• Density of cement = 1440 kg/m3
• Desity of Sand = 1450-1500 kg/m3
• Density of Aggregate = 1450-1550 kg/m3
• 1 Bag of cement = 50 kg
• 1 Bag of cement = 34.7 liters
• 1 Bag of cement = 0.0347 cubic meter
• Specific gravity of cement = 3.15
Where 33, 43, 53, compressive strength of cement in N/mm2
How to calculate cement, sand, and aggregates in concrete
Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5
cement:sand:aggregates
Where, M = Mix 20 = characteristic compressive strength
Dry volume of concrete = 1 ×1.5 = 1.54m3
Cement =
1
5.5
×1.54 = 0.28𝑚3
Density of cement is 1440/𝑚3
= 0.28 × 1440 = 403.2 kg
We have each bag of cement is 50 kg
=
403.2
50
= 8 Bags
We know in one bag of cement = 1.226 CFT
= 8 × 1.226 = 9.8 CFT
How to calculate cement, sand, and aggregates in concrete
Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5
cement:sand:aggregates
Where, M = Mix 20 = characteristic compressive strength
Sand =
1.5
5.5
×1.54 = 0.42𝑚3
Density of sand is 1450/𝑚3
=0.42 ×1450= 609 kg/𝑚3
As we know that 1𝑚3 = 35.31 CFT
=0.42 × 35.31 = 14.83 CFT
How to calculate cement, sand, and aggregates in concrete
Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5
cement:sand:aggregates
Where, M = Mix 20 = characteristic compressive strength
Aggregates=
3
5.5
×1.54 = 0.84𝑚3
Density of aggregates is 1500/𝑚3
=0.84 ×1500= 1260 kg/𝑚3
As we know that 1𝑚3 = 35.31 CFT
=0.84 × 35.31 = 29.66 CFT
To verify the calculation we can add 0.28𝑚3
+0.42𝑚3
+0.84𝑚3
= 1.54m3

More Related Content

What's hot

Introduction to Concrete
Introduction to ConcreteIntroduction to Concrete
Introduction to ConcreteSumit Gupta
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)Er.Navazhushen Patel
 
5#rate analysis problems
5#rate analysis   problems5#rate analysis   problems
5#rate analysis problemsLIJI A
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Process of Building Construction
Process of Building ConstructionProcess of Building Construction
Process of Building ConstructionAyushHajare
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete gradejay panchal
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & propertieslalitha moorthy
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentationSze Ting Kuek
 
Building construction 1 (MASONRY)
Building construction 1 (MASONRY)Building construction 1 (MASONRY)
Building construction 1 (MASONRY)Safiullah Khan
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methodsSimarpreet Singh
 

What's hot (20)

Introduction to Concrete
Introduction to ConcreteIntroduction to Concrete
Introduction to Concrete
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
 
Special Concretes
Special Concretes Special Concretes
Special Concretes
 
5#rate analysis problems
5#rate analysis   problems5#rate analysis   problems
5#rate analysis problems
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Fresh Concrete
Fresh ConcreteFresh Concrete
Fresh Concrete
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Process of Building Construction
Process of Building ConstructionProcess of Building Construction
Process of Building Construction
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete grade
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
Building construction 1 (MASONRY)
Building construction 1 (MASONRY)Building construction 1 (MASONRY)
Building construction 1 (MASONRY)
 
PRESENTATION ON CONCRETE
PRESENTATION ON CONCRETEPRESENTATION ON CONCRETE
PRESENTATION ON CONCRETE
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Construction material in civil engineering
Construction material in civil engineeringConstruction material in civil engineering
Construction material in civil engineering
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methods
 

More from SANJEEV Wazir

Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 
Use of bim in project management
Use of bim in project managementUse of bim in project management
Use of bim in project managementSANJEEV Wazir
 
Common causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsCommon causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsSANJEEV Wazir
 
Periodical meeting report and progress report
Periodical meeting report and progress reportPeriodical meeting report and progress report
Periodical meeting report and progress reportSANJEEV Wazir
 
What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...SANJEEV Wazir
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18SANJEEV Wazir
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksSANJEEV Wazir
 
impact field work report
 impact field work report impact field work report
impact field work reportSANJEEV Wazir
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of constructionSANJEEV Wazir
 
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdfSANJEEV Wazir
 
How to calculate quantity of steel in slab
How to calculate quantity of steel in slabHow to calculate quantity of steel in slab
How to calculate quantity of steel in slabSANJEEV Wazir
 

More from SANJEEV Wazir (20)

Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 
Use of bim in project management
Use of bim in project managementUse of bim in project management
Use of bim in project management
 
Lean costruction
Lean costructionLean costruction
Lean costruction
 
Common causes of cost overruns in construction projects
Common causes of cost overruns in construction projectsCommon causes of cost overruns in construction projects
Common causes of cost overruns in construction projects
 
Periodical meeting report and progress report
Periodical meeting report and progress reportPeriodical meeting report and progress report
Periodical meeting report and progress report
 
RECORD KEEPING
RECORD KEEPINGRECORD KEEPING
RECORD KEEPING
 
What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
impact field work report
 impact field work report impact field work report
impact field work report
 
canal regulators
 canal regulators canal regulators
canal regulators
 
construction project planing
 construction project planing construction project planing
construction project planing
 
energy dissipators
energy dissipatorsenergy dissipators
energy dissipators
 
energy dissipators
energy dissipatorsenergy dissipators
energy dissipators
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of construction
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
theory of seepage
theory of seepagetheory of seepage
theory of seepage
 
DIVERSION HEAD WORK
DIVERSION HEAD WORKDIVERSION HEAD WORK
DIVERSION HEAD WORK
 
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf
.BOUSSINESQ’S THEORY FOR VERTICAL STRESSES UNDER A CIRCULAR AREA.pdf
 
How to calculate quantity of steel in slab
How to calculate quantity of steel in slabHow to calculate quantity of steel in slab
How to calculate quantity of steel in slab
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdfPratik Pawar
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 

HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES

  • 1. How to calculate cement, sand, and aggregates in concrete
  • 2. How to calculate cement, sand, and aggregates in concrete • Density of cement = 1440 kg/m3 • Desity of Sand = 1450-1500 kg/m3 • Density of Aggregate = 1450-1550 kg/m3 • 1 Bag of cement = 50 kg • 1 Bag of cement = 34.7 liters • 1 Bag of cement = 0.0347 cubic meter • Specific gravity of cement = 3.15 Where 33, 43, 53, compressive strength of cement in N/mm2
  • 3. How to calculate cement, sand, and aggregates in concrete Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5 cement:sand:aggregates Where, M = Mix 20 = characteristic compressive strength Dry volume of concrete = 1 ×1.5 = 1.54m3 Cement = 1 5.5 ×1.54 = 0.28𝑚3 Density of cement is 1440/𝑚3 = 0.28 × 1440 = 403.2 kg We have each bag of cement is 50 kg = 403.2 50 = 8 Bags We know in one bag of cement = 1.226 CFT = 8 × 1.226 = 9.8 CFT
  • 4. How to calculate cement, sand, and aggregates in concrete Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5 cement:sand:aggregates Where, M = Mix 20 = characteristic compressive strength Sand = 1.5 5.5 ×1.54 = 0.42𝑚3 Density of sand is 1450/𝑚3 =0.42 ×1450= 609 kg/𝑚3 As we know that 1𝑚3 = 35.31 CFT =0.42 × 35.31 = 14.83 CFT
  • 5. How to calculate cement, sand, and aggregates in concrete Consider volume of concrete = 1m3 M-20 = 1:1.5:3 = 5.5 cement:sand:aggregates Where, M = Mix 20 = characteristic compressive strength Aggregates= 3 5.5 ×1.54 = 0.84𝑚3 Density of aggregates is 1500/𝑚3 =0.84 ×1500= 1260 kg/𝑚3 As we know that 1𝑚3 = 35.31 CFT =0.84 × 35.31 = 29.66 CFT To verify the calculation we can add 0.28𝑚3 +0.42𝑚3 +0.84𝑚3 = 1.54m3