• After the construction project began the VA changed the
program used for document management
• The need arose to alter the status of documents
• The renegotiated contract regarding communications and
record keeping included the compromise that any new
procedures would only be adapted moving forward
• The upper management of the VA asked why so many issues
that had previously been settled were showing up as active or
open on their reports
• Neither entity had the ability to change the status of these
issues in the new program
Introduction
• Document management and report status of issues are
important aspect of communications during a project
• These documents record the process and final disposition of
issues that arise during the project
• Reports that include the status of these documents generate
agenda items for meetings and affect the projected timeline,
budgeting and work plan dates of completion
The Current Situation
• Initially the document management
programs were compatible
• During the project the VA began using a
new program which was not compatible
with that of the General Contractor
• Reports generated by the VA were
indicating incorrect status
• There was not a means to change the
status of these document by either the VA
or the General Contractor
• The vendor claimed that the required
operation was not covered in the contract
or the Users License Agreement
Key Success Factors
• Correct the status of all older documents
• Retain the proper status of newer documents
• VA to generate reports with correct status of documents
• Craft a solution that would have no cost to VA or AW
Analysis of Alternatives
Since neither the VA nor the contractor was contractually
responsible for changing the status of previously settled issues,
neither had the ability to make such changes in the document
management system. The only alternative was for the
administrators of the system to make these changes at the
server folder level. It took a combined effort of the VA and
contractor to convince them it was important to do so.
Strategic Option
Proposals created by administrative assistants from each entity
were submitted. The project managers jointly decided which
proposal was the most persuasive and complete, to be
forwarded to the management of the program vendor. After
review the one I created was chosen.
Benefits
• All documents will show the proper status
• VA able to generate reports showing proper document status
• The status continues to change correctly as needed
Risks
• Vendor would decide to charge for this change
• Program would not accommodate the solution
• System would be unavailable while changes were made
• Reports generated by VA would not show the proper status
Final Recommendation
Call to Action
• The proposal required the VA and the contractor to
collaborate to create a list of the documents that needed to
have their status changed
• This was approved and accomplished, and the result was sent
to the program vendor as a means of sorting the documents
Solution
• The vendor was able to enter the documents requiring change
into a separate folder on the server
• The vendor changed every document in the new folder
simultaneously while leaving the status of the remainder of
documents unchanged
• All the documents were combined into one folder
Highlighted References
Due to security restrictions in the contract I cannot include any
material that references the actual documents or specific
process used to sort them or change their status.
Link to the
PowerPoint Presentation

More Related Content

What's hot

PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
TrainingandCoaching Trainer
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)
p6academy
 
2015 - Manning resume
2015 - Manning resume2015 - Manning resume
2015 - Manning resume
Roderic Manning
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
Aditya Pandey
 
Migration To Z Os V1 R9 Kick Off Meeting
Migration To Z Os V1 R9   Kick Off MeetingMigration To Z Os V1 R9   Kick Off Meeting
Migration To Z Os V1 R9 Kick Off Meeting
ocabanillas
 
How to close a project
How to close a projectHow to close a project
How to close a project
Emmanuel Mwagomba
 
Resume
ResumeResume
YOLANDA BARRETO - Projects
YOLANDA BARRETO - ProjectsYOLANDA BARRETO - Projects
YOLANDA BARRETO - Projects
Yolanda Parker
 
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
BDO IT Solutions
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
Kishan Solankimbaccepmp
 
]project-open[ OSS Project Mangement
]project-open[ OSS Project Mangement]project-open[ OSS Project Mangement
]project-open[ OSS Project Mangement
Klaus Hofeditz
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
CADD Centre Software Solutions Private Limited
 
Project control wps office
Project control wps officeProject control wps office
Project control wps office
karansingh1064
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
Stephanus Roux C Eng , IntPE(uk) , FIET
 
CPCL Case study
CPCL Case studyCPCL Case study
PMP دوره آمادگی ازمون
PMP دوره آمادگی ازمونPMP دوره آمادگی ازمون
Payforce implementation methodology overview1
Payforce implementation methodology overview1Payforce implementation methodology overview1
Payforce implementation methodology overview1
Nathan Gazzard
 
Kimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_ResumeKimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_Resume
Kimberly Gilbert
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
Dhamo daran
 

What's hot (19)

PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)
 
2015 - Manning resume
2015 - Manning resume2015 - Manning resume
2015 - Manning resume
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
Migration To Z Os V1 R9 Kick Off Meeting
Migration To Z Os V1 R9   Kick Off MeetingMigration To Z Os V1 R9   Kick Off Meeting
Migration To Z Os V1 R9 Kick Off Meeting
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Resume
ResumeResume
Resume
 
YOLANDA BARRETO - Projects
YOLANDA BARRETO - ProjectsYOLANDA BARRETO - Projects
YOLANDA BARRETO - Projects
 
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
]project-open[ OSS Project Mangement
]project-open[ OSS Project Mangement]project-open[ OSS Project Mangement
]project-open[ OSS Project Mangement
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
 
Project control wps office
Project control wps officeProject control wps office
Project control wps office
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
CPCL Case study
CPCL Case studyCPCL Case study
CPCL Case study
 
PMP دوره آمادگی ازمون
PMP دوره آمادگی ازمونPMP دوره آمادگی ازمون
PMP دوره آمادگی ازمون
 
Payforce implementation methodology overview1
Payforce implementation methodology overview1Payforce implementation methodology overview1
Payforce implementation methodology overview1
 
Kimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_ResumeKimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_Resume
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 

Viewers also liked

10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
Tony
 
Proposals
ProposalsProposals
Proposals
Fiona Beals
 
ICI Final project: Development Proposal
ICI Final project: Development ProposalICI Final project: Development Proposal
ICI Final project: Development Proposal
Lau Hui Ming Belinda
 
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
Universal Peace Federation -UK
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
Nikhil Kumar Rai
 
Preparing a project proposal
Preparing a project proposalPreparing a project proposal
Preparing a project proposal
Shivappa Ramakrishna
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
nooone
 
Project Management Proposal
Project Management ProposalProject Management Proposal
Project Management Proposal
Jordan Cambron
 
Earsmus+: How to prepare a competitive project proposal
Earsmus+: How to prepare a competitive project proposalEarsmus+: How to prepare a competitive project proposal
Earsmus+: How to prepare a competitive project proposal
metamath
 
PP Waste Management Recycling Project2007- Azhee Amin
PP Waste Management Recycling Project2007- Azhee AminPP Waste Management Recycling Project2007- Azhee Amin
PP Waste Management Recycling Project2007- Azhee Amin
Azhee Amin
 
Proposal writing basics
Proposal writing basicsProposal writing basics
Proposal writing basics
GlobalGiving
 
A Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe managementA Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe management
svrohith 9
 
Proposal5 Ivaquino2
Proposal5 Ivaquino2Proposal5 Ivaquino2
Proposal5 Ivaquino2
Benigno Aquino High School
 
Maseno university year iii project proposal school management system
Maseno university year iii project proposal school management systemMaseno university year iii project proposal school management system
Maseno university year iii project proposal school management system
franklinokech2
 
Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)
SN Chakraborty
 
2 waste disposal and recycling project
2 waste disposal and recycling project2 waste disposal and recycling project
2 waste disposal and recycling project
jsleep1
 
Proposal bull hotel website design & development
Proposal bull hotel website design & developmentProposal bull hotel website design & development
Proposal bull hotel website design & development
mikerogerhexagon
 
Solid waste management model
Solid waste management modelSolid waste management model
Solid waste management model
Eshwari P
 
Student Project: Recycling
Student Project: RecyclingStudent Project: Recycling
Student Project: Recycling
icti
 
Project Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDFProject Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDF
Geoff Penhorwood
 

Viewers also liked (20)

10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Proposals
ProposalsProposals
Proposals
 
ICI Final project: Development Proposal
ICI Final project: Development ProposalICI Final project: Development Proposal
ICI Final project: Development Proposal
 
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
Preparing a project proposal
Preparing a project proposalPreparing a project proposal
Preparing a project proposal
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Project Management Proposal
Project Management ProposalProject Management Proposal
Project Management Proposal
 
Earsmus+: How to prepare a competitive project proposal
Earsmus+: How to prepare a competitive project proposalEarsmus+: How to prepare a competitive project proposal
Earsmus+: How to prepare a competitive project proposal
 
PP Waste Management Recycling Project2007- Azhee Amin
PP Waste Management Recycling Project2007- Azhee AminPP Waste Management Recycling Project2007- Azhee Amin
PP Waste Management Recycling Project2007- Azhee Amin
 
Proposal writing basics
Proposal writing basicsProposal writing basics
Proposal writing basics
 
A Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe managementA Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe management
 
Proposal5 Ivaquino2
Proposal5 Ivaquino2Proposal5 Ivaquino2
Proposal5 Ivaquino2
 
Maseno university year iii project proposal school management system
Maseno university year iii project proposal school management systemMaseno university year iii project proposal school management system
Maseno university year iii project proposal school management system
 
Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)
 
2 waste disposal and recycling project
2 waste disposal and recycling project2 waste disposal and recycling project
2 waste disposal and recycling project
 
Proposal bull hotel website design & development
Proposal bull hotel website design & developmentProposal bull hotel website design & development
Proposal bull hotel website design & development
 
Solid waste management model
Solid waste management modelSolid waste management model
Solid waste management model
 
Student Project: Recycling
Student Project: RecyclingStudent Project: Recycling
Student Project: Recycling
 
Project Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDFProject Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDF
 

Similar to 12. project proposal

SRE Week-14.pptx
SRE Week-14.pptxSRE Week-14.pptx
SRE Week-14.pptx
azhar imran
 
Proposal DMS
Proposal   DMS Proposal   DMS
Proposal DMS
Media-Mosaic
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2
Media-Mosaic
 
Requirement anlaysis and_Management.pptx
Requirement anlaysis  and_Management.pptxRequirement anlaysis  and_Management.pptx
Requirement anlaysis and_Management.pptx
ALIBAZIL
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
PhocasSebastian1
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
SN Panigrahi, PMP
 
Multimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvtMultimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvt
Wsolvt
 
Multimedia Project Life Cycle Wsolvt
Multimedia Project Life Cycle  WsolvtMultimedia Project Life Cycle  Wsolvt
Multimedia Project Life Cycle Wsolvt
Hatemkarim
 
Project scope management and planning
Project scope management and planningProject scope management and planning
Project scope management and planning
Abubeker mukemil
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
satish526
 
Turning your project around
Turning your project aroundTurning your project around
Turning your project around
Project Management Solutions
 
03ch
03ch03ch
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
BhuWan Khadka
 
How the change control process affects project quality
How the change control process affects project qualityHow the change control process affects project quality
How the change control process affects project quality
Mark Troncone MBA, PMP, CBAP, ITILv3, CSM
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
Dhamo daran
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
PM Majik
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_management
SAJID ALI RUK
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Example
haroldtaylor1113
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
Inam Khosa
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
Project Management Solutions
 

Similar to 12. project proposal (20)

SRE Week-14.pptx
SRE Week-14.pptxSRE Week-14.pptx
SRE Week-14.pptx
 
Proposal DMS
Proposal   DMS Proposal   DMS
Proposal DMS
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2
 
Requirement anlaysis and_Management.pptx
Requirement anlaysis  and_Management.pptxRequirement anlaysis  and_Management.pptx
Requirement anlaysis and_Management.pptx
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 
Multimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvtMultimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvt
 
Multimedia Project Life Cycle Wsolvt
Multimedia Project Life Cycle  WsolvtMultimedia Project Life Cycle  Wsolvt
Multimedia Project Life Cycle Wsolvt
 
Project scope management and planning
Project scope management and planningProject scope management and planning
Project scope management and planning
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
 
Turning your project around
Turning your project aroundTurning your project around
Turning your project around
 
03ch
03ch03ch
03ch
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
How the change control process affects project quality
How the change control process affects project qualityHow the change control process affects project quality
How the change control process affects project quality
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_management
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Example
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 

Recently uploaded

Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
Nguyen Thanh Tu Collection
 
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
Kalna College
 
Information and Communication Technology in Education
Information and Communication Technology in EducationInformation and Communication Technology in Education
Information and Communication Technology in Education
MJDuyan
 
Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
Taste
 
Ch-4 Forest Society and colonialism 2.pdf
Ch-4 Forest Society and colonialism 2.pdfCh-4 Forest Society and colonialism 2.pdf
Ch-4 Forest Society and colonialism 2.pdf
lakshayrojroj
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
Kalna College
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
Kalna College
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
Kalna College
 
Data Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsxData Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsx
Prof. Dr. K. Adisesha
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
Steve Thomason
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
indexPub
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
nitinpv4ai
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdfمصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
سمير بسيوني
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
Kalna College
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
 

Recently uploaded (20)

Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
 
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
 
Information and Communication Technology in Education
Information and Communication Technology in EducationInformation and Communication Technology in Education
Information and Communication Technology in Education
 
Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
 
Ch-4 Forest Society and colonialism 2.pdf
Ch-4 Forest Society and colonialism 2.pdfCh-4 Forest Society and colonialism 2.pdf
Ch-4 Forest Society and colonialism 2.pdf
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
 
Data Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsxData Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsx
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdfمصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
 

12. project proposal

  • 1. Project Proposal Changing the status of settled issues in the new VA document management program
  • 2. Overview • After the construction project began the VA changed the program used for document management • The need arose to alter the status of documents • The renegotiated contract regarding communications and record keeping included the compromise that any new procedures would only be adapted moving forward • The upper management of the VA asked why so many issues that had previously been settled were showing up as active or open on their reports • Neither entity had the ability to change the status of these issues in the new program
  • 3. Introduction • Document management and report status of issues are important aspect of communications during a project • These documents record the process and final disposition of issues that arise during the project • Reports that include the status of these documents generate agenda items for meetings and affect the projected timeline, budgeting and work plan dates of completion
  • 4. The Current Situation • Initially the document management programs were compatible • During the project the VA began using a new program which was not compatible with that of the General Contractor • Reports generated by the VA were indicating incorrect status • There was not a means to change the status of these document by either the VA or the General Contractor • The vendor claimed that the required operation was not covered in the contract or the Users License Agreement
  • 5. Key Success Factors • Correct the status of all older documents • Retain the proper status of newer documents • VA to generate reports with correct status of documents • Craft a solution that would have no cost to VA or AW
  • 6. Analysis of Alternatives Since neither the VA nor the contractor was contractually responsible for changing the status of previously settled issues, neither had the ability to make such changes in the document management system. The only alternative was for the administrators of the system to make these changes at the server folder level. It took a combined effort of the VA and contractor to convince them it was important to do so.
  • 7. Strategic Option Proposals created by administrative assistants from each entity were submitted. The project managers jointly decided which proposal was the most persuasive and complete, to be forwarded to the management of the program vendor. After review the one I created was chosen.
  • 8. Benefits • All documents will show the proper status • VA able to generate reports showing proper document status • The status continues to change correctly as needed
  • 9. Risks • Vendor would decide to charge for this change • Program would not accommodate the solution • System would be unavailable while changes were made • Reports generated by VA would not show the proper status
  • 10. Final Recommendation Call to Action • The proposal required the VA and the contractor to collaborate to create a list of the documents that needed to have their status changed • This was approved and accomplished, and the result was sent to the program vendor as a means of sorting the documents
  • 11. Solution • The vendor was able to enter the documents requiring change into a separate folder on the server • The vendor changed every document in the new folder simultaneously while leaving the status of the remainder of documents unchanged • All the documents were combined into one folder
  • 12. Highlighted References Due to security restrictions in the contract I cannot include any material that references the actual documents or specific process used to sort them or change their status.
  • 13. Link to the PowerPoint Presentation