Project : Approximate estimation of Rigid pavement
Item : Excavation in Hard Rock (by Blasting)
By
Sandeep Bora AP14003
Anchit Agrawal AP14012
Aditya Avinashe AP14079
Pratik Dalai AP14081
Shivali Kalra AP14088
Topics
 Approximate estimation of rigid pavement
 Specifications of excavation in hard rock
 Brief Specification
 Detailed Specification
 Rate Analysis for excavation in hard rock
Rigid pavement cost per km
Sr No Project
Distance
(km)
Cost (cr)
Cost/km
(cr)
1 Mudhol Maharashtra border road on SH 18 in Karnataka 107.94 317.60 2.94
Contractor- Ashoka Buildcon and GVR Infra (On going project)
2 Malavalli to Pavagada(karnataka) 193.34 313.65 1.62
Contractor- Sadbhav Engineering Ltd and GKC Projects Ltd
(On going project)
3 Trichy Karur road(4 lane road) 63.00 732.84 2.91
Contractor-Reliance Infra (completed project)
4 Construction of approach road from South Garo Hills to Jetra 17.00 28.76 1.69
(On going project)
5 Construction of road from Pakoti to Kamsha 6.50 9.50 1.46
(On going project)
AVERAGE cost per km 2.13
Brief specification
 Excavation for foundation in hard rock by blasting including trimming and levelling
the bed and removing the excavated material and stacking it into measurable heaps
within a distance of 50 meters from site area.
Lift: 0 to 1.5m
Detailed specification
 Scope and objectives
 Equipment used
 Material Used
 Workmanship
 Testing and Acceptance Criteria
 Mode of measurement and payment
Scope and Objectives
 The purpose of this procedure is to establish the methodology to be followed
for excavation work during the construction phase .
 This procedure is applicable to the execution team. It intends to co-relate and
control the entire task needed to be done in order to achieve satisfactory
construction excavation work.
 Excavation is to be done for Hard rock by the means of blasting.
 We have used a machine intensive approach .
 Scope of work- 10 cubic meter
Equipment deployed
 Hydraulic Excavator
 Tipper
 Jack hammer
Hydraulic excavator
Excavator(Hyundai 250 R)Purpose:
Digging of trenches ,holes and
foundation.
Material handling,
Pising,
Demolition
Attachment:
Bucket, Breaker,
Auger
Rent
Rs 2200/hr
Capacity:
Bucket size: 0.93 cum
Tipper
Tipper (Bharat Benz)Purpose:
 Hauling of material
Charges
 Monthly rent (1.25 lakhs
excluding diesel)
Capacity: 14 cum
Jack Hammer
Jack hammerPurpose:
Drilling of holes,
Depth of drilling is 2m in this
case
Action of drilling takes place by
percussion action.
A pilot rod is drilled into the
surface with the help of
jackhammer
Charges: Rs11/ft or Rs 400/hour
Material Used
 Explosives
 Special Gelatine (gelatine stick)
 Powergel IDL
 25 mm thick
 Rs 2000/25kg
 Each stick of 125 grams.
 Electric detonator
 SED – Rajasthan Explosives
 1.8 m long wire
 Rs 12 / Piece
Workmanship
 Preparation of surface:
o Firstly the ground for blasting should be cleared of all obstacles.
o The ground should be preferably leveled.
o The ground should be cleaned and marked.
 Method of Blasting:
o Holes are to be drilled in triangular pattern for the required length.
o The electronic detonator is inserted into the explosive gel tube which is connected to
the external wire circuit
o Explosives are placed within the hole and are then grouted with dry soil up to the top
o The connection are checked and rechecked by the blaster
o All the explosives are connected in parallel and series connection
o This wire is connected to the detonating fuse.
o warning siren are sounded at an interval of 5 minutes before blasting, all the traffic in
the area should also be halted & red flags to be placed along the way, fragile structure
should be covered by polymer or plastic sheets to avoid damage.
o The blast shed should be located at least 10 m from the blasting area.
o After the detonation has taken place the area is excavated with the help of a excavator &
loaded into the tipper.
o Small pieces of rocks are removed and ground is levelled.
Blasting pattern
Testing and Acceptance Criteria
 The dimensions of the pits will be checked as per the GFC drawings .
 All over excavations filled back to required lines, levels and grades by placing plain
cement concrete of grade M10 and/or richer and/or by compacted earth, as
directed by the Engineer, at the Contractor’s cost.
 Sand replacement method of testing the field density on site to ensure the desire
densification has been obtained i.e minimum 95% of its maximum dry density.
Mode of measurement and payment
 Mode of measurement-
As per IS 1200(Part 1),
o Mode of measurement for Excavation is in cubic meter
o Each dimension shall be measured to the nearest 0.01m
o Areas shall be worked out to the nearest 0.01 sq.m
o Cubical content shall be worked out to the nearest 0.01 cu.m
o Working Authorised working space shall be special in each case. Where authorised
working space is not so specified the following shall apply:
600 mm measured from the face of substructure ( including protective measures, if
any) at lowest level, where extra working space is required.
 Mode of payment-
o Payment shall be done as per the GFC drawings.
Rate analysis
 Rate as per calculations: Rs 680.58
 Rate as per DSR 2014: Rs 653
 Rate analysis
estimation and quantity surveying

More Related Content

What's hot

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...A Makwana
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDAshwiniChaudhari13
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tendersgayu pandian
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...A Makwana
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkAshwiniChaudhari13
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimatealwin prabakar
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant pptdip17
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
 
Manufacturing of bricks
Manufacturing of bricksManufacturing of bricks
Manufacturing of bricksSarthak Kaura
 
Transportation: Construction Equipments
Transportation: Construction EquipmentsTransportation: Construction Equipments
Transportation: Construction EquipmentsSanjana Gupta
 

What's hot (20)

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Estimation
Estimation    Estimation
Estimation
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
 
Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...
 
Concrete works
Concrete worksConcrete works
Concrete works
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWD
 
Is 7272 1 (1)
Is 7272 1 (1)Is 7272 1 (1)
Is 7272 1 (1)
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant ppt
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
Manufacturing of bricks
Manufacturing of bricksManufacturing of bricks
Manufacturing of bricks
 
Trenching machine
Trenching machineTrenching machine
Trenching machine
 
Transportation: Construction Equipments
Transportation: Construction EquipmentsTransportation: Construction Equipments
Transportation: Construction Equipments
 
earth moving equipments
earth moving equipmentsearth moving equipments
earth moving equipments
 
GRADERS
GRADERSGRADERS
GRADERS
 

Similar to estimation and quantity surveying

Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAman Jain
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase llRavi Bhadani
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and CostingGanesh Tatikonda
 
chapter1-210122051628.pdf
chapter1-210122051628.pdfchapter1-210122051628.pdf
chapter1-210122051628.pdfDeepak37004
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationSiddhartha Bhamidipati
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking pptPatel Tapan
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration TestMuftah Aljoat
 
A valuable journey proposal
A valuable journey proposalA valuable journey proposal
A valuable journey proposalkjanand
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Roshan Kumar Patel
 
final presentation 1 goa
final presentation 1 goafinal presentation 1 goa
final presentation 1 goaAnkit Anand
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfDanielWisman1
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building ConstructionAdnan. Ali
 
ULCCS - industrial visit report
ULCCS - industrial visit reportULCCS - industrial visit report
ULCCS - industrial visit reportSHAMJITH KM
 

Similar to estimation and quantity surveying (20)

Summer training report
Summer training reportSummer training report
Summer training report
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha university
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase ll
 
Geotechnical Investigation
Geotechnical InvestigationGeotechnical Investigation
Geotechnical Investigation
 
RoadstaB august 2013
RoadstaB august 2013RoadstaB august 2013
RoadstaB august 2013
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and Costing
 
chapter1-210122051628.pdf
chapter1-210122051628.pdfchapter1-210122051628.pdf
chapter1-210122051628.pdf
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
 
Cep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek pandaCep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek panda
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
 
A valuable journey proposal
A valuable journey proposalA valuable journey proposal
A valuable journey proposal
 
Power shovel
Power shovelPower shovel
Power shovel
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
final presentation 1 goa
final presentation 1 goafinal presentation 1 goa
final presentation 1 goa
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
Summer training
Summer trainingSummer training
Summer training
 
ULCCS - industrial visit report
ULCCS - industrial visit reportULCCS - industrial visit report
ULCCS - industrial visit report
 
Phase 2
Phase 2Phase 2
Phase 2
 

Recently uploaded

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 

estimation and quantity surveying

  • 1. Project : Approximate estimation of Rigid pavement Item : Excavation in Hard Rock (by Blasting) By Sandeep Bora AP14003 Anchit Agrawal AP14012 Aditya Avinashe AP14079 Pratik Dalai AP14081 Shivali Kalra AP14088
  • 2. Topics  Approximate estimation of rigid pavement  Specifications of excavation in hard rock  Brief Specification  Detailed Specification  Rate Analysis for excavation in hard rock
  • 3. Rigid pavement cost per km Sr No Project Distance (km) Cost (cr) Cost/km (cr) 1 Mudhol Maharashtra border road on SH 18 in Karnataka 107.94 317.60 2.94 Contractor- Ashoka Buildcon and GVR Infra (On going project) 2 Malavalli to Pavagada(karnataka) 193.34 313.65 1.62 Contractor- Sadbhav Engineering Ltd and GKC Projects Ltd (On going project) 3 Trichy Karur road(4 lane road) 63.00 732.84 2.91 Contractor-Reliance Infra (completed project) 4 Construction of approach road from South Garo Hills to Jetra 17.00 28.76 1.69 (On going project) 5 Construction of road from Pakoti to Kamsha 6.50 9.50 1.46 (On going project) AVERAGE cost per km 2.13
  • 4. Brief specification  Excavation for foundation in hard rock by blasting including trimming and levelling the bed and removing the excavated material and stacking it into measurable heaps within a distance of 50 meters from site area. Lift: 0 to 1.5m
  • 5. Detailed specification  Scope and objectives  Equipment used  Material Used  Workmanship  Testing and Acceptance Criteria  Mode of measurement and payment
  • 6. Scope and Objectives  The purpose of this procedure is to establish the methodology to be followed for excavation work during the construction phase .  This procedure is applicable to the execution team. It intends to co-relate and control the entire task needed to be done in order to achieve satisfactory construction excavation work.  Excavation is to be done for Hard rock by the means of blasting.  We have used a machine intensive approach .  Scope of work- 10 cubic meter
  • 7. Equipment deployed  Hydraulic Excavator  Tipper  Jack hammer
  • 8. Hydraulic excavator Excavator(Hyundai 250 R)Purpose: Digging of trenches ,holes and foundation. Material handling, Pising, Demolition Attachment: Bucket, Breaker, Auger Rent Rs 2200/hr Capacity: Bucket size: 0.93 cum
  • 9. Tipper Tipper (Bharat Benz)Purpose:  Hauling of material Charges  Monthly rent (1.25 lakhs excluding diesel) Capacity: 14 cum
  • 10. Jack Hammer Jack hammerPurpose: Drilling of holes, Depth of drilling is 2m in this case Action of drilling takes place by percussion action. A pilot rod is drilled into the surface with the help of jackhammer Charges: Rs11/ft or Rs 400/hour
  • 11. Material Used  Explosives  Special Gelatine (gelatine stick)  Powergel IDL  25 mm thick  Rs 2000/25kg  Each stick of 125 grams.  Electric detonator  SED – Rajasthan Explosives  1.8 m long wire  Rs 12 / Piece
  • 12. Workmanship  Preparation of surface: o Firstly the ground for blasting should be cleared of all obstacles. o The ground should be preferably leveled. o The ground should be cleaned and marked.  Method of Blasting: o Holes are to be drilled in triangular pattern for the required length. o The electronic detonator is inserted into the explosive gel tube which is connected to the external wire circuit o Explosives are placed within the hole and are then grouted with dry soil up to the top o The connection are checked and rechecked by the blaster o All the explosives are connected in parallel and series connection o This wire is connected to the detonating fuse. o warning siren are sounded at an interval of 5 minutes before blasting, all the traffic in the area should also be halted & red flags to be placed along the way, fragile structure should be covered by polymer or plastic sheets to avoid damage. o The blast shed should be located at least 10 m from the blasting area. o After the detonation has taken place the area is excavated with the help of a excavator & loaded into the tipper. o Small pieces of rocks are removed and ground is levelled.
  • 14. Testing and Acceptance Criteria  The dimensions of the pits will be checked as per the GFC drawings .  All over excavations filled back to required lines, levels and grades by placing plain cement concrete of grade M10 and/or richer and/or by compacted earth, as directed by the Engineer, at the Contractor’s cost.  Sand replacement method of testing the field density on site to ensure the desire densification has been obtained i.e minimum 95% of its maximum dry density.
  • 15. Mode of measurement and payment  Mode of measurement- As per IS 1200(Part 1), o Mode of measurement for Excavation is in cubic meter o Each dimension shall be measured to the nearest 0.01m o Areas shall be worked out to the nearest 0.01 sq.m o Cubical content shall be worked out to the nearest 0.01 cu.m o Working Authorised working space shall be special in each case. Where authorised working space is not so specified the following shall apply: 600 mm measured from the face of substructure ( including protective measures, if any) at lowest level, where extra working space is required.  Mode of payment- o Payment shall be done as per the GFC drawings.
  • 16. Rate analysis  Rate as per calculations: Rs 680.58  Rate as per DSR 2014: Rs 653  Rate analysis