IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
A Review of Cost overruns in Construction Project Managementijsrd.com
In construction industry cost is amongst the major considerations throughout the project management life cycle and thus can be regarded as one of the most important parameter of a project and the driving force of project success. Despite of its proven importance it is not uncommon to see a construction project failing to achieve its objectives within the specified cost. Cost overrun is a very frequent phenomenon and is almost associated with nearly all projects in the construction industry. In this paper different type of cost are enlisted and due to the effect of cost overruns enumerated in building projects. Effects Cost overruns are decrease in the building projects so, different methods are used the analysis cost overruns factors and give the top ten ranks.
Effect of construction delays on project time overruneSAT Journals
Abstract The time and cost for performance of a project are usually important to the employer and contractor. About 57% of Indian construction projects are experiencing time overrun. These time overruns always contributed as expensive to all parties. This paper highlights the types of construction delays due to which project suffer time and cost overrun. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. The construction industry is the tool through which a society achieves its goal of urban and rural development. It is one of the sectors that provides important ingredient for the development of an economy. This paper studies external and internal factors that influence the construction process and outlines the effect of delay in large construction projects. Various media reports shows incidents of extended delays and extensive cost overruns in infrastructure projects. These delayed projects are further can conclude additional delays and this affects an ongoing projects and also new projects which could not be started due to pending projects whose completion date already elongated. Realizing the density of matter this paper studies the performance of previous year 2012 ongoing and also completed projects. These projects are from around 17 various central sectors costing Rs. 1000 crore and above (Mega Projects). Keywords: Delays, Time overrun, Cost overrun, Megaprojects etc
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
A Review of Cost overruns in Construction Project Managementijsrd.com
In construction industry cost is amongst the major considerations throughout the project management life cycle and thus can be regarded as one of the most important parameter of a project and the driving force of project success. Despite of its proven importance it is not uncommon to see a construction project failing to achieve its objectives within the specified cost. Cost overrun is a very frequent phenomenon and is almost associated with nearly all projects in the construction industry. In this paper different type of cost are enlisted and due to the effect of cost overruns enumerated in building projects. Effects Cost overruns are decrease in the building projects so, different methods are used the analysis cost overruns factors and give the top ten ranks.
Effect of construction delays on project time overruneSAT Journals
Abstract The time and cost for performance of a project are usually important to the employer and contractor. About 57% of Indian construction projects are experiencing time overrun. These time overruns always contributed as expensive to all parties. This paper highlights the types of construction delays due to which project suffer time and cost overrun. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. The construction industry is the tool through which a society achieves its goal of urban and rural development. It is one of the sectors that provides important ingredient for the development of an economy. This paper studies external and internal factors that influence the construction process and outlines the effect of delay in large construction projects. Various media reports shows incidents of extended delays and extensive cost overruns in infrastructure projects. These delayed projects are further can conclude additional delays and this affects an ongoing projects and also new projects which could not be started due to pending projects whose completion date already elongated. Realizing the density of matter this paper studies the performance of previous year 2012 ongoing and also completed projects. These projects are from around 17 various central sectors costing Rs. 1000 crore and above (Mega Projects). Keywords: Delays, Time overrun, Cost overrun, Megaprojects etc
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative importance index used to rank the causes of delays in the construction industry as per the questionnaire responses obtained. .It is found that the top 10 causes of delays in construction projects in Kuwait are as listed below. Using a lowest price bidding and tendering system Poor performance of the main contractor Inadequate experience or qualifications of main contractor’s staff Delay of payments from client to other parties Poor performance of subcontractors Shortage in the supply of general labour Frequent changes of subcontractors Delay in decision making by the client Poor management of subcontractors Conflict between the main parties to the contract Inappropriate methods used by the main contractor Proposals of ways to effectively prevent delays in the future construction projects managed in Kuwait construction industry were developed from the identified causes delay
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of mechanical and civil engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in mechanical and civil engineering. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
Time and expense overruns are regular occurrences in the construction industry all around the world but these are a major concern in developing countries such as India, and their consequences can be extremely harmful when public infrastructure projects are concerned. In India as per the MoS & PI report, as of October 2019, there were 552 delayed construction projects, and the mean time overrun in these 552 delayed projects is29.07 months. Many studies in the literature review previously, have concentrated on a variety of infrastructure risk management issues but there have only been a few studies that have looked into the overall dynamics of infrastructure and how a project's timeline can be affected by changing risk interactions. This article aids in the investigation of the variables and causes of construction delays in infrastructure projects.
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
This work found out the most significant reasons of time and cost overrun for ongoing residential projects, along with this, the study focuses on formulating recommendations for improving construction performance. At the end of this work, I have reached a conclusion that what are common issues that are attributing to time and cost overrun in projects.
"How to avoid rework phenomena in construction projects by maintaining a reliable organizational profile? The application of LEAN-6 SIGMA methodology minimizes time variability in construction phase."
Evaluation of 6 noded quareter point element for crack analysis by analytical...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Passive control of structures using sliding isolators at intermediate floor l...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Design and implementation of an ancrchitecture of embedded web server for wir...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative importance index used to rank the causes of delays in the construction industry as per the questionnaire responses obtained. .It is found that the top 10 causes of delays in construction projects in Kuwait are as listed below. Using a lowest price bidding and tendering system Poor performance of the main contractor Inadequate experience or qualifications of main contractor’s staff Delay of payments from client to other parties Poor performance of subcontractors Shortage in the supply of general labour Frequent changes of subcontractors Delay in decision making by the client Poor management of subcontractors Conflict between the main parties to the contract Inappropriate methods used by the main contractor Proposals of ways to effectively prevent delays in the future construction projects managed in Kuwait construction industry were developed from the identified causes delay
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of mechanical and civil engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in mechanical and civil engineering. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
Time and expense overruns are regular occurrences in the construction industry all around the world but these are a major concern in developing countries such as India, and their consequences can be extremely harmful when public infrastructure projects are concerned. In India as per the MoS & PI report, as of October 2019, there were 552 delayed construction projects, and the mean time overrun in these 552 delayed projects is29.07 months. Many studies in the literature review previously, have concentrated on a variety of infrastructure risk management issues but there have only been a few studies that have looked into the overall dynamics of infrastructure and how a project's timeline can be affected by changing risk interactions. This article aids in the investigation of the variables and causes of construction delays in infrastructure projects.
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
This work found out the most significant reasons of time and cost overrun for ongoing residential projects, along with this, the study focuses on formulating recommendations for improving construction performance. At the end of this work, I have reached a conclusion that what are common issues that are attributing to time and cost overrun in projects.
"How to avoid rework phenomena in construction projects by maintaining a reliable organizational profile? The application of LEAN-6 SIGMA methodology minimizes time variability in construction phase."
Evaluation of 6 noded quareter point element for crack analysis by analytical...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Passive control of structures using sliding isolators at intermediate floor l...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Design and implementation of an ancrchitecture of embedded web server for wir...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Emission characteristics of a diesel engine using soyabean oil and diesel blendseSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Parametric study of response of an asymmetric building for various earthquake...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Analysis of multi hop relay algorithm for efficient broadcasting in manetseSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Security constrained optimal load dispatch using hpso technique for thermal s...eSAT Publishing House
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...IJMER
Indian Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fibre of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because of the overriding importance of time for both the Owner and the Contractor, it is the source of frequent disputes and claims leading to lawsuits. The growing rate of delays is adversely affecting the timely delivery of construction projects. Presently construction industries are facing a lot of problems, considering that a paper assess construction stakeholder’s perception to the causes of delays and its effects on project delivery. And also one case study is considered in this paper to elicit responses from construction stakeholders. The primary aim of this paper is to identify the perceptions of the different parties regarding causes of delays, the allocation of responsibilities and the types of delays, and method of minimizing the construction delays
“Investigation of Time-Cost Effectiveness on Construction Projects”IOSR Journals
Development projects undertaken in various sectors of economy and finance are building blocks of
national economy. This paper examines the time-cost effectiveness on construction projects by quantification of
16 different project performance parameters applied on 49 construction projects (both public and private sector
projects). A questionnaire was drafted to test the parameters and criteria adopted when assessing the success of construction projects. The results shows that for general group of construction projects all 16 parameters have significant impact on cost growth.
Similar to Analysis of factors contributing delays and claims in (20)
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Analysis of factors contributing delays and claims in
1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 390
ANALYSIS OF FACTORS CONTRIBUTING DELAYS AND CLAIMS IN
CONSTRUCTION PROJECTS
Ketki S. Kamble1
, A. R. Kambekar2
1
PG. Student, Const. Management, 2
Assistant Professor, CED, SPCE Andheri (W), Mumbai 400058, Maharashtra,
ketki08@gmail.com
Abstract
Construction activities are the most competitive and it involves higher risk with minimum profitability due to competition.
Construction of any infrastructural work involves complex management skills related to manpower, materials, plant, machineries,
new technologies etc. It also involves many agencies interdependent on each other like the planners, structural and functional
designers including various types of specialized engineers and it also includes support of financial institutions, insurers, contractors
and specialized contractors. As there are prevailing labour bye laws it needs special care of their well beings. In such kind of complex
and intense framework some disputes is quite natural between the agencies involved in such activities which further results in claims
management as the unsettled dispute finally leads to financial claims. Higher incidences of disputes are generally reported from the
construction contract. Even if there is an appropriate understanding of construction contract clauses from the agencies in the
agreement yet claims seems to be a major crisis in the construction sector. The research reported in this paper aims in identifying the
major factors responsible of project delay that may give rise to claims for delay damages. The in this paper research mainly highlights
on finding the major components of claims with perspective of contractor for delay damages.
Keywords: Claims, delay, damages, construction industry, disputes.
--------------------------------------------------------------------***---------------------------------------------------------------------
1. INTRODUCTION
Claims as per Hughes [1] “It is a demand, a request or
application for something to which a contractor considers,
believes or contends he is entitled but in respect of which
agreement has not yet been reached”. As per Harris [2] the
major five causes of disputes in Asian construction projects
are as follows:
• Failure to make interim awards on extensions of time
and to give associated compensation
• Unrealistic risk transfer from employers to
contractors
• Conflicting party interests
• An unrealistic contract completion date being defined
at tender stage
• Incomplete design information or employer
requirements.
In general it was reported in literature that the construction
sector involves disputes from the sources like changes which
includes variation, alteration, addition, deletion, delays and
suspensions, differing site conditions, unjust enrichment by
owners. It was also observed that there are five potential areas
which can give rise to disputes: document errors, estimation
errors, change in conditions, implied promises and agencies
involved. Claims however fall under two major categories
based on their occurrence i.e. during (i) execution of contract
and (ii) administration of contract. Execution of contract
includes claims due to change in design and drawing, delays in
handing over site/issuance of drawings/getting clearance
certificate from appropriate authorities, claims due to original
scope of work change, claims due to differing site conditions
and claims due to variation in methodology. Similarly during
administration of contract claims may be due to delay in
payment of running account bills and claims due to
foreclosure/termination of contract. Similarly delays in
schedules of construction projects are one of the most
common types of disputes in the construction industry. The
client and contractor works for a common objective i.e. to
complete the project within scheduled time as well as cost.
Time overrun is the most common failure of objective that in
turn leads to cost overrun and hence failure in the objective of
timely completion leads to failure of overall project budget
which ultimately gives rise to disputes. The reasons for delays
could be caused by client, contractor, force majeure i.e. act of
God, change in laws, rules and regulations, improper co-
ordination between client and contractors, non-availability of
required skilled labour, non-availability of required special
material, differing site conditions, non-issuance of working
drawing and changes in work leading to change in
methodology. Delays can be further classified as excusable or
non-excusable. Some of the practical cases of non-excusable
delays are incompetent sub-contractor, financial incompetency
of the contractor, labour disputes hindering work progress,
poor workmanship leading to rework, poor material quality
and delay in handing over the site by client and excusable
2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 391
delay includes sudden floods, natural calamities like
earthquake, tsunami etc. riots, labour strike, non-foreseeable
situation. Critical delay are defined as a delay in any given
activity which results in delay of total project and non-critical
delay is defined as delays which may not upset total time
frame of the contract [1].
This paper mainly focuses on delay damage claims related to
additional cost incurred by the contractor due to delay caused
by the client. Evaluation of delay damages are when a
contractor bids for a tender, a number of factors are considered
apart from the labour, material and equipment that are
required to execute the work. In tender the duration required to
complete the work is generally mentioned and hence the
contractor quotes accordingly. The quote includes material
cost, labour cost, plant and machinery cost, shuttering
material, human resource cost, financial cost, site overheads
and above all profit. In an event of prolongation of contract,
the major factors that are affected are additional overheads,
plant and machinery, labour and material cost, loss of
productivity, loss of profit, loss of new business opportunities
and early mobilization.
2. METHODOLOGY ADOPTED
Following methodology is adopted for this research work.
This includes identification of claims that occur, factors
responsible for delay, prolongation claim if any, focus on
factors that are affected due to delay in completion the project,
factors mostly considered while setting up prolongation claim,
ranking based on case studies to understand the major factor
affecting the delay damages claim finally recommendations
based on the study. The delays which occur in construction
projects are due to various reasons. Analysis of three projects
have been carried out details of the same is given in Table 1.
Project cost, value of claims and claim in % of project cost for
(i) construction of mall in Mumbai, (ii) construction of hotel
and casino in Goa and (iii) construction of power transmission
tower in Raigad district of Maharashtra is considered in this
paper. The range of delay claims by contractor was in the
range of around 1.08 % to 400% of the project cost. This may
due to various reasons.
Table1. Analysis of delay damages in construction projects.
Sr. No
Project
description
Project
cost
(Lakhs
Rs.)
Value
of claim
(Lakhs
Rs.)
Claim
in % of
project
cost
1
Construction
of mall in
Mumbai.
4314 623.58 14.45%
2
Construction
of hotel and
casino in
Goa.
3494 37.68 1.08%
3
Construction
of power
transmission
tower
foundation
in Raigad
district.
12.43 49.64 400%
2.1 Project 1: Construction of Mall in Mumbai
Construction of a mall in Mumbai was taken as first case study
for delay claims. The project cost was around 4314 Lakhs Rs.,
claim amount by contractor was 623.58 Lakhs Rs. and delay
was almost of 7 months. Various reasons for claims observed
in this case includes the mainly due to delay in approved
drawings. The total built up area was around 6,77,000 Sq.ft.
and large quantity of MS shuttering material was required to
be deployed on site. Since the work was suspended in the
middle of project, the resources like staff, machinery was
demobilized and transferred to other project, but it was
difficult to transfer the shuttering material to other site since
the cost of transportation for demobilizing and again
mobilizing when the work resumes was observed as a
governing factor. Hence in this project 81% of Claim
constitutes for M.S Shuttering Material. Details of claim for
various reasons in % for project 1 are shown in Table 2. This
includes claims for MS shuttering material, labour, overheads
and machinery. Next section gives similar analysis for
construction of hotel and casino in Goa.
Table2 Details of claim for project 1
Sr.
No.
Description
Claim
amount
(In Lakhs
Rs.)
Claim
in % of
project
cost
Importance
as per
claim
amount
1
M.S.
Shuttering
Material
503.08 81% 1
2 Labour 58.24 9% 2
3 Overheads 47.50 8% 3
4 Machinery 14.75 2% 4
Total claim
(In Lakhs Rs.)
623.58
2.2 Project 2: Construction of Hotel and Casino in
Goa
The construction of hotel and casino in Goa was having
estimated project cost of 3494 Lakhs Rs. and the claim was
37.68 Lakhs Rs with delay of 1 month. It was noted that the
work order given shows the site mobilization within 15 days
and in the tender it was also mentioned the minimum staff
cadre and equipment needs to be deployed on site at the time
of mobilization. Table 3 gives details of claim for various
reasons in % for project 2 showing importance as per claim
3. IJRET: International Journal of Research in Engineering and Technolo
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @
amount. As per the conditions the contractor mobilized the s
with the required resources but there was a delay of 1 month
in handing over the site. In this case the amount of
M.S. shuttering material, overheads and machinery
same, since the claim was at the start of the project hence the
minimum resources were deployed. The third case study
includes the construction of power transmis
foundation in Raigad district detailed analysis is given in the
next section.
Table3. Details of claim for project 2.
Sr.
No.
Description
Claim
amount
(In
Lakhs
Rs.)
Claim in
% of
project
cost
1
M.S
shuttering
material
10.93 29%
2 Overheads 10.60 28%
3 Machinery 9.55 25%
4 Labour 6.60 18%
Total claim
(In Lakhs Rs.)
37.68
2.3 Project 3. Construction of Power Transmission
Tower Foundation in Raigad District
The scope of work in this case study was to construct RCC
power transmission tower foundation at
locations. Table 4 gives details of claim for project 3.
work was supposed to be executed after getting unhindered
land at all the four locations along with the necessary
9%
2% 8%
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319
__________________________________________________________________________________________
2013, Available @ http://www.ijret.org
ontractor mobilized the site
ut there was a delay of 1 month
this case the amount of claim for
achinery was almost
at the start of the project hence the
The third case study
includes the construction of power transmission tower
foundation in Raigad district detailed analysis is given in the
project 2.
Claim in
project
Importance
as per
claim
amount
1
2
3
4
Power Transmission
was to construct RCC
foundation at four different
Table 4 gives details of claim for project 3. The
to be executed after getting unhindered
along with the necessary
approvals from the local authorities. It was
that all four locations would
project. The duration of project was 45 days. The contractor
mobilized the site with adequate resources
of all the four location was not
working drawing was not issued
local authorities was not taken by the
cost was 12.43 Lakhs Rs., c
and the delay resulted the work to be completed in 14.5
months leading to total delay of
details of claims by contractor for project 1, 2 and 3 on various
elements of the respective projects.
Table4. Details of
Sr.
No.
Description
Claim
amount
(In
Lakhs
Rs.)
1 Labour 21
2
M.S
Shuttering
Material
10
3 Overheads 10
4 Machinery 6.
Total claim
(In Lakhs Rs.)
49
(a)
81%
8%
Project 1.
M.S. Shuttering Material
Labour
Machinery
Overheads
eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
392
from the local authorities. It was also mentioned
ould be made available at the start of
project. The duration of project was 45 days. The contractor
mobilized the site with adequate resources but the possession
location was not allotted to the contractor. The
not issued and the permission from the
not taken by the client. The total project
Rs., claim amount was 49.64 Lakhs Rs.
sulted the work to be completed in 14.5
total delay of 13 months. Figure 1 shows
details of claims by contractor for project 1, 2 and 3 on various
elements of the respective projects.
Details of claim for project 3
Claim
amount
(In
Lakhs
Rs.)
Claim in
% of
project
cost
Importance
as per claim
amount
21.58 40% 1
10.79 20% 2
10.79 20% 2
.47 12% 3
49.64
M.S. Shuttering Material
4. IJRET: International Journal of Research in Engineering and Technolo
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @
Fig1. Details of claims by contractor for
CONCLUSIONS
The investigation in this work was to identify the major
factors responsible for project delay that may give rise to
claims for delay damages for three major projects of 1.
Construction of mall, 2. Construction of hotel and casino and
3. Construction of power transmission tower at various
locations of India. The main highlights in this study are to find
out the major components of claims with perspective of
contractor for delay damages. For mall project it can be seen
that M.S. shuttering material is most affected factor of delay
damages. This is because normally mall constructions are
wide spread and the area required for construction is more and
hence shuttering required to support the plywood is required in
huge quantities. If the project is suspended or
charges for the material mounts to a huge expenditure. In case
of hotel and casino construction delay in project was
due to handing over of site hence all the M.S shuttering
material, labour, staff, equipment which were mobilized
underutilized. In this case it was observed that all
25%
18%
20%
20%
12%
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319
__________________________________________________________________________________________
2013, Available @ http://www.ijret.org
Details of claims by contractor for (a) project 1, (b) project 2 and (c) project 3 on various elements
The investigation in this work was to identify the major
project delay that may give rise to
claims for delay damages for three major projects of 1.
Construction of mall, 2. Construction of hotel and casino and
wer transmission tower at various
locations of India. The main highlights in this study are to find
out the major components of claims with perspective of
all project it can be seen
ffected factor of delay
damages. This is because normally mall constructions are
wide spread and the area required for construction is more and
hence shuttering required to support the plywood is required in
huge quantities. If the project is suspended or delayed the idle
charges for the material mounts to a huge expenditure. In case
in project was mainly
due to handing over of site hence all the M.S shuttering
which were mobilized but
underutilized. In this case it was observed that all four factors
are equally contributing delay.
for power transmission tower
was due to not handing over
unhindered at the same time
project was supposed to be completed in
time was the key factor and t
complete project but work front
labour factor was the majo
RECOMMENDATIONS
Following are some of the
contractors of the construction projects
(1) Recommendations for Client:
have proper of planning before awarding the work.
The design and drawing should be ready before hand
to avoid any delay in work.
completely handed over instead of piece meal.
analysis of all factors which may lead to delay in
work from their end should be taken
(b)
(c)
29%
28%
18%
Project 2.
M.S. Shuttering Material
Labour
Machinery
Overheads
40%
20%
Project 3.
M.S. Shuttering Material
Labour
Overheads
Machinery
eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
393
3 on various elements
ng delay. In case of claims by contractor
ower foundation project, the delay
handing over of all the four locations
at the same time and delay in drawings. Since the
be completed in one and half months,
the key factor and the contractor mobilized for the
complete project but work front was not given. Hence the
major affected factor in this case.
RECOMMENDATIONS
are some of the recommendations for clients and
contractors of the construction projects
Recommendations for Client: the client should
have proper of planning before awarding the work.
and drawing should be ready before hand
to avoid any delay in work. The site should be
completely handed over instead of piece meal. Risk
analysis of all factors which may lead to delay in
end should be taken care of.
M.S. Shuttering Material
Machinery
Overheads
M.S. Shuttering Material
Overheads
Machinery
5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 394
(2) Recommendation for Contractor: It is the duty of
the contractor to validate the drawings given by client
at the time of bidding the tender. The contractor must
also analyze all the factors which may lead to delays
from government bodies, changes in rules and
regulations. The contractor should also be financially
stable to digest the cost overrun leading to delays
REFERENCES
[1] ED-ON Centre lecture notes: “One day workshop on
Contract Administration and Arbitration”. Pages 37-43.
[2] E. C. Harris: “Global Construction Disputes 2012:
Moving in the Right Direction” Pages 3-5 (2012)