IJSRED-V2I3P74
•
0 likes
•
12 views
IJSRED
Follow
International Journal of Scientific Research and Engineering Development
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 5
Download now
Download to read offline
Recommended
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
Analysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims in
eSAT Publishing House
causes and implication of delay in construction
causes and implication of delay in construction
sudinak
M Sc - Nefert Moussa - Risk Allocation in Egyptian Construction Industry
M Sc - Nefert Moussa - Risk Allocation in Egyptian Construction Industry
nefertsalah
NATIONAL BUILDING CODE- SP7
NATIONAL BUILDING CODE- SP7
Dr. BASWESHWAR JIRWANKAR
Nefer Moussa, Masters of Science dissertation, Risk Allocation in Egyptian C...
Nefer Moussa, Masters of Science dissertation, Risk Allocation in Egyptian C...
nefertsalah
The significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential project
IOSR Journals
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET Journal
Recommended
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
Analysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims in
eSAT Publishing House
causes and implication of delay in construction
causes and implication of delay in construction
sudinak
M Sc - Nefert Moussa - Risk Allocation in Egyptian Construction Industry
M Sc - Nefert Moussa - Risk Allocation in Egyptian Construction Industry
nefertsalah
NATIONAL BUILDING CODE- SP7
NATIONAL BUILDING CODE- SP7
Dr. BASWESHWAR JIRWANKAR
Nefer Moussa, Masters of Science dissertation, Risk Allocation in Egyptian C...
Nefer Moussa, Masters of Science dissertation, Risk Allocation in Egyptian C...
nefertsalah
The significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential project
IOSR Journals
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET Journal
National building code
National building code
Mayank Rawat
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
ijsrd.com
Time overruns
Time overruns
Bhalchandra Tankkar
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
Twana Ahmad
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
World-Academic Journal
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
IAEME Publication
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET Journal
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
Fidic yellow vs silver
Fidic yellow vs silver
Weero Koster
National Building Code 2005
National Building Code 2005
mahendra institute of engineering and technology
Causes of delay and cost overruns in construction of groundwater projects in ...
Causes of delay and cost overruns in construction of groundwater projects in ...
Charles Abraham Scheck
Bye laws fire
Bye laws fire
Rameez Gazi
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
UTHM
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Chapter 3- Construction Law
Chapter 3- Construction Law
Delhi Technological University
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
Abhishek Shah
Ijciet 10 01_088
Ijciet 10 01_088
IAEME Publication
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
eSAT Journals
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
eSAT Journals
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
IRJET Journal
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
IJMER
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
IAEME Publication
More Related Content
What's hot
National building code
National building code
Mayank Rawat
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
ijsrd.com
Time overruns
Time overruns
Bhalchandra Tankkar
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
Twana Ahmad
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
World-Academic Journal
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
IAEME Publication
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET Journal
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
Fidic yellow vs silver
Fidic yellow vs silver
Weero Koster
National Building Code 2005
National Building Code 2005
mahendra institute of engineering and technology
Causes of delay and cost overruns in construction of groundwater projects in ...
Causes of delay and cost overruns in construction of groundwater projects in ...
Charles Abraham Scheck
Bye laws fire
Bye laws fire
Rameez Gazi
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
UTHM
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Chapter 3- Construction Law
Chapter 3- Construction Law
Delhi Technological University
What's hot
(15)
National building code
National building code
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
Time overruns
Time overruns
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
SWOT ANALYSIS OF ARBITRATION AWARDS IN INDIAN CONSTRUCTION CONTRACTS
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
Fidic yellow vs silver
Fidic yellow vs silver
National Building Code 2005
National Building Code 2005
Causes of delay and cost overruns in construction of groundwater projects in ...
Causes of delay and cost overruns in construction of groundwater projects in ...
Bye laws fire
Bye laws fire
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Chapter 3- Construction Law
Chapter 3- Construction Law
Similar to IJSRED-V2I3P74
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
Abhishek Shah
Ijciet 10 01_088
Ijciet 10 01_088
IAEME Publication
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
eSAT Journals
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
eSAT Journals
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
IRJET Journal
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
IJMER
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
IAEME Publication
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
Dr. Amarjeet Singh
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
IJMREMJournal
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
IJMREMJournal
CSCM Causes of project delay
CSCM Causes of project delay
Est
Literature review on_ extension of time
Literature review on_ extension of time
Joseph Sangpang
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
IJERA Editor
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET Journal
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
IOSR Journals
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
IOSR Journals
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
IOSR Journals
B012140812
B012140812
IOSR Journals
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
IRJET Journal
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET Journal
Similar to IJSRED-V2I3P74
(20)
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
Ijciet 10 01_088
Ijciet 10 01_088
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
CSCM Causes of project delay
CSCM Causes of project delay
Literature review on_ extension of time
Literature review on_ extension of time
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
B012140812
B012140812
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
More from IJSRED
IJSRED-V3I6P13
IJSRED-V3I6P13
IJSRED
School Bus Tracking and Security System
School Bus Tracking and Security System
IJSRED
BigBasket encashing the Demonetisation: A big opportunity
BigBasket encashing the Demonetisation: A big opportunity
IJSRED
Quantitative and Qualitative Analysis of Plant Leaf Disease
Quantitative and Qualitative Analysis of Plant Leaf Disease
IJSRED
DC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric Vehicles
IJSRED
Growth Path Followed by France
Growth Path Followed by France
IJSRED
Acquisition System
Acquisition System
IJSRED
Parallelization of Graceful Labeling Using Open MP
Parallelization of Graceful Labeling Using Open MP
IJSRED
Study of Phenotypic Plasticity of Fruits of Luffa Acutangula Var. Amara
Study of Phenotypic Plasticity of Fruits of Luffa Acutangula Var. Amara
IJSRED
Understanding Architecture of Internet of Things
Understanding Architecture of Internet of Things
IJSRED
Smart shopping cart
Smart shopping cart
IJSRED
An Emperical Study of Learning How Soft Skills is Essential for Management St...
An Emperical Study of Learning How Soft Skills is Essential for Management St...
IJSRED
Smart Canteen Management
Smart Canteen Management
IJSRED
Gandhian trusteeship and Economic Ethics
Gandhian trusteeship and Economic Ethics
IJSRED
Impacts of a New Spatial Variable on a Black Hole Metric Solution
Impacts of a New Spatial Variable on a Black Hole Metric Solution
IJSRED
A Study to Assess the Effectiveness of Planned Teaching Programme on Knowledg...
A Study to Assess the Effectiveness of Planned Teaching Programme on Knowledg...
IJSRED
Inginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition System
IJSRED
Farmer's Analytical assistant
Farmer's Analytical assistant
IJSRED
Functions of Forensic Engineering Investigator in India
Functions of Forensic Engineering Investigator in India
IJSRED
Participation Politique Feminine En Competition Électorale Au Congo-Kinshasa....
Participation Politique Feminine En Competition Électorale Au Congo-Kinshasa....
IJSRED
More from IJSRED
(20)
IJSRED-V3I6P13
IJSRED-V3I6P13
School Bus Tracking and Security System
School Bus Tracking and Security System
BigBasket encashing the Demonetisation: A big opportunity
BigBasket encashing the Demonetisation: A big opportunity
Quantitative and Qualitative Analysis of Plant Leaf Disease
Quantitative and Qualitative Analysis of Plant Leaf Disease
DC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric Vehicles
Growth Path Followed by France
Growth Path Followed by France
Acquisition System
Acquisition System
Parallelization of Graceful Labeling Using Open MP
Parallelization of Graceful Labeling Using Open MP
Study of Phenotypic Plasticity of Fruits of Luffa Acutangula Var. Amara
Study of Phenotypic Plasticity of Fruits of Luffa Acutangula Var. Amara
Understanding Architecture of Internet of Things
Understanding Architecture of Internet of Things
Smart shopping cart
Smart shopping cart
An Emperical Study of Learning How Soft Skills is Essential for Management St...
An Emperical Study of Learning How Soft Skills is Essential for Management St...
Smart Canteen Management
Smart Canteen Management
Gandhian trusteeship and Economic Ethics
Gandhian trusteeship and Economic Ethics
Impacts of a New Spatial Variable on a Black Hole Metric Solution
Impacts of a New Spatial Variable on a Black Hole Metric Solution
A Study to Assess the Effectiveness of Planned Teaching Programme on Knowledg...
A Study to Assess the Effectiveness of Planned Teaching Programme on Knowledg...
Inginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition System
Farmer's Analytical assistant
Farmer's Analytical assistant
Functions of Forensic Engineering Investigator in India
Functions of Forensic Engineering Investigator in India
Participation Politique Feminine En Competition Électorale Au Congo-Kinshasa....
Participation Politique Feminine En Competition Électorale Au Congo-Kinshasa....
Recently uploaded
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
pranjaldaimarysona
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
Recently uploaded
(20)
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
IJSRED-V2I3P74
1.
International Journal of
Scientific Research and Engineering Development-– Volume 2 Issue 3, May –June 2019 Available at www.ijsred.com ISSN : 2581-7175 ©IJSRED: All Rights are Reserved Page 648 Causes of Claims in the Construction Project Anita Rauzana*, Tripoli** *(Department of Civil Engineering,Syiah Kuala University, Aceh Province, Indonesia) **(Department of Civil Engineering,Syiah Kuala University, Aceh Province, Indonesia) ----------------------------------------************************---------------------------------- Abstract: Claims on construction projects are requests or demands for adding costs, and time of construction. Claims can trigger a dispute because the implementation of the project is not in accordance with the contract. Construction contracts are used as guidelines in submitting construction claims. Studies of construction claims have been carried out by various researchers, and every cause of construction claims is influenced by location / area, and project characteristics. This study aims to establish the theoretical framework for the cause of contractor claims for delays in construction projects from literature review, various research results, literature, and various relevant information. According to a review of several articles / research, obtained factors that influence claims are design changes. Keywords – claims, contractors, construction, owners, projects ----------------------------------------************************---------------------------------- I. INTRODUCTION The construction industry is a complex industrial sector, and can contribute to economic growth in Indonesia. The role of the construction industry is cooperation from various sectors. However, relations between these sectors often run less smoothly, due to the construction industry often having complicated problems, so that relations with other sectors are disrupted. This is due to the development of the construction industry being a complex industry both in terms of forms, costs, contract systems, and existing resources. For project owners, especially the government, it avoids claims, while contractors are reluctant to make claims, for fear of being recorded as a contracting company that has poor performance (Yasin, 2004). This article presents review results of the causes of claims on private and government projects. Construction claims occur because one RESEARCH ARTICLE OPEN ACCESS
2.
International Journal of
Scientific Research and Engineering Development-– Volume 2 Issue 3, May –June 2019 Available at www.ijsred.com ISSN : 2581-7175 ©IJSRED: All Rights are Reserved Page 649 party fails to carry out its responsibilities and obligations. In implementing the project, the agreement reached is stated in the contract document. But during this time, there were still frequent disputes between the owner and the contractor, or the contractor blamed the consultant. To minimize the problem, it is very important to know the risks that can occur in the project, and whether those risks are covered in the contract articles. Risk is one of the important things that must be considered in each project. Risk occurs in every project and contractor, therefore, it must be aware of the effects of risk by implementing good risk management. Risk is a condition that arises because of uncertainty in the implementation of a construction project. Claims is demands, however, the notion of claims according to Wibowo (2009), that claims are categorized into three as contractual claims, ex- contractual claims, and common law claims, as well as formulating four strategies for contractors so that claims can be overcome, namely recognizing claims, providing accurate notifications, collecting documentation complete, and present claims so that the owner can grant the claim submitted. Claims will arise when one party believes that it has been harmed by another party neglecting its contractual obligations, therefore it needs to get compensation (Kuluanga et al., 2000). Claims can occur with owners, contractors or suppliers (Cox, 1997). The definition of claim is more directed at the contractor's request to compensate for losses or avoid liquidated damages (Seeley, 1993). It can be concluded that claims occur because of a request for the implementation of a construction service work between the contractor and the owner, or with a sub contractor related to additional costs, time and other compensation. Yasin (2004) concluded that the main causes of construction claims are: 1) Inaccurate design information 2) Incomplete design information 3) Investigation of incomplete locations 4) Slow client reactions / responses 5) Poor communication between human resources 6) Time targets that are not realized 7) Imperfect administration 8) Incomplete tender information 9) Unclear risk allocation 10) Late payment Due to delays in construction projects and additional costs, it is important to know what factors contribute to claims in the construction project. The incompatibility of the realization with the expectations of the construction project has the potential to cause losses to the owner and the implementing contractor. Incompatibility that occurs is the time of implementation, namely the project is completed outside the time set. Parties who experience losses due to delays must be able to
3.
International Journal of
Scientific Research and Engineering Development-– Volume 2 Issue 3, May –June 2019 Available at www.ijsred.com ISSN : 2581-7175 ©IJSRED: All Rights are Reserved Page 650 recognize who should be responsible for the delay (Arditi 2008), then can take appropriate steps to reduce or eliminate the losses incurred. Based on the responsible party, delay can be classified into three, namely due to owner delays (commonly known as type E), contractors (type C), and not due to owners and contractors (type N). Determination of the responsible party is important to determine the type of compensation that must be given, whether time compensation, and cost compensation (Scott 1997) II. METHODOLOGY The purpose of writing this article is to establish a theoretical framework for potential construction claims by contractors, conducting studies from previous studies, journals, and from relevant literature reviews. The methodology used in this article is using the study of literature. III. RESULTS AND DISCUSSION Identification of potential claims by contractors on construction projects is carried out by conducting studies from various literature studies. The study of construction claims by contractors to the owners of construction projects is often done, different results regarding the main causes of contractor claims to the owners of construction projects have been investigated by previous researchers. Wibowo (2009) presented the results of a survey of construction service actors about the practice of contractor claims to project owners, because the delay was the responsibility of government construction project owners. Based on frequency, there are three main reasons why claims are not submitted by contractors are (1) claims are not significant, (2) unpreparedness of supporting claims documents, (3) the need to maintain good relations with service users. Meanwhile the reason for service users (project owners) rejecting contractor's claims is (1) claims not regulated in the contract, (2) incomplete supporting documents for claims, (3) budget unavailability. According to Pasaribu (2009), there are findings that claims have a correlation of 81.2% on time performance. There are claims that affect payments to air conditioning subcontractors, architectural subcontractors, and interior subcontractors. Chandra (2005) stated that the main causes of claims were design changes and added work carried out by building owners, whereas contractor claims often took the form of additional costs, and claim settlement methods, which are often used by parties are engineering judgment methods. According to Satwanirat (2009), building construction claims submitted by the contractor to the owner during the construction process almost frequently occur, and a good understanding of claim submission is needed which can help contractors in the process of submitting their
4.
International Journal of
Scientific Research and Engineering Development-– Volume 2 Issue 3, May –June 2019 Available at www.ijsred.com ISSN : 2581-7175 ©IJSRED: All Rights are Reserved Page 651 claims, claims get additional time, additional costs and or compensation. According to Putri (2013), the implementation of construction project claims is divided into the consequences of (1) the actions of the project owner, (2) the consultant planner's actions, (3) supervisory counseling, and ( 4) external factors. According to Nurisra (2009), there are 7 groups of factors that cause claims, namely: 1) contract articles that are incomplete and clear, 2) conflicts in design, specifications and special risks, 3) changes or modifications to the contents of contracts, 4) weather conditions, 5) differences in field conditions, 6) changes in schedule by the owner, 7) delays due to the owner. The most potential claim in the ranking is higher than usual rainfall, and the land investigation conducted by the owner does not describe the project land conditions. IV. CONCLUSION Construction claims caused by the owner as a demand for the contractor, which leads to requests for additional time to complete, and is still a problem that is always present in every construction project. The results of the study on the factors causing the submission of construction claims from several articles / studies determine the main rating, namely the change in design by the owner, and the delay in approving and submitting the design, followed by higher than usual rainfall conditions, and investigations of land that is not according to field conditions. The impact of submitting these claims is the addition of work, implementation time, and compensation. Claims that occur can be solved by several mutually agreed methods, and included in the contract, among others (Malak, 2002; Barrie, 1992; Edward, 1997) : (1) Engineering Judgement, where the design consultant appointed by the building owner is responsible for making the final decision on the settlement of the claim and binding on all parties. (2) Negotiation, where the disputing party seeks a solution without interference from other parties. (3) Mediation, where the disputing party uses a neutral mediator and the decision is non- binding. (4) Arbitration, where the disputing party appoints the arbitrator and the decision is binding. (5) Litigation, where disputes are brought to court and each party is represented by its lawyer. (6) Mini-trial, where the disputing party is represented by each project manager and the third party is an advisor. (7) Dispute review board, where each disputing party chooses one representative to appoint a third party and the decision is non- binding. According to (Malak, 2002), To control risk and avoid claims, several ways can be done, namely: The parties concerned must study the contract as well as possible, insurance, check the construction work program before the offering period, choose a competent construction team, apply the system
5.
International Journal of
Scientific Research and Engineering Development-– Volume 2 Issue 3, May –June 2019 Available at www.ijsred.com ISSN : 2581-7175 ©IJSRED: All Rights are Reserved Page 652 management information to identify potential problems. REFERENCES [1] Arditi, D. And Pattanakitchamroon, T. “Analysis Methods In Time-Based Claims”, J. Const. Eng. Mgmt., Vol. 134, No.4, 242-252. 2008. [2] Barrie, D.S., and Paulson, B.C. Professional Construction Management. Mc. Graw-Hill, New York. 1992. [3] Cox. R. K.“Managing change orders and claims“, J. Mgmt. in Eng., Vol. 13, No.1, 24-29. 1997. [4] Edward R., Fisk, P.E.Contruction Project Administration, Fifth Edition, Prentice Hall, New Jersey. 1997. [5] Chandra H.P. Study of Submitting Construction Claims from Contractors to Building Owners, Journal ofDimensiTeknikSipil, Vol. 7 No. 2, pp. 90- 96. 2005. [6] Kululanga, G.K.“Construction contractor’s claim process framework“, J. Constr. Eng. Mgmt., Vol. 127, No. 4, 309-314. 2000. [7] Malak, A., Asem, M.U., El-Saadi, M. M.H., Abou-Zeid, M. G. Process Model For Administrating Construction Claims. Journal of Construction Engineeringand Management.18(2), 84-94.2002. [8] Nurisra. Factors Causing Submission of Claims on Construction Projects, Civil Engineering Journal, Syiah Kuala University, 7, pp. 93-99. 2009. [9] Pasaribu, A. Factors Causing the occurrence of Claims Affecting the Time Performance of Toll Road Construction Projects in Jabodetabek, Thesis, University of Indonesia. 2009. [10] Putri, P.,T.Analysis of Factors Causing Submission of Claims for Construction Implementation by Contractors, Civil Engineering Infrastructure Electronic Scientific Journal, pp. VI.1-VI.7. 2013 [11] Scott, S. “Delay claims in U.K. contracts”, J. Constr. Eng. Mgmt., Vol. 123, No. 3, 238-244. 1997. [12] Seeley, I.V. Civilengineering contract administration and control, 2nd. Ed., Macmillan Press, London. 1993. [13] Yasin, N. Recognizing Construction Claims and Construction Dispute Settlement, Publisher: Gramedia, Jakarta. 2004 [14] Wibowo, A. Perception Survey Submitting Claims for Delays due to Owners on GovernmentConstruction Projects, National Civil Engineering Conference 3, pp. M187-193. 2009.
Download now