This document provides information and examples on analyzing construction rates. It begins by defining rate analysis as determining the cost of work items based on required materials, labor, and their prices. Sample rate analyses are then shown for excavation, filling, and concrete work. Equations for calculating material quantities are provided. The document concludes with a full example rate analysis for a conglomerate floor involving concrete and sand filling over a 10 square meter area.