About CPCL
Chennai Petroleum Corporation Limited (CPCL), formerly known as Madras Refineries Limited (MRL) was
formed as a joint venture in 1965 between the Government of India (GOI), AMOCO and National Iranian
Oil Company (NIOC) having a share holding in the ratio 74%: 13%: 13% respectively. Originally, CPCL
Refinery was set up with an installed capacity of 2.5 Million Tonnes Per Annum (MMTPA) in a record
time of 27 months at a cost of Rs. 43 crore without any time or cost overrun.

SHUT DOWN & MAINTANCE PROJECT
Business Problem
Planned and shutdown maintenance department of CPCL, Chennai wants to monitor their plant
shutdown effectively. They are doing the planned shutdown project for three plants which are executed
by different contractors. They were using excel, paper and other legacy application to list down the
activities of projects. Using experienced personnel expertise, they were updating the activity progress
which management was not looking for. They need a project management system to show the activity %
percent complete after entering actual efforts for the day. Since they did not have centralized
application to create activities, sequence those activities and identify critical path for the projects such
progress update and rolling up of data till the project level was not possible.

What have we done?
CADD Centre does consulting by collecting the activities from contractors. Using Primavera we have a
created a shutdown project and sequence activities. Using the option of Primavera critical path
functionality, we have helped them to identify critical activities. We have updated project progress by
collecting actual percentage complete from different contractors. Also we generated project progress
reports on a daily, weekly basis which intern helped CPCL to manage their shut down projects
effectively.
Project Structure & Plan:


Consists of Plants such as 15,16,17,18,19,205,207,210



Each plant having one of the following functional components namely,
1. Furnaces
2. Columns
3. Heat Exchangers
4. Piping



Several contractors have been employed to perform the various maintenance jobs



Breakdown can be done as having separate projects for each plant.



Functional components can be considered as WBS and sub-WBS can be given for specific
components.



All the plants can be collectively grouped as ‘MAINTENANCE’ portfolio.



Activities are done 24x7 and are scheduled in hour basis.

Project Structure & Plan:


Overall % complete needs to be given based on weightage.



Co-ordinating with the contractors for inflow of data on a daily basis.



Arriving at a standard format for getting the data from various contractors or officials.



Cope with changes in activity during progress.



Finding an optimum solution to provide weightage for projects.



Integrating all these projects and managing them properly.

Customer Needs:
1. Getting daily progress data and updating the schedule.
2. Generating reports on each project based on customer requirements.
3. Provide list of activities to be performed on the current day and notify the critical ones.
4. Notify activities that are behind schedule.
5. Produce an overall project report for top-level management when prompted.
Necessary Learning areas:


Customization of reports



Usage of filters for getting specific layouts



Usage of User defined fields and global change



Various methods of updating activities



Explore tool for deriving more options and apply them effectively.

More Related Content

What's hot

IOCL summer internship report
IOCL summer internship reportIOCL summer internship report
IOCL summer internship report
sagarmehra
 
Working capital management_of_ccl2
Working capital management_of_ccl2Working capital management_of_ccl2
Working capital management_of_ccl2
manojkrbit07
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECT
GAURAV SHUKLA
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
samohi
 
INTRODUCTION of CENTRAL COALFIELD LIMITED
INTRODUCTION of CENTRAL COALFIELD LIMITEDINTRODUCTION of CENTRAL COALFIELD LIMITED
INTRODUCTION of CENTRAL COALFIELD LIMITED
sneh samrani
 
central coal field limited
central coal field limitedcentral coal field limited
central coal field limited
Nupur Sahu
 
Iocl questionnaire
Iocl questionnaireIocl questionnaire
Iocl questionnaire
Anupam Joshi
 
FINAL REPORT OF ONGC
FINAL REPORT OF ONGCFINAL REPORT OF ONGC
FINAL REPORT OF ONGC
BIDHAN DAS
 

What's hot (20)

Ntpc Ltd.
Ntpc Ltd.Ntpc Ltd.
Ntpc Ltd.
 
IOCL summer internship report
IOCL summer internship reportIOCL summer internship report
IOCL summer internship report
 
ONGC traning report
ONGC traning report ONGC traning report
ONGC traning report
 
Working capital management_of_ccl2
Working capital management_of_ccl2Working capital management_of_ccl2
Working capital management_of_ccl2
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECT
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
 
INTRODUCTION of CENTRAL COALFIELD LIMITED
INTRODUCTION of CENTRAL COALFIELD LIMITEDINTRODUCTION of CENTRAL COALFIELD LIMITED
INTRODUCTION of CENTRAL COALFIELD LIMITED
 
Flowsheet ONGC
Flowsheet ONGCFlowsheet ONGC
Flowsheet ONGC
 
Report on industrial training at indian oil corporation ltd,barauni refinery
Report on industrial training at indian oil corporation ltd,barauni refineryReport on industrial training at indian oil corporation ltd,barauni refinery
Report on industrial training at indian oil corporation ltd,barauni refinery
 
Financial tactics of ongc
Financial tactics of ongcFinancial tactics of ongc
Financial tactics of ongc
 
Iocl barauni report doc.
Iocl barauni report doc.Iocl barauni report doc.
Iocl barauni report doc.
 
Ongc analysis
Ongc analysisOngc analysis
Ongc analysis
 
Indian oil
Indian oilIndian oil
Indian oil
 
ongc project ppt
ongc project pptongc project ppt
ongc project ppt
 
central coal field limited
central coal field limitedcentral coal field limited
central coal field limited
 
Summer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation LimitedSummer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation Limited
 
INDIAN OIL CORPORATION LIMITED
INDIAN OIL CORPORATION LIMITEDINDIAN OIL CORPORATION LIMITED
INDIAN OIL CORPORATION LIMITED
 
Iocl questionnaire
Iocl questionnaireIocl questionnaire
Iocl questionnaire
 
Internship presentation (iocl)
Internship presentation (iocl)Internship presentation (iocl)
Internship presentation (iocl)
 
FINAL REPORT OF ONGC
FINAL REPORT OF ONGCFINAL REPORT OF ONGC
FINAL REPORT OF ONGC
 

Similar to CPCL Case study

Sanjay KHOSLA - Synopsis
Sanjay KHOSLA - SynopsisSanjay KHOSLA - Synopsis
Sanjay KHOSLA - Synopsis
Sanjay Khosla
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
todd771
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
walterl4
 
Production Deployment of the New Integrator Project C.docx
Production Deployment of the New Integrator  Project C.docxProduction Deployment of the New Integrator  Project C.docx
Production Deployment of the New Integrator Project C.docx
briancrawford30935
 
Summer_intern_NTPC
Summer_intern_NTPCSummer_intern_NTPC
Summer_intern_NTPC
Parag Goyal
 

Similar to CPCL Case study (20)

IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
 
Business discovery @ escorts
Business discovery @ escortsBusiness discovery @ escorts
Business discovery @ escorts
 
PRINCE2_for_Fed_Gov_Projects
PRINCE2_for_Fed_Gov_ProjectsPRINCE2_for_Fed_Gov_Projects
PRINCE2_for_Fed_Gov_Projects
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
LRAFB_Project Profile
LRAFB_Project ProfileLRAFB_Project Profile
LRAFB_Project Profile
 
Erp.ppt
Erp.pptErp.ppt
Erp.ppt
 
Project plan and charter
Project plan and charterProject plan and charter
Project plan and charter
 
Sanjay KHOSLA - Synopsis
Sanjay KHOSLA - SynopsisSanjay KHOSLA - Synopsis
Sanjay KHOSLA - Synopsis
 
Best Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsBest Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM Projects
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
 
Justification of real-life project organization structure
Justification of real-life project organization structureJustification of real-life project organization structure
Justification of real-life project organization structure
 
Business Case _ PM.pptx
Business Case _ PM.pptxBusiness Case _ PM.pptx
Business Case _ PM.pptx
 
C3 Continuity is Key
C3 Continuity is KeyC3 Continuity is Key
C3 Continuity is Key
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
 
Production Deployment of the New Integrator Project C.docx
Production Deployment of the New Integrator  Project C.docxProduction Deployment of the New Integrator  Project C.docx
Production Deployment of the New Integrator Project C.docx
 
Working capital management
Working capital managementWorking capital management
Working capital management
 
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
 
The Wright Move – A Continued Journey to the Oracle EPM Cloud
 The Wright Move – A Continued Journey to the Oracle EPM Cloud The Wright Move – A Continued Journey to the Oracle EPM Cloud
The Wright Move – A Continued Journey to the Oracle EPM Cloud
 
Summer_intern_NTPC
Summer_intern_NTPCSummer_intern_NTPC
Summer_intern_NTPC
 
1 ws
1  ws1  ws
1 ws
 

More from CADD Centre Software Solutions Private Limited

More from CADD Centre Software Solutions Private Limited (20)

Primavera manual
Primavera manual Primavera manual
Primavera manual
 
A b-c-d-(e) of ccsspl corporate presentation
A b-c-d-(e) of ccsspl corporate presentationA b-c-d-(e) of ccsspl corporate presentation
A b-c-d-(e) of ccsspl corporate presentation
 
Login methodology for Primavera V8.3 (EPPM)
Login methodology for Primavera V8.3 (EPPM)Login methodology for Primavera V8.3 (EPPM)
Login methodology for Primavera V8.3 (EPPM)
 
Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3
 
Oracle Primavera contractor
Oracle Primavera  contractorOracle Primavera  contractor
Oracle Primavera contractor
 
Recurring task IN MS project
Recurring task IN MS project Recurring task IN MS project
Recurring task IN MS project
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
 
Uses of Project Status field
Uses of  Project Status field Uses of  Project Status field
Uses of Project Status field
 
Oracle primavera Universal content management
Oracle primavera Universal content management Oracle primavera Universal content management
Oracle primavera Universal content management
 
Pert master risk analysis tool
Pert master   risk analysis toolPert master   risk analysis tool
Pert master risk analysis tool
 
Oracle Primavera P6 PRO R8 Tips & tricks
Oracle Primavera P6 PRO R8 Tips & tricksOracle Primavera P6 PRO R8 Tips & tricks
Oracle Primavera P6 PRO R8 Tips & tricks
 
User preference Option in Oracle Primavera EPPM P6
User preference Option in Oracle Primavera EPPM P6User preference Option in Oracle Primavera EPPM P6
User preference Option in Oracle Primavera EPPM P6
 
Team member in iphones and android
Team member in iphones and androidTeam member in iphones and android
Team member in iphones and android
 
Activity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in PrimaveraActivity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in Primavera
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Primavera portlets
Primavera portletsPrimavera portlets
Primavera portlets
 
Tested configuration for different Primavera versions
Tested configuration for different Primavera versionsTested configuration for different Primavera versions
Tested configuration for different Primavera versions
 
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
 
Features comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft ProjectFeatures comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft Project
 
Project management software consulting
Project management software consultingProject management software consulting
Project management software consulting
 

Recently uploaded

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Recently uploaded (20)

Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 

CPCL Case study

  • 1. CPCL – Project Documentation About CPCL Chennai Petroleum Corporation Limited (CPCL), formerly known as Madras Refineries Limited (MRL) was formed as a joint venture in 1965 between the Government of India (GOI), AMOCO and National Iranian Oil Company (NIOC) having a share holding in the ratio 74%: 13%: 13% respectively. Originally, CPCL Refinery was set up with an installed capacity of 2.5 Million Tonnes Per Annum (MMTPA) in a record time of 27 months at a cost of Rs. 43 crore without any time or cost overrun. SHUT DOWN & MAINTANCE PROJECT Business Problem Planned and shutdown maintenance department of CPCL, Chennai wants to monitor their plant shutdown effectively. They are doing the planned shutdown project for three plants which are executed by different contractors. They were using excel, paper and other legacy application to list down the activities of projects. Using experienced personnel expertise, they were updating the activity progress which management was not looking for. They need a project management system to show the activity % percent complete after entering actual efforts for the day. Since they did not have centralized application to create activities, sequence those activities and identify critical path for the projects such progress update and rolling up of data till the project level was not possible. What have we done? CADD Centre does consulting by collecting the activities from contractors. Using Primavera we have a created a shutdown project and sequence activities. Using the option of Primavera critical path functionality, we have helped them to identify critical activities. We have updated project progress by collecting actual percentage complete from different contractors. Also we generated project progress reports on a daily, weekly basis which intern helped CPCL to manage their shut down projects effectively.
  • 2. Project Structure & Plan:  Consists of Plants such as 15,16,17,18,19,205,207,210  Each plant having one of the following functional components namely, 1. Furnaces 2. Columns 3. Heat Exchangers 4. Piping  Several contractors have been employed to perform the various maintenance jobs  Breakdown can be done as having separate projects for each plant.  Functional components can be considered as WBS and sub-WBS can be given for specific components.  All the plants can be collectively grouped as ‘MAINTENANCE’ portfolio.  Activities are done 24x7 and are scheduled in hour basis. Project Structure & Plan:  Overall % complete needs to be given based on weightage.  Co-ordinating with the contractors for inflow of data on a daily basis.  Arriving at a standard format for getting the data from various contractors or officials.  Cope with changes in activity during progress.  Finding an optimum solution to provide weightage for projects.  Integrating all these projects and managing them properly. Customer Needs: 1. Getting daily progress data and updating the schedule. 2. Generating reports on each project based on customer requirements. 3. Provide list of activities to be performed on the current day and notify the critical ones. 4. Notify activities that are behind schedule. 5. Produce an overall project report for top-level management when prompted.
  • 3. Necessary Learning areas:  Customization of reports  Usage of filters for getting specific layouts  Usage of User defined fields and global change  Various methods of updating activities  Explore tool for deriving more options and apply them effectively.