SlideShare a Scribd company logo
1 of 6
Download to read offline
Journal for Research| Volume 02 | Issue 06 | August 2016
ISSN: 2395-7549
All rights reserved by www.journalforresearch.org 33
Implementation of Lean Manufacturing Tools for
Improving Productivity: A Case Study
Brijbhushan Onkar Singh Bhatia
PG Student Associate Professor
Department of Mechanical Engineering Department of Mechanical Engineering
Green Hills Engineering College Green Hills Engineering College
Vikas Ucharia
Assistant Professor
Department of Mechanical Engineering
Green Hills Engineering College
Abstract
Present research focuses on the quality improvement at Himachal Pradesh based manufacturing unit a precision machining
company for two and three wheeler components. The objective of present research focuses on current Quality Management
System (QMS) implemented and to identify the current quality problems that the company faces and to study. Present research is
divided into two parts Ethnographic and Qualitative research design. Recommendations and solutions to the problem faced will
be suggested to the heads and supervisors, to improve the current quality system, as well as increase efficiency and reduce non
conformities. This research only focuses on problem faced in the production section of the company. In the ethnographic part
study is focused on plunging of workers and qualitative part research is focused on various causes of rejection. Lean
manufacturing tools is considered as the pilot project to solve the problem. Various tools were used such as Multiple activity
charts, Pareto chart, PDCA cycles, cause and effect diagram and control chart. With the help of lean tools, plunging of workers
come to zero, better working environment is provided to workers, rejection has reduced o 12000ppm from 29000ppm and
reduced the loss of organization from 4.02% to 2.79%. Retention of worker saves the training cost. Tool life also increased.
Keywords: Ethnographic, Lean Tools, Pareto, PDCA, Qualitative Research
_______________________________________________________________________________________________________
I. INTRODUCTION
Dynamic and technological world requires organization to be competitive and pioneer with its products or services. Companies
are forced to rethink their manufacturing and management approaches to lower costs, waste reduction, improve productivity and
at the same time increase quality. It is true that the number of tools, techniques and technologies are available to improve
operational performance is growing fast and 5s is also among the pilot tools of industrial engineering to remain competitive in
business. 5s requires less effort, capital, and time to make quality products with less number of defects. It is a lean system to
manage and manufacture products. Fields et al. recommended that 5S training be imparted to the management, supervisors, and
workers and a change management team be formed which can help to bring the necessary change.
The 5S system is a lean system used for organizing and managing manufacturing operations so that they require less human
effort, space, capital, and time to make products with fewer defects.
All these benefits result in greater productivity, better quality, less cost, workplace safety, and high morale. 5Ss lays the
foundation for the company’s overall lean production system, and lack of a robust 5S system will make other lean tools
ineffective. Implementing 5Ss alone may not bring the desired results, unless it is followed by educating the target work group
on the corporate objective and soliciting its support and participation.
Worker teams who participate in a Lean Manufacturing project are trained in the use of statistical and problem solving tools as
well as project management techniques to define, measure, analyze, and make improvement in the operation of organization by
eliminating defects and variability in its processes. The main concept of lean manufacturing is that defects in a given process can
be measured and quantified.
Table – 1
Percentage Rejection
Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study
(J4R/ Volume 02 / Issue 06 / 007)
All rights reserved by www.journalforresearch.org 34
Aim is to investigate the possible causes of rejection and non-conformities. On the basis of various graphs of trends study is
divided into two parts
 Ethnographic Research is focused on the worker class. The aim of ethnography is to understand, another way of life from
the native point of view” (Spradley, 1980, p. 3). The most important component of ethnography concerns the meaning of
actions and events of the people we are trying to understand. This ethnographic study was conducted over a period of six
months. It helps in describing how the Indian Sub-Continent group works, and it explores their beliefs, behaviors, and
cultural norms.
 Qualitative research is a research design utilized and concentrated on rejection of gear blank of kick Idler of two wheelers
(Bajaj). After forging, CNC turning is the pilot operation using CCGT insert (tool tip) with FANUC control CNC machine.
Measurement is done with the help of special design gauges, plug gauge and air pressure plug gauge (APG). Tool life is
also decided by occurrence of rejection or change after 2200 parts, which is actually for meant for 1500 parts. Air pressure
is set between the ranges of 30-50 bars without any fixed value.
Table – 2
Characteristics of UP and Bihar people
Fig. 1: Man- Man Chart Fig. 2: Demming Cycle/PDCA Cycle
Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study
(J4R/ Volume 02 / Issue 06 / 007)
All rights reserved by www.journalforresearch.org 35
Fig. 3: Cause & Effect Diagram Fig. 4: Pareto chart for rejection
The fishbone diagram is a tool for analyzing the business process and its effectiveness, which shows the possible causes of a
specific event or a problem as shown in Fig. 3.
Fig. 4 shows the Pareto analysis for the various parameters of gear blank idler, which were responsible for the rejections.
Various parameters were along x-axis and no. of rejections is along y-axis. Rejection for outer diameter is maximum, which is
66% of total.
For presenting these simple statistics related to process median 160 specimen of said component are measured for outer
diameter. 20 pieces are measured in the interval of one hour in a single shift.
Table – 3
Measurement System Analysis for Outer Diameter
Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study
(J4R/ Volume 02 / Issue 06 / 007)
All rights reserved by www.journalforresearch.org 36
Fig. 5: Rejection trend for OD
Fig. 6: X-bar chart for OD
Fig. 7: Range chart for OD
Results of control charts for OD are same, as shown in Fig. 6 and Fig. 7. This concludes that to achieve repeatability, training
and sustainability are must.
Daily Availability Calculation
Availability takes into account down time loss.
Firstly, daily average availability has been calculated for the existing machine in the floor.
Actual capacity time for 8 hours shift = 480 min.
Total downtime (sum of loss time) = 110 min.
Planned downtime = Total downtime – (breakdown time + set up)
= 110 - 60 = 50 min.
Planned run time = 420 min.
Operating time = Planned run time – Planned downtime
= 420 - 160 = 260 min.
Therefore, Availability = Operating time *100%
Planned run time
= 260 *100% = 61.90%
420
Performance Rate
The performance only concerns the gross operating time. A property of the gross operating time is that the speed exceeds zero at
any time. There are no down time losses in the gross operational time. The performance factor is a measure for the speed losses.
Performance Rate = Planned run time – Planned Down time *100%
Planned run time
= 420-50 *100% = 88.09%
420
Quality Rate
During the net operational time, no down time or speed losses occur. It is not certain that the total produced output is conform
quality specifications. To gain insight into this, the quality factor is defined:
Quality Rate = Total output –Average reject *100%
Total output
= Good pieces *100%
Total pieces
Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study
(J4R/ Volume 02 / Issue 06 / 007)
All rights reserved by www.journalforresearch.org 37
=971000 *100% = 97.1%
1000000
Rate of expected OEE = availability (100 %) * performance rate * quality rate
= 61.90 * .88 * .971 = 52.89
When compared with world class standards, the values of OEE are far below it.
Operator Issues
All operators’s related issues were taken to Worker Union and after their consent it was decided to take strict action against the
negligence.
For new operator coming in area, training sessions & supervision by skilled operators was made compulsory.
Warning letters were issued for negligence from operators.
New & updated work instructions were put on machine boards.
Head were requested to provide tea breaks, sanitary facilities, water facilities and fans for better efficiency.
Table - 4
Total major cost for manufacturing
Total Major cost for 36000 parts = Rs.1, 38,600
Minor Cost: - It comprises of Holding Cost, Carrying Cost, Setup Cost, Material Cost, Light Cost, etc.
Minor Cost =Total processing cost – major cost = 4 - 3.85 = 15paisa
Total processed cost of 35000 parts =35000×4 = Rs. 1, 40,000
%age loss to company = (140000/347533) × 100 = 4.02%
Table – 5
Total major cost after new practices (lean tools)
Total Major cost for 12000 parts = Rs 1,39,920
Total processed cost of 12000 parts =12000×12 = Rs 1,44,000
%age loss to company = (1,44,000/1,16,60,000) × 100 = 1.23%
%age reduction in manufacturing cost = %age loss before lean tools - %loss after lean tools =4.02 - 1.23 =2.79 %
Reduction in manufacturing cost = 3,47,533 – 1,39,920 =Rs.2,07,613
Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study
(J4R/ Volume 02 / Issue 06 / 007)
All rights reserved by www.journalforresearch.org 38
ACKNOWLEDGMENT
I pay my sincere thanks to my guide Mr. Onkar Singh Bhatia, for helping and providing needful guidance in my research
work. I express my thanks to my Institution Green Hills Engineering College, Solan, HP for providing me with a good
motivation, environment and facilities like Internet, books, computers and all that as my source to complete this research work.
REFERENCES
[1] Agrahari, R.S. Dangle, P.A. and Chandratre, K.V, “Implementation of 5S methodology in The Small Scale Industry: A Case Study”, International Journal
of Scientific & Technology Research, Vol. 4, Iss.4, 2015.
[2] Aomar, R.A, “Analysis of Lean Construction practices at Abu Dhabi construction industry”, Lean Construction Journal, pp. 105-121, 2012.
[3] Arunagiri, P. and Gnanavelbabu, A, “Identification of High Impact Lean Production Tools in Automobile Industries Using Weighted Average Method”,
Elsevier, 2014.
[4] Baghban, A.A. Younespour, S. Jambarsang, S. Yousefi, M. Zayeri, F. and Jalilian, F.A, “How to test normality distribution for a variable: a real example
and a simulation study”, Journal of Paramedical Science, Vol.4, No.1, 2013.
[5] Chakrabortty, R.K. Biswas, T.K. and Ahmed, I, “Reducing process variability by using DMAIC Model: A Case study in BANGLADESH”, International
Journal for Quality Research 7(1) 127-140, 2013.
[6] Chandra, P.V, “Approach to Lean Leadership through Creating a Lean Culture”, International Journal of Engineering Science and Innovative Technology,
Vol. 2, Iss.4, 2013.
[7] Chitre, A. R, “Implementing 5S Methodology for Lab Management in the Quality Assurance Lab of a Flexible Packaging Converter”, American
Psychological Association, 6th edition, 2010.
[8] Chowdury, M. L. R. and Hoque, M.A, “Evaluation of Total Productive Maintenance Implementation in a Selected Semi-Automated Manufacturing
Industry”, International Journal of Modern Engineering Research, Vol. 4, Iss.8, 2014.
[9] Deshpande, S.P. Damle, V.V. Patel, M. L. And Kholamkar, A. B, “Implementation of 5s Technique in a Manufacturing Organization: A Case Study”,
International Journal of Research in Engineering and Technology, Vol. 04, Iss.01, 2015.
[10] Dighe, S.B. and Kakirde, A, “Lean Manufacturing Implementation Using Value Stream Mapping: A Case Study of Pumps Manufacturing Company”,
International Journal of Science and Research, Vol. 3 Iss.6, 2014.
[11] Falkowski, P. And Kitowski, P, “The 5S Methodology as a Tool for Improving Organization of Production”, PhD Interdisciplinary Journal, vol.4, pp.127-
133, 2013.
[12] Ghodrati, A. and Zulkifli, N, “The Impact of 5S Implementation on Industrial Organizations’ Performance” International Journal of Business and
Management Invention, Vol.2, Iss.3, pp.43-49, 2013.
[13] Gupta, N, “A Study of Employee Retention with Special Reference to Indian Tourism Industry”, European Academic Research, Vol. I, Iss.6, 2013.
[14] Hassan, M.K , “Applying Lean Six Sigma for Waste Reduction in a Manufacturing Environment”, American Journal of Industrial Engineering, Vol. 1, No.
2, pp. 28-35, 2013.
[15] Hossain, M, “A Study to Reduce the Lead Time of a Bakery Factory by Using Lean Tools: A Case Study”, International Journal of Scientific and Research
Publications, Vol. 5, Iss.11, 2015.
[16] Jagtap, N.S. Ugale, V.D. Kadam, M.M. Kamble, S.S. and Salve, A.V , “Setup Time Reduction of Machine Using SMED Techniques and Lean
Manufacturing”, Vol. 1, Iss.2, 2015.
[17] Joshi, R.R. Patil, R. Naik, G.R. and Kharade, M.V. “Through-Put Time Reduction by Lean Manufacturing”, IOSR Journal of Mechanical and Civil
Engineering, ISSN: 2278-1684, pp. 40-45.
[18] Juhari, N. H. B. Abidin, N. and Omar, M. W, “Factors influencing employees’ motivation in implementing 5s system”, Elixir International Journal, Vol. 39,
pp 4836- 4847, 2011.
[19] Kariuki, B.M, “Role of Lean Manufacturing on Organization Competitiveness”, Vol.3, No.10, 2013.
[20] Koripadu, M. and Subbaiah, K.V , “Problem Solving Management Using Six Sigma Tools & Techniques, International Journal of Scientific & Technology
Research, Vol. 3, Iss.2, 2014.
[21] Kovacs, G , “Productivity improvement by Lean Manufacturing Philosophy”, Vol. 6.No. 1, pp. 9-16, 2012.
[22] Lingareddy, H. Reddy, G.S. and Jagadeshwar, K, “5s as a Tool and Strategy for Improvising the Work Place”, International Journal of Advanced
Engineering Technology,Vol. 4, Iss.2, pp 28-30, 2013.
[23] Mahale, R. and Gaitonde, V.N, “Implementing the concept of paint before assembly to the typical assembly line”, International Journal of Innovative
Research in Advanced Engineering, Vol. 1 Iss.9, 2014.
[24] Mayatra, M. Chauhan, N.D. and Trivedi, P. “A literature review on implementation of Lean Manufacturing Techniques”, International Journal of Advance
Research, Ideas and Innovations in Technology, Vol. 1, Iss.4.
[25] Michalska, J. and Szewieczek, D , “The 5S methodology as a tool for improving the organization”, Journal of Achievements in Materials and
Manufacturing Engineering, Vol. 24, Iss.2, Pp. 211-214,2007.

More Related Content

What's hot

Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
work study impact on productivity
work study impact on productivity work study impact on productivity
work study impact on productivity Mohammad Younus
 
project-presentation
project-presentationproject-presentation
project-presentationronybste
 
Artistic apparel audit presentation ...
Artistic apparel audit presentation ...Artistic apparel audit presentation ...
Artistic apparel audit presentation ...Üzâîr Âhmêd
 
Application of Industrial Engineering on garments industry
Application of Industrial Engineering on garments industryApplication of Industrial Engineering on garments industry
Application of Industrial Engineering on garments industryMH RONY
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
J0371055062
J0371055062J0371055062
J0371055062theijes
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel productionNiloy Rahman
 
First Step In Increasing Productivity: Work Sampling
First Step In Increasing Productivity: Work SamplingFirst Step In Increasing Productivity: Work Sampling
First Step In Increasing Productivity: Work Samplingjournal ijrtem
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYSharif Mrh
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &eSAT Publishing House
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...ijtsrd
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 

What's hot (20)

Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
work study impact on productivity
work study impact on productivity work study impact on productivity
work study impact on productivity
 
project-presentation
project-presentationproject-presentation
project-presentation
 
Artistic apparel audit presentation ...
Artistic apparel audit presentation ...Artistic apparel audit presentation ...
Artistic apparel audit presentation ...
 
Application of Industrial Engineering on garments industry
Application of Industrial Engineering on garments industryApplication of Industrial Engineering on garments industry
Application of Industrial Engineering on garments industry
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
J0371055062
J0371055062J0371055062
J0371055062
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
 
Work study
Work studyWork study
Work study
 
First Step In Increasing Productivity: Work Sampling
First Step In Increasing Productivity: Work SamplingFirst Step In Increasing Productivity: Work Sampling
First Step In Increasing Productivity: Work Sampling
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
Methods Enigeering
Methods EnigeeringMethods Enigeering
Methods Enigeering
 
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 

Viewers also liked

DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...Journal For Research
 
La paz-destino-turistico
La paz-destino-turisticoLa paz-destino-turistico
La paz-destino-turisticoGalo Saravia
 
Reviews - The Ultimate Assist
Reviews - The Ultimate AssistReviews - The Ultimate Assist
Reviews - The Ultimate AssistAaron Weiche
 
Visual content strategy infosnaps 2.0
Visual content strategy infosnaps 2.0Visual content strategy infosnaps 2.0
Visual content strategy infosnaps 2.0High Five Media
 
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACH
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACHGRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACH
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACHJournal For Research
 
Planeación y organización de eventos deportivos
Planeación y organización de eventos deportivosPlaneación y organización de eventos deportivos
Planeación y organización de eventos deportivosEFsanjose17
 
Palliative care:Pain Management Reflection Assignment
Palliative care:Pain Management Reflection AssignmentPalliative care:Pain Management Reflection Assignment
Palliative care:Pain Management Reflection AssignmentMurray Tracey
 
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTING
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTINGA WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTING
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTINGJournal For Research
 
Frecuencia cardiaca y pulso
Frecuencia cardiaca y pulsoFrecuencia cardiaca y pulso
Frecuencia cardiaca y pulsoEFsanjose17
 
SMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOTSMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOTJournal For Research
 
HSA Foundation Overview
HSA Foundation OverviewHSA Foundation Overview
HSA Foundation OverviewHSA Foundation
 
OBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEYOBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEYJournal For Research
 
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...Journal For Research
 
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...Journal For Research
 
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...Journal For Research
 
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...Journal For Research
 
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...Journal For Research
 
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...Journal For Research
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYJournal For Research
 

Viewers also liked (20)

DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
 
La paz-destino-turistico
La paz-destino-turisticoLa paz-destino-turistico
La paz-destino-turistico
 
Reviews - The Ultimate Assist
Reviews - The Ultimate AssistReviews - The Ultimate Assist
Reviews - The Ultimate Assist
 
Turismo Rural en Europa
Turismo Rural en EuropaTurismo Rural en Europa
Turismo Rural en Europa
 
Visual content strategy infosnaps 2.0
Visual content strategy infosnaps 2.0Visual content strategy infosnaps 2.0
Visual content strategy infosnaps 2.0
 
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACH
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACHGRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACH
GRAY SCALE IMAGE SEGMENTATION USING OTSU THRESHOLDING OPTIMAL APPROACH
 
Planeación y organización de eventos deportivos
Planeación y organización de eventos deportivosPlaneación y organización de eventos deportivos
Planeación y organización de eventos deportivos
 
Palliative care:Pain Management Reflection Assignment
Palliative care:Pain Management Reflection AssignmentPalliative care:Pain Management Reflection Assignment
Palliative care:Pain Management Reflection Assignment
 
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTING
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTINGA WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTING
A WHITE BOX TESTING TECHNIQUE IN SOFTWARE TESTING : BASIS PATH TESTING
 
Frecuencia cardiaca y pulso
Frecuencia cardiaca y pulsoFrecuencia cardiaca y pulso
Frecuencia cardiaca y pulso
 
SMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOTSMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOT
 
HSA Foundation Overview
HSA Foundation OverviewHSA Foundation Overview
HSA Foundation Overview
 
OBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEYOBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEY
 
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...
PAPER ON WELDABILITY OF H30 ALUMINIUM WITH BS970 MILD STEEL USING FRICTION WE...
 
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
 
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...
REMOVAL OF DISSOLVED SOLIDS IN WASTE WATER USING ACTIVATED CARBON FROM COCONU...
 
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...
SECURITY IMPLEMENTATION IN MEDIA STREAMING APPLICATIONS USING OPEN NETWORK AD...
 
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...
CORRELATION STUDIES ON PHYSICO-CHEMICAL PARAMETER AND PHYTOPLANKTON IN FRESH ...
 
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...
AN APPROACH TO DETECT STUBBLE BURNED AREAS IN PUNJAB BY DIGITALLY ANALYZING S...
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
 

Similar to IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE STUDY

Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyIRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
A038301010
A038301010A038301010
A038301010theijes
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & OREIRJET Journal
 
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...Angela Williams
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing CompanyIRJET Journal
 
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...IRJET Journal
 
Application of Taguchi Parametric Technique for the Decrease in Productivity...
Application of Taguchi Parametric Technique for the Decrease in  Productivity...Application of Taguchi Parametric Technique for the Decrease in  Productivity...
Application of Taguchi Parametric Technique for the Decrease in Productivity...IJMER
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET Journal
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...IRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 

Similar to IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE STUDY (20)

Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
I012536474
I012536474I012536474
I012536474
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
I04402058062
I04402058062I04402058062
I04402058062
 
A038301010
A038301010A038301010
A038301010
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
 
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
 
H012535263
H012535263H012535263
H012535263
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
Application of Quality Tools in Manufacturing Industries in simple ways: A Ca...
 
Application of Taguchi Parametric Technique for the Decrease in Productivity...
Application of Taguchi Parametric Technique for the Decrease in  Productivity...Application of Taguchi Parametric Technique for the Decrease in  Productivity...
Application of Taguchi Parametric Technique for the Decrease in Productivity...
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
13
1313
13
 

More from Journal For Research

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Journal For Research
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Journal For Research
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Journal For Research
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016Journal For Research
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...Journal For Research
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015Journal For Research
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014Journal For Research
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...Journal For Research
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...Journal For Research
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012Journal For Research
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...Journal For Research
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009Journal For Research
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008Journal For Research
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002Journal For Research
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001Journal For Research
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021Journal For Research
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...Journal For Research
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023Journal For Research
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024Journal For Research
 

More from Journal For Research (20)

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
 
LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
 

Recently uploaded

AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 

Recently uploaded (20)

AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 

IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE STUDY

  • 1. Journal for Research| Volume 02 | Issue 06 | August 2016 ISSN: 2395-7549 All rights reserved by www.journalforresearch.org 33 Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study Brijbhushan Onkar Singh Bhatia PG Student Associate Professor Department of Mechanical Engineering Department of Mechanical Engineering Green Hills Engineering College Green Hills Engineering College Vikas Ucharia Assistant Professor Department of Mechanical Engineering Green Hills Engineering College Abstract Present research focuses on the quality improvement at Himachal Pradesh based manufacturing unit a precision machining company for two and three wheeler components. The objective of present research focuses on current Quality Management System (QMS) implemented and to identify the current quality problems that the company faces and to study. Present research is divided into two parts Ethnographic and Qualitative research design. Recommendations and solutions to the problem faced will be suggested to the heads and supervisors, to improve the current quality system, as well as increase efficiency and reduce non conformities. This research only focuses on problem faced in the production section of the company. In the ethnographic part study is focused on plunging of workers and qualitative part research is focused on various causes of rejection. Lean manufacturing tools is considered as the pilot project to solve the problem. Various tools were used such as Multiple activity charts, Pareto chart, PDCA cycles, cause and effect diagram and control chart. With the help of lean tools, plunging of workers come to zero, better working environment is provided to workers, rejection has reduced o 12000ppm from 29000ppm and reduced the loss of organization from 4.02% to 2.79%. Retention of worker saves the training cost. Tool life also increased. Keywords: Ethnographic, Lean Tools, Pareto, PDCA, Qualitative Research _______________________________________________________________________________________________________ I. INTRODUCTION Dynamic and technological world requires organization to be competitive and pioneer with its products or services. Companies are forced to rethink their manufacturing and management approaches to lower costs, waste reduction, improve productivity and at the same time increase quality. It is true that the number of tools, techniques and technologies are available to improve operational performance is growing fast and 5s is also among the pilot tools of industrial engineering to remain competitive in business. 5s requires less effort, capital, and time to make quality products with less number of defects. It is a lean system to manage and manufacture products. Fields et al. recommended that 5S training be imparted to the management, supervisors, and workers and a change management team be formed which can help to bring the necessary change. The 5S system is a lean system used for organizing and managing manufacturing operations so that they require less human effort, space, capital, and time to make products with fewer defects. All these benefits result in greater productivity, better quality, less cost, workplace safety, and high morale. 5Ss lays the foundation for the company’s overall lean production system, and lack of a robust 5S system will make other lean tools ineffective. Implementing 5Ss alone may not bring the desired results, unless it is followed by educating the target work group on the corporate objective and soliciting its support and participation. Worker teams who participate in a Lean Manufacturing project are trained in the use of statistical and problem solving tools as well as project management techniques to define, measure, analyze, and make improvement in the operation of organization by eliminating defects and variability in its processes. The main concept of lean manufacturing is that defects in a given process can be measured and quantified. Table – 1 Percentage Rejection
  • 2. Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study (J4R/ Volume 02 / Issue 06 / 007) All rights reserved by www.journalforresearch.org 34 Aim is to investigate the possible causes of rejection and non-conformities. On the basis of various graphs of trends study is divided into two parts  Ethnographic Research is focused on the worker class. The aim of ethnography is to understand, another way of life from the native point of view” (Spradley, 1980, p. 3). The most important component of ethnography concerns the meaning of actions and events of the people we are trying to understand. This ethnographic study was conducted over a period of six months. It helps in describing how the Indian Sub-Continent group works, and it explores their beliefs, behaviors, and cultural norms.  Qualitative research is a research design utilized and concentrated on rejection of gear blank of kick Idler of two wheelers (Bajaj). After forging, CNC turning is the pilot operation using CCGT insert (tool tip) with FANUC control CNC machine. Measurement is done with the help of special design gauges, plug gauge and air pressure plug gauge (APG). Tool life is also decided by occurrence of rejection or change after 2200 parts, which is actually for meant for 1500 parts. Air pressure is set between the ranges of 30-50 bars without any fixed value. Table – 2 Characteristics of UP and Bihar people Fig. 1: Man- Man Chart Fig. 2: Demming Cycle/PDCA Cycle
  • 3. Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study (J4R/ Volume 02 / Issue 06 / 007) All rights reserved by www.journalforresearch.org 35 Fig. 3: Cause & Effect Diagram Fig. 4: Pareto chart for rejection The fishbone diagram is a tool for analyzing the business process and its effectiveness, which shows the possible causes of a specific event or a problem as shown in Fig. 3. Fig. 4 shows the Pareto analysis for the various parameters of gear blank idler, which were responsible for the rejections. Various parameters were along x-axis and no. of rejections is along y-axis. Rejection for outer diameter is maximum, which is 66% of total. For presenting these simple statistics related to process median 160 specimen of said component are measured for outer diameter. 20 pieces are measured in the interval of one hour in a single shift. Table – 3 Measurement System Analysis for Outer Diameter
  • 4. Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study (J4R/ Volume 02 / Issue 06 / 007) All rights reserved by www.journalforresearch.org 36 Fig. 5: Rejection trend for OD Fig. 6: X-bar chart for OD Fig. 7: Range chart for OD Results of control charts for OD are same, as shown in Fig. 6 and Fig. 7. This concludes that to achieve repeatability, training and sustainability are must. Daily Availability Calculation Availability takes into account down time loss. Firstly, daily average availability has been calculated for the existing machine in the floor. Actual capacity time for 8 hours shift = 480 min. Total downtime (sum of loss time) = 110 min. Planned downtime = Total downtime – (breakdown time + set up) = 110 - 60 = 50 min. Planned run time = 420 min. Operating time = Planned run time – Planned downtime = 420 - 160 = 260 min. Therefore, Availability = Operating time *100% Planned run time = 260 *100% = 61.90% 420 Performance Rate The performance only concerns the gross operating time. A property of the gross operating time is that the speed exceeds zero at any time. There are no down time losses in the gross operational time. The performance factor is a measure for the speed losses. Performance Rate = Planned run time – Planned Down time *100% Planned run time = 420-50 *100% = 88.09% 420 Quality Rate During the net operational time, no down time or speed losses occur. It is not certain that the total produced output is conform quality specifications. To gain insight into this, the quality factor is defined: Quality Rate = Total output –Average reject *100% Total output = Good pieces *100% Total pieces
  • 5. Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study (J4R/ Volume 02 / Issue 06 / 007) All rights reserved by www.journalforresearch.org 37 =971000 *100% = 97.1% 1000000 Rate of expected OEE = availability (100 %) * performance rate * quality rate = 61.90 * .88 * .971 = 52.89 When compared with world class standards, the values of OEE are far below it. Operator Issues All operators’s related issues were taken to Worker Union and after their consent it was decided to take strict action against the negligence. For new operator coming in area, training sessions & supervision by skilled operators was made compulsory. Warning letters were issued for negligence from operators. New & updated work instructions were put on machine boards. Head were requested to provide tea breaks, sanitary facilities, water facilities and fans for better efficiency. Table - 4 Total major cost for manufacturing Total Major cost for 36000 parts = Rs.1, 38,600 Minor Cost: - It comprises of Holding Cost, Carrying Cost, Setup Cost, Material Cost, Light Cost, etc. Minor Cost =Total processing cost – major cost = 4 - 3.85 = 15paisa Total processed cost of 35000 parts =35000×4 = Rs. 1, 40,000 %age loss to company = (140000/347533) × 100 = 4.02% Table – 5 Total major cost after new practices (lean tools) Total Major cost for 12000 parts = Rs 1,39,920 Total processed cost of 12000 parts =12000×12 = Rs 1,44,000 %age loss to company = (1,44,000/1,16,60,000) × 100 = 1.23% %age reduction in manufacturing cost = %age loss before lean tools - %loss after lean tools =4.02 - 1.23 =2.79 % Reduction in manufacturing cost = 3,47,533 – 1,39,920 =Rs.2,07,613
  • 6. Implementation of Lean Manufacturing Tools for Improving Productivity: A Case Study (J4R/ Volume 02 / Issue 06 / 007) All rights reserved by www.journalforresearch.org 38 ACKNOWLEDGMENT I pay my sincere thanks to my guide Mr. Onkar Singh Bhatia, for helping and providing needful guidance in my research work. I express my thanks to my Institution Green Hills Engineering College, Solan, HP for providing me with a good motivation, environment and facilities like Internet, books, computers and all that as my source to complete this research work. REFERENCES [1] Agrahari, R.S. Dangle, P.A. and Chandratre, K.V, “Implementation of 5S methodology in The Small Scale Industry: A Case Study”, International Journal of Scientific & Technology Research, Vol. 4, Iss.4, 2015. [2] Aomar, R.A, “Analysis of Lean Construction practices at Abu Dhabi construction industry”, Lean Construction Journal, pp. 105-121, 2012. [3] Arunagiri, P. and Gnanavelbabu, A, “Identification of High Impact Lean Production Tools in Automobile Industries Using Weighted Average Method”, Elsevier, 2014. [4] Baghban, A.A. Younespour, S. Jambarsang, S. Yousefi, M. Zayeri, F. and Jalilian, F.A, “How to test normality distribution for a variable: a real example and a simulation study”, Journal of Paramedical Science, Vol.4, No.1, 2013. [5] Chakrabortty, R.K. Biswas, T.K. and Ahmed, I, “Reducing process variability by using DMAIC Model: A Case study in BANGLADESH”, International Journal for Quality Research 7(1) 127-140, 2013. [6] Chandra, P.V, “Approach to Lean Leadership through Creating a Lean Culture”, International Journal of Engineering Science and Innovative Technology, Vol. 2, Iss.4, 2013. [7] Chitre, A. R, “Implementing 5S Methodology for Lab Management in the Quality Assurance Lab of a Flexible Packaging Converter”, American Psychological Association, 6th edition, 2010. [8] Chowdury, M. L. R. and Hoque, M.A, “Evaluation of Total Productive Maintenance Implementation in a Selected Semi-Automated Manufacturing Industry”, International Journal of Modern Engineering Research, Vol. 4, Iss.8, 2014. [9] Deshpande, S.P. Damle, V.V. Patel, M. L. And Kholamkar, A. B, “Implementation of 5s Technique in a Manufacturing Organization: A Case Study”, International Journal of Research in Engineering and Technology, Vol. 04, Iss.01, 2015. [10] Dighe, S.B. and Kakirde, A, “Lean Manufacturing Implementation Using Value Stream Mapping: A Case Study of Pumps Manufacturing Company”, International Journal of Science and Research, Vol. 3 Iss.6, 2014. [11] Falkowski, P. And Kitowski, P, “The 5S Methodology as a Tool for Improving Organization of Production”, PhD Interdisciplinary Journal, vol.4, pp.127- 133, 2013. [12] Ghodrati, A. and Zulkifli, N, “The Impact of 5S Implementation on Industrial Organizations’ Performance” International Journal of Business and Management Invention, Vol.2, Iss.3, pp.43-49, 2013. [13] Gupta, N, “A Study of Employee Retention with Special Reference to Indian Tourism Industry”, European Academic Research, Vol. I, Iss.6, 2013. [14] Hassan, M.K , “Applying Lean Six Sigma for Waste Reduction in a Manufacturing Environment”, American Journal of Industrial Engineering, Vol. 1, No. 2, pp. 28-35, 2013. [15] Hossain, M, “A Study to Reduce the Lead Time of a Bakery Factory by Using Lean Tools: A Case Study”, International Journal of Scientific and Research Publications, Vol. 5, Iss.11, 2015. [16] Jagtap, N.S. Ugale, V.D. Kadam, M.M. Kamble, S.S. and Salve, A.V , “Setup Time Reduction of Machine Using SMED Techniques and Lean Manufacturing”, Vol. 1, Iss.2, 2015. [17] Joshi, R.R. Patil, R. Naik, G.R. and Kharade, M.V. “Through-Put Time Reduction by Lean Manufacturing”, IOSR Journal of Mechanical and Civil Engineering, ISSN: 2278-1684, pp. 40-45. [18] Juhari, N. H. B. Abidin, N. and Omar, M. W, “Factors influencing employees’ motivation in implementing 5s system”, Elixir International Journal, Vol. 39, pp 4836- 4847, 2011. [19] Kariuki, B.M, “Role of Lean Manufacturing on Organization Competitiveness”, Vol.3, No.10, 2013. [20] Koripadu, M. and Subbaiah, K.V , “Problem Solving Management Using Six Sigma Tools & Techniques, International Journal of Scientific & Technology Research, Vol. 3, Iss.2, 2014. [21] Kovacs, G , “Productivity improvement by Lean Manufacturing Philosophy”, Vol. 6.No. 1, pp. 9-16, 2012. [22] Lingareddy, H. Reddy, G.S. and Jagadeshwar, K, “5s as a Tool and Strategy for Improvising the Work Place”, International Journal of Advanced Engineering Technology,Vol. 4, Iss.2, pp 28-30, 2013. [23] Mahale, R. and Gaitonde, V.N, “Implementing the concept of paint before assembly to the typical assembly line”, International Journal of Innovative Research in Advanced Engineering, Vol. 1 Iss.9, 2014. [24] Mayatra, M. Chauhan, N.D. and Trivedi, P. “A literature review on implementation of Lean Manufacturing Techniques”, International Journal of Advance Research, Ideas and Innovations in Technology, Vol. 1, Iss.4. [25] Michalska, J. and Szewieczek, D , “The 5S methodology as a tool for improving the organization”, Journal of Achievements in Materials and Manufacturing Engineering, Vol. 24, Iss.2, Pp. 211-214,2007.