The importance of material management can be gauged from the fact that in any typical building project the share of material costs is about 60 %, labour costs about 25 % and PIL (Petrol, oil and Lubricants), overheads, taxes and profits about 5%.
Materials management deals with meticulous planning even before the start of the project to its completion in selection, procurement, storage and efficient use of the construction materials.
Planning of materials in Construction Project managementAravind Samala
Materials management is an important element in project planning and control. Materials represent a major expense in construction, so minimizing procurement or purchase costs presents important opportunities for reducing costs.
Materials management is not just a concern during the monitoring stage in which construction is taking place. Decisions about material procurement may also be required during the initial planning and scheduling stages.
Construction material management_Construction Management (2180611) (Semester-...A Makwana
The importance of material management can be gauged from the fact that in any typical building project the share of material costs is about 60 %, labour costs about 25 % and PIL (Petrol, oil and Lubricants), overheads, taxes and profits about 5%.
Materials management deals with meticulous planning even before the start of the project to its completion in selection, procurement, storage and efficient use of the construction materials.
Planning of materials in Construction Project managementAravind Samala
Materials management is an important element in project planning and control. Materials represent a major expense in construction, so minimizing procurement or purchase costs presents important opportunities for reducing costs.
Materials management is not just a concern during the monitoring stage in which construction is taking place. Decisions about material procurement may also be required during the initial planning and scheduling stages.
Material management is a scientific technique, concerned with Planning, Organizing & Control of flow of materials, from their initial purchase to destination.
Inventory generally refers to the materials in stock. It is also called the idle resource of an enterprise. Inventories represent those items, which are either stocked for sale or they are in the process of manufacturing or they are in the form of materials, which are yet to be utilized.
Material management is a scientific technique, concerned with Planning, Organizing & Control of flow of materials, from their initial purchase to destination.
Inventory generally refers to the materials in stock. It is also called the idle resource of an enterprise. Inventories represent those items, which are either stocked for sale or they are in the process of manufacturing or they are in the form of materials, which are yet to be utilized.
material management ppt describe the what is material management, aim of material management, objective of material management and function of material management
Cleaner Production - it is the major advancement in the chemical industry or in all sectors. I have provided this file its all about TEXTILE INDUSTRIES with CP. So go through it.
The characteristics, quantities, volume and composition of solid waste generated may differ from one country to another and between urban and rural areas.
It depends mainly upon the customs, climate, living conditions and economic standard of the area. As a consequence, if solid waste management is to be accomplished in an efficient and orderly manner, the fundamental aspects and relationships involved must be identified, adjusted for uniformity of data, and understood clearly. This section deals about :Solid Waste Generation ; Solid Waste Handling, Storage and Processing at the Source.
➽=ALL False flag-War Machine-War profiteering-Energy (oil/Gas) Iraq, Iran,…oil and gas
USA invades other countries just to own their natural resources and to place them in the hands of American corporations. Facebook doesn’t call that terrorism. They call it democracy. BBC, CNN, FOX NEWS, FR 24, ITV/CH 4, SKY, EURO NEWS, ITV trash Sun paper,… Facebook all are protector and preserver of the propaganda classifying IR Iran as a dangerous terrorist organization. But FB, BBC, CNN, FOX NEWS, FR 24, ITV/CH 4-SKY, EURO NEWS, ITV do know well, that USA is the biggest terrorist country in the world.
‘terrorism’ the unlawful use of violence and intimidation, especially against civilians, in the pursuit of political aims.
"the fight against terrorism" is the fight against the unlawful use of violence and intimidation and carpet bombing.
Ever since the beginning of the 19th century, the West has been sucking on the jugular vein of the Moslem body politic like a veritable vampire whose thirst for Moslem blood is never sated and who refused to let go. Since 1979, Iran, which has always played the role of the intellectual leader of the Islamic world, has risen up to put a stop to this outrage against God’s law and will, and against all decency.
MY NEWS PUNCH DR F DEJAHANG 28/12/2019
PART 1 (IN TOTAL 12 PARTS)
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FR 24, EURO NEWS, ITV…
ALL In My Documents: https://www.edocr.com/user/drdejahang02
Also in https://www.edocr.com/v/jqmplrpj/drdejahang02/LINKS-08-12-2019-PROJECT-ONE Click on Social Websites of mine >60
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD) ➽➜R⇢➤=RESEARCH ➽=ALL
PPTs https://www.slideshare.net/DrFereidounDejahang/16-fd-my-news-punch-rev-16122019
MY NEWS PUNCH 16-12-2019
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FRNACE 24, EURO NEWS
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD)
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
2. MATERIAL MANAGEMENT
Materials management is an important
process.
It is about how to reduce waste
Improve productivity
Follow a Sustainable development
It is about how a building is designed and
how materials are estimated?
It is about how materials are acquired and
how the packaging is specified.
3. MATERIAL MANAGEMENT
It is about how the delivery schedule is
designed.
It is about how contractors plan materials
use and how they manage previously
used materials and cuts.
It is about how waste is managed for use
elsewhere or recycling rather than being
discarded in a landfill.
4. MATERIAL MANAGEMENT
Often on site usable or reusable pieces of
material can be seen in a construction site.
-Examples
lighting ballasts,
electrical switches
plasterboards damaged under the rain/bad
handling/storage etc.
Torn bags of cement,
Broken tiles, bricks, blocks,
various lengths of piping and conduit.
And many more.
5. MATERIAL MANAGEMENT
Cost of Waste
The cost of waste is more than simply the cost of
getting it to a landfill and dumping it.
The cost of waste is:
Original cost of material
Delivery cost
Handling cost
Management cost
Cleanup cost
Waste hauling cost
Tipping fee
=Total cost of construction waste
6. MATERIAL MANAGEMENT
Materials use
materials reuse,
reduction and recycling
begins in the planning stages of a project.
1. It starts with the architect,
2. proceeds through the engineer, the estimator,
the purchaser,
3. The construction manager
4. finally the contractors.
7. MATERIAL MANAGEMENT
Materials cost control often starts with a
plan.
Once the material is on site and especially
once its been cut, it is too late to plan.
With carefully well planned operational
procedures and construction practices, a
plan can be developed and implemented
to save significant costs in materials.
8. MATERIAL MANAGEMENT
Researchers in the past have tried to
quantify the potential benefits of applying
effective material management practice on
commercial building practice.
Overall, they found that 25 site factors and
conditions potentially affect productivity.
One of which is material management, this
is shown diagrammatically in figure below.
9.
10. MATERIAL MANAGEMENT
Ineffective material management reduces
labour productivity.
Material handling could be improved by
simple measures such a:
organizing the delivering and storage of
materials in a sequential manner,
the end result will improve productivity.
11. MATERIAL MANAGEMENT
Researchers have tried to quantify the potential
benefits of applying material management
practices on construction sites.
They carried out material management on a
number of selected sites.
The projects were all constructed under similar
conditions.
Only one project used material management
technique.
All material related problems were identified,
quantified, and linked to site material practice.
12. MATERIAL MANAGEMENT
The number of work hours wasted was
calculated.
The result of their study concluded that
work hour losses resulting from poor
material management caused cost
overrun of 18%.
13. MATERIAL MANAGEMENT
The case study also showed that an
investment of £1100.00 in the field of
material management would have saved
£6300.00 in quantified disruption, a
benefit/cost ratio of 5.7.
Material management involves organizing
the storage area, delivery of materials,
material handling and distribution.
14. MATERIAL MANAGEMENT
The construction industry has a major
impact on the environment, both in terms
of the resources it consumes and the
waste it produces.
The construction industry is responsible
for producing all kinds of wastes.
The amount and type of which depends
on factors such as:
the stage of construction,
type of construction work and practices on
site.
15. MATERIAL MANAGEMENT
Over 90% of non -energy minerals
extracted in Great Britain are used to
supply the construction industry with
materials.
Every year more than 70 million tones of
construction and demolition waste has
been produced in England and Wales
16. MATERIAL MANAGEMENT-POLICY
Reduce > Reuse > Recycle
The construction industry is the UK’s
largest user of natural resources, and
produces a large amounts of waste.
Everyone in the construction industry can
contribute to tackling waste-by.
It is by reducing waste, using materials in
a better way, with care.
Collecting waste for recycling.
17. MATERIAL MANAGEMENT
1. 400 MILLION TONNES of material is
used
2. 100 MILLION TONNES of waste is
produced – more than one-third of the
UK’s annual waste
3. 25 MILLION TONNES of construction
waste is disposed to landfill
18. MATERIAL MANAGEMENT
Waste hierarchy
1. Reuse
2. Recycle
3. Dispose
Firstly, aim to reduce the amount of waste you
create.
If waste is created, identify ways you can reuse
the materials.
Finally, if materials cannot be reused then
collect them to recycle.
Only dispose of waste as a last resort.
19. MATERIAL MANAGEMENT
Try to be involved early in a project to
encourage designs that cause less waste
to be created.
Use standard sizes and quantities of
materials, and plan ahead to reduce off
cuts.
Avoid over-ordering.
20. MATERIAL MANAGEMENT
arrange deliveries to match work stages,
avoid materials being stored on site longer
than necessary,
ensure storage areas are safe, secure and
weatherproof,
Minimise rework from errors and poor
workmanship.
21. MATERIAL MANAGEMENT
Refuse poor quality or damaged deliveries.
Don’t remove protective packaging from
materials before they are needed.
RECOMMENDATIONS
The site induction and toolbox talks are
opportunities to raise awareness of good waste
management.
Having one person responsible for ordering
materials helps avoid surplus being purchased.
22. MATERIAL MANAGEMENT
Buying sand and gravel in bulk bags
rather than loose helps reduce wastage.
Computer software is available to estimate
required quantities accurately.
Your duty of care
All businesses have a duty to ensure that
waste they produce is handled safely and
within the law.
This is a duty of care we are all part of the
process.
23. MATERIAL MANAGEMENT
check that any company removing waste
from your site is a registered waste carrier,
make sure that they take the waste to a
registered waste management site,
If you do not check and it is illegally
disposed of, you could be held
responsible.
24. MATERIAL MANAGEMENT
Every load of waste that leaves your site
must be accompanied by a Waste
Transfer Note.
This provides an accurate description of
the waste to enable it to be treated safely.
Keep copies of all waste transfer notes for
at least two years
25. MATERIAL MANAGEMENT
Site Waste Management Plans
A Site Waste Management Plan (SWMP)
is a legal requirement in England for
projects over £300,000.
It requires you to forecast and record
waste and how it is managed.
26. MATERIAL MANAGEMENT
Using the SWMP as a waste management
tool can help the company to:
1. increase profit margins;
2. reduce waste management costs;
3. demonstrate compliance with your legal
obligations; and decrease the amount of
waste you dispose of to landfill.
27. MATERIAL MANAGEMENT
The true cost of waste is not just the cost
of hiring a skip.
It also includes:
1. the cost of the materials that end up as
waste;
2. the labour cost to handle the waste on
site; and the cost of waste storage,
3. transport, treatment and disposal.
28. MATERIAL MANAGEMENT
1. Most of waste arises on the structure
and fitting stages of construction.
2. BENCHMARK DATA
There are no agreed bench mark data
available.
3. On going study at Centre for Research in
the Built Environment is looking at the
bench marking for waste minimisation.
29. MATERIAL MANAGEMENT-WASTE CONTROL
Environmentally friendly policy
Step1-Sustainable development
Step2-On site Material Management
Policy
Step3-On site prevention policy
Step4-On site reduction
Step5-On site reuse Policy
Step6-On site recovery Policy
32. MATERIAL MANAGEMENT
RECORD KEEPING
Complete documentation of all contract
activities is an important part of material
management.
These records provide an accurate record of:
1. material testing,
2. Inspections
3. work performed.
They also provide proof of and support for the
decisions and actions taken.
These records show that the contractual
obligations of the contractor have been fulfilled
and the public’s funds have been properly
spent.
33. MATERIAL MANAGEMENT
These records show how the material
was used, what was the level of
material wastage on site.
I twill provide valuable information on
how to reduce waste and have a tight
control on material management.
34. MATERIAL MANAGEMENT
Good Recordkeeping Practices
Keep records up-to-date, accurate, and
complete.
This will save time throughout the process.
-To achieve this:
enter records on the day of the event,
enter information in a manner so another person
could easily complete the entry,
when needed, without additional instructions.
35. MATERIAL MANAGEMENT
If % waste allowed is =5% a good record
keeping will show the level of waste for each
activities.
If the waste for let us say activity 100-120 is
6.65% the good record keeping will
demonstrate why waste was high for that
activity.
Lesson can be learnt from waste increase.
Waste and material management have strong
correlation.
36. MATERIAL MANAGEMENT
Recordkeeping Policies and Procedures
Resources
Record the date first.
Record verbal instructions and minor conditions.
Weather conditions.
Work in progress, including temporary erosion
control methods employed.
Location of work (activity 1-2, 2-3,…)
Contractors and subcontractor’s work force
Arrival and departure of equipment
37. MATERIAL MANAGEMENT
♦ Quantity of equipment and its usage at the
project for each activity.
♦ Important instructions to the contractor.
♦ Names of official visitors and a summary
of any discussions with the visitors
♦ Unusual construction or work conditions
♦ Decision making discussions with the
contractor
♦ Disagreements with the contract
38. MATERIAL MANAGEMENT
Detailed information that may have a connection
with a probable dispute or claim against the
department
Project completion and final inspection
Other important features of the project, such as
discussions concerning Disadvantaged
Business Enterprise (DBE) and Equal
Opportunity (EEO)
Record time suspension and reason
Record resumption of work
39. MATERIAL MANAGEMENT
Record all materials brought onto the project
even if they are material-on-hand and the date
that the material arrived
Record the date that Storm Water Inspections
were performed and any violation by the
contractor of Project Specific Locations (PSLs)
in the ROW or within one mile of the
project
Record traffic control being used
40. MATERIAL MANAGEMENT
Time inspector is on the project
Credit Days – Enter reason for credit day
in Site Manager Daily Work Report (DWR)
and Diary. (Exception for Saturday &
Sunday – unless the contractor is
working.)
41. MATERIAL MANAGEMENT
NOTE: The Site Manager DWR contains 10
different categories on the first tab under
‘Remarks’
to record information. These categories are:
• Accident
• Contractor Work Hours
• Dispute/Claim
• EEO Issues
• GENERAL
42. MATERIAL MANAGEMENT
• General
• Other
• Safety Violations
• Traffic and
• Visitors.
Records Management Resources from GSD
Keeping good records does not mean keeping
all records indefinitely. The Records
Management
Section of the General Services Division (GSD)
provides guidance on general records
43. MATERIAL MANAGEMENT
management issues on their website.
Information on the Records Retention Schedule
is also
available. Specific information on District
Construction Records can be accessed online.
The
link to Division/Office Schedules of Unique
Records include records maintained by the
Construction Division and other Divisions. To
establish record retention practices that conform
to the standards described in these online
resources, review of these sites is
recommended.
44. MATERIAL MANAGEMENT
Electronic Data Management Systems
(EDMS)
Electronic Data Management Systems
(EDMS) will provide the department with a
means of
maintaining project records that are not
stored in Site Manager electronically.
Several districts
45. MATERIAL MANAGEMENT
and divisions now have EDMS to allow
storage of electronic records and allow
scanning and
storing hard-copy records. Ideally, most, if
not all, documentation will be electronically
stored
from cradle to grave in the future.