This document discusses the analysis of rates for construction projects. It provides information on how to calculate rates based on material and labor costs. The key points are:
1. Rates are analyzed by determining costs of materials, labor, tools/plants, transportation, water charges, and contractor's profit for each item of work.
2. Example calculations are provided to determine the materials required for 1 cubic meter of cement concrete and lime concrete.
3. A sample rate analysis is shown for excavation work, earth filling, and cement concrete in foundations based on local material and labor costs.