On 23 May 2012, McLachlan Lister's Anamaria Popescu made a presentation on "Extensions of Time - Avoiding the Traps or Taking Advantage of Them" in conjunction with well-known Australian law firm Holding Redlich
Introduction to Cost Management and Professional Certificates
محتوى المحاضرة:
●عناصر التكلفة الرئيسية للمشاريع.
●طرق ومستويات تقدير التكاليف.
●القيمة المكتسبة والتحكم في التكاليف.
●المؤثرات المختلفة على التكاليف.
●أهم الشهادات الاحترافية في إدارة التكاليف.
●فكرة عن شهادة CCP وكيفية الحصول عليها.
Construction Contracts Management based on UK common law using more than 40 cases of law with references from the UK, USA regulations, and international rules plus some examples from standard forms of construction contracts such as JCT, NEC & FIDIC.
مراجعة كاملة وشاملة لشهادة محترف ادارة المشاريع
دورة محاضرات فيديو مع اسئلة: http://prof.planner.teachable.com/courses/pmp-arabic/
على قناة اليوتيوب الفيديو: https://www.youtube.com/playlist?list=PL9HqmhqTzU-UkDJ6GANiBffjTHBgfY_Gu
إدارة القيمة المكتسبة مفيدة ومخادعة في التحكم في المشروعات
فيديو دورة الأساسيات: http://prof.planner.teachable.com/p/evm-basics/
دورة المستوى المتقدم: http://www.slideshare.net/MohamedMaged8/contracts-classification
للمزيد: https://www.facebook.com/groups/prof.cost.engineers/
On 23 May 2012, McLachlan Lister's Anamaria Popescu made a presentation on "Extensions of Time - Avoiding the Traps or Taking Advantage of Them" in conjunction with well-known Australian law firm Holding Redlich
Introduction to Cost Management and Professional Certificates
محتوى المحاضرة:
●عناصر التكلفة الرئيسية للمشاريع.
●طرق ومستويات تقدير التكاليف.
●القيمة المكتسبة والتحكم في التكاليف.
●المؤثرات المختلفة على التكاليف.
●أهم الشهادات الاحترافية في إدارة التكاليف.
●فكرة عن شهادة CCP وكيفية الحصول عليها.
Construction Contracts Management based on UK common law using more than 40 cases of law with references from the UK, USA regulations, and international rules plus some examples from standard forms of construction contracts such as JCT, NEC & FIDIC.
مراجعة كاملة وشاملة لشهادة محترف ادارة المشاريع
دورة محاضرات فيديو مع اسئلة: http://prof.planner.teachable.com/courses/pmp-arabic/
على قناة اليوتيوب الفيديو: https://www.youtube.com/playlist?list=PL9HqmhqTzU-UkDJ6GANiBffjTHBgfY_Gu
- Having a brief of FIDIC
- Understand the steps and stages of Contract Management Using FIDIC.
- Understand the Role of PM during construction project to protect the organization Business case.
مقدمة في إدارة العقود الهندسية
The lecture includes:
- 5/50 Questions of Contract Fundamentals
- 3 Suites of Standard Forms of Contracts
- 5 Examples of Case Law
- 1 Sub-clause of FIDIC Red Book 2017
Video: https://youtu.be/2vrYi0PxpYg
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
Learn how to quantify damages related to delay, disruption and inefficiencies on Construction projects. Convert your delays and impacts into cost claims with this proven process.
Performance Measurement and Weightage Systems
قياس الأداء بالمشاريع وتوزيع النسب على البرنامج الزمني
1-Master and High Level Programmes
2-WBS Decomposition and Consistency
3-Consuming Time vs Cost vs Effort
4-Programme Weightage and Rules of Credit
5-Primavera Resource Loading
6-Appropriateness for control and forecasting
7-Narrative Report - Programme/Schedule Basis
8-Programme Updating and EVM
Video: https://www.youtube.com/watch?v=17ZQgIGVcRc
Earned schedule role in performance reporting and other important delay indicators.
Video: https://www.youtube.com/watch?v=FbA6RWB1gDM&feature=youtu.be
The full course: https://www.luqmanacademy.com/course?course=project-control-using-evm_399sl6015424f8aba9
Video: https://twitter.com/magedkom/status/1354678096683618305?s=20
مقارنة بين ثلاثة من الصيغ النموذجية البريطانية والدولية مع فكرة عن نموذج رابع أمريكي
FIDIC - JCT - NEC - AIA
محاضرة الشرح: https://www.youtube.com/watch?v=fVpeut_-9-0
الاصدار الثاني من الأسس الخمسين لإدارة عقود التشييد والمقاولات
الشرح مع أمثلة من القانون والحالات القضائية والصيغ النموذجية للعقود كالفيديك وغيره موجود على: https://www.luqmanacademy.com/course?course=_525sl60348e7e6d487
APM webinar hosted by the Greater Bay Area Branch on 21 June 2023.
Speakers: Dennis Wong and Anel Idriz
The Greater Area Bay Branch invited Dennis Wong and Anel Idriz to share their professional project management experience on this Webinar- “Delay Analysis from a technical and legal perspective” on 21 June 2023.
Dennis has a wide experience of various forms of commercial dispute resolution including mediation, arbitration, litigation, and adjudication. In particular, he specialises in resolving complex contractual and construction disputes. Anel's experience is diverse across the construction industry including private residential buildings, leisure, commercial office, large mixed‐use developments, hospitals, education, casinos, heavy civil engineering, highways, and railways.
The webinar targeted to price an Insight into delay analysis and provide a legal update on extension of time/ liquidate damages. The speakers has covered:
Introduction to Planning and Programming
The Role of a Programming and Delay Expert
Understanding Delay Analysis
Accepted Methods of Delay Analysis
Selecting a Method for the Analysis
What Records are important to be maintained for a robust Analysis
Latest cases on the extension of time / liquidated damages
https://youtu.be/l1ChOBpoLwk
https://www.apm.org.uk/news/delay-analysis-from-a-technical-and-legal-perspective-webinar/
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
•Contract Price is an agreed amount or lump sum amount for the design, execution and completion of the works, remedying of defects and adjustments.
•The Contract Price is inclusive of all taxes, duties and fees and adjusted as per changes in legislation.
•The Contract Price is linked with variation, legislation, access to site, delay damages, provisional sum, costs, unforeseeable difficulties, employer’s risk etc.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
إدارة التخطيط والبرامج الزمنية
فيديو المحاضرة: https://www.youtube.com/watch?v=HiGNZeLQ9Po
Content:
1- Planning and scheduling
2- Time schedule development
3- Resource and cost loading
4- Time schedule submittal
5- Review and approval
6- Update and reporting
7- Delay quantification approaches
8- Mitigation and action plans
تصنيف أنواع العقود في مجال الانشاءات
دورة مجانية في: https://www.udemy.com/contracts-arabic/
الدورة الكاملة: prof.planner.teachable.com/p/contract-management/
Contractor’s ability to mitigate damages can be limited if coupled with uncertainty of the duration of the delay. HOOH is recoverable in certain prolonged delay situations and has been granted by courts and amicable settlements for more than half a century. The Contractor may recover the return that he would have achieved on other work had his resources not been detained on the Works due to the delay. The presentation highlights the different formulae used in the calculations and conditions precedent to do so.
- Having a brief of FIDIC
- Understand the steps and stages of Contract Management Using FIDIC.
- Understand the Role of PM during construction project to protect the organization Business case.
مقدمة في إدارة العقود الهندسية
The lecture includes:
- 5/50 Questions of Contract Fundamentals
- 3 Suites of Standard Forms of Contracts
- 5 Examples of Case Law
- 1 Sub-clause of FIDIC Red Book 2017
Video: https://youtu.be/2vrYi0PxpYg
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
Learn how to quantify damages related to delay, disruption and inefficiencies on Construction projects. Convert your delays and impacts into cost claims with this proven process.
Performance Measurement and Weightage Systems
قياس الأداء بالمشاريع وتوزيع النسب على البرنامج الزمني
1-Master and High Level Programmes
2-WBS Decomposition and Consistency
3-Consuming Time vs Cost vs Effort
4-Programme Weightage and Rules of Credit
5-Primavera Resource Loading
6-Appropriateness for control and forecasting
7-Narrative Report - Programme/Schedule Basis
8-Programme Updating and EVM
Video: https://www.youtube.com/watch?v=17ZQgIGVcRc
Earned schedule role in performance reporting and other important delay indicators.
Video: https://www.youtube.com/watch?v=FbA6RWB1gDM&feature=youtu.be
The full course: https://www.luqmanacademy.com/course?course=project-control-using-evm_399sl6015424f8aba9
Video: https://twitter.com/magedkom/status/1354678096683618305?s=20
مقارنة بين ثلاثة من الصيغ النموذجية البريطانية والدولية مع فكرة عن نموذج رابع أمريكي
FIDIC - JCT - NEC - AIA
محاضرة الشرح: https://www.youtube.com/watch?v=fVpeut_-9-0
الاصدار الثاني من الأسس الخمسين لإدارة عقود التشييد والمقاولات
الشرح مع أمثلة من القانون والحالات القضائية والصيغ النموذجية للعقود كالفيديك وغيره موجود على: https://www.luqmanacademy.com/course?course=_525sl60348e7e6d487
APM webinar hosted by the Greater Bay Area Branch on 21 June 2023.
Speakers: Dennis Wong and Anel Idriz
The Greater Area Bay Branch invited Dennis Wong and Anel Idriz to share their professional project management experience on this Webinar- “Delay Analysis from a technical and legal perspective” on 21 June 2023.
Dennis has a wide experience of various forms of commercial dispute resolution including mediation, arbitration, litigation, and adjudication. In particular, he specialises in resolving complex contractual and construction disputes. Anel's experience is diverse across the construction industry including private residential buildings, leisure, commercial office, large mixed‐use developments, hospitals, education, casinos, heavy civil engineering, highways, and railways.
The webinar targeted to price an Insight into delay analysis and provide a legal update on extension of time/ liquidate damages. The speakers has covered:
Introduction to Planning and Programming
The Role of a Programming and Delay Expert
Understanding Delay Analysis
Accepted Methods of Delay Analysis
Selecting a Method for the Analysis
What Records are important to be maintained for a robust Analysis
Latest cases on the extension of time / liquidated damages
https://youtu.be/l1ChOBpoLwk
https://www.apm.org.uk/news/delay-analysis-from-a-technical-and-legal-perspective-webinar/
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
•Contract Price is an agreed amount or lump sum amount for the design, execution and completion of the works, remedying of defects and adjustments.
•The Contract Price is inclusive of all taxes, duties and fees and adjusted as per changes in legislation.
•The Contract Price is linked with variation, legislation, access to site, delay damages, provisional sum, costs, unforeseeable difficulties, employer’s risk etc.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
إدارة التخطيط والبرامج الزمنية
فيديو المحاضرة: https://www.youtube.com/watch?v=HiGNZeLQ9Po
Content:
1- Planning and scheduling
2- Time schedule development
3- Resource and cost loading
4- Time schedule submittal
5- Review and approval
6- Update and reporting
7- Delay quantification approaches
8- Mitigation and action plans
تصنيف أنواع العقود في مجال الانشاءات
دورة مجانية في: https://www.udemy.com/contracts-arabic/
الدورة الكاملة: prof.planner.teachable.com/p/contract-management/
Contractor’s ability to mitigate damages can be limited if coupled with uncertainty of the duration of the delay. HOOH is recoverable in certain prolonged delay situations and has been granted by courts and amicable settlements for more than half a century. The Contractor may recover the return that he would have achieved on other work had his resources not been detained on the Works due to the delay. The presentation highlights the different formulae used in the calculations and conditions precedent to do so.
Contract management is the systematic process of creating, administering, and enforcing contracts between two or more parties. It ensures both parties fulfill their obligations as outlined in the agreement and minimizes potential risks.
This lecture include introduction to software contracts. Before starting development companies prepare agreement document to deal with conflicts afterwards.
10 Essentials For An Effective Construction ContractSarah Fox
An overview of the 10 aspects every contract for a construction works package (however large or small) needs to include to make it an effective tool.
These 10 essentials are the foundation to the 500-Word Contract (TM), developed as a basis for construction contracts in England/Wales. They are also a checklist for your own terms and conditions.
For more information go to www.500words.co.uk or send Sarah an email sarah@500words.co.uk
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...IJMER
Indian Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fibre of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because of the overriding importance of time for both the Owner and the Contractor, it is the source of frequent disputes and claims leading to lawsuits. The growing rate of delays is adversely affecting the timely delivery of construction projects. Presently construction industries are facing a lot of problems, considering that a paper assess construction stakeholder’s perception to the causes of delays and its effects on project delivery. And also one case study is considered in this paper to elicit responses from construction stakeholders. The primary aim of this paper is to identify the perceptions of the different parties regarding causes of delays, the allocation of responsibilities and the types of delays, and method of minimizing the construction delays
Sheet1Silver Fiddle Company Risk MatrixRisk DescriptionProbability.docxlesleyryder69361
Sheet1Silver Fiddle Company Risk MatrixRisk DescriptionProbabilityImpactFactorOwnerMitigationSFC is scheduled to complete 11 other homes in the area. This puts the project schedule at risk339SFCDisclose this risk to all clients and work out a realistic schedule with each one.Two employees at SFC to complete 12 projects are not enough. Risk for mistakes and unhappy clients236SFCHire additional resources for the booming house marketLabor shortage due to booming construction market in Grand Junction224SFCHire contractors on contingency and set up a priority agreement with them.Material shortage due to booming construction market in Grand Junction224SFCNegotiate material cost ahead of time for all 12 projects.If there is an injury on the job site, who is responsible for medical payments and short/long term disability? Does SFC have enough insurance to cover such an instance? Should the Czopek's purchase additional liability insurance?122SFC/Czopek'sSFC has adequate insurance. The contractors are required to cover their own employees. The risk of a personal litigation reaching the Czopeks is very minimal since they have not closed on the house.If SFC defaults or goes out of business and the contractors were not paid, are the Czopek’s legally liable to pay the contractors even though they paid SFC?133Czopek'sThe Czopek's sign lien waivers to protect themselves from litigation.With a glut of housing, the city may be over flooded with permit requests, depending on their process, permits may not be approved by the schedule date of July 5th, which will push back dates on the rest of the project. Permits can average anywhere from 2-6 weeks.326SFCThe city is unlikely to change their process, build enough time in the schedule to allow for this risk.With a possible delayed schedule, the Czopeks may have to stay in their temporary housing longer. There is a risk they could be legally and physically “homeless” for a period of time.236Czopek'sWork out a week by week (or monthly) rental plan with the landlord of current housingContractors SFC hires may prove to be unreliable or not show up when scheduled.122SFCSFC has had the same contractors for all of their projects and has set up priority with them. If there is a default, there are back up contractorsSince housing is booming, this can result in a price increase in materials and labor, which will most likely raise the total house cost the Czopek’s budgeted for.236Czopek'sThis is a risk that will occur, SFC can negotiate all materials up front at a lower price for all 12 projectsInclement weather preventing foundation from being poured or curing properly - causing schedule delay122SFCAccept risk, there is no control over weather. Plan extra time into scheduleIf the house does not pass interim and final inspections are there steps to bring the house up to code in a timely fashion?111SFCSFC has processes in place. Past quality work, so not too many issues with this.If there is a price increase in labor and mate.
We are delighted to welcome you to the first edition of Systech
Insights in which we share our expertise and opinions on a range of topical issues.
Stephen Rayment and Mark Woodward-Smith
Group Managing Directors
مهارات التواصل والقيادة عن مهارات هامة كان يجب أن نتعلمها وبعض المهارات الحديثة الهامة..
Topics:
-Communication.
-Negotiation.
-Leadership.
-Cultural Intelligence.
-Critical Thinking.
-Rights and Law Principles.
-Success!!
-Technology becoming Important.
-Modern Technologies.
أسئلة عن التخطيط والتحكم في المشروعات
البرامج الزمنية والتقارير ورقابة التكلفة والمطالبات وتحليل التأخير
الدورات كاملة على: https://www.luqmanacademy.com
برنامج الحفل السنوي الخامس
بعد نجاح الحفل السنوي الثالث الذي شارك فيه النجوم العشرة من أعضاء الجروب وكل أعضاء الجروب نجوم نسعد بتواجدهم معنا، ونظرا لعدم امكانية عقد مؤتمر سنوي هذا العام فسوف يتم عقد حفل سنوي خامس اونلاين حسب البرنامج التالي:
- مسابقة اختيار شعار slogan للنشاط والمؤتمر (يتم تقديم الشعار مع شرح مختصر وفيديو لا يزيد عن دقيقتين تعريف باهم انجازات النشاط من وجهة نظرك وسبب اختيار هذا الشعار)
- دراسة المميزات والعيوب مع القوى والضعف SWOT وطرح مبادرات لتطوير النشاط
- وضع استراتيجية لتحسين أداء الجروب وطريقة نشر الاعلانات
- تشكيل فريق لتخطيط وتنفيذ المبادرات المختارة
Announce your attendance- Share this
Prof.Planner
بعد اتمام الصفحة أربع سنوات بأربعة أيام رزقني الله ببنوته جميله الحمد لله، وقد أصبحت حسابات الفيسبوك 4=صفحة+ثلاث جروبات، كما أصبح منشورا على موقع الدورات PPCA أربع دوات، وكتبت المنشور ثم أجلته ليوم الربعاء الساعة الرابعة بتوقيت المنشأ (القاهرة).....وكل عام وانتم بخير....نسعد بمتابعتكم ونتشرف بمشاركاتكم ونتمنى الاستفادة للجميع
تقرير نشاط السنوات الأربع: https://www.youtube.com/watch?v=fAo4gEAJ58I&index=2&list=PL9HqmhqTzU-Uc4rn7vQL97z0Dn1UIl9v9
للمزيد يمكنك زيارة الموقع http://prof.planner.teachable.com/
ومتابعة الحسابات الاخرى التابعة لنا https://twitter.com/magedkom
Subscribe: https://www.youtube.com/c/profplannerblogspotplanner
https://prof-planner.blogspot.com/
#ProfPlanner #Best_Advice_for_Planners #كيف_تكون_بلانر_محترفا #ArabPlanners #دورة_عقود_التشيييد #PMP #Cost_engineers #FIDIC
أهم روابط وأنشطة الصفحة Prof.Planners خلال ثلاثة أعوام تستطيعون الوصول إاليها عن طريق النقر على الصور في محتويات هذا الملف........نسعد بمتابعتكم ونتمنى للجميع الاستفادة.
موجود أيضا على: https://www.facebook.com/groups/prof.planners/657123091102626/
مراجعة ادارة المشتريات - جمعية المهندسين المصريين في الرياض
https://www.youtube.com/watch?v=-d48_IVpud4&index=5&list=PL9HqmhqTzU-UVL9Z2wGyzo8tALNOC2ym7
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
2. 2
WHAT IS DELAY?
• DELAY is an act or event that extends the time required to
perform tasks or activities under a Contract . It is usually
reflected as additional days of work or as delayed start of
activities.
• DELAY May or may not include change(s) in the scope of work
of activity(s) or the Contract.
4. 4
• Activity duration and relation determination.
• Network Forward and Backward calculations lead
to float (most used is total float).
• Total float is margin for delay, and equal the
difference between late and early dates.
• Total Float Indicator
Positive Float: Project/Activity in good situation
Zero Float: Project/ Activity is critical
Negative Float: Project/ Activity is delayed
6. 6
Risk Events:
Usually causes will be categorized as Contractor Risk
Events (CRE), or Employer Risk Events (ERE). Until
any of these events are confirmed as having caused
actual delay, they are only risk events.
There is another category is Neutral event such as
Force majeure.
8. 8
Concurrent Delay
(ERE) exceed (CRE)(CRE) exceed (ERE) (ERE) after completion date
Excusable Delay
(ERE)
In‐Excusable Delay (CRE)
Excusable Non
Compensable Delay
In-Excusable
Delay
concurrent
with shorter
Excusable
Delay yields
a net
Excusable
Non
Compensable
Delay
ONLY Time
Extension is
Granted
Should be
recovered
Excusable Delay (ERE)
In‐Excusable Delay
(CRE)
Excusable Non
Compensable Delay
In-Excusable
Delay
concurrent
with longer
Excusable
Delay yields
an Excusable
Delay and
Partial
Compensation
- Time
Extension is
Granted with
prolongation
cost
Excusable
Compensable
10. 10
Prospective Delay Analysis:
Analysis of facts associated with delay events during
construction of a project and the estimation of their effect
upon the planned completion date of a project. (Interim
Extension of Time)
Retrospective Delay Analysis:
Analysis of facts associated with delay events after completion
of the construction period of a project. (Final Extension of
Time)
11. 11
Guidance Section 4
4. Guidelines on dealing with disputed extension of time issues after completion of
the project – retrospective delay analysis
4.13 The table below summarises the types of analysis that can be conducted depending
on the types of factual material available. An ‘X’ indicates the factual material that is
required for a particular analysis, but in some cases there are alternatives, as indicated in
the table:
13. 13
Change Request
Instruction or Proposal of new woks
requested by any stakeholder may
include: addition, omission, corrective
action or preventive action.
Claim Submittal
Request from one contracting party to
another party for additional payment/
compensation, or/and extension of the
time for completion, as result of change
or any other event / issue.
Variation Order
Description of the work to be performed
including the time impact or/and cost
impact if applicable, as result of change
or claim.
Dispute
Unresolved claim, and resolution
methods are: negotiation, mediation,
arbitration & litigation.
14. 14
Methods of Dispute
resolving
Negotiation
The most direct method for
resolving any type of
construction claim.
Requires certain skills that reduce the gap between the
negotiation parties.
The objective: is to reach a solution that might be acceptable
to both parties.
15. 15
Mediation
When negotiation does not work, either because of lack of
trust or a lack of skills, mediation may be an option.
The mediator may be an individual or a team.
Dispute review boards
The owner and the contractor select
an independent neutral panel with
construction experience when the
contract is signed .
Rather than waiting until the end of project to settle claims,
(DRBs) resolve disputes as they arise.
16. 16
Arbitration
It is usually a formal process performed
by an independent professional
arbitrator.
Arbitration is voluntary.
Arbitration does not require the use
of lawyers
Litigation
When none of the previous work and parties can not
reach a settlement, the complaining party uses the
other party in a court of law.
Construction litigation is usually complicated lengthy,
and expensive.
18. Institutional vs. 'ad hoc' arbitration
Domestic vs. International arbitration
(address is the difference)
Types of Arbitration
19. Arbitration agreement :
The arbitration agreement is ordinarily a
clause in a larger contract.
or, post-dispute arbitration agreement.
Procedure, dispute, arbitrator panel, seat /
legal place, duration, language, the applicable
law and rules.