STUDIES ON AVAILABILITY AND UTILISATION OF
MINING EQUIPMENT- AN OVERVIEW
M.E.Michael Arputharaj
Deputy Chief Engineer / Mining, Neyveli Lignite Corporation Ltd,
Tamilnadu, India
ABSTRACT
In any opencast mining project, the major share of initial capital investment goes towards the
excavation and transportation equipment. Hence it is very important to analyse the performance of
those equipment, at regular intervals to achieve cost- effectiveness in excavation and transportation
operations.
In this paper, an attempt is made to calculate the percentage availability and utilisation of
shovel, dumpers and dozer, employed in an opencast mine and to analyse the contributing factors to
improve the overall equipment performance.
Keywords: Performance, Scheduled Hours, Available Hours, Utilised Hours, Availability,
utilisation, Production Efficiency, Equipment Operating Efficiency, Job Management Efficiency,
Overall Efficiency.
1. INTRODUCTION
The production performance of mining equipment depends on its availability and utilization.
Hence it is necessary to determine the percentage availability and utilization of machinery with an
aim to improve the same.
Different mines are following different terms and maintaining different information. The only
common information in most of the mines is the working hours of shovels. There is a need to
develop proper feedback and to define terms, factors and indices relating to mining equipment.
These would serve as management’s tool in improving performance. There can also be used for
inter-firm comparisons. To sum up, there is a necessity to lay down on systematic basic, well defined
terms, factors and indices required for control and management of mining equipment.
INTERNATIONAL JOURNAL OF ADVANCED RESEARCH IN ENGINEERING
AND TECHNOLOGY (IJARET)
ISSN 0976 - 6480 (Print)
ISSN 0976 - 6499 (Online)
Volume 6, Issue 3, March (2015), pp. 14-21
© IAEME: www.iaeme.com/ IJARET.asp
Journal Impact Factor (2015): 8.5041 (Calculated by GISI)
www.jifactor.com
IJARET
© I A E M E
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
15
2. RECORDS TO BE MAINTAINED
For a proper analysis of the performance of equipment one must keep proper and up- to-date
records regarding the following.
2.1. Calendar Hours (CH)
This means the total number of hours during the period of observation. It is equal to
365*24=8760 hours in a year.
2.2. Scheduled Shift Hours (SSH)
This means number of hours, the mine employing the machinery is supposed to work in a
year. This is a management decision after giving due consideration to the type of mineral mined, the
ore reserves, the output of mineral, capital investment involved, market conditions, labour conditions
etc. The higher the capital investment, the higher should be the figure for scheduled- shift – hours. In
advanced countries very large equipment work round the clock.
In India, the general tendency is to work for 16 hours a day and six days a week. In the mine
under consideration, the equipment are planned to work for two shifts of six hours each. So the
scheduled shift hours are 12 hours per day.
2.3. Machine Available Hours (MAH)
This means the number of hours, out of schedule shift hours; a machine is available for work
at a face. The maintenance programme dictates it. Technical department’s expertise and availability
of spares have bearings on this. This also indicates how earnest and agile the management is to get
maintenance and spare supply departments.
2.4. Actual Hours Machine Worked in a Year
This information is very important as it reflects the efficiency of coordination of various
operations of production departments. Lack of coordination may result in machine being idle for
want of blasted ore or matching equipment etc. Difference between machine available hours and
actual hours of use measures the lapse of operating department.
3. FACTORS AND INDICES
From the basic information collected, as above availability and utilization factors both on
schedule-shit-hours basis and on machine-available –hours basis, production efficiency and overall
efficiency can be determined. In the following paragraphs these factors and indices have been
defined and their importance brought out.
3.1. Percentage Availability
A machine is considered available when it is fit to be put to perform its duties. The
availability is determined by dividing the hours the machine is available and is used plus the hours it
is available but not used due to various reasons over a period of one year. It is normally expressed in
percentages. Number of scheduled-shift-hours in a year for equipment operation is taken as total shift
hours. Overtime hours of work if any are added to the total shift hours. Stoppage of less than 15
minutes is ignored and the machine is taken as having been used during that period.
Percentage availability helps in judging and comparing the efficiency of the maintenance
departments of different units. This can also assist the management in knowing how the availability
of machine would change by changing the scheduled shift hours of work. Percentage availability of
machine would change by changing the scheduled shift hours of work.
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
16
3.2. Utilization Factor (UF)
This is defined as the ratio of the time in hours the machine is actually used in ayear to the
total hours. Here the denominator, i.e. total hours can be either total annual Scheduled – Shift –
Hours (SSH)or total Machine Available Hours (MAH) in a year and depending upon that the value
of UF will change. As MAH is always less than SSH, UF, based on MAH will be higher that UF
based on SSH
Actual Hours of use in a year
UF SSH =-----------------------------------------------------------------------------------------
SSH
Actual Hours of use in a year
UF MAH =-----------------------------------------------------------------------------------------
MAH
UF SSHis a measure of the efficiency of both maintenance and operational staff, whereas value of UF
MAHindicated the enthusiasm and effectiveness of operational staff alone.
3.3. Production Efficiency (Pe)
Actual Output
Production efficiency (Pe)--------------------------------------------*100
Theoretical output
Figure of output may be for an hour or shift or a year. As a matter of fact it is the product of
equipment operating efficiency and the job management efficiency. Here it is necessary to mention
something about equipment operating efficiency and the job management efficiency. Equipment
operating efficiency is determined by the capacity at which it is operating as compared to its rated
capacity. Influencing factors are within the equipment-sluggish behaviour of hydraulic systems, etc.
Job management efficiency is influenced by external and environment factors,- weather , human
skill, etc. their values are only empirical ones. Table 1,2 and 3 give values of them applicable in
most of mining conditions.
Table 1- Equipment Operating Efficiency
Equipment Operating Efficiency Remark
0.90 Good
0.80 Average
0.70 Poor
Table 2- Job Management Efficiency
Job Management Efficiency Remark
1.00 Good
0.85 Average
0.65 Poor
International Journal of Advanced Research in Engineering and Technology (IJARET)
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue
Table 3 - Combined Efficiency
Equipment operating
efficiency
Good
Average
Poor
When the shovel is operating as an independent unit such as in stripping operations where the
material is cast and not loaded into trucks, the production efficiency is equal to equipment
efficiency. But when the shovel is part of a system both e
management efficiency are obviously to be considered.
3.4. Overall Efficiency (Oe)
It is the product of Utilization Factor on the basis of Scheduled
Efficiency
Or Oe = Pe*UF SSH
It is an overall performance measure and
interested. A Manipulation in Utilization factor by recording more operation time or in production
efficiency by recording less time cannot alter or inflate the figure in ov
4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A
YEAR
The month wise details regarding working hours, repair hours, idle hours, availability and
utilization of various equipment including shovel, dumpers and dozer have been
analysed. The month wise percentage availability and utilization on
dumper and dozer have been shown graphically in Fig1,
International Journal of Advanced Research in Engineering and Technology (IJARET)
6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
17
Combined Efficiency Factors (Production Efficiency
Job management efficiency
Good Average
0.90 0.77
0.80 0.68
0.70 0.60
When the shovel is operating as an independent unit such as in stripping operations where the
material is cast and not loaded into trucks, the production efficiency is equal to equipment
efficiency. But when the shovel is part of a system both equipment operating efficiency and job
management efficiency are obviously to be considered.
It is the product of Utilization Factor on the basis of Scheduled-Shift
erall performance measure and is the one in which the top management is actually
interested. A Manipulation in Utilization factor by recording more operation time or in production
cannot alter or inflate the figure in overall Efficiency
4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A
The month wise details regarding working hours, repair hours, idle hours, availability and
utilization of various equipment including shovel, dumpers and dozer have been
. The month wise percentage availability and utilization on MAH and SSH basis for shovel,
e been shown graphically in Fig1, Fig 2, and Fig 3 respectively.
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
© IAEME
Production Efficiency)
Job management efficiency
Poor
0.59
0.52
0.45
When the shovel is operating as an independent unit such as in stripping operations where the
material is cast and not loaded into trucks, the production efficiency is equal to equipment operating
quipment operating efficiency and job
Shift –hours and production
is the one in which the top management is actually
interested. A Manipulation in Utilization factor by recording more operation time or in production
erall Efficiency.
4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A
The month wise details regarding working hours, repair hours, idle hours, availability and
utilization of various equipment including shovel, dumpers and dozer have been collected and
and SSH basis for shovel,
respectively.
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
18
Those values for the whole year have been given in table4
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
19
Tabel 4. Availability and utilization of equipment for a year
Equipment Shovel Dumpers Dozer
Parameter L6 H31 H32 H33 H34 H37 D4
Spoil removal (in hours) 1756.10. 962.10 374.40 1144.70 1371.25 1569.05 -
Others (in hours) 244.40 92.25 39.40 111.70 134.10 144.80 1676.76
Working hours 2000.50 1054.35 413.80 1454.40 1505.35 1710.85 1676.67
Idle hours 845.80 1963.45 643.40 1683.35 1731.50 1518.70 934.09
Repair hours 608.45 424.70 2406.0 154.60 261.10 186.65 837.85
Total scheduled hours 3456.0 3442.50 3463.20 3292.35 3497.95 3416.40 3448.70
Availability (%) 82.64 87.39 30.53 95.42 93.78 94.42 76.60
Utilization on MAH
basis (%)
70.36 35.03 39.14 44.44 46.53 53.20 63.47
Utilization on SSH
basis(%)
58.15 30.61 11.95 42.20 43.64 50.23 48.62
The average values of percentage availability and utilization of shovel, dumper and dozer are
given in table5.The CIL Standards (C.M.P.D.I norms for Coal India Limited ) for those values have
been given within brackets for comparison purposes.
Table 5.Comparison of percentage availability and utilization with C.I.L standards
Equipment Availibality Utilization on SSH Basis
Shovel 82.64(80) 58.15(58)
Dumper 80.31(67) 35.73(50)
Dozer 76.60 (70) 48.62(45)
Values with brackets indicate C.I.L.norms
Table 6 gives the percentage of unscheduled hours, unavilable hours, unutilized hours and
utilized hours with regard to calendar hours.
Table 6. Percentage Distributions Of Calendar Hours
Parameters Shovel Dumper Dozer
Unscheduled hours 60.56 60.93 60.64
Unavailable hours 6.940 7.84 9.56
Unutilized hours 9.76 17.22 10.66
Utilized hours 22.84 14.01 19.14
Calendar hours 100.00 100.00 100.00
The percentage distributions of calendar hoursin case of shovel, dumper and dozer have been
shown in fig 4, fig 5 and fig 6 respectively.
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
20
5. FINDINGS OF THE ANALYSIS
The results of the analysis show that the unscheduled hours are vey high since the equipment
are scheduled only for two shifts, that too only for six hours in a shift. The availability of the
equipment is comparable with that of CIL standards, but there is a wide gap between availability and
utilization of equipemnt . The percentage utilization of machinery especially that of dumper is belor
normal. Hence the managemetn has to take steps to improve the equipment utilization.
60%
7%
10%
23%
Fig 4. Percentage Distribution of
Calendar Hours of Shovel
Unscheduled Hours
Unavailable Hours
Unutilized Hours
Utilized Hours
61%
8%
17%
14%
Fig 5. Percentage Distribution of
Calendar Hours of Dumper
Unscheduled Hours
Unavailable Hours
Unutilized Hours
Utilized Hours
60%
10%
11%
19%
Fig 6. Percentage Distribution of
Calendar Hours of Dozer
Unscheduled Hours
Unavailable Hours
Unutilized Hours
Utilized Hours
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME
21
6.CONCLUSION
Availability and utilisation study is a known method to measure performance of
productionequipment in manufacturing industries and adapted for mining industry in this paper.
The views expressed in this paper are of the author and not necessarily of the organisation, he
belongs to.
REFERENCES
1. Sharma S.N., and Surana D.M., 1972, Analysis for Performance Assessment and
Performance Control of Dipper Shovels used in Mines, Journal of Mines, Metals & Fuels,
August,1972.
2. Singh B.P., 1997, Mine Mechanisation and Safety – A case Study on Ananta OCP of
Mahanadi Coalfields Ltd., Journal of Mines, Metals, & Fuels, January,1997.
3. Singh B.P. and Tiwari , 1984, Application of Reliability and Availability to Underground
Mine Transport, Journal of Mines, Metals, & Fuels, January,1984.
4. Dr. Anshu bhardwaj, “Financial Leverage and Firm’s Value: A Study of Metal, Metal
Products And Mining Sector Firms” International Journal of Management (IJM), Volume 5,
Issue 6, 2013, pp. 50 - 56, ISSN Print: 0976-6502, ISSN Online: 0976-6510.
5. G. Sreenivasa Rao, Dr. A. Manjunath and Dr. Mvss Giridhar, “Studies on Impact of Mining
On Surface and Groundwater” International Journal of Civil Engineering & Technology
(IJCIET), Volume 5, Issue 6, 2014, pp. 125 - 130, ISSN Print: 0976 – 6308, ISSN Online:
0976 – 6316.

More Related Content

What's hot

Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCLUlimella Siva Sankar
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit miningSATYANARAYANA I
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesaashutosh chhirolya
 
Open pit mining
Open pit miningOpen pit mining
Open pit mininggereltuya
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Lectures on metal mining
Lectures on metal miningLectures on metal mining
Lectures on metal miningRanjeet Kumar
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculationKrishna Deo Prasad
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesAnurag Jha
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mininggopal karmakar
 
ROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blastingROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blastingJignesh Ruperi
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound minesUlimella Siva Sankar
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 

What's hot (20)

Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Lectures on metal mining
Lectures on metal miningLectures on metal mining
Lectures on metal mining
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Haul road design
Haul road designHaul road design
Haul road design
 
BENCH & ROAD STANDARS IN OPENCAST MINES.pptx
BENCH & ROAD STANDARS IN OPENCAST MINES.pptxBENCH & ROAD STANDARS IN OPENCAST MINES.pptx
BENCH & ROAD STANDARS IN OPENCAST MINES.pptx
 
Mine planning
Mine planning Mine planning
Mine planning
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
ROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blastingROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blasting
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound mines
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Surface miner
Surface minerSurface miner
Surface miner
 
Open pit mining
Open pit miningOpen pit mining
Open pit mining
 

Similar to STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW

IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
Effect of equipment utilisation on economics of mining project a case study
Effect of equipment utilisation on economics of mining project a case studyEffect of equipment utilisation on economics of mining project a case study
Effect of equipment utilisation on economics of mining project a case studyIAEME Publication
 
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY IAEME Publication
 
Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesIAEME Publication
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...IAEME Publication
 
A038301010
A038301010A038301010
A038301010theijes
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET Journal
 
Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...IAEME Publication
 
Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...IAEME Publication
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET Journal
 

Similar to STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW (20)

IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
Effect of equipment utilisation on economics of mining project a case study
Effect of equipment utilisation on economics of mining project a case studyEffect of equipment utilisation on economics of mining project a case study
Effect of equipment utilisation on economics of mining project a case study
 
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY
EFFECT OF EQUIPMENT UTILISATION ON ECONOMICS OF MINING PROJECT-A CASE STUDY
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industries
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
 
A038301010
A038301010A038301010
A038301010
 
A012430106
A012430106A012430106
A012430106
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
F04943847
F04943847F04943847
F04943847
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
30120140501003
3012014050100330120140501003
30120140501003
 
Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...
 
Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...Improving productivity for engine crank shaft machining line using tps techni...
Improving productivity for engine crank shaft machining line using tps techni...
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
I012536474
I012536474I012536474
I012536474
 
Over all Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plan...
Over all Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plan...Over all Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plan...
Over all Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plan...
 
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW

  • 1. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 14 STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW M.E.Michael Arputharaj Deputy Chief Engineer / Mining, Neyveli Lignite Corporation Ltd, Tamilnadu, India ABSTRACT In any opencast mining project, the major share of initial capital investment goes towards the excavation and transportation equipment. Hence it is very important to analyse the performance of those equipment, at regular intervals to achieve cost- effectiveness in excavation and transportation operations. In this paper, an attempt is made to calculate the percentage availability and utilisation of shovel, dumpers and dozer, employed in an opencast mine and to analyse the contributing factors to improve the overall equipment performance. Keywords: Performance, Scheduled Hours, Available Hours, Utilised Hours, Availability, utilisation, Production Efficiency, Equipment Operating Efficiency, Job Management Efficiency, Overall Efficiency. 1. INTRODUCTION The production performance of mining equipment depends on its availability and utilization. Hence it is necessary to determine the percentage availability and utilization of machinery with an aim to improve the same. Different mines are following different terms and maintaining different information. The only common information in most of the mines is the working hours of shovels. There is a need to develop proper feedback and to define terms, factors and indices relating to mining equipment. These would serve as management’s tool in improving performance. There can also be used for inter-firm comparisons. To sum up, there is a necessity to lay down on systematic basic, well defined terms, factors and indices required for control and management of mining equipment. INTERNATIONAL JOURNAL OF ADVANCED RESEARCH IN ENGINEERING AND TECHNOLOGY (IJARET) ISSN 0976 - 6480 (Print) ISSN 0976 - 6499 (Online) Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME: www.iaeme.com/ IJARET.asp Journal Impact Factor (2015): 8.5041 (Calculated by GISI) www.jifactor.com IJARET © I A E M E
  • 2. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 15 2. RECORDS TO BE MAINTAINED For a proper analysis of the performance of equipment one must keep proper and up- to-date records regarding the following. 2.1. Calendar Hours (CH) This means the total number of hours during the period of observation. It is equal to 365*24=8760 hours in a year. 2.2. Scheduled Shift Hours (SSH) This means number of hours, the mine employing the machinery is supposed to work in a year. This is a management decision after giving due consideration to the type of mineral mined, the ore reserves, the output of mineral, capital investment involved, market conditions, labour conditions etc. The higher the capital investment, the higher should be the figure for scheduled- shift – hours. In advanced countries very large equipment work round the clock. In India, the general tendency is to work for 16 hours a day and six days a week. In the mine under consideration, the equipment are planned to work for two shifts of six hours each. So the scheduled shift hours are 12 hours per day. 2.3. Machine Available Hours (MAH) This means the number of hours, out of schedule shift hours; a machine is available for work at a face. The maintenance programme dictates it. Technical department’s expertise and availability of spares have bearings on this. This also indicates how earnest and agile the management is to get maintenance and spare supply departments. 2.4. Actual Hours Machine Worked in a Year This information is very important as it reflects the efficiency of coordination of various operations of production departments. Lack of coordination may result in machine being idle for want of blasted ore or matching equipment etc. Difference between machine available hours and actual hours of use measures the lapse of operating department. 3. FACTORS AND INDICES From the basic information collected, as above availability and utilization factors both on schedule-shit-hours basis and on machine-available –hours basis, production efficiency and overall efficiency can be determined. In the following paragraphs these factors and indices have been defined and their importance brought out. 3.1. Percentage Availability A machine is considered available when it is fit to be put to perform its duties. The availability is determined by dividing the hours the machine is available and is used plus the hours it is available but not used due to various reasons over a period of one year. It is normally expressed in percentages. Number of scheduled-shift-hours in a year for equipment operation is taken as total shift hours. Overtime hours of work if any are added to the total shift hours. Stoppage of less than 15 minutes is ignored and the machine is taken as having been used during that period. Percentage availability helps in judging and comparing the efficiency of the maintenance departments of different units. This can also assist the management in knowing how the availability of machine would change by changing the scheduled shift hours of work. Percentage availability of machine would change by changing the scheduled shift hours of work.
  • 3. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 16 3.2. Utilization Factor (UF) This is defined as the ratio of the time in hours the machine is actually used in ayear to the total hours. Here the denominator, i.e. total hours can be either total annual Scheduled – Shift – Hours (SSH)or total Machine Available Hours (MAH) in a year and depending upon that the value of UF will change. As MAH is always less than SSH, UF, based on MAH will be higher that UF based on SSH Actual Hours of use in a year UF SSH =----------------------------------------------------------------------------------------- SSH Actual Hours of use in a year UF MAH =----------------------------------------------------------------------------------------- MAH UF SSHis a measure of the efficiency of both maintenance and operational staff, whereas value of UF MAHindicated the enthusiasm and effectiveness of operational staff alone. 3.3. Production Efficiency (Pe) Actual Output Production efficiency (Pe)--------------------------------------------*100 Theoretical output Figure of output may be for an hour or shift or a year. As a matter of fact it is the product of equipment operating efficiency and the job management efficiency. Here it is necessary to mention something about equipment operating efficiency and the job management efficiency. Equipment operating efficiency is determined by the capacity at which it is operating as compared to its rated capacity. Influencing factors are within the equipment-sluggish behaviour of hydraulic systems, etc. Job management efficiency is influenced by external and environment factors,- weather , human skill, etc. their values are only empirical ones. Table 1,2 and 3 give values of them applicable in most of mining conditions. Table 1- Equipment Operating Efficiency Equipment Operating Efficiency Remark 0.90 Good 0.80 Average 0.70 Poor Table 2- Job Management Efficiency Job Management Efficiency Remark 1.00 Good 0.85 Average 0.65 Poor
  • 4. International Journal of Advanced Research in Engineering and Technology (IJARET) 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue Table 3 - Combined Efficiency Equipment operating efficiency Good Average Poor When the shovel is operating as an independent unit such as in stripping operations where the material is cast and not loaded into trucks, the production efficiency is equal to equipment efficiency. But when the shovel is part of a system both e management efficiency are obviously to be considered. 3.4. Overall Efficiency (Oe) It is the product of Utilization Factor on the basis of Scheduled Efficiency Or Oe = Pe*UF SSH It is an overall performance measure and interested. A Manipulation in Utilization factor by recording more operation time or in production efficiency by recording less time cannot alter or inflate the figure in ov 4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A YEAR The month wise details regarding working hours, repair hours, idle hours, availability and utilization of various equipment including shovel, dumpers and dozer have been analysed. The month wise percentage availability and utilization on dumper and dozer have been shown graphically in Fig1, International Journal of Advanced Research in Engineering and Technology (IJARET) 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 17 Combined Efficiency Factors (Production Efficiency Job management efficiency Good Average 0.90 0.77 0.80 0.68 0.70 0.60 When the shovel is operating as an independent unit such as in stripping operations where the material is cast and not loaded into trucks, the production efficiency is equal to equipment efficiency. But when the shovel is part of a system both equipment operating efficiency and job management efficiency are obviously to be considered. It is the product of Utilization Factor on the basis of Scheduled-Shift erall performance measure and is the one in which the top management is actually interested. A Manipulation in Utilization factor by recording more operation time or in production cannot alter or inflate the figure in overall Efficiency 4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A The month wise details regarding working hours, repair hours, idle hours, availability and utilization of various equipment including shovel, dumpers and dozer have been . The month wise percentage availability and utilization on MAH and SSH basis for shovel, e been shown graphically in Fig1, Fig 2, and Fig 3 respectively. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – © IAEME Production Efficiency) Job management efficiency Poor 0.59 0.52 0.45 When the shovel is operating as an independent unit such as in stripping operations where the material is cast and not loaded into trucks, the production efficiency is equal to equipment operating quipment operating efficiency and job Shift –hours and production is the one in which the top management is actually interested. A Manipulation in Utilization factor by recording more operation time or in production erall Efficiency. 4. ANALYSIS OF AVAILABILITY AND UTILIZATION OF EQUIPMENT DURING A The month wise details regarding working hours, repair hours, idle hours, availability and utilization of various equipment including shovel, dumpers and dozer have been collected and and SSH basis for shovel, respectively.
  • 5. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 18 Those values for the whole year have been given in table4
  • 6. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 19 Tabel 4. Availability and utilization of equipment for a year Equipment Shovel Dumpers Dozer Parameter L6 H31 H32 H33 H34 H37 D4 Spoil removal (in hours) 1756.10. 962.10 374.40 1144.70 1371.25 1569.05 - Others (in hours) 244.40 92.25 39.40 111.70 134.10 144.80 1676.76 Working hours 2000.50 1054.35 413.80 1454.40 1505.35 1710.85 1676.67 Idle hours 845.80 1963.45 643.40 1683.35 1731.50 1518.70 934.09 Repair hours 608.45 424.70 2406.0 154.60 261.10 186.65 837.85 Total scheduled hours 3456.0 3442.50 3463.20 3292.35 3497.95 3416.40 3448.70 Availability (%) 82.64 87.39 30.53 95.42 93.78 94.42 76.60 Utilization on MAH basis (%) 70.36 35.03 39.14 44.44 46.53 53.20 63.47 Utilization on SSH basis(%) 58.15 30.61 11.95 42.20 43.64 50.23 48.62 The average values of percentage availability and utilization of shovel, dumper and dozer are given in table5.The CIL Standards (C.M.P.D.I norms for Coal India Limited ) for those values have been given within brackets for comparison purposes. Table 5.Comparison of percentage availability and utilization with C.I.L standards Equipment Availibality Utilization on SSH Basis Shovel 82.64(80) 58.15(58) Dumper 80.31(67) 35.73(50) Dozer 76.60 (70) 48.62(45) Values with brackets indicate C.I.L.norms Table 6 gives the percentage of unscheduled hours, unavilable hours, unutilized hours and utilized hours with regard to calendar hours. Table 6. Percentage Distributions Of Calendar Hours Parameters Shovel Dumper Dozer Unscheduled hours 60.56 60.93 60.64 Unavailable hours 6.940 7.84 9.56 Unutilized hours 9.76 17.22 10.66 Utilized hours 22.84 14.01 19.14 Calendar hours 100.00 100.00 100.00 The percentage distributions of calendar hoursin case of shovel, dumper and dozer have been shown in fig 4, fig 5 and fig 6 respectively.
  • 7. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 20 5. FINDINGS OF THE ANALYSIS The results of the analysis show that the unscheduled hours are vey high since the equipment are scheduled only for two shifts, that too only for six hours in a shift. The availability of the equipment is comparable with that of CIL standards, but there is a wide gap between availability and utilization of equipemnt . The percentage utilization of machinery especially that of dumper is belor normal. Hence the managemetn has to take steps to improve the equipment utilization. 60% 7% 10% 23% Fig 4. Percentage Distribution of Calendar Hours of Shovel Unscheduled Hours Unavailable Hours Unutilized Hours Utilized Hours 61% 8% 17% 14% Fig 5. Percentage Distribution of Calendar Hours of Dumper Unscheduled Hours Unavailable Hours Unutilized Hours Utilized Hours 60% 10% 11% 19% Fig 6. Percentage Distribution of Calendar Hours of Dozer Unscheduled Hours Unavailable Hours Unutilized Hours Utilized Hours
  • 8. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online), Volume 6, Issue 3, March (2015), pp. 14-21 © IAEME 21 6.CONCLUSION Availability and utilisation study is a known method to measure performance of productionequipment in manufacturing industries and adapted for mining industry in this paper. The views expressed in this paper are of the author and not necessarily of the organisation, he belongs to. REFERENCES 1. Sharma S.N., and Surana D.M., 1972, Analysis for Performance Assessment and Performance Control of Dipper Shovels used in Mines, Journal of Mines, Metals & Fuels, August,1972. 2. Singh B.P., 1997, Mine Mechanisation and Safety – A case Study on Ananta OCP of Mahanadi Coalfields Ltd., Journal of Mines, Metals, & Fuels, January,1997. 3. Singh B.P. and Tiwari , 1984, Application of Reliability and Availability to Underground Mine Transport, Journal of Mines, Metals, & Fuels, January,1984. 4. Dr. Anshu bhardwaj, “Financial Leverage and Firm’s Value: A Study of Metal, Metal Products And Mining Sector Firms” International Journal of Management (IJM), Volume 5, Issue 6, 2013, pp. 50 - 56, ISSN Print: 0976-6502, ISSN Online: 0976-6510. 5. G. Sreenivasa Rao, Dr. A. Manjunath and Dr. Mvss Giridhar, “Studies on Impact of Mining On Surface and Groundwater” International Journal of Civil Engineering & Technology (IJCIET), Volume 5, Issue 6, 2014, pp. 125 - 130, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316.