Abstract - The construction team plays an important role
in the construction sector, it costs up to 36% of the total cost
of the construction project, however, the maintenanceofthe
equipment has not received adequate attention and this
contributes to about 40% of the total costoftheconstruction
project. The goal of this research is to ensure that
construction professionals implement and adhere to the
appropriate equipment maintenance strategyasaneffective
aspect of the profitability of the construction project. To
assess the factors, some questionnaireswere preparedusing
this information and distributed among construction
professionals. The purpose of this document is to reduce
downtime, obtain optimal use ofthe equipmentandincrease
production at a minimal cost.
Key Words: Equipment Management, Construction
Industry, Cost Management
1. INTRODUCTION
The selection of construction equipment plays a crucial role
in the actual completion of any civil project. Therefore,
equipment selection and planning are essential for use with
minimal cost. It is the responsibility of the engineer to
instruct a team to complete a task based on the site
conditions. Since a large amountofequipmentisavailableon
the market, it becomes difficult to selectequipmentbasedon
productivity and other responsible factors.
Many of the construction companies are unawareofthe new
construction equipment available on the market. To
complete the project within a set deadline, the use of
equipment becomes a priority. Therefore, teams need to be
well classified to reduce selection times. The aim of this
document is to address the classification, selection, and use
of all construction equipment to facilitate the selection
method and the timely completion of the project.
The cost of the equipment in a project variesfrom10-30%of
the total cost of the project, depending on the degree of
mechanization. The appropriate planning, selection,
acquisition, installation, operation, maintenance and
replacement of equipment policy plays an important role in
managing the equipment for the success of the project.
Traditionally, the equipment purchase process was
completed when the contractor selecteda specific brandand
machine model from a distributor.
Considering the various aspects of the usefulness of a
equipment, the contractor must economically justify
whether to buy or rent the equipment. A good construction
manager must identify these factors and when evaluating
them, decisions can be made
Another factor that can influence real construction wages is
technology. In recent decades, there have been many
technological changes in construction equipment and
materials technology. Construction equipment has become
more powerful, automated, more precise, safer and more
functional, allowing workers to be more productive in
construction activities.
1.1 Requirement of Equipment Management
Cost analysis and the desire to adopt the appropriate
techniques for the situation are the basic factors for success
and, therefore, rational planning, adequate selection and
reasonable deployment ofequipmentconcerningtheoptimal
conditions of use. It is a common fact to find a wide range of
construction machinery on every construction site, which
makes construction work easy, safe and fast.
Cash purchase, loan financing, rental, andleasingarethefour
most common ways to buy construction equipment (CEA).
Having the best results intermsofprofitsfortheconstruction
industry, choosing the best alternative for obtaining
equipment is one of the most important issues.
There is a shortage of skilled workers in the construction
sector. Advancement in construction equipment and
materials automation, alongwithextensiblecomponentsand
estimation and schedule strategies have made up for the
shortage of skilled labor.
1.2 Importance of this Study
The company's goal is to minimize operating, maintenance
and repair costs while achieving a high use of construction
equipment. The main objectives of the study are:
 Offer suggestions for the effective use of the
equipment and its management in the construction
sector.
 In providing a detailed report for the selection of
equipment suitable for the projects.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 01 | Jan 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 186
 Identify the factor that influences the selection and
effective use of the equipment.
 Analyse the various tasks involved and the
difficulties encountered by respondents in
construction projects.
Table -1: Frequency Percentage of Designation of the
respondents
Designate on
of the
respondent to
Freque
ncy
Percent Valid
Percent
Cumulative
Percent
Engineer 7 35.0 35.0 35.0
Contractor 6 30.0 30.0 65.0
Supervisor 5 25.0 25.0 90.0
Equipment t
operator
2 10.0 10.0 100.0
Total 20 100.0 100.0
2. Proper selection of Equipment
 Work size: larger work volumes require greater
capacity or machines of smaller and smaller
capacity.
 Time limits of the activity: the lack of time for, for
example, excavation can force contractors to
increase the size or quantity of equipment for the
activities related to the excavation.
 Availability of the equipment:theproductivityofthe
excavation activities will decrease if the equipment
used to perform them is available but not the most
appropriate.
 Cost of transporting equipment: this cost depends
on the size of the work, the distance oftransportand
the means of transport.
 Type of excavation: The main types of excavation in
construction projects are cutting and / or filling,
massive excavation and excavation for foundation
elements. The most suitable equipment to carry out
one of these activities is not the most suitable to
carry out the other.
 Soil characteristics: the type and conditions of the
soil are important in choosing the most suitable
equipment, since each piece of equipment has
different exits for differentterrains.Furthermore,an
excavation well may have different soils in different
layers.
 Geometric characteristics of the elements to be
excavated: the functional characteristics of the
different types of equipment make these
considerations necessary.
 Spatial limitations: the performance of the
equipment is influencedbythespatiallimitationsfor
the movement of the excavators.
 Drive unit characteristics: the size of an excavator
will depend on the drive units if there is arestriction
on the size and / or number of these units.
 Location of the unloading areas: the distance
between the construction site and the unloading
areas could be relevant not only for selecting the
type and number of conveyors, but also the type of
excavators.
 Climate and temperature: rain, snow and harsh
temperature conditions affect the productivity of
work and equipment in the workplace.
3. METHODOLOGY
The general methodology of this study is largely based on
the survey questionnaire that will be collected by local
building contractors of different sizes by post or by staff
meeting. A thorough
The bibliographic survey was initially conducted to identify
the management of risk-free equipment.
Table -2: Type of Machines
Types of Machine
used
Mean SD F
value
P
value
Excavator 24.43 2.573
13.012 .001*
Excavator cum
loader
17.50 1.414
Tractor loader 17.00 3.000
Trenching
machine
23.50 4.950
Total 20.45 4.174
Chart -1: Percentage of Respondents
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 01 | Jan 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 187
From the above table it could be inferred that Engineer
constitute 35% of the total respondents followed by
contractor of 30%, supervisor constituting 25% and
Equipment operator to 10% of the total respondents
Table -3: Frequency percentage of type of equipment used
Location of
the project Frequency Percent Valid
Percent
Cumulativ
e Percent
Rural 5 25.0 25.0 25.0
Urban 6 30.0 30.0 55.0
Semi urban 8 40.0 40.0 95.0
Hilly area 1 5.0 5.0 100.0
Total 20 100.0 100.0
As for the construction site it could be he noted that most of
the buildings are built in semi-urban areas that make up
40% of respondents, followed by buildings tested in 30%
urban areas and rural areas that make up 25% of total
respondents.
Table -4: Analysis of variance between cost factor and
type of machine used
Experience of
the respondents
Frequ
ency
Percent Valid
Percent
Cumulativ
e Percent
Below 5 years 2 10.0 10.0 10.0
5-10 years 9 45.0 45.0 55.0
10-15 years 6 30.0 30.0 85.0
Above 15 years 3 15.0 15.0 100.0
Total 20 100.0 100.0
Analysis of the variance between cost factor and type of
machine used in construction Industry. From the previous
table it can be deduced that the value of p is less than 0.05
therefore, the null hypothesis is rejected with a significance
level of 5%. Therefore, we can conclude that there is a
significant difference between the cost factor and the types
of machines used. These are the types of machines used in
the construction sector that have a great impact on the
aspects of determining costs. Apart from this, by comparing
the average of the various types of machines used with the
cost factor, the excavator influences more the cost factors
with the highest average score of 24.43 and the variablethat
least influences the cost factor is the tractor loader with
17.00 as an average score.
The equipment can be available with companies or it can
also be outsourced. Therefore, to outsource the equipment,
we need to analyze the supplier for any information he
provides. As if we were hiring a computer from a provider
and if it breaks down on a site, the provider must have
provisions for another backup equipment.Toavoiddelaysin
an activity. The equipment is alsoavailableina company,but
when the situation arises where we need the same machine
for more than one location, we need a subcontracting
agency. A company must have a good database of these
suppliers. Depending on factors such as
Time period for equipment to rent, rental cost, original cost,
manufacturer'sname,teamcapacity,spacelimits,equipment
productivity, maintenance cost, equipment labor cost, the
company / contractor can decide whether to buy the
equipment or rent it or rent it.
3. CONCLUSION
The study reveals that the types of machines used in the
construction sector have a significant influence on the
construction sector. Since the cost of equipment plays an
important role, the construction industry based on the size
of the projects (i.e. small, medium or large projects) usesthe
types of equipment according to their needs. However,
optimism among construction machinery distributors
remains high. The growth of the rental fleet is expected to
play an increasingly important role in the business model of
distributors who cannot afford to own equipment.
REFERENCES
[1] Construction Equipment Management (2006),
“Planning and Selection of Equipment”, Centre for
Distance Education, NICMAR, Pune.
[2] Arslan, M.C., Catay, B., Budak, E., 2004. A decision
support system for machine tool selection. J. Manuf.
Technol. Manage. 15 (1), 101–109
[3] https://www.teletracnavman.com/resources/resource-
library/faqs/what-is-equipment-management
[4] https://www.who.int/ihr/training/laboratory_quality/
3_b_content_equipment.pdf?ua=1

More Related Content

What's hot

technical analysis
technical analysistechnical analysis
technical analysisAshish Singh
 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectioneSAT Journals
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET Journal
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET Journal
 
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...The Comparison of Statistical Quality Control Results on Reinforced Concrete ...
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...ijtsrd
 
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...SuparJon
 
Introduction of Industrial Engineering
Introduction of Industrial EngineeringIntroduction of Industrial Engineering
Introduction of Industrial Engineeringvijay kumar
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyLiu PeiLing
 
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...IAEME Publication
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET Journal
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment ManagementAhmed Ezz-eldin
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 

What's hot (19)

Ppc 2mark answer
Ppc 2mark answerPpc 2mark answer
Ppc 2mark answer
 
technical analysis
technical analysistechnical analysis
technical analysis
 
Vision of construction mechanizer
Vision of construction mechanizerVision of construction mechanizer
Vision of construction mechanizer
 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspection
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
 
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...The Comparison of Statistical Quality Control Results on Reinforced Concrete ...
The Comparison of Statistical Quality Control Results on Reinforced Concrete ...
 
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...
EVALUATION OF LAYOUT DESIGN, OPERATION, & MAINTENANCE OF MULTI SYSTEM AUTOMAT...
 
Introduction of Industrial Engineering
Introduction of Industrial EngineeringIntroduction of Industrial Engineering
Introduction of Industrial Engineering
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technology
 
Module 1
Module 1Module 1
Module 1
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...
A MODEL STUDY ON COMPARATIVE COST ANALYSIS OF EQUIPMENT MANAGEMENT IN CONSTRU...
 
engineering
engineering engineering
engineering
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 

Similar to IRJET- Systematic Construction Equipment Handling in Construction Industry for Cost Efficiency & Proper Management

Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectIRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...IRJET Journal
 
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...IRJET Journal
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptxmegha desai
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxmegha desai
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectIRJET Journal
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTOPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTIRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...IRJET Journal
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...IRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic ArmIRJET Journal
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET Journal
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineIRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET Journal
 

Similar to IRJET- Systematic Construction Equipment Handling in Construction Industry for Cost Efficiency & Proper Management (20)

Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...
IRJET- Analysis of Constructions Productivity based on Progress Payment Certi...
 
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptx
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTOPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling Machine
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

IRJET- Systematic Construction Equipment Handling in Construction Industry for Cost Efficiency & Proper Management

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 185 Systematic Construction Equipment Handling in Construction Industry for Cost Efficiency & Proper Management Kumar Hemant Raul1 1M.Tech, MITCOM, MIT Art, Design & Technology University, Pune, Maharashtra ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - The construction team plays an important role in the construction sector, it costs up to 36% of the total cost of the construction project, however, the maintenanceofthe equipment has not received adequate attention and this contributes to about 40% of the total costoftheconstruction project. The goal of this research is to ensure that construction professionals implement and adhere to the appropriate equipment maintenance strategyasaneffective aspect of the profitability of the construction project. To assess the factors, some questionnaireswere preparedusing this information and distributed among construction professionals. The purpose of this document is to reduce downtime, obtain optimal use ofthe equipmentandincrease production at a minimal cost. Key Words: Equipment Management, Construction Industry, Cost Management 1. INTRODUCTION The selection of construction equipment plays a crucial role in the actual completion of any civil project. Therefore, equipment selection and planning are essential for use with minimal cost. It is the responsibility of the engineer to instruct a team to complete a task based on the site conditions. Since a large amountofequipmentisavailableon the market, it becomes difficult to selectequipmentbasedon productivity and other responsible factors. Many of the construction companies are unawareofthe new construction equipment available on the market. To complete the project within a set deadline, the use of equipment becomes a priority. Therefore, teams need to be well classified to reduce selection times. The aim of this document is to address the classification, selection, and use of all construction equipment to facilitate the selection method and the timely completion of the project. The cost of the equipment in a project variesfrom10-30%of the total cost of the project, depending on the degree of mechanization. The appropriate planning, selection, acquisition, installation, operation, maintenance and replacement of equipment policy plays an important role in managing the equipment for the success of the project. Traditionally, the equipment purchase process was completed when the contractor selecteda specific brandand machine model from a distributor. Considering the various aspects of the usefulness of a equipment, the contractor must economically justify whether to buy or rent the equipment. A good construction manager must identify these factors and when evaluating them, decisions can be made Another factor that can influence real construction wages is technology. In recent decades, there have been many technological changes in construction equipment and materials technology. Construction equipment has become more powerful, automated, more precise, safer and more functional, allowing workers to be more productive in construction activities. 1.1 Requirement of Equipment Management Cost analysis and the desire to adopt the appropriate techniques for the situation are the basic factors for success and, therefore, rational planning, adequate selection and reasonable deployment ofequipmentconcerningtheoptimal conditions of use. It is a common fact to find a wide range of construction machinery on every construction site, which makes construction work easy, safe and fast. Cash purchase, loan financing, rental, andleasingarethefour most common ways to buy construction equipment (CEA). Having the best results intermsofprofitsfortheconstruction industry, choosing the best alternative for obtaining equipment is one of the most important issues. There is a shortage of skilled workers in the construction sector. Advancement in construction equipment and materials automation, alongwithextensiblecomponentsand estimation and schedule strategies have made up for the shortage of skilled labor. 1.2 Importance of this Study The company's goal is to minimize operating, maintenance and repair costs while achieving a high use of construction equipment. The main objectives of the study are:  Offer suggestions for the effective use of the equipment and its management in the construction sector.  In providing a detailed report for the selection of equipment suitable for the projects.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 186  Identify the factor that influences the selection and effective use of the equipment.  Analyse the various tasks involved and the difficulties encountered by respondents in construction projects. Table -1: Frequency Percentage of Designation of the respondents Designate on of the respondent to Freque ncy Percent Valid Percent Cumulative Percent Engineer 7 35.0 35.0 35.0 Contractor 6 30.0 30.0 65.0 Supervisor 5 25.0 25.0 90.0 Equipment t operator 2 10.0 10.0 100.0 Total 20 100.0 100.0 2. Proper selection of Equipment  Work size: larger work volumes require greater capacity or machines of smaller and smaller capacity.  Time limits of the activity: the lack of time for, for example, excavation can force contractors to increase the size or quantity of equipment for the activities related to the excavation.  Availability of the equipment:theproductivityofthe excavation activities will decrease if the equipment used to perform them is available but not the most appropriate.  Cost of transporting equipment: this cost depends on the size of the work, the distance oftransportand the means of transport.  Type of excavation: The main types of excavation in construction projects are cutting and / or filling, massive excavation and excavation for foundation elements. The most suitable equipment to carry out one of these activities is not the most suitable to carry out the other.  Soil characteristics: the type and conditions of the soil are important in choosing the most suitable equipment, since each piece of equipment has different exits for differentterrains.Furthermore,an excavation well may have different soils in different layers.  Geometric characteristics of the elements to be excavated: the functional characteristics of the different types of equipment make these considerations necessary.  Spatial limitations: the performance of the equipment is influencedbythespatiallimitationsfor the movement of the excavators.  Drive unit characteristics: the size of an excavator will depend on the drive units if there is arestriction on the size and / or number of these units.  Location of the unloading areas: the distance between the construction site and the unloading areas could be relevant not only for selecting the type and number of conveyors, but also the type of excavators.  Climate and temperature: rain, snow and harsh temperature conditions affect the productivity of work and equipment in the workplace. 3. METHODOLOGY The general methodology of this study is largely based on the survey questionnaire that will be collected by local building contractors of different sizes by post or by staff meeting. A thorough The bibliographic survey was initially conducted to identify the management of risk-free equipment. Table -2: Type of Machines Types of Machine used Mean SD F value P value Excavator 24.43 2.573 13.012 .001* Excavator cum loader 17.50 1.414 Tractor loader 17.00 3.000 Trenching machine 23.50 4.950 Total 20.45 4.174 Chart -1: Percentage of Respondents
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 187 From the above table it could be inferred that Engineer constitute 35% of the total respondents followed by contractor of 30%, supervisor constituting 25% and Equipment operator to 10% of the total respondents Table -3: Frequency percentage of type of equipment used Location of the project Frequency Percent Valid Percent Cumulativ e Percent Rural 5 25.0 25.0 25.0 Urban 6 30.0 30.0 55.0 Semi urban 8 40.0 40.0 95.0 Hilly area 1 5.0 5.0 100.0 Total 20 100.0 100.0 As for the construction site it could be he noted that most of the buildings are built in semi-urban areas that make up 40% of respondents, followed by buildings tested in 30% urban areas and rural areas that make up 25% of total respondents. Table -4: Analysis of variance between cost factor and type of machine used Experience of the respondents Frequ ency Percent Valid Percent Cumulativ e Percent Below 5 years 2 10.0 10.0 10.0 5-10 years 9 45.0 45.0 55.0 10-15 years 6 30.0 30.0 85.0 Above 15 years 3 15.0 15.0 100.0 Total 20 100.0 100.0 Analysis of the variance between cost factor and type of machine used in construction Industry. From the previous table it can be deduced that the value of p is less than 0.05 therefore, the null hypothesis is rejected with a significance level of 5%. Therefore, we can conclude that there is a significant difference between the cost factor and the types of machines used. These are the types of machines used in the construction sector that have a great impact on the aspects of determining costs. Apart from this, by comparing the average of the various types of machines used with the cost factor, the excavator influences more the cost factors with the highest average score of 24.43 and the variablethat least influences the cost factor is the tractor loader with 17.00 as an average score. The equipment can be available with companies or it can also be outsourced. Therefore, to outsource the equipment, we need to analyze the supplier for any information he provides. As if we were hiring a computer from a provider and if it breaks down on a site, the provider must have provisions for another backup equipment.Toavoiddelaysin an activity. The equipment is alsoavailableina company,but when the situation arises where we need the same machine for more than one location, we need a subcontracting agency. A company must have a good database of these suppliers. Depending on factors such as Time period for equipment to rent, rental cost, original cost, manufacturer'sname,teamcapacity,spacelimits,equipment productivity, maintenance cost, equipment labor cost, the company / contractor can decide whether to buy the equipment or rent it or rent it. 3. CONCLUSION The study reveals that the types of machines used in the construction sector have a significant influence on the construction sector. Since the cost of equipment plays an important role, the construction industry based on the size of the projects (i.e. small, medium or large projects) usesthe types of equipment according to their needs. However, optimism among construction machinery distributors remains high. The growth of the rental fleet is expected to play an increasingly important role in the business model of distributors who cannot afford to own equipment. REFERENCES [1] Construction Equipment Management (2006), “Planning and Selection of Equipment”, Centre for Distance Education, NICMAR, Pune. [2] Arslan, M.C., Catay, B., Budak, E., 2004. A decision support system for machine tool selection. J. Manuf. Technol. Manage. 15 (1), 101–109 [3] https://www.teletracnavman.com/resources/resource- library/faqs/what-is-equipment-management [4] https://www.who.int/ihr/training/laboratory_quality/ 3_b_content_equipment.pdf?ua=1