IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. IV (Jan- Feb. 2015), PP 08-12
www.iosrjournals.org
DOI: 10.9790/1684-12140812 www.iosrjournals.org 8 | Page
Causes of Delay in Construction of Bridge Girders
Keval J. Shah1
, Prof. M. R. Apte2
1
Post graduate student, Department of Civil Engineering, Maharashtra Institute of Technology,
Pune (Maharashtra, India)
2
Professor Emeritus, Department of Civil Engineering, Maharashtra Institute of Technology, Pune
(Maharashtra, India)
Abstract: The construction industry is the tool through which a society achieves its goal of urban and rural
development. Delays inconstruction are the most serious problems which even slow down the national
development. It is one of the sectors that provides important ingredient for the development of an economy.It is
widely accepted that a project is successful when it is finished on time. Unfortunately, due to many reasons,
largenumber of construction projects fails to follow the planned schedule and hence delayed. Construction
delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect
on project success in terms of time, cost and quality. So, careful study and planning of each and every activity of
a construction project becomes important in order to minimise delays. This paper presents the causes of
delayoccurring on anongoing bridge construction project with respect to constructionof bridge girders of three
spansof a Major bridge across river Sabarmati, Gandhinagar, Gujaratas a case study.
Keywords:Project delay, Types of delay, Time overrun, Cost overrun
I. Introduction
Issue of delay in the construction sector is a worldwideproblem. Delays occur in most construction
projects, either simple or complex. In construction, delay can be defined as the extension of time in the
completion of project. In short delay means failure to complete project in targeted time and budgeted cost as
agreed in contract. Construction site activities are only the second part of the whole construction process. The
first part comprises of all kinds of office work like planning, designing, estimating, negotiating, purchasing,
scheduling, controlling, accounting, etc. are required to be done carefully in the office before the work starts on
the site to accomplish the objective of a project within budget and on schedule. Construction delays are
widespread in most projects around the world. Some delays may happen in the preconstruction phase which is
defined as the period beginning from the initial conception of the project to the signing of the contract between
the owner and the contractor; however some of them may happen in the construction phase that is the period
when actual construction is underway. Project schedules are dynamic and uncertain. Several factors,
controllable and uncontrollable, affect the project schedule and cause delays. These delays definitely create
negative impacts on project performance. Delay in schedule in the completion of a construction project is a
majorproblem for contractors leading to disputes and spoiled relationships between project participants.
The challenge is to measure the net impact of construction delays accurately. In absence of which delay
claims between all parties involved in the construction process would become serious and lead to litigation.Time
for performance of a project is particularly an important consideration for the owner and the contractor. Often,
the most troublesome construction disputes involve delays and failure to complete the work in a timely manner.
In fact, delays can be caused by several parties therefore the effects and remedies vary from case to case.
Concurrent delays are two or more delays occurring at the same time and are always difficult to resolve.
So, in this paper delay occurrences on a bridge project is given with respect to the construction
ofgirders as a case study.
II. Objective Of Study
The objectives of this study are:
1. Determine the major construction delays of the project.
2. To analyse different causes of delay of the project
3. To measure the net impact of construction delays accurately.
III. Construction Delays
There are a number of definitions for delay. In the construction management context, the simplest
definition of a delay is “an event or a condition that results in finishing the project later than stipulated in the
contract.”
There are four main groups of construction delays:
Causes of Delay in Construction of Bridge Girders
DOI: 10.9790/1684-12140812 www.iosrjournals.org 9 | Page
1. Critical or noncritical
2. Excusable or non-excusable
3. Compensable or non-compensable
4. Concurrent or non-concurrent
The diagram displayedin figure presents a general overview of how the construction delays can be
categorized and some of the frequently occurring delays on any infrastructure project and the responsible stack
holder are as follows.
Chart 1: Delay classification
SR. REASONS FOR DELAY RESPONSIBILITY
1. Delay in handing over of site Client
2. Unforeseen ground conditions Consultant
3. Conflicts between owner and other parties Other
4. Improper planning of contractor during bidding stage Contractor
5. Poor means of contracting Contractor
6. Inaccurate specification of site condition Client
7. Unrealistic time schedule given in contract Consultant
8. Faulty soil investigation report Client
9. Slow decision from owner Client
10. Bureaucracy in client's organisation. Client
11. Ambiguity in specifications and conflicting interpretation by parties. Client
12. Unrealistic inspection and testing methods proposed in contract. Client
13. Delay in approval of completed work (i.e. stage passing) Client
14. Delay in approval of shop drawings and samples Client
15. Non availability of drawing/ design on time Client
16. Consultant or Architect's reluctance for change Consultant
17. Obtaining permissions from local authorities Client
18. Poor organizational structure for client or consultant Client/Consultant
19. Financial Constraints of contractor Contactor
20. Delay in running bill payments to the contractor Client
21. Inadequate experience of contractor Contractor
22. Poor labour productivity Contractor
23. Lack of control over subcontractor Contractor
24. Frequent change of subcontractor Contractor
25. Poor site management and supervision Contractor
26. Use of improper or obsolete construction methods Contractor
27. Increase in scope of work Client
28. Rework due to errors in execution Contractor
29. Rework due to change of design or deviation order Client
30. Delay in finalization of rates for extra items Client
31. Poor coordination among parties Client
32. Delay in material delivery by vendors Other
33. Delay in material to be supplied by the owner client
34. Delay in material procurement (action by the contractor) Contractor
35. Change in material prices/ price escalation Other
36. Improper storage of materials leading to damaged material when necessary Contractor
37. Inefficient use of equipment Contractor
38. Lack of skilled operators for specialized equipment Contractor
39. Extreme weather conditions Other
40. Local political conditions Other
41. Restricted access at site Client
42. Site accidents due to lack of safety measures Contractor
43. Site accidents due to Negligence Contractor
44. Lack of motivation for contractor(viz. Incentive for early finish etc.) Client
Causes of Delay in Construction of Bridge Girders
DOI: 10.9790/1684-12140812 www.iosrjournals.org 10 | Page
IV. Research Methodology
Research methodology is designed after assessing the extent of the objectives to be fulfilled. For data
collection a cable stayed Major Bridge across river Sabarmati, Gandhinagar, Gujaratis taken as a case study.
There was a huge difference in rate of progress and time required in completion between planned schedule and
actual execution in girders of three spans constructed on site. Frequent site visits were carried out to find the key
factors that control time performance as well as the factors which govern the rate of progress in order to find out
major as well as general causes of delay in construction of girders.
V. Data Collection
The data collected from site regarding the progress of construction of bridge girders is given in
Appendix-A (planned vs execution period in days).
End cross section of girder
VI. Data Analysis
For data analysis each activity of construction of bridge girders has been compared with its planned
duration andactual duration. Delays occurred in each activity and the cumulative delay are calculated in days as
shown in Appendix B (delay and cumulative delay in days). Also graphs for planned schedule vs as executed
and cumulative delay occurred on each girder are plotted for better understanding of the delay phenomenon.
Total delay caused on the project in completion of girders for 3 spans is 75 days (Appendix B (Delay and
Cumulative delay in days)). Activity wise total delay is shown in following table.
Sr. Activity Delay on Span 1
(Days)
Delay on Span 2
(Days)
Delay on Span 3
(Days)
TotalDelay
(Days)
1 Staging work 3 3 2 8
2 Shuttering Work 7 7 2 16
3 Reinforcement fixing 22 6 6 39
4 Cable arrangement 8 4 0 12
5 Concreting 0 0 0 0
Total 75
There upon reasons of delay and interpretation are discussed in next section.
Chart 1: Cumulative delay
Chart 2: Planned vs Execution.
Causes of Delay in Construction of Bridge Girders
DOI: 10.9790/1684-12140812 www.iosrjournals.org 11 | Page
After careful study of delay occurred on each activity and the reason of delay are worked out and the
stake holders responsible for the delay are as follows.
SR. REASONS FOR DELAY RESPONSIBE PARTY
1 Insufficient crane capacity Contractor
2 Non availability of bar binder Contractor
3 Non availability of skilled labour Contractor
4 Delay in design Client /Consultant
5 Labour issues Contractor
6 Conventional method of bar cutting and bending Contractor
7 Over labour employment on a single work other than important one. Contractor
8 Poor site layout resulting in poor labour productivity Contractor
9 Shortage of Concrete due to insufficient capacity of RMC Contractor
10 Delay in procurement of bearing plate Contractor
Table: Summary of Delay reasons
Above mentioned causes of delay have direct effecton time overrun and cost overrun for the whole
project. Careful identification and mitigation of causes of delay is required to save time and cost. The
comparisonof cumulative delay is shown in Chart 1. It is observed from Chart 1 thatthe construction of girder of
span 1 delayed more than the other two girders. Major cause of delay of construction offirst girder on span 1 is
delay in getting working drawings.Other two girders will not be affected by this reason because all girders are
symmetrical on the bridge. There are also some reasons which affect performance of girder on span 1 such as
labour issues, more number of labours employed on an unimportant work and lack of skilled labours etc.
Another important reason is poor site layout planning. Because of poor site layout planning workers have to
walk more and this resulted in wastage of time and poor labour productivity. Same girder on span 2 gets delayed
by less number of days compared tothat on span 1. Major reason is labour issues. Contractor is responsible for
this delay. Third girder is delayed by 15 days only and major reason for delay is again labour issues.
VII. Conclusion
This study aims to investigate the important causes of delay in construction of bridge girder. Activities
on site with respect to construction of girder are thoroughly observed and comparison done between planned
and as executed schedule. The results revealed that the problem ofdelays in construction of bridge girder is
frequent and notable. Contractor plays vital role in completion of project as scheduled. Most of reasons for
delays are related with contractor performance such as site management, labour productivity, and lack of expert
proficiency in supervision etc. Same as delay in drawing and delay in design come under client responsibility.It
is evident that consultant has a less responsibility. Some of the causes are to be addressed are beyond the control
of all the project parties such as differing site conditions, unforeseen weather etc. Talking about the overall
responsibility of delay, contractor possesses near about more responsibility.
Total time required as per planned scheduleon Span 1 + Span 2 + Span 3 = 150 days but actual time of
execution taken for the same 225 days. Therefore total delay is 75 days.
Causes of Delay in Construction of Bridge Girders
DOI: 10.9790/1684-12140812 www.iosrjournals.org 12 | Page
References
[1] Assaf, S. A., And Al-Hejji S. (2006). “Causes of Delay in Large Construction Projects”. International J. Project Mgmt.,Science Direct,
24, 349-357. 4
[2] Enasfathitaher, R.K.Pandey “Study Of Delay In Project Planning And Design Stage Of Civil Engineering Projects” (2013)
[3] S.K.Patil, A.K.Gupta, D.B.Desai, A.S.Sajane “Causes Of Delay In Indian Transportation Infrastructure Project” (2013)
[4] Jyh-Bin Yang And Chih-Kuei Kao “Review Of Delay Analysis Methods: A Process-Based Comparison” (2008)
[5] Tarek Hegazy And Wail Menesi “Delay Analysis Under Multiple Baseline Updates” (2007)
[6] Muralisambasivan , Yau Wen Soon “Causes And Effects Of Delays In Malaysian Construction Industry”
[7] Ashwiniarunsalunkhe, Rahul S. Patil“Effect Of Construction Delays On Project Time Overrun Indian Scenario (2014)
[8] Ram Singh, “Delays And Cost Overruns In Infrastructure Projects: Extent, Causes And Remedies”, Economic And Political Weekly,
Vol.21. May 22, 2010, Pp 43-54.

More Related Content

What's hot

Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlM Maged Hegazy, LLM, MBA, CCP, P3O
 
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time AnalysisFarhan Moosa
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesThe Vertex Companies, LLC
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021M Maged Hegazy, LLM, MBA, CCP, P3O
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m magedM Maged Hegazy, LLM, MBA, CCP, P3O
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2Abdelhay Ghanem
 
Mitigation of Risk in Dual Schedules
Mitigation of Risk in Dual SchedulesMitigation of Risk in Dual Schedules
Mitigation of Risk in Dual SchedulesChris Carson
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact AnalysisChris Carson
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...Chris Carson
 

What's hot (20)

Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
CCP Technical Paper and Application
CCP Technical Paper and ApplicationCCP Technical Paper and Application
CCP Technical Paper and Application
 
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Scope creep - cylfe campain
Scope creep - cylfe campainScope creep - cylfe campain
Scope creep - cylfe campain
 
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
Project Controls Expo, 13th Nov 2013 - "Forensic Schedule Analysis – How to F...
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule Analyses
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
 
Claim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINALClaim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINAL
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2
 
Product-oriented construction management
Product-oriented construction managementProduct-oriented construction management
Product-oriented construction management
 
Mitigation of Risk in Dual Schedules
Mitigation of Risk in Dual SchedulesMitigation of Risk in Dual Schedules
Mitigation of Risk in Dual Schedules
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficiencies
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact Analysis
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
 

Viewers also liked

Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Karthik Madhavan
 
Analysis of Image Compression Using Wavelet
Analysis of Image Compression Using WaveletAnalysis of Image Compression Using Wavelet
Analysis of Image Compression Using WaveletIOSR Journals
 
On Bernstein Polynomials
On Bernstein PolynomialsOn Bernstein Polynomials
On Bernstein PolynomialsIOSR Journals
 
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...IOSR Journals
 
A classification of methods for frequent pattern mining
A classification of methods for frequent pattern miningA classification of methods for frequent pattern mining
A classification of methods for frequent pattern miningIOSR Journals
 
A Digital Pen with a Trajectory Recognition Algorithm
A Digital Pen with a Trajectory Recognition AlgorithmA Digital Pen with a Trajectory Recognition Algorithm
A Digital Pen with a Trajectory Recognition AlgorithmIOSR Journals
 
The Development of Software for Assessment of Environmental Impact Indicators...
The Development of Software for Assessment of Environmental Impact Indicators...The Development of Software for Assessment of Environmental Impact Indicators...
The Development of Software for Assessment of Environmental Impact Indicators...IOSR Journals
 
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...IOSR Journals
 
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...IOSR Journals
 
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder ConfigurationIOSR Journals
 
Comparative Effect of Crude and Commercial Enzyme in Shea Fat Extraction
Comparative Effect of Crude and Commercial Enzyme in Shea Fat ExtractionComparative Effect of Crude and Commercial Enzyme in Shea Fat Extraction
Comparative Effect of Crude and Commercial Enzyme in Shea Fat ExtractionIOSR Journals
 

Viewers also liked (20)

Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872
 
Analysis of Image Compression Using Wavelet
Analysis of Image Compression Using WaveletAnalysis of Image Compression Using Wavelet
Analysis of Image Compression Using Wavelet
 
G1102025055
G1102025055G1102025055
G1102025055
 
On Bernstein Polynomials
On Bernstein PolynomialsOn Bernstein Polynomials
On Bernstein Polynomials
 
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...
Possible Inverse Isotope effect in High Tc Superconductors Using the Non Vari...
 
A classification of methods for frequent pattern mining
A classification of methods for frequent pattern miningA classification of methods for frequent pattern mining
A classification of methods for frequent pattern mining
 
K017216574
K017216574K017216574
K017216574
 
A Digital Pen with a Trajectory Recognition Algorithm
A Digital Pen with a Trajectory Recognition AlgorithmA Digital Pen with a Trajectory Recognition Algorithm
A Digital Pen with a Trajectory Recognition Algorithm
 
A012420106
A012420106A012420106
A012420106
 
B010230612
B010230612B010230612
B010230612
 
D012232835
D012232835D012232835
D012232835
 
The Development of Software for Assessment of Environmental Impact Indicators...
The Development of Software for Assessment of Environmental Impact Indicators...The Development of Software for Assessment of Environmental Impact Indicators...
The Development of Software for Assessment of Environmental Impact Indicators...
 
B010620715
B010620715B010620715
B010620715
 
E017312532
E017312532E017312532
E017312532
 
E010412941
E010412941E010412941
E010412941
 
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...
Digital Image Compression using Hybrid Transform with Kekre Transform and Oth...
 
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...
Synthesis, characterization and in vitro Antimicrobial activity of Cu (II) an...
 
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration
40 Gbit/S All-Optical Signal Regeneration with Soa In Mach-Zehnder Configuration
 
H012425361
H012425361H012425361
H012425361
 
Comparative Effect of Crude and Commercial Enzyme in Shea Fat Extraction
Comparative Effect of Crude and Commercial Enzyme in Shea Fat ExtractionComparative Effect of Crude and Commercial Enzyme in Shea Fat Extraction
Comparative Effect of Crude and Commercial Enzyme in Shea Fat Extraction
 

Similar to Causes of Delay in Construction of Bridge Girders

A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...IRJET Journal
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...IJMER
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsRick Vogel
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET Journal
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of timeJoseph Sangpang
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...IRJET Journal
 
A Study in Construction Delays of Residential Structures
A Study in Construction Delays of Residential StructuresA Study in Construction Delays of Residential Structures
A Study in Construction Delays of Residential StructuresIRJESJOURNAL
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 
C. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxC. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxEdenBekele5
 
The significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential projectThe significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential projectIOSR Journals
 
1616-5398-2-PB.pdf
1616-5398-2-PB.pdf1616-5398-2-PB.pdf
1616-5398-2-PB.pdfEyobMiteku
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTIRJET Journal
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectseSAT Journals
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectseSAT Journals
 

Similar to Causes of Delay in Construction of Bridge Girders (20)

A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
 
A Study in Construction Delays of Residential Structures
A Study in Construction Delays of Residential StructuresA Study in Construction Delays of Residential Structures
A Study in Construction Delays of Residential Structures
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 
C. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxC. Site managment chapter 5.pptx
C. Site managment chapter 5.pptx
 
The significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential projectThe significant Causes and effects of delays in Ghadir 2206 residential project
The significant Causes and effects of delays in Ghadir 2206 residential project
 
1616-5398-2-PB.pdf
1616-5398-2-PB.pdf1616-5398-2-PB.pdf
1616-5398-2-PB.pdf
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
D012522433
D012522433D012522433
D012522433
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
 

More from IOSR Journals (20)

A011140104
A011140104A011140104
A011140104
 
M0111397100
M0111397100M0111397100
M0111397100
 
L011138596
L011138596L011138596
L011138596
 
K011138084
K011138084K011138084
K011138084
 
J011137479
J011137479J011137479
J011137479
 
I011136673
I011136673I011136673
I011136673
 
G011134454
G011134454G011134454
G011134454
 
H011135565
H011135565H011135565
H011135565
 
F011134043
F011134043F011134043
F011134043
 
E011133639
E011133639E011133639
E011133639
 
D011132635
D011132635D011132635
D011132635
 
C011131925
C011131925C011131925
C011131925
 
B011130918
B011130918B011130918
B011130918
 
A011130108
A011130108A011130108
A011130108
 
I011125160
I011125160I011125160
I011125160
 
H011124050
H011124050H011124050
H011124050
 
G011123539
G011123539G011123539
G011123539
 
F011123134
F011123134F011123134
F011123134
 
E011122530
E011122530E011122530
E011122530
 
D011121524
D011121524D011121524
D011121524
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 

Causes of Delay in Construction of Bridge Girders

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. IV (Jan- Feb. 2015), PP 08-12 www.iosrjournals.org DOI: 10.9790/1684-12140812 www.iosrjournals.org 8 | Page Causes of Delay in Construction of Bridge Girders Keval J. Shah1 , Prof. M. R. Apte2 1 Post graduate student, Department of Civil Engineering, Maharashtra Institute of Technology, Pune (Maharashtra, India) 2 Professor Emeritus, Department of Civil Engineering, Maharashtra Institute of Technology, Pune (Maharashtra, India) Abstract: The construction industry is the tool through which a society achieves its goal of urban and rural development. Delays inconstruction are the most serious problems which even slow down the national development. It is one of the sectors that provides important ingredient for the development of an economy.It is widely accepted that a project is successful when it is finished on time. Unfortunately, due to many reasons, largenumber of construction projects fails to follow the planned schedule and hence delayed. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. So, careful study and planning of each and every activity of a construction project becomes important in order to minimise delays. This paper presents the causes of delayoccurring on anongoing bridge construction project with respect to constructionof bridge girders of three spansof a Major bridge across river Sabarmati, Gandhinagar, Gujaratas a case study. Keywords:Project delay, Types of delay, Time overrun, Cost overrun I. Introduction Issue of delay in the construction sector is a worldwideproblem. Delays occur in most construction projects, either simple or complex. In construction, delay can be defined as the extension of time in the completion of project. In short delay means failure to complete project in targeted time and budgeted cost as agreed in contract. Construction site activities are only the second part of the whole construction process. The first part comprises of all kinds of office work like planning, designing, estimating, negotiating, purchasing, scheduling, controlling, accounting, etc. are required to be done carefully in the office before the work starts on the site to accomplish the objective of a project within budget and on schedule. Construction delays are widespread in most projects around the world. Some delays may happen in the preconstruction phase which is defined as the period beginning from the initial conception of the project to the signing of the contract between the owner and the contractor; however some of them may happen in the construction phase that is the period when actual construction is underway. Project schedules are dynamic and uncertain. Several factors, controllable and uncontrollable, affect the project schedule and cause delays. These delays definitely create negative impacts on project performance. Delay in schedule in the completion of a construction project is a majorproblem for contractors leading to disputes and spoiled relationships between project participants. The challenge is to measure the net impact of construction delays accurately. In absence of which delay claims between all parties involved in the construction process would become serious and lead to litigation.Time for performance of a project is particularly an important consideration for the owner and the contractor. Often, the most troublesome construction disputes involve delays and failure to complete the work in a timely manner. In fact, delays can be caused by several parties therefore the effects and remedies vary from case to case. Concurrent delays are two or more delays occurring at the same time and are always difficult to resolve. So, in this paper delay occurrences on a bridge project is given with respect to the construction ofgirders as a case study. II. Objective Of Study The objectives of this study are: 1. Determine the major construction delays of the project. 2. To analyse different causes of delay of the project 3. To measure the net impact of construction delays accurately. III. Construction Delays There are a number of definitions for delay. In the construction management context, the simplest definition of a delay is “an event or a condition that results in finishing the project later than stipulated in the contract.” There are four main groups of construction delays:
  • 2. Causes of Delay in Construction of Bridge Girders DOI: 10.9790/1684-12140812 www.iosrjournals.org 9 | Page 1. Critical or noncritical 2. Excusable or non-excusable 3. Compensable or non-compensable 4. Concurrent or non-concurrent The diagram displayedin figure presents a general overview of how the construction delays can be categorized and some of the frequently occurring delays on any infrastructure project and the responsible stack holder are as follows. Chart 1: Delay classification SR. REASONS FOR DELAY RESPONSIBILITY 1. Delay in handing over of site Client 2. Unforeseen ground conditions Consultant 3. Conflicts between owner and other parties Other 4. Improper planning of contractor during bidding stage Contractor 5. Poor means of contracting Contractor 6. Inaccurate specification of site condition Client 7. Unrealistic time schedule given in contract Consultant 8. Faulty soil investigation report Client 9. Slow decision from owner Client 10. Bureaucracy in client's organisation. Client 11. Ambiguity in specifications and conflicting interpretation by parties. Client 12. Unrealistic inspection and testing methods proposed in contract. Client 13. Delay in approval of completed work (i.e. stage passing) Client 14. Delay in approval of shop drawings and samples Client 15. Non availability of drawing/ design on time Client 16. Consultant or Architect's reluctance for change Consultant 17. Obtaining permissions from local authorities Client 18. Poor organizational structure for client or consultant Client/Consultant 19. Financial Constraints of contractor Contactor 20. Delay in running bill payments to the contractor Client 21. Inadequate experience of contractor Contractor 22. Poor labour productivity Contractor 23. Lack of control over subcontractor Contractor 24. Frequent change of subcontractor Contractor 25. Poor site management and supervision Contractor 26. Use of improper or obsolete construction methods Contractor 27. Increase in scope of work Client 28. Rework due to errors in execution Contractor 29. Rework due to change of design or deviation order Client 30. Delay in finalization of rates for extra items Client 31. Poor coordination among parties Client 32. Delay in material delivery by vendors Other 33. Delay in material to be supplied by the owner client 34. Delay in material procurement (action by the contractor) Contractor 35. Change in material prices/ price escalation Other 36. Improper storage of materials leading to damaged material when necessary Contractor 37. Inefficient use of equipment Contractor 38. Lack of skilled operators for specialized equipment Contractor 39. Extreme weather conditions Other 40. Local political conditions Other 41. Restricted access at site Client 42. Site accidents due to lack of safety measures Contractor 43. Site accidents due to Negligence Contractor 44. Lack of motivation for contractor(viz. Incentive for early finish etc.) Client
  • 3. Causes of Delay in Construction of Bridge Girders DOI: 10.9790/1684-12140812 www.iosrjournals.org 10 | Page IV. Research Methodology Research methodology is designed after assessing the extent of the objectives to be fulfilled. For data collection a cable stayed Major Bridge across river Sabarmati, Gandhinagar, Gujaratis taken as a case study. There was a huge difference in rate of progress and time required in completion between planned schedule and actual execution in girders of three spans constructed on site. Frequent site visits were carried out to find the key factors that control time performance as well as the factors which govern the rate of progress in order to find out major as well as general causes of delay in construction of girders. V. Data Collection The data collected from site regarding the progress of construction of bridge girders is given in Appendix-A (planned vs execution period in days). End cross section of girder VI. Data Analysis For data analysis each activity of construction of bridge girders has been compared with its planned duration andactual duration. Delays occurred in each activity and the cumulative delay are calculated in days as shown in Appendix B (delay and cumulative delay in days). Also graphs for planned schedule vs as executed and cumulative delay occurred on each girder are plotted for better understanding of the delay phenomenon. Total delay caused on the project in completion of girders for 3 spans is 75 days (Appendix B (Delay and Cumulative delay in days)). Activity wise total delay is shown in following table. Sr. Activity Delay on Span 1 (Days) Delay on Span 2 (Days) Delay on Span 3 (Days) TotalDelay (Days) 1 Staging work 3 3 2 8 2 Shuttering Work 7 7 2 16 3 Reinforcement fixing 22 6 6 39 4 Cable arrangement 8 4 0 12 5 Concreting 0 0 0 0 Total 75 There upon reasons of delay and interpretation are discussed in next section. Chart 1: Cumulative delay Chart 2: Planned vs Execution.
  • 4. Causes of Delay in Construction of Bridge Girders DOI: 10.9790/1684-12140812 www.iosrjournals.org 11 | Page After careful study of delay occurred on each activity and the reason of delay are worked out and the stake holders responsible for the delay are as follows. SR. REASONS FOR DELAY RESPONSIBE PARTY 1 Insufficient crane capacity Contractor 2 Non availability of bar binder Contractor 3 Non availability of skilled labour Contractor 4 Delay in design Client /Consultant 5 Labour issues Contractor 6 Conventional method of bar cutting and bending Contractor 7 Over labour employment on a single work other than important one. Contractor 8 Poor site layout resulting in poor labour productivity Contractor 9 Shortage of Concrete due to insufficient capacity of RMC Contractor 10 Delay in procurement of bearing plate Contractor Table: Summary of Delay reasons Above mentioned causes of delay have direct effecton time overrun and cost overrun for the whole project. Careful identification and mitigation of causes of delay is required to save time and cost. The comparisonof cumulative delay is shown in Chart 1. It is observed from Chart 1 thatthe construction of girder of span 1 delayed more than the other two girders. Major cause of delay of construction offirst girder on span 1 is delay in getting working drawings.Other two girders will not be affected by this reason because all girders are symmetrical on the bridge. There are also some reasons which affect performance of girder on span 1 such as labour issues, more number of labours employed on an unimportant work and lack of skilled labours etc. Another important reason is poor site layout planning. Because of poor site layout planning workers have to walk more and this resulted in wastage of time and poor labour productivity. Same girder on span 2 gets delayed by less number of days compared tothat on span 1. Major reason is labour issues. Contractor is responsible for this delay. Third girder is delayed by 15 days only and major reason for delay is again labour issues. VII. Conclusion This study aims to investigate the important causes of delay in construction of bridge girder. Activities on site with respect to construction of girder are thoroughly observed and comparison done between planned and as executed schedule. The results revealed that the problem ofdelays in construction of bridge girder is frequent and notable. Contractor plays vital role in completion of project as scheduled. Most of reasons for delays are related with contractor performance such as site management, labour productivity, and lack of expert proficiency in supervision etc. Same as delay in drawing and delay in design come under client responsibility.It is evident that consultant has a less responsibility. Some of the causes are to be addressed are beyond the control of all the project parties such as differing site conditions, unforeseen weather etc. Talking about the overall responsibility of delay, contractor possesses near about more responsibility. Total time required as per planned scheduleon Span 1 + Span 2 + Span 3 = 150 days but actual time of execution taken for the same 225 days. Therefore total delay is 75 days.
  • 5. Causes of Delay in Construction of Bridge Girders DOI: 10.9790/1684-12140812 www.iosrjournals.org 12 | Page References [1] Assaf, S. A., And Al-Hejji S. (2006). “Causes of Delay in Large Construction Projects”. International J. Project Mgmt.,Science Direct, 24, 349-357. 4 [2] Enasfathitaher, R.K.Pandey “Study Of Delay In Project Planning And Design Stage Of Civil Engineering Projects” (2013) [3] S.K.Patil, A.K.Gupta, D.B.Desai, A.S.Sajane “Causes Of Delay In Indian Transportation Infrastructure Project” (2013) [4] Jyh-Bin Yang And Chih-Kuei Kao “Review Of Delay Analysis Methods: A Process-Based Comparison” (2008) [5] Tarek Hegazy And Wail Menesi “Delay Analysis Under Multiple Baseline Updates” (2007) [6] Muralisambasivan , Yau Wen Soon “Causes And Effects Of Delays In Malaysian Construction Industry” [7] Ashwiniarunsalunkhe, Rahul S. Patil“Effect Of Construction Delays On Project Time Overrun Indian Scenario (2014) [8] Ram Singh, “Delays And Cost Overruns In Infrastructure Projects: Extent, Causes And Remedies”, Economic And Political Weekly, Vol.21. May 22, 2010, Pp 43-54.