2
Topics Covered
 Who are the Involved Parties
 The Construction Process
 The Contracts
 The Construction Documents
 Bidding
 Contract Administration
 Cost Reduction Techniques
 And In All Cases, How To
Minimize Risk
3
Construction Projects
For Community Associations
 Typical Projects
◦ Paving
◦ Roofing
◦ Facades
◦ Siding
◦ Drainage
◦ Decking
◦ Retaining Walls
◦ Mechanical Equipment
Construction Projects
For Community Associations
4
 Reasons For Projects
◦ Age (review your
reserve study)
◦ Upgrades
◦ New Amenities
◦ Natural Disasters
 Flooding
 Ice Damming
◦ Fire
◦ Energy Efficiency
5
Sources of Funds For
Community Associations
 Sources of Funds
◦ Reserves
◦ Assessments
◦ Borrowing
◦ Insurance
◦ Incentives
 Pay 4 Performance
 Direct Install
 Dsireusa.org
The Involved Parties
6
 The Community Association
 The Community Association
Manager
 The Community Associations
Attorney
 The Engineer
 The Contractor
The Construction Process
7
 Engineer works directly for the Owner:
◦ Preparing designs and specifications
◦ Providing assistance in selecting contractor
◦ Providing oversight during construction
 Contractor works directly for the Owner
◦ Doing the work
Design / Bid / Build
8
The Design, Bid, Build Process
Owner
Community
Association
Design
Professional
Contractor
9
Who Is The Owner?
 With the project
being coordinated
through the
Manager
Owner
Design
Professional
Contractor
Manager Manager
10
Who Is The Design Professional?
 The Design Professional is
Typically the Engineer (or
Architect) who drafts the
specifications and provides
Contract Administration
Services
Owner
Design
Professional
Contractor
11
Who Is The Contractor?
 The Contractor
is responsible
for taking the
specifications
and for the
agreed upon
price delivers
the described
work.
Owner
Design
Professional
Contractor
12
Who Is The Contractor?
 And, lets not
forget the
Attorney for the
contract reviews
and preparation
Owner
Design
Professional
Contractor
Attorney
13
The Contracts
 Community Association and
Engineer
◦ Generally Prepared by Engineer
and Reviewed by Associations
Attorney and describes
contractual requirements and
scope of work
 Payment terms
 Insurance
 Commercial Terms
 Schedule
14
The Contracts
 Community Association and
Contractor
◦ Contract : Describes the
contractual requirements.
 Payment terms
 Warranties
 Insurance
 Schedule
 Commercial terms
 Work to be performed
15
What are the Contracts?
 The Contracts form the basis
for the Relationships and
Responsibilities of the Parties
◦ Prepared (or reviewed) by
Owners Attorney
 Forgotten when the project is
going smoothly
 When problems occur they are
the primary source of what is
and is not included
16
The Owner/Engineer Contract
 Scope of Services
◦ Construction Documents
 Drawings
 Specifications
◦ Cost Estimates
 First Cost
 Evaluated Cost
◦ Bidding
 Pre Bid Meetings
 Contractor Selection
 Bid Evaluation
◦ Contract Administration
 Construction Observations and
Reports
 Change Order Requests
 Punch lists
 Review and Approval of
Invoices
17
The Owner/Engineer Contract
◦ Should Describe
 The work to be performed
 Cost of the work
 Payment Terms
 Schedule
 Dispute resolution
 Additional work
◦ Limits of liability
 Indemnification
 Additional Insured's
18
The Construction Documents
 Design Drawings
 Specifications
19
Design Drawings
 A graphical presentation of the proposed project which identifies
both the existing as well as the proposed conditions which are
used to define the project.
◦ Architectural
 Floor plans
 Elevations
 Sections
◦ Engineering
 Civil
 Structural
 Electrical
 Mechanical
 Plumbing
20
Specifications
 The written portion of the construction documents which describe
the specific products and quality standards required for the
construction of the project.
 The Contractor should acknowledge in the Contract that they
have read and agree to all portions of the Specification and that
they can perform the work outlined, have no questions regarding
the work specified and will be performing all work in conformance
with the Contract and if they are not, what alternates they are
proposing.
 Specifications are not intended to define the means or methods
for execution the project. This is the Contractors responsibility.
21
Specification Sections
 For Major Projects, Much Less Extensive For Small Projects
 Advertisement for Bid
◦ When bids are due
◦ Pre bid meetings
◦ Questions regarding bids
 Instructions to Bidders
◦ How to ask questions (in writing by deadline)
◦ How to submit bids (3 copies, sealed envelopes)
 Bid Proposal Form
◦ Format of bids (lumps sum, quantities, etc.)
◦ Adds, deducts
 Certificate of Ownership (of contracting firm)
22
Specification Sections
 Bidders Affidavit
◦ Confirming price and for
how long
 Qualification Questionnaire
◦ References
 Non Collusion Affidavit
 Site Visit Form
 Bid Bond
 Affirmative Action Plan
 General Conditions
23
The General Conditions
 Are Meant to Define the Relationships, Rights
and Responsibilities of the Various Parties
Involved
 Cost of Project
 Method, Conditions and Limitations (retainage)
of Payment
◦ Retainage : a reductions in payments until
certain construction milestones are reached
or the project is completed. In a typical case,
a 10% retainage is withheld from each
payment and not released until all work is
complete and all punchlist work is
completed.
 Project Schedule
◦ Penalties for being late possibly including
cost of additional engineering oversight
24
The General Conditions
 Insurance Requirements
◦ General Liability (for personal
injury or property damage)
◦ Motor Vehicle
◦ Workers Compensation (on the job
injuries)
◦ Builders Risk (property loss during
the project prior to completion)
◦ Owner should also require
certificates of insurance from all
subcontractors being used as well
as from Contractor showing that all
policies are current.
◦ Also request that the Association,
Management Company, Engineer
and all Contractors representatives
are named as additional insured's
on the policies.
25
The General Conditions
 Bond Requirements
(insurance that work will
be completed if
Contractor goes out of
business during course
of project)
26
The General Conditions
 Indemnifications : Contractor will
indemnify and defend parties for damage,
injury etc. caused during the project.
◦ Association
◦ Management Company
◦ Engineer
27
The General Conditions
 Schedule of Values
◦ Lists total cost as well as a breakdown of the quantities
and costs for each portion of the work. In many cases the
schedule of values is used as the basis for payment to
the contract as they will submit an invoice which shows
the percentage complete for each item and how much is
due (less retainage if applicable).
◦ Quantities
 Include for apples to apples and ask for confirmation
 Request for apples to apples , not confirmation
◦ Allowances
◦ Unit Pricing
◦ Add Alternates
◦ Deduct Alternates
28
The General Conditions
 Types of Project Costing Methods
◦ Lump Sum
◦ Unit price
◦ Time and Materials
◦ Costs plus fees
◦ Combinations
 Pavement restoration project, combination lump sum
for overlay and unit cost for pavement reconstruction
in areas that are not visible during specification
preparation
 Roofing, combination lump sum for shingles and unit
cost for damaged sheathing which cannot be seen
during specification preparation.
29
The General Conditions
 Guarantees and
Warranties required
 Communications
◦ Owners rep, Engineer etc.
 Coordination of Permits
and Inspections
30
Bidding
 The process in which the
Construction Documents are Sent to
the Selected Bidders to Obtain Bids
 The first step is to select the
Contractors to bid. This should be
based on
◦ Experience with Contractors
◦ Reputation of Contractors
◦ Trade Journals (such as CAI
magazines)
 If the project is publicly bid using
services such as the Dodge Reports
of the Construction Data News, it is
much more imperative to check
references, financial strength etc.
31
Bidding
 The Pre Bid Conference
◦ Either mandatory or optional
◦ Listen to Contractors questions as
they will help understand the
completeness of the bid
documents and any areas which
should be clarified.
◦ Typical Agenda
 Circulate a sign in sheet
 Introduction of Owner, Manager and
Project Team
 Introduction of contractors
 Overview of project
 Bidding procedures and deadlines
 Questions and Comments
◦ Answers will be provided to all in a
formal addendum
 Tour of property
32
Negotiation
 Purposes of Negotiation
◦ Value Engineering
◦ Confirm low bids
◦ Discuss project
schedule, penalties,
subcontractors
◦ Bonds vs. payment
terms
◦ Cost savings based on
payment terms
◦ Working hours
33
Negotiation
 This is the opportunity to confirm
that all parts of the specification
are clear and that no
misunderstanding can exist with
any of the Contractors. During this
period, any questions can be
answered and clarifications
provided to all bidders. It also can
help assure that all bidders are
bidding based upon the same
expectations of the bid documents.
 It is also very important that the
bidders are not only clear on the
work to be performed but also on
the Bid Proposal Form
requirements. This is the
opportunity to confirm this
understanding
34
Contract Administration
 The services provided by the Engineer to
review for general conformance to the
construction documents.
 Reviewing Work For General
Conformance with Design Documents
◦ Field reports
 Provide interpretations of the contract
documents when requested
 Evaluate and recommend additional work
◦ Critical for renovations
 To review progress of work to authorize
payment
 To prepare punch list of damage to be
corrected prior to release of retainage
 Not responsible for “supervision”
 Not responsible for means or methods
 CONTRACTOR IS STILL RSPONSIBLE FOR
THEIR WORK !
35
Cost Reduction Techniques
 Consolidate Multiple
Projects of the Same
Type When Bidding
 Review available
Incentives/Rebates
 Review break even
periods when including
maintenance and
energy costs (Use
Green Reserve Study
as starting point)
36
Minimize Risk
 Understand the roles of each
party
 Contractor is responsible for
executing the construction
documents
 Engineer is responsible for
developing the construction
documents and is the Owners
Representative.
 Low price is not always the
best alternative
 Establish payment terms based
on completed work only (if
possible)
 Do not let Manager provide
services out of expertise
37
Why Pay For an Engineer When I
can Get it Free From a Contractor?
 Nothing is Free
 Better Pricing Due to
Competition
 ‘Apple for Apple’
Comparison
 Consistency in the Bids
 Predictable Results
38
And Now, The Short Commercial…
mfrumkin@Kipcon.com
 Reserves
 Transitions
 Value
Engineering
 Energy Audits
 Building
Envelope
Analysis and
Design
 Site Analysis and
Design
 Rebate Analysis
39
Questions ?
Mitch Frumkin
mfrumkin@Kipcon.com
Call us to walk site or for in house
presentation or a copy of this
presentation
Next Webinar
Construction Defects : How to
Evaluate if Your Claims are
Objective
Wednesday February 18

More Related Content

What's hot

Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
srinivas2036
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
Melvin Lim
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
Michael Audu
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
Rajesh Sharma
 
Construction contract
Construction contractConstruction contract
Construction contract
Delhi Technological University
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
MahSobeh
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
Daniel Ross
 
Construction Documents
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
JIT KUMAR GUPTA
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
irkportal
 
Presentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionPresentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionJustin DeMerchant
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
M Maged Hegazy, LLM, MBA, CCP, P3O
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
Dr K M SONI
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
Archistudent Portal
 
Types of contract
Types of contractTypes of contract
Types of contract
HarshalNarkhede7
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
elliotfus
 

What's hot (20)

Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 
Presentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionPresentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute Resolution
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 

Viewers also liked

It outsourcing contracts relationship between parties
It outsourcing contracts relationship between partiesIt outsourcing contracts relationship between parties
It outsourcing contracts relationship between parties
Alfredo Saad
 
IT outsourcing_frustrating results qmk_what went wrong_qmk
IT outsourcing_frustrating results qmk_what went wrong_qmkIT outsourcing_frustrating results qmk_what went wrong_qmk
IT outsourcing_frustrating results qmk_what went wrong_qmk
Alfredo Saad
 
Nbs specification (updated for contract)
Nbs specification (updated for contract)Nbs specification (updated for contract)
Nbs specification (updated for contract)Noel Hickey
 
CITADIL CONSTRCTION
CITADIL CONSTRCTIONCITADIL CONSTRCTION
CITADIL CONSTRCTION
bkhataloans
 
Contract law lecture - 1 - definition and meaning(terminology)
Contract law   lecture - 1 - definition and meaning(terminology)Contract law   lecture - 1 - definition and meaning(terminology)
Contract law lecture - 1 - definition and meaning(terminology)
Dr. Arun Verma
 
Contracting and subcontracting
Contracting and subcontractingContracting and subcontracting
Contracting and subcontractingRoi Xcel
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
umes manandhar
 
Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Lawtheacademist
 
A contract is a legally binding agreement or relationship that exists between...
A contract is a legally binding agreement or relationship that exists between...A contract is a legally binding agreement or relationship that exists between...
A contract is a legally binding agreement or relationship that exists between...chelliah selvavishnu
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
Kapp Edge Solutions Pvt Ltd
 
Manual de convivencia y uso de areas comunes
Manual de convivencia y uso de areas comunesManual de convivencia y uso de areas comunes
Manual de convivencia y uso de areas comunesoviedo-apartamentos
 
Study notes contract law
Study notes   contract lawStudy notes   contract law
Study notes contract law
Ramona Vansluytman
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
SlideShare
 

Viewers also liked (15)

It outsourcing contracts relationship between parties
It outsourcing contracts relationship between partiesIt outsourcing contracts relationship between parties
It outsourcing contracts relationship between parties
 
IT outsourcing_frustrating results qmk_what went wrong_qmk
IT outsourcing_frustrating results qmk_what went wrong_qmkIT outsourcing_frustrating results qmk_what went wrong_qmk
IT outsourcing_frustrating results qmk_what went wrong_qmk
 
Nbs specification (updated for contract)
Nbs specification (updated for contract)Nbs specification (updated for contract)
Nbs specification (updated for contract)
 
CITADIL CONSTRCTION
CITADIL CONSTRCTIONCITADIL CONSTRCTION
CITADIL CONSTRCTION
 
Contract law lecture - 1 - definition and meaning(terminology)
Contract law   lecture - 1 - definition and meaning(terminology)Contract law   lecture - 1 - definition and meaning(terminology)
Contract law lecture - 1 - definition and meaning(terminology)
 
Contracting and subcontracting
Contracting and subcontractingContracting and subcontracting
Contracting and subcontracting
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Contracts
ContractsContracts
Contracts
 
Types of conract
Types of conractTypes of conract
Types of conract
 
Introduction to Contract Law
Introduction to Contract LawIntroduction to Contract Law
Introduction to Contract Law
 
A contract is a legally binding agreement or relationship that exists between...
A contract is a legally binding agreement or relationship that exists between...A contract is a legally binding agreement or relationship that exists between...
A contract is a legally binding agreement or relationship that exists between...
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Manual de convivencia y uso de areas comunes
Manual de convivencia y uso de areas comunesManual de convivencia y uso de areas comunes
Manual de convivencia y uso de areas comunes
 
Study notes contract law
Study notes   contract lawStudy notes   contract law
Study notes contract law
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 

Similar to Contract Specifications, Bidding and Contractor Selection for Capital Replacement Projects

contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
ssuser32da691
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
johnkirth1898
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
Sahl Buhary
 
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy pptCON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
2cd
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
ByishimoBTCChef
 
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
sheryl90
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
R.R.G.S Bandara
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
kohwenqi
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptx
IrfanAwan25
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3
Project Controls Expo
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.ppt
DonaAlisyahSiregar
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
Timun Loh
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...
Browne Jacobson LLP
 
Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?
Association for Project Management
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
SHKLaw
 
Construction Futures Wales - NEC Contracts Overview Workshop
Construction Futures Wales  - NEC Contracts Overview WorkshopConstruction Futures Wales  - NEC Contracts Overview Workshop
Construction Futures Wales - NEC Contracts Overview Workshop
Rae Davies
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
Tulsi Pokhrel
 

Similar to Contract Specifications, Bidding and Contractor Selection for Capital Replacement Projects (20)

contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy pptCON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
1._pmc_2019_day_1_project_initiation_and_planning_final.pptx
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptx
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.ppt
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...
 
Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Construction Futures Wales - NEC Contracts Overview Workshop
Construction Futures Wales  - NEC Contracts Overview WorkshopConstruction Futures Wales  - NEC Contracts Overview Workshop
Construction Futures Wales - NEC Contracts Overview Workshop
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 

More from Kipcon Inc.

The Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingThe Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your Building
Kipcon Inc.
 
Ditching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims ObjectiveDitching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims Objective
Kipcon Inc.
 
Winter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
Winter Concerns: Ice Damming, De-Icing Chemicals & Other IssuesWinter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
Winter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
Kipcon Inc.
 
Strategic Planning for 2015 Capital Replacement Projects
Strategic Planning for 2015 Capital Replacement ProjectsStrategic Planning for 2015 Capital Replacement Projects
Strategic Planning for 2015 Capital Replacement Projects
Kipcon Inc.
 
Who says money can’t grow on trees 9.30.2014
Who says money can’t grow on trees 9.30.2014Who says money can’t grow on trees 9.30.2014
Who says money can’t grow on trees 9.30.2014
Kipcon Inc.
 
Webinar: Reserve Studies
Webinar: Reserve StudiesWebinar: Reserve Studies
Webinar: Reserve Studies
Kipcon Inc.
 
Transition webinar 072414
Transition webinar 072414Transition webinar 072414
Transition webinar 072414
Kipcon Inc.
 

More from Kipcon Inc. (7)

The Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingThe Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your Building
 
Ditching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims ObjectiveDitching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims Objective
 
Winter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
Winter Concerns: Ice Damming, De-Icing Chemicals & Other IssuesWinter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
Winter Concerns: Ice Damming, De-Icing Chemicals & Other Issues
 
Strategic Planning for 2015 Capital Replacement Projects
Strategic Planning for 2015 Capital Replacement ProjectsStrategic Planning for 2015 Capital Replacement Projects
Strategic Planning for 2015 Capital Replacement Projects
 
Who says money can’t grow on trees 9.30.2014
Who says money can’t grow on trees 9.30.2014Who says money can’t grow on trees 9.30.2014
Who says money can’t grow on trees 9.30.2014
 
Webinar: Reserve Studies
Webinar: Reserve StudiesWebinar: Reserve Studies
Webinar: Reserve Studies
 
Transition webinar 072414
Transition webinar 072414Transition webinar 072414
Transition webinar 072414
 

Recently uploaded

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Contract Specifications, Bidding and Contractor Selection for Capital Replacement Projects

  • 1. Contract Specifications Bidding and Contractor Selection for Capital Replacement Projects Presented by: Mitchell H. Frumkin, PE, RS, CGP President mfrumkin@kipcon.com www.kipcon.com (800) 828 4118
  • 2. 2 Topics Covered  Who are the Involved Parties  The Construction Process  The Contracts  The Construction Documents  Bidding  Contract Administration  Cost Reduction Techniques  And In All Cases, How To Minimize Risk
  • 3. 3 Construction Projects For Community Associations  Typical Projects ◦ Paving ◦ Roofing ◦ Facades ◦ Siding ◦ Drainage ◦ Decking ◦ Retaining Walls ◦ Mechanical Equipment
  • 4. Construction Projects For Community Associations 4  Reasons For Projects ◦ Age (review your reserve study) ◦ Upgrades ◦ New Amenities ◦ Natural Disasters  Flooding  Ice Damming ◦ Fire ◦ Energy Efficiency
  • 5. 5 Sources of Funds For Community Associations  Sources of Funds ◦ Reserves ◦ Assessments ◦ Borrowing ◦ Insurance ◦ Incentives  Pay 4 Performance  Direct Install  Dsireusa.org
  • 6. The Involved Parties 6  The Community Association  The Community Association Manager  The Community Associations Attorney  The Engineer  The Contractor
  • 7. The Construction Process 7  Engineer works directly for the Owner: ◦ Preparing designs and specifications ◦ Providing assistance in selecting contractor ◦ Providing oversight during construction  Contractor works directly for the Owner ◦ Doing the work Design / Bid / Build
  • 8. 8 The Design, Bid, Build Process Owner Community Association Design Professional Contractor
  • 9. 9 Who Is The Owner?  With the project being coordinated through the Manager Owner Design Professional Contractor Manager Manager
  • 10. 10 Who Is The Design Professional?  The Design Professional is Typically the Engineer (or Architect) who drafts the specifications and provides Contract Administration Services Owner Design Professional Contractor
  • 11. 11 Who Is The Contractor?  The Contractor is responsible for taking the specifications and for the agreed upon price delivers the described work. Owner Design Professional Contractor
  • 12. 12 Who Is The Contractor?  And, lets not forget the Attorney for the contract reviews and preparation Owner Design Professional Contractor Attorney
  • 13. 13 The Contracts  Community Association and Engineer ◦ Generally Prepared by Engineer and Reviewed by Associations Attorney and describes contractual requirements and scope of work  Payment terms  Insurance  Commercial Terms  Schedule
  • 14. 14 The Contracts  Community Association and Contractor ◦ Contract : Describes the contractual requirements.  Payment terms  Warranties  Insurance  Schedule  Commercial terms  Work to be performed
  • 15. 15 What are the Contracts?  The Contracts form the basis for the Relationships and Responsibilities of the Parties ◦ Prepared (or reviewed) by Owners Attorney  Forgotten when the project is going smoothly  When problems occur they are the primary source of what is and is not included
  • 16. 16 The Owner/Engineer Contract  Scope of Services ◦ Construction Documents  Drawings  Specifications ◦ Cost Estimates  First Cost  Evaluated Cost ◦ Bidding  Pre Bid Meetings  Contractor Selection  Bid Evaluation ◦ Contract Administration  Construction Observations and Reports  Change Order Requests  Punch lists  Review and Approval of Invoices
  • 17. 17 The Owner/Engineer Contract ◦ Should Describe  The work to be performed  Cost of the work  Payment Terms  Schedule  Dispute resolution  Additional work ◦ Limits of liability  Indemnification  Additional Insured's
  • 18. 18 The Construction Documents  Design Drawings  Specifications
  • 19. 19 Design Drawings  A graphical presentation of the proposed project which identifies both the existing as well as the proposed conditions which are used to define the project. ◦ Architectural  Floor plans  Elevations  Sections ◦ Engineering  Civil  Structural  Electrical  Mechanical  Plumbing
  • 20. 20 Specifications  The written portion of the construction documents which describe the specific products and quality standards required for the construction of the project.  The Contractor should acknowledge in the Contract that they have read and agree to all portions of the Specification and that they can perform the work outlined, have no questions regarding the work specified and will be performing all work in conformance with the Contract and if they are not, what alternates they are proposing.  Specifications are not intended to define the means or methods for execution the project. This is the Contractors responsibility.
  • 21. 21 Specification Sections  For Major Projects, Much Less Extensive For Small Projects  Advertisement for Bid ◦ When bids are due ◦ Pre bid meetings ◦ Questions regarding bids  Instructions to Bidders ◦ How to ask questions (in writing by deadline) ◦ How to submit bids (3 copies, sealed envelopes)  Bid Proposal Form ◦ Format of bids (lumps sum, quantities, etc.) ◦ Adds, deducts  Certificate of Ownership (of contracting firm)
  • 22. 22 Specification Sections  Bidders Affidavit ◦ Confirming price and for how long  Qualification Questionnaire ◦ References  Non Collusion Affidavit  Site Visit Form  Bid Bond  Affirmative Action Plan  General Conditions
  • 23. 23 The General Conditions  Are Meant to Define the Relationships, Rights and Responsibilities of the Various Parties Involved  Cost of Project  Method, Conditions and Limitations (retainage) of Payment ◦ Retainage : a reductions in payments until certain construction milestones are reached or the project is completed. In a typical case, a 10% retainage is withheld from each payment and not released until all work is complete and all punchlist work is completed.  Project Schedule ◦ Penalties for being late possibly including cost of additional engineering oversight
  • 24. 24 The General Conditions  Insurance Requirements ◦ General Liability (for personal injury or property damage) ◦ Motor Vehicle ◦ Workers Compensation (on the job injuries) ◦ Builders Risk (property loss during the project prior to completion) ◦ Owner should also require certificates of insurance from all subcontractors being used as well as from Contractor showing that all policies are current. ◦ Also request that the Association, Management Company, Engineer and all Contractors representatives are named as additional insured's on the policies.
  • 25. 25 The General Conditions  Bond Requirements (insurance that work will be completed if Contractor goes out of business during course of project)
  • 26. 26 The General Conditions  Indemnifications : Contractor will indemnify and defend parties for damage, injury etc. caused during the project. ◦ Association ◦ Management Company ◦ Engineer
  • 27. 27 The General Conditions  Schedule of Values ◦ Lists total cost as well as a breakdown of the quantities and costs for each portion of the work. In many cases the schedule of values is used as the basis for payment to the contract as they will submit an invoice which shows the percentage complete for each item and how much is due (less retainage if applicable). ◦ Quantities  Include for apples to apples and ask for confirmation  Request for apples to apples , not confirmation ◦ Allowances ◦ Unit Pricing ◦ Add Alternates ◦ Deduct Alternates
  • 28. 28 The General Conditions  Types of Project Costing Methods ◦ Lump Sum ◦ Unit price ◦ Time and Materials ◦ Costs plus fees ◦ Combinations  Pavement restoration project, combination lump sum for overlay and unit cost for pavement reconstruction in areas that are not visible during specification preparation  Roofing, combination lump sum for shingles and unit cost for damaged sheathing which cannot be seen during specification preparation.
  • 29. 29 The General Conditions  Guarantees and Warranties required  Communications ◦ Owners rep, Engineer etc.  Coordination of Permits and Inspections
  • 30. 30 Bidding  The process in which the Construction Documents are Sent to the Selected Bidders to Obtain Bids  The first step is to select the Contractors to bid. This should be based on ◦ Experience with Contractors ◦ Reputation of Contractors ◦ Trade Journals (such as CAI magazines)  If the project is publicly bid using services such as the Dodge Reports of the Construction Data News, it is much more imperative to check references, financial strength etc.
  • 31. 31 Bidding  The Pre Bid Conference ◦ Either mandatory or optional ◦ Listen to Contractors questions as they will help understand the completeness of the bid documents and any areas which should be clarified. ◦ Typical Agenda  Circulate a sign in sheet  Introduction of Owner, Manager and Project Team  Introduction of contractors  Overview of project  Bidding procedures and deadlines  Questions and Comments ◦ Answers will be provided to all in a formal addendum  Tour of property
  • 32. 32 Negotiation  Purposes of Negotiation ◦ Value Engineering ◦ Confirm low bids ◦ Discuss project schedule, penalties, subcontractors ◦ Bonds vs. payment terms ◦ Cost savings based on payment terms ◦ Working hours
  • 33. 33 Negotiation  This is the opportunity to confirm that all parts of the specification are clear and that no misunderstanding can exist with any of the Contractors. During this period, any questions can be answered and clarifications provided to all bidders. It also can help assure that all bidders are bidding based upon the same expectations of the bid documents.  It is also very important that the bidders are not only clear on the work to be performed but also on the Bid Proposal Form requirements. This is the opportunity to confirm this understanding
  • 34. 34 Contract Administration  The services provided by the Engineer to review for general conformance to the construction documents.  Reviewing Work For General Conformance with Design Documents ◦ Field reports  Provide interpretations of the contract documents when requested  Evaluate and recommend additional work ◦ Critical for renovations  To review progress of work to authorize payment  To prepare punch list of damage to be corrected prior to release of retainage  Not responsible for “supervision”  Not responsible for means or methods  CONTRACTOR IS STILL RSPONSIBLE FOR THEIR WORK !
  • 35. 35 Cost Reduction Techniques  Consolidate Multiple Projects of the Same Type When Bidding  Review available Incentives/Rebates  Review break even periods when including maintenance and energy costs (Use Green Reserve Study as starting point)
  • 36. 36 Minimize Risk  Understand the roles of each party  Contractor is responsible for executing the construction documents  Engineer is responsible for developing the construction documents and is the Owners Representative.  Low price is not always the best alternative  Establish payment terms based on completed work only (if possible)  Do not let Manager provide services out of expertise
  • 37. 37 Why Pay For an Engineer When I can Get it Free From a Contractor?  Nothing is Free  Better Pricing Due to Competition  ‘Apple for Apple’ Comparison  Consistency in the Bids  Predictable Results
  • 38. 38 And Now, The Short Commercial… mfrumkin@Kipcon.com  Reserves  Transitions  Value Engineering  Energy Audits  Building Envelope Analysis and Design  Site Analysis and Design  Rebate Analysis
  • 39. 39 Questions ? Mitch Frumkin mfrumkin@Kipcon.com Call us to walk site or for in house presentation or a copy of this presentation Next Webinar Construction Defects : How to Evaluate if Your Claims are Objective Wednesday February 18