Planning and Selection of Heavy Construction Equipments in Civil
Engineering
PRITAM KHANDVE1, PALASH MURKUTE2, SHIVRAJ SWAMI3, PRANAV KHARE4
Dr. D. Y. Patil School of Engineering and Technology, Charholi (Bk.),Pune – 412105
--------------------------------------------------------------------------***--------------------------------------------------------------------
Abstract- Any enterprise cannot operate on its own. Even a
contractor can neither build nor operate on itself. Therefore,
it has to be manned by the people who form the backbone of
the enterprise, and it is their candid performance on which
the success of the whole enterprise depends. Their
knowledge and skills are to be scrutinized and analyzed so
as to fit the right person in the right place.
A large percentage of construction site accidents involve the
negligence of someone other than a co-employee or
employer. Many subcontractors may be involved and
responsible for your damages. There are a variety of
circumstances in which a construction worker can be
injured. There are many causes for construction site
accidents, including negligent and dangerous construction
site practices.
Key Words: Construction, Planning, Civil, Engineering,
Equipment.
1.1 INTRODUCTION
Construction equipment planning and selection plays
crucial role for the success of construction firms .
Inadequate manual processes of equipment planning and
selection and the subjective decisions of equipment
managers usually result in major losses in construction
firms. An indispensable item of resources, it produces
output at accelerated speed, enables completion of task in
limited time. Equipment saves manpower, which is
becoming costly and more demanding day by day.
Equipment improves quality, productivity and safety.
Construction equipment planning aims at identifying
construction equipment for executing project tasks,
assessing equipment performance capability, forecasting
date wise requirement type of equipment and finally
participating in the selection of equipment to be acquired.
To derive full benefits from the equipment, there should be
proper selection and good planning of its operations. This
paper deals with the planning and selection procedure for
equipment adopted by a company to achieve its objective
of timely project completion
1.2 OBJECTIVES
Considering various activities carried out during
construction of tunnel, the objective of this thesis is to
describe and evaluate various methods and management
techniques for efficient selection and planning of
construction equipment, by studying particular case.
1.3 METHODOLOGY
The first step of study is to identify different
components of a construction work and to study
construction procedure of it. This will give very clear idea
about different equipment that is used for construction
work and their application. The second step is to study
existing literature available on the selection and planning
of equipment and factors affecting the same. The third step
is to study selection and planning procedure followed by
particular construction firms engaged in construction of a
specific construction project and evaluating the same.
1.4 FIELD APPLICATION
1. Planned construction equipment lead to handle any job
and makes smart use of technology and services to
improve your jobsite efficiency.
2. Selection of Equipment also matters in construction. eg.
The long reach excavator or high reach excavator is a
development of the excavator with an especially long
boom arm, that is primarily used for demolition. Instead of
excavating ditches, the long reach excavator is designed to
reach the upper stories of buildings that are being
demolished and pull down the structure in a controlled
fashion.
3. Dragline Excavation Systems are heavy equipment used
in civil engineering and surface mining. In civil engineering
the smaller types are used for road and port construction.
The larger types are used in strip mining operations to
move overburden above coal, and for tar-sand mining.
4. Proper Selection of Equipment matters a lot. The old
method to apply Gypsum manually took hours of labor and
also had poor durability due to manual errors. Now with
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 165
automation in this field, application through machine is
gaining wide spread popularity as its not only faster but
also cheaper in long run as very less labor is required.
5. More over the results are much more stronger and
durable If planning and selection of equipment is done
well.
1.5 Types Of Construction equipment Depending on
the application, construction machines are classified
into various categories.
1. Earthmoving equipments
2. Construction vehicles
3. Material handling equipments
4. Construction equipments
1.6 Information Collected From Site
1. Main site location- the rose society , dr. d. y. patil
road opposite the main gate of college
2. Initial point of loading – vadgaonshinde
3. Distance between initial point and main site
location is 6-7 km
1.7 The information collected about equipment should
include
1. Model number
2. Horse power
3. Engine speed
4. Fuel consumption
5. Weight Of Material
6. Distance of each cycle
7. Time required
8. Capacity
9. Type of control
10. Maintenance details
1.8 Data Collected for JCB Back Hoe
Horse power - 75 HP
Engine running speed - 30 km / hr
Fuel consumption - 4 to 5 litre/hr
Material in bucket - 300 kg
Material in loader bucket - 1000 – 1200 kg
Time required to load
The material - 25 to 30 Mi for 3 brs
Working Speed Of Engine - 12 To 15 RPM
Type Of Control - Manual
Maintenance Charges - 20k / month
Rate Per Hour - 650 to 700
Fuel tank capacity - 120 litre
1.9 The time required for completing one cycle sing
formulas
 The Time Required For One Cycle Can Be
Calculated By The Given Formulas.Time For One
Cycle = Load Time + Haul Time+ Dump Time +
Return Time.
 Load Time Can Be Calculated As, Load Time =
Number Of Buckets X Bucket Cycle Time.
 Haul Time Can Be Calculated As, Haul Time = Haul
Distance / mph X Haul Speed.
 Dump Time as, Average Dump Time Is Taken
From 1.5 To 2 Minutes.
 Return Time Calculated As, Return Time = Return
Distance / 88mph X Haul Speed.
2.0 RESULT
Working cycle
Step-1
Initial point(where we excavate & load the material).
Location – vadgaonshinde (which is 7 km away from final
point) by using jcb as an excavator we excavate the
material like soil, murum etc.
it takes 20 to 25 minutes to load the material into dumpers
, and 15 to 20 minutes to load the material into tractors.
Step-2
final point (where we dump or unload the material).
location – survey no 286 , the rose society, opposite d. y.
patil main gate.
this step includes the travelling from initial point to final
point and unloading of material at final point.
it takes 20 to 25 minutes to travel this distance of 7 kms.
As the vehicles are loaded with material & it takes 3 to 5
minutes to dump or unload the material at final point.
Step- 3
It is last step of this working cycle.
This step includes travelling back to the initial point from
final point.
it takes 15 to 20 minutes to cover the distance of 6 – 7 km
as vehicle is totally empty.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 166
2.1 CAMPARISON
As compared to tractor, dumper is more economical as far
as the speed , carrying capacity, fuel consumption and
rates are concerned.
dumper – tractor –
speed 60 to 80 kmph 40 to 50 kmph
Carrying capacity – 3 brass 0.90 brass
Fuel consumption – 4 liter/km 4-5 liter
Comparison between the equipments based on type of
soil
CONCLUSION
Man, Money And Machinery these are very
important parts of construction industry. Equipment plays
an important role in today’s infrastructure projects as they
are more demanding in highway projects, big projects are
need to be completed in given time with most economical
way and best in quality. Proper selection and planning,
sheduling of equipment is very important for timely
completion of project, within plant cost and for increasing
profit, margin and for development of firm. Selection and
planning needs to exercise very seriously as it is one of the
factors that affect the progress of work. Planning of
equipment depends upon nature and quality of work and
time available for completion. Planning of equipment
needs to be done by a well experienced person, who got
expertise in that area, who has got good exposure of
execution of work and who knows the factors that affect
the output of equipment. capital investment means risk,
this risk should be managed while procuring equipments.
Selection is a process in which the equipment that is most
suitable for a particular job is found out. And decision is
made regarding the make of the equipment to be procured.
REFERENCES
[1]Miquel Casals, Nuria Forcada, Xavier Roca, “A
Methodology To Select Construction Equipment,”
Polytechnic University of Catalonia, Department of
Construction Engineering, C/Colum 11, Edifici TR-5, 08221
Terrassa, Barcelona, Spain,
miquel.casals@upc.es.(ISARC2003)
[2]Masoud NavazandehSajoudi,
ohammadaliKazerooniSadi, Arham Abdullah,
MohammadrezaKasraei, HodaRezaie, “Evaluation of
Factors Affecting on Construction Equipment Acquisition
Methods in Malaysia,” 2011 International Conference on
Information and Finance IPEDR vol.21, 2011.
[3] Paper on " International Journal Of Optimization In
Civil Engineering" Int. J. Optim. Civil Eng., 2012; 2(2):235-
246 (P. Valli*, † and C. Antony Jeyasehar)
[4] Mr. Nilesh D. Chinchore, Prof.Pranay R. Khare,
“Planning and Selection of Heavy Construction Equipment
in Civil Engineering,” International Journal of Engineering
Research and Applications, ISSN: 2248- 9622, Vol. 4, Issue
12( Part 1), December 2014, pp.29- 31.
[5] Remon F. Aziz, Yasser R. Aboel-Magd, “Suitably
Selection for Earthwork Equipment In Egyptian Sites,”
International Journal of Education and Research Vol. 3 No.
1 January 2015
[6] Information Paper On"Technology Development
ProspectsFor The Indian Power Sector" (Uwe Remme,
Nathalie Trudeau, Dagmar Graczyk and Peter Taylor)
[7] Yuki Sakaida, Daisuke Chugo, Kuniaki Kawabata /
HayatoKaetsu, Hajime Asama, “The Analysis of Excavator
Operation by SkillfulOperator,”ISARC2006.
[8] Construction Equipment Management(2006),
“Planning and Selection of Equipment”, Centre for Distance
Education, NICMAR, Pune.
[9] Deodhar, S. V.(2001), “Construction Equipment and Job
Planning”, Khanna Publisher, Second Edition.
[10] Singh Jagman, (2001)“Heavy Construction – Planning,
Equipment and Methods”, Oxford and IBH Publishing Co.
Pvt. Ltd., Second Edition.
[11] S.C.Sharma, “Construction Equipment and its
Management”(Delhi, Khanna Publishers, 2010)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 167
[12] S.Seetharaman, Construction Engineering and
Management(Delhi, Umesh Publications,2002)
[13] Paper on A methodology to select construction
equipment Miquel Casals, Nuria Forcada, Xavier Roca
[14] Information Paper On Technology Development
Prospects For The Indian Power Sector (Uwe Remme,
Nathalie Tru deau, Dagmar Graczyk and Peter Taylor)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072

More Related Content

What's hot

Planning and Selection of Heavy Construction Equipment in Civil Engineering
Planning and Selection of Heavy Construction Equipment in Civil EngineeringPlanning and Selection of Heavy Construction Equipment in Civil Engineering
Planning and Selection of Heavy Construction Equipment in Civil EngineeringIJERA Editor
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...IRJET Journal
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET Journal
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWIAEME Publication
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET Journal
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGFuratAj
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
A study of financial performance of hec
A study of financial performance of hecA study of financial performance of hec
A study of financial performance of hecsurajkumar1357
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET Journal
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1Bob Bin
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisSarang Bhutada
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingeSAT Journals
 
Reverse Logistics and Remanufacturing in Industry
Reverse Logistics and Remanufacturing in IndustryReverse Logistics and Remanufacturing in Industry
Reverse Logistics and Remanufacturing in IndustryIRJET Journal
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningDr. Amarjeet Singh
 

What's hot (19)

Planning and Selection of Heavy Construction Equipment in Civil Engineering
Planning and Selection of Heavy Construction Equipment in Civil EngineeringPlanning and Selection of Heavy Construction Equipment in Civil Engineering
Planning and Selection of Heavy Construction Equipment in Civil Engineering
 
Ops class4
Ops class4Ops class4
Ops class4
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPING
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
Iy3416321635
Iy3416321635Iy3416321635
Iy3416321635
 
A study of financial performance of hec
A study of financial performance of hecA study of financial performance of hec
A study of financial performance of hec
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysis
 
Bhushan Bhapkar-CV
Bhushan Bhapkar-CVBhushan Bhapkar-CV
Bhushan Bhapkar-CV
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Hari Prasath _N
Hari Prasath _NHari Prasath _N
Hari Prasath _N
 
Ppc 2 m and 16m
Ppc 2 m and 16mPpc 2 m and 16m
Ppc 2 m and 16m
 
Reverse Logistics and Remanufacturing in Industry
Reverse Logistics and Remanufacturing in IndustryReverse Logistics and Remanufacturing in Industry
Reverse Logistics and Remanufacturing in Industry
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in Machining
 

Similar to IRJET- Planning and Selection of Heavy Construction Equipments in Civil Engineering

Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectIRJET Journal
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxmegha desai
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET Journal
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineIRJET Journal
 
Construction Equipment Fleet Management
Construction Equipment Fleet ManagementConstruction Equipment Fleet Management
Construction Equipment Fleet ManagementIJMER
 
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNITDESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNITSomashekhar Mudalagi
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptxmegha desai
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET Journal
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...IRJET Journal
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfINDRAKUMARPADWANI1
 
Design Of Mechanical Systems for Small Scale Harvesting Robot
Design Of Mechanical Systems for Small Scale Harvesting RobotDesign Of Mechanical Systems for Small Scale Harvesting Robot
Design Of Mechanical Systems for Small Scale Harvesting RobotIRJET Journal
 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET Journal
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPIRJET Journal
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfHasanSajib3
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 

Similar to IRJET- Planning and Selection of Heavy Construction Equipments in Civil Engineering (20)

Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
 
Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling Machine
 
Construction Equipment Fleet Management
Construction Equipment Fleet ManagementConstruction Equipment Fleet Management
Construction Equipment Fleet Management
 
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNITDESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptx
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdf
 
B1303020508
B1303020508B1303020508
B1303020508
 
Design Of Mechanical Systems for Small Scale Harvesting Robot
Design Of Mechanical Systems for Small Scale Harvesting RobotDesign Of Mechanical Systems for Small Scale Harvesting Robot
Design Of Mechanical Systems for Small Scale Harvesting Robot
 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdf
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

IRJET- Planning and Selection of Heavy Construction Equipments in Civil Engineering

  • 1. © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 164 Planning and Selection of Heavy Construction Equipments in Civil Engineering PRITAM KHANDVE1, PALASH MURKUTE2, SHIVRAJ SWAMI3, PRANAV KHARE4 Dr. D. Y. Patil School of Engineering and Technology, Charholi (Bk.),Pune – 412105 --------------------------------------------------------------------------***-------------------------------------------------------------------- Abstract- Any enterprise cannot operate on its own. Even a contractor can neither build nor operate on itself. Therefore, it has to be manned by the people who form the backbone of the enterprise, and it is their candid performance on which the success of the whole enterprise depends. Their knowledge and skills are to be scrutinized and analyzed so as to fit the right person in the right place. A large percentage of construction site accidents involve the negligence of someone other than a co-employee or employer. Many subcontractors may be involved and responsible for your damages. There are a variety of circumstances in which a construction worker can be injured. There are many causes for construction site accidents, including negligent and dangerous construction site practices. Key Words: Construction, Planning, Civil, Engineering, Equipment. 1.1 INTRODUCTION Construction equipment planning and selection plays crucial role for the success of construction firms . Inadequate manual processes of equipment planning and selection and the subjective decisions of equipment managers usually result in major losses in construction firms. An indispensable item of resources, it produces output at accelerated speed, enables completion of task in limited time. Equipment saves manpower, which is becoming costly and more demanding day by day. Equipment improves quality, productivity and safety. Construction equipment planning aims at identifying construction equipment for executing project tasks, assessing equipment performance capability, forecasting date wise requirement type of equipment and finally participating in the selection of equipment to be acquired. To derive full benefits from the equipment, there should be proper selection and good planning of its operations. This paper deals with the planning and selection procedure for equipment adopted by a company to achieve its objective of timely project completion 1.2 OBJECTIVES Considering various activities carried out during construction of tunnel, the objective of this thesis is to describe and evaluate various methods and management techniques for efficient selection and planning of construction equipment, by studying particular case. 1.3 METHODOLOGY The first step of study is to identify different components of a construction work and to study construction procedure of it. This will give very clear idea about different equipment that is used for construction work and their application. The second step is to study existing literature available on the selection and planning of equipment and factors affecting the same. The third step is to study selection and planning procedure followed by particular construction firms engaged in construction of a specific construction project and evaluating the same. 1.4 FIELD APPLICATION 1. Planned construction equipment lead to handle any job and makes smart use of technology and services to improve your jobsite efficiency. 2. Selection of Equipment also matters in construction. eg. The long reach excavator or high reach excavator is a development of the excavator with an especially long boom arm, that is primarily used for demolition. Instead of excavating ditches, the long reach excavator is designed to reach the upper stories of buildings that are being demolished and pull down the structure in a controlled fashion. 3. Dragline Excavation Systems are heavy equipment used in civil engineering and surface mining. In civil engineering the smaller types are used for road and port construction. The larger types are used in strip mining operations to move overburden above coal, and for tar-sand mining. 4. Proper Selection of Equipment matters a lot. The old method to apply Gypsum manually took hours of labor and also had poor durability due to manual errors. Now with International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
  • 2. © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 165 automation in this field, application through machine is gaining wide spread popularity as its not only faster but also cheaper in long run as very less labor is required. 5. More over the results are much more stronger and durable If planning and selection of equipment is done well. 1.5 Types Of Construction equipment Depending on the application, construction machines are classified into various categories. 1. Earthmoving equipments 2. Construction vehicles 3. Material handling equipments 4. Construction equipments 1.6 Information Collected From Site 1. Main site location- the rose society , dr. d. y. patil road opposite the main gate of college 2. Initial point of loading – vadgaonshinde 3. Distance between initial point and main site location is 6-7 km 1.7 The information collected about equipment should include 1. Model number 2. Horse power 3. Engine speed 4. Fuel consumption 5. Weight Of Material 6. Distance of each cycle 7. Time required 8. Capacity 9. Type of control 10. Maintenance details 1.8 Data Collected for JCB Back Hoe Horse power - 75 HP Engine running speed - 30 km / hr Fuel consumption - 4 to 5 litre/hr Material in bucket - 300 kg Material in loader bucket - 1000 – 1200 kg Time required to load The material - 25 to 30 Mi for 3 brs Working Speed Of Engine - 12 To 15 RPM Type Of Control - Manual Maintenance Charges - 20k / month Rate Per Hour - 650 to 700 Fuel tank capacity - 120 litre 1.9 The time required for completing one cycle sing formulas  The Time Required For One Cycle Can Be Calculated By The Given Formulas.Time For One Cycle = Load Time + Haul Time+ Dump Time + Return Time.  Load Time Can Be Calculated As, Load Time = Number Of Buckets X Bucket Cycle Time.  Haul Time Can Be Calculated As, Haul Time = Haul Distance / mph X Haul Speed.  Dump Time as, Average Dump Time Is Taken From 1.5 To 2 Minutes.  Return Time Calculated As, Return Time = Return Distance / 88mph X Haul Speed. 2.0 RESULT Working cycle Step-1 Initial point(where we excavate & load the material). Location – vadgaonshinde (which is 7 km away from final point) by using jcb as an excavator we excavate the material like soil, murum etc. it takes 20 to 25 minutes to load the material into dumpers , and 15 to 20 minutes to load the material into tractors. Step-2 final point (where we dump or unload the material). location – survey no 286 , the rose society, opposite d. y. patil main gate. this step includes the travelling from initial point to final point and unloading of material at final point. it takes 20 to 25 minutes to travel this distance of 7 kms. As the vehicles are loaded with material & it takes 3 to 5 minutes to dump or unload the material at final point. Step- 3 It is last step of this working cycle. This step includes travelling back to the initial point from final point. it takes 15 to 20 minutes to cover the distance of 6 – 7 km as vehicle is totally empty. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
  • 3. © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 166 2.1 CAMPARISON As compared to tractor, dumper is more economical as far as the speed , carrying capacity, fuel consumption and rates are concerned. dumper – tractor – speed 60 to 80 kmph 40 to 50 kmph Carrying capacity – 3 brass 0.90 brass Fuel consumption – 4 liter/km 4-5 liter Comparison between the equipments based on type of soil CONCLUSION Man, Money And Machinery these are very important parts of construction industry. Equipment plays an important role in today’s infrastructure projects as they are more demanding in highway projects, big projects are need to be completed in given time with most economical way and best in quality. Proper selection and planning, sheduling of equipment is very important for timely completion of project, within plant cost and for increasing profit, margin and for development of firm. Selection and planning needs to exercise very seriously as it is one of the factors that affect the progress of work. Planning of equipment depends upon nature and quality of work and time available for completion. Planning of equipment needs to be done by a well experienced person, who got expertise in that area, who has got good exposure of execution of work and who knows the factors that affect the output of equipment. capital investment means risk, this risk should be managed while procuring equipments. Selection is a process in which the equipment that is most suitable for a particular job is found out. And decision is made regarding the make of the equipment to be procured. REFERENCES [1]Miquel Casals, Nuria Forcada, Xavier Roca, “A Methodology To Select Construction Equipment,” Polytechnic University of Catalonia, Department of Construction Engineering, C/Colum 11, Edifici TR-5, 08221 Terrassa, Barcelona, Spain, miquel.casals@upc.es.(ISARC2003) [2]Masoud NavazandehSajoudi, ohammadaliKazerooniSadi, Arham Abdullah, MohammadrezaKasraei, HodaRezaie, “Evaluation of Factors Affecting on Construction Equipment Acquisition Methods in Malaysia,” 2011 International Conference on Information and Finance IPEDR vol.21, 2011. [3] Paper on " International Journal Of Optimization In Civil Engineering" Int. J. Optim. Civil Eng., 2012; 2(2):235- 246 (P. Valli*, † and C. Antony Jeyasehar) [4] Mr. Nilesh D. Chinchore, Prof.Pranay R. Khare, “Planning and Selection of Heavy Construction Equipment in Civil Engineering,” International Journal of Engineering Research and Applications, ISSN: 2248- 9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29- 31. [5] Remon F. Aziz, Yasser R. Aboel-Magd, “Suitably Selection for Earthwork Equipment In Egyptian Sites,” International Journal of Education and Research Vol. 3 No. 1 January 2015 [6] Information Paper On"Technology Development ProspectsFor The Indian Power Sector" (Uwe Remme, Nathalie Trudeau, Dagmar Graczyk and Peter Taylor) [7] Yuki Sakaida, Daisuke Chugo, Kuniaki Kawabata / HayatoKaetsu, Hajime Asama, “The Analysis of Excavator Operation by SkillfulOperator,”ISARC2006. [8] Construction Equipment Management(2006), “Planning and Selection of Equipment”, Centre for Distance Education, NICMAR, Pune. [9] Deodhar, S. V.(2001), “Construction Equipment and Job Planning”, Khanna Publisher, Second Edition. [10] Singh Jagman, (2001)“Heavy Construction – Planning, Equipment and Methods”, Oxford and IBH Publishing Co. Pvt. Ltd., Second Edition. [11] S.C.Sharma, “Construction Equipment and its Management”(Delhi, Khanna Publishers, 2010) International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072
  • 4. © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 167 [12] S.Seetharaman, Construction Engineering and Management(Delhi, Umesh Publications,2002) [13] Paper on A methodology to select construction equipment Miquel Casals, Nuria Forcada, Xavier Roca [14] Information Paper On Technology Development Prospects For The Indian Power Sector (Uwe Remme, Nathalie Tru deau, Dagmar Graczyk and Peter Taylor) International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June 2018 www.irjet.net p-ISSN: 2395-0072