
labours required and their costs 
• The rates of materials and labour are 
changing from place to place, therefore the 
rates o different items of work also 
changes from place to place
ANALYSIS OF RATES 
• Every Estimate should be accompanied 
by the analysis of rates of the items 
provided in it . 
• Analysis of rates comprises of 
1. Cost of Material 
2. Cost of Labour 
3. T and P , and Sundries 
4. Carriage 
5. Contractor’s Profit
ANALYSIS OF RATES 
• Tools and Plants ( T & P ) = 2.5 to 3 % of 
the labour cost 
• Transportation cost more than 8 km is 
considered 
• Water charges = 1.5 to 2 % 0f total cost 
• Contractor ‘ s profit = 10 %
ANALYSIS OF RATES 
• Rates of Materials and Labours : 
• 1st class bricks = Rs 4500 per 1000 Nos. 
• 2nd class bricks = Rs 4000 per 1000 Nos. 
• Brick Ballast = Rs 800 per cum 
• Coarse sand = Rs 800 per cum 
• Cement 50 kg bag = Rs 270 per bag 
• Twisted bars = Rs 5000 per Quintel 
• Bitumen = Rs 10 per kg
ANALYSIS OF RATES 
• Mason = Rs 450 per day 
• Plaster = Rs 400 per day 
• Carpenter = Rs 400 per day 
• Bhishti = Rs 250 per day 
• Mazdoor = Rs 250 per day 
• Painter = Rs 300 per day
ANALYSIS OF RATES 
• Earth work in excavation: Mazdoor = 33 
(% cum) Mason = 1.5 
• Earth work in Filling : Mazdoor = 18 
(% cum) Mason = 0.5 
• Cement concrete : Mazdoor = 15 
in foundation Mason =1.5 
Bhishti = 2
ANALYSIS OF RATES 
• Cement concrete : Mazdoor = 15 
Mason = 1 
Bhishti = 2.5 
• R. Cement concrete : Mazdoor = 40 
(10 cum ) Mason = 2.5 
Bhishti = 5 
Blacksmith = 4 
Carpenter = 4
ANALYSIS OF RATES 
• DPC : Mazdoor = 2.5 
(10 cum ) Mason = 1.5 
Bhishti = 0.5 
• 1st class brick work : Mazdoor = 15 
Mason = 8 
Bhishti = 2
ANALYSIS OF RATES 
• Plastering work : Mazdoor = 10 
( 100 sqm) Mason = 10 
Bhishti = 2 
• Distempering/painting/white washing : 
Mazdoor = 5 
( 100 sqm) Painter = 4
ANALYSIS OF RATES 
Example 1. Find out dry materials required 
for 1 cu m. C. concrete 1:4:8 in foundation. 
Solution. 
Ratio = 1:4:8 (cement,sand and aggregate) 
Sum = 1+4+8=13 
cont..
Total dry mortar for 1 cu m cement concrete 
=1.54 cu m 
Therefore the following materials are 
required: 
Cement = (1*1.54*28.8)/13 
= 3.41 bags 
Sand = (4*1.54)/13 
= 0.47 cu m 
cont..
Aggregate (Brick ballast) = (8*1.57)/13 
= 0.94 cu m 
so materials for 1 cu m cement concrete 
1:4:8. 
Cement 3.41 bags 
Sand 0.47 cu m Ans. 
Brick ballast 0.94 cu m
Example 2. Find out dry materials for 1 
cu m lime concrete. 
Solution: 
Ratio = 1:2 (lime,surkhi) 
Sum = 1+2 
= 3 
Total dry mortar for 1 cu m lime concrete 
= 0.40 (lime, surkhi mortar)
Therefore the following materials are 
required. 
Lime = (1*0.40)/3 
= 0.13 cu m 
Surkhi = (2*0.40)/3 
= 0.27 cu m 
Aggregate (brick ballast) = 1.00 cu m
Materials required for1 cu m lime cocrete 1:2 
Lime 0.13 cu m 
Surkhi 0.27 cu m Ans. 
Brick ballast 1.00 cu m
ANALYSIS OF RATES OF 
DIFFERENT ITEMS OF 
WORK. 
1. Excavation for foundation: payment 
% cu m 
(a)Materials at the site for % cu m nil 
No material is required Rs. P. 
(b)labour for % cu m 
Mazdoor 33 nos.@ 250.00/day = 8250.00
Mason 1 no. @ 450.00 = 450.00 
Sundries and Tand P 3% 
on labour = 261.00 
Total = 8961.00 
(c)Add 10% contractor’s profit = 896.10 
grand total =9857.10 
say Rs. = 9857.00 
Rate per % cu m = Rs. 9857.00
2.Earth filling under floors payment % cu m 
(a)Materials at site for %cu m Rs.P. 
No material is required nil 
(b) Labour for % cu m 
Majdoor18nos.@250.00/day =4500.00 
Bhishti 1/2no.@250.00/day = 125.00 
Sundries and Tand P3% on 
labour 465.00 = 123.75 
total = 4748.75 
Add 10% contractor’s profit = 474.87
G.Total= 5223.62 say Rs.=5224.00 
Rate per % cu m = Rs. 5224.00 
3. Cement concrete 1:4:8 in foundations 
(a) Materials at site for 1 cu m payment 
per cu m 
Cement 3.41 bags @270 bag = 929.70 
Sand 0.47 cu m @800.00 per cu m=376.00
Brick ballast 0.94 cu m @ 800.00 
= 752.00 
Cost of labour for 10 cu m = 7520.00 
(b)Labour for 10 cu m Rs. P 
Mason 1@ 400.00/ day = 400.00 
Mazdoors 15@ 250.00/ day = 3750.00 
Bhishti 2@ 250.oo/ day = 500.00 
Sundries and Tand P @ 3% 
on labour = 139.50
• Cost of for 10 cu m = 12309.50 
• Cost of for 1 cu m =12309.50/10 
• =1230.95 
• PROBLEM: Conglomerate floor 4 cm thick 
of cement concrete 1:2:4 over 10 cm thick 
cement concrete 1:6:18 over 10 cm sand 
filling.
calculation of material for 10 sq m 
(1) Wet mortar for cement concrete 
1:2:4= 10 sq m*4cm 
= 10*4/100 
=0.40cu m
Dry mortar = 0.40*1.54=0.616+0.62 cu m 
Ratio = 1:2:4 Sum =1+2+4=7 
Cement = 1*0.62*28.8/7 =2.55 bags 
Sand = 2*0.62/7 = 0.18 cu m
Crusher = 4*0.62/7=0.36 cu m 
(2)Wet mortar for cement concrete 1:6:18 
= 10 sq m*10 cm 
=10*10/100 
=1 cu m
Dry mortar 1*1.54 =1.54cu m 
Ratio =1:6:18=1+6+18 
= 25 
Cement = 1*1.54*28.8/25 
= 1.78 bags
Sand =6*1.54/25 
= 0.37 cu m 
Brick ballast = 18*1.54/2 
= 1.11 cu m 
(3) Sand for 10 sq m = 10 sq m* 10 cm 
= 10*10/10
= 1 cu m 
Total dry mortar for 10 sq m conglomerate 
flooring. 
Cement = 2.55+1.78 
Sand = 0.18+0.37+1.00 
Crusher = 0.46
(a) Materials at site for 10 sq m Rs.P 
Cement 4.33 bags @ 270.00/bag = 1170.00 
sand 1.55 cum@ 800.00 per cu m = 1240.00 
Crusher 0.36 cu m @1200 /cu m = 432.00 
Brick ballast 1.11 cu m@ 800 / cu m = 888.00
Cost of material for 10 sq m =3730.00 
(b) Labour for 10 sq m Rs. P 
Mason 2@ 400.00/ day = 900.00 
Mazdoor 3@ 250.00/day = 750.00 
Bhishti 1@ 250.00 / day = 250.00
Sundries T and P 3% on labour 
= 57.00 
Cost of labour for 10 sq m = 1957.00 
Cost of material and labour for 10 sq m 
=5687.00
Add 10% contractor’s profit = 
568.70 
and total = 6255.70 
Rate for 10 sq m = Rs.6256.00 
Rate per sq m = Rs.625.60

More Related Content

What's hot

Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing Vijay325
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkAshwiniChaudhari13
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity SSudhaVelan
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitslalitha moorthy
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingAnchit Agrawal
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation ddscte
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Mital Damani
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 

What's hot (20)

Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Concrete calculation
Concrete calculationConcrete calculation
Concrete calculation
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limits
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Plastering
PlasteringPlastering
Plastering
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Tiles
TilesTiles
Tiles
 
Bulk density and bulking of fine and coarse aggregate
Bulk density and bulking of fine and coarse aggregateBulk density and bulking of fine and coarse aggregate
Bulk density and bulking of fine and coarse aggregate
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 

Similar to Analysis of rates

ANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptRijuDasgupta
 
Ratesanalysis for Material and Labor
Ratesanalysis for Material and LaborRatesanalysis for Material and Labor
Ratesanalysis for Material and LaborNagoorkani Majeed
 
Estimation and costing pdf
Estimation and costing pdfEstimation and costing pdf
Estimation and costing pdfSaqib Imran
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imranSaqib Imran
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imranSaqib Imran
 
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.pptHimani762003
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxRajnishKumar916873
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.pptashoklalwani6
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity TabulationLamaJassim1
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdfRoshani Shahi
 
IRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in MortarIRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in MortarIRJET Journal
 

Similar to Analysis of rates (20)

ANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.ppt
 
Ratesanalysis for Material and Labor
Ratesanalysis for Material and LaborRatesanalysis for Material and Labor
Ratesanalysis for Material and Labor
 
Estimation and costing pdf
Estimation and costing pdfEstimation and costing pdf
Estimation and costing pdf
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imran
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imran
 
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptx
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.ppt
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity Tabulation
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdf
 
Costing
CostingCosting
Costing
 
Section 6
Section 6Section 6
Section 6
 
Case Study of Foundry
Case Study of FoundryCase Study of Foundry
Case Study of Foundry
 
IRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in MortarIRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in Mortar
 
2 review
2 review2 review
2 review
 
section7.pptx
section7.pptxsection7.pptx
section7.pptx
 

More from Vahabshaik Shai

2021 icse reducedsylabiix-second language-indian languages
2021 icse reducedsylabiix-second language-indian languages2021 icse reducedsylabiix-second language-indian languages
2021 icse reducedsylabiix-second language-indian languagesVahabshaik Shai
 
2021 icse reducedsylabiix-physics
2021 icse reducedsylabiix-physics2021 icse reducedsylabiix-physics
2021 icse reducedsylabiix-physicsVahabshaik Shai
 
2021 icse reducedsylabiix-mathematics
2021 icse reducedsylabiix-mathematics2021 icse reducedsylabiix-mathematics
2021 icse reducedsylabiix-mathematicsVahabshaik Shai
 
2021 icse reducedsylabiix-history and civics
2021 icse reducedsylabiix-history and civics2021 icse reducedsylabiix-history and civics
2021 icse reducedsylabiix-history and civicsVahabshaik Shai
 
2021 icse reducedsylabiix-geography
2021 icse reducedsylabiix-geography2021 icse reducedsylabiix-geography
2021 icse reducedsylabiix-geographyVahabshaik Shai
 
2021 icse reducedsylabiix-computer applications
2021 icse reducedsylabiix-computer applications2021 icse reducedsylabiix-computer applications
2021 icse reducedsylabiix-computer applicationsVahabshaik Shai
 
2021 icse reducedsylabiix-chemistry
2021 icse reducedsylabiix-chemistry2021 icse reducedsylabiix-chemistry
2021 icse reducedsylabiix-chemistryVahabshaik Shai
 
2021 icse reducedsylabiix-appendix-i
2021 icse reducedsylabiix-appendix-i2021 icse reducedsylabiix-appendix-i
2021 icse reducedsylabiix-appendix-iVahabshaik Shai
 
2021 icse reducedsylabiix-biology
2021 icse reducedsylabiix-biology2021 icse reducedsylabiix-biology
2021 icse reducedsylabiix-biologyVahabshaik Shai
 

More from Vahabshaik Shai (11)

Icse english class ix
Icse english class ixIcse english class ix
Icse english class ix
 
Cir icse 02072020
Cir icse 02072020Cir icse 02072020
Cir icse 02072020
 
2021 icse reducedsylabiix-second language-indian languages
2021 icse reducedsylabiix-second language-indian languages2021 icse reducedsylabiix-second language-indian languages
2021 icse reducedsylabiix-second language-indian languages
 
2021 icse reducedsylabiix-physics
2021 icse reducedsylabiix-physics2021 icse reducedsylabiix-physics
2021 icse reducedsylabiix-physics
 
2021 icse reducedsylabiix-mathematics
2021 icse reducedsylabiix-mathematics2021 icse reducedsylabiix-mathematics
2021 icse reducedsylabiix-mathematics
 
2021 icse reducedsylabiix-history and civics
2021 icse reducedsylabiix-history and civics2021 icse reducedsylabiix-history and civics
2021 icse reducedsylabiix-history and civics
 
2021 icse reducedsylabiix-geography
2021 icse reducedsylabiix-geography2021 icse reducedsylabiix-geography
2021 icse reducedsylabiix-geography
 
2021 icse reducedsylabiix-computer applications
2021 icse reducedsylabiix-computer applications2021 icse reducedsylabiix-computer applications
2021 icse reducedsylabiix-computer applications
 
2021 icse reducedsylabiix-chemistry
2021 icse reducedsylabiix-chemistry2021 icse reducedsylabiix-chemistry
2021 icse reducedsylabiix-chemistry
 
2021 icse reducedsylabiix-appendix-i
2021 icse reducedsylabiix-appendix-i2021 icse reducedsylabiix-appendix-i
2021 icse reducedsylabiix-appendix-i
 
2021 icse reducedsylabiix-biology
2021 icse reducedsylabiix-biology2021 icse reducedsylabiix-biology
2021 icse reducedsylabiix-biology
 

Recently uploaded

KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfmahaffeycheryld
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 

Analysis of rates

  • 1. PREPARED BY Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Govt. Polytechnic College, Badbar
  • 2. ANALYSIS OF RATES • To determine the rate of a particular item of work from a quantities of materials and labours required and their costs • The rates of materials and labour are changing from place to place, therefore the rates o different items of work also changes from place to place
  • 3. ANALYSIS OF RATES • Every Estimate should be accompanied by the analysis of rates of the items provided in it . • Analysis of rates comprises of 1. Cost of Material 2. Cost of Labour 3. T and P , and Sundries 4. Carriage 5. Contractor’s Profit
  • 4. ANALYSIS OF RATES • Tools and Plants ( T & P ) = 2.5 to 3 % of the labour cost • Transportation cost more than 8 km is considered • Water charges = 1.5 to 2 % 0f total cost • Contractor ‘ s profit = 10 %
  • 5. ANALYSIS OF RATES • Rates of Materials and Labours : • 1st class bricks = Rs 4500 per 1000 Nos. • 2nd class bricks = Rs 4000 per 1000 Nos. • Brick Ballast = Rs 800 per cum • Coarse sand = Rs 800 per cum • Cement 50 kg bag = Rs 270 per bag • Twisted bars = Rs 5000 per Quintel • Bitumen = Rs 10 per kg
  • 6. ANALYSIS OF RATES • Mason = Rs 450 per day • Plaster = Rs 400 per day • Carpenter = Rs 400 per day • Bhishti = Rs 250 per day • Mazdoor = Rs 250 per day • Painter = Rs 300 per day
  • 7. ANALYSIS OF RATES • Earth work in excavation: Mazdoor = 33 (% cum) Mason = 1.5 • Earth work in Filling : Mazdoor = 18 (% cum) Mason = 0.5 • Cement concrete : Mazdoor = 15 in foundation Mason =1.5 Bhishti = 2
  • 8. ANALYSIS OF RATES • Cement concrete : Mazdoor = 15 Mason = 1 Bhishti = 2.5 • R. Cement concrete : Mazdoor = 40 (10 cum ) Mason = 2.5 Bhishti = 5 Blacksmith = 4 Carpenter = 4
  • 9. ANALYSIS OF RATES • DPC : Mazdoor = 2.5 (10 cum ) Mason = 1.5 Bhishti = 0.5 • 1st class brick work : Mazdoor = 15 Mason = 8 Bhishti = 2
  • 10. ANALYSIS OF RATES • Plastering work : Mazdoor = 10 ( 100 sqm) Mason = 10 Bhishti = 2 • Distempering/painting/white washing : Mazdoor = 5 ( 100 sqm) Painter = 4
  • 11. ANALYSIS OF RATES Example 1. Find out dry materials required for 1 cu m. C. concrete 1:4:8 in foundation. Solution. Ratio = 1:4:8 (cement,sand and aggregate) Sum = 1+4+8=13 cont..
  • 12. Total dry mortar for 1 cu m cement concrete =1.54 cu m Therefore the following materials are required: Cement = (1*1.54*28.8)/13 = 3.41 bags Sand = (4*1.54)/13 = 0.47 cu m cont..
  • 13. Aggregate (Brick ballast) = (8*1.57)/13 = 0.94 cu m so materials for 1 cu m cement concrete 1:4:8. Cement 3.41 bags Sand 0.47 cu m Ans. Brick ballast 0.94 cu m
  • 14. Example 2. Find out dry materials for 1 cu m lime concrete. Solution: Ratio = 1:2 (lime,surkhi) Sum = 1+2 = 3 Total dry mortar for 1 cu m lime concrete = 0.40 (lime, surkhi mortar)
  • 15. Therefore the following materials are required. Lime = (1*0.40)/3 = 0.13 cu m Surkhi = (2*0.40)/3 = 0.27 cu m Aggregate (brick ballast) = 1.00 cu m
  • 16. Materials required for1 cu m lime cocrete 1:2 Lime 0.13 cu m Surkhi 0.27 cu m Ans. Brick ballast 1.00 cu m
  • 17. ANALYSIS OF RATES OF DIFFERENT ITEMS OF WORK. 1. Excavation for foundation: payment % cu m (a)Materials at the site for % cu m nil No material is required Rs. P. (b)labour for % cu m Mazdoor 33 nos.@ 250.00/day = 8250.00
  • 18. Mason 1 no. @ 450.00 = 450.00 Sundries and Tand P 3% on labour = 261.00 Total = 8961.00 (c)Add 10% contractor’s profit = 896.10 grand total =9857.10 say Rs. = 9857.00 Rate per % cu m = Rs. 9857.00
  • 19. 2.Earth filling under floors payment % cu m (a)Materials at site for %cu m Rs.P. No material is required nil (b) Labour for % cu m Majdoor18nos.@250.00/day =4500.00 Bhishti 1/2no.@250.00/day = 125.00 Sundries and Tand P3% on labour 465.00 = 123.75 total = 4748.75 Add 10% contractor’s profit = 474.87
  • 20. G.Total= 5223.62 say Rs.=5224.00 Rate per % cu m = Rs. 5224.00 3. Cement concrete 1:4:8 in foundations (a) Materials at site for 1 cu m payment per cu m Cement 3.41 bags @270 bag = 929.70 Sand 0.47 cu m @800.00 per cu m=376.00
  • 21. Brick ballast 0.94 cu m @ 800.00 = 752.00 Cost of labour for 10 cu m = 7520.00 (b)Labour for 10 cu m Rs. P Mason 1@ 400.00/ day = 400.00 Mazdoors 15@ 250.00/ day = 3750.00 Bhishti 2@ 250.oo/ day = 500.00 Sundries and Tand P @ 3% on labour = 139.50
  • 22. • Cost of for 10 cu m = 12309.50 • Cost of for 1 cu m =12309.50/10 • =1230.95 • PROBLEM: Conglomerate floor 4 cm thick of cement concrete 1:2:4 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
  • 23. calculation of material for 10 sq m (1) Wet mortar for cement concrete 1:2:4= 10 sq m*4cm = 10*4/100 =0.40cu m
  • 24. Dry mortar = 0.40*1.54=0.616+0.62 cu m Ratio = 1:2:4 Sum =1+2+4=7 Cement = 1*0.62*28.8/7 =2.55 bags Sand = 2*0.62/7 = 0.18 cu m
  • 25. Crusher = 4*0.62/7=0.36 cu m (2)Wet mortar for cement concrete 1:6:18 = 10 sq m*10 cm =10*10/100 =1 cu m
  • 26. Dry mortar 1*1.54 =1.54cu m Ratio =1:6:18=1+6+18 = 25 Cement = 1*1.54*28.8/25 = 1.78 bags
  • 27. Sand =6*1.54/25 = 0.37 cu m Brick ballast = 18*1.54/2 = 1.11 cu m (3) Sand for 10 sq m = 10 sq m* 10 cm = 10*10/10
  • 28. = 1 cu m Total dry mortar for 10 sq m conglomerate flooring. Cement = 2.55+1.78 Sand = 0.18+0.37+1.00 Crusher = 0.46
  • 29. (a) Materials at site for 10 sq m Rs.P Cement 4.33 bags @ 270.00/bag = 1170.00 sand 1.55 cum@ 800.00 per cu m = 1240.00 Crusher 0.36 cu m @1200 /cu m = 432.00 Brick ballast 1.11 cu m@ 800 / cu m = 888.00
  • 30. Cost of material for 10 sq m =3730.00 (b) Labour for 10 sq m Rs. P Mason 2@ 400.00/ day = 900.00 Mazdoor 3@ 250.00/day = 750.00 Bhishti 1@ 250.00 / day = 250.00
  • 31. Sundries T and P 3% on labour = 57.00 Cost of labour for 10 sq m = 1957.00 Cost of material and labour for 10 sq m =5687.00
  • 32. Add 10% contractor’s profit = 568.70 and total = 6255.70 Rate for 10 sq m = Rs.6256.00 Rate per sq m = Rs.625.60