This document contains the resume of Eng'r Wajid Ali Shah, a registered electrical engineer in Saudi Arabia and Pakistan with over 10 years of experience in engineering, procurement, construction, commissioning, operation, and maintenance of power plants, substations, and buildings. His experience includes working as a senior design engineer on a 2400MW combined cycle power plant and desalination plant in Saudi Arabia, and as an electrical project engineer on a 3000MW simple cycle power plant in Saudi Arabia. He has expertise in areas such as power generation, substations, engineering design, and project management.
1. Eng’r Wajid Ali Shah
Registered Electrical Engineer
Saudi Council of Engineers (SCE)
PEC Reg. No Elect/25575(Professional Engineer)
Address: House#116, street#7, sector#E-11/1 Islamabad Pakistan
Permanent address: House#116, street#7, sector#E-11/1 Islamabad Pakistan
Skype ID: wajid_bemco
Mobile Phone #s: +92-3339390314
Email: engr_wajid85@yahoo.com
EXPERIENCE: Above 10 Years of Experience
Engineering Procurement Construction Commissioning Operation / Maintenance of Substations
,Combined Cycle Power Plants, Multi-stories Buildings & Hospitals.
Highly Energetic, Result Oriented Professional. Achievement Driven Experience, with Exceptional
Leadership, Communication and Vision Skills
Specialties: Power Generation ( Gas Turbine Power Plant, Steam Turbine Power Plant & Combine Cycle Gas
Turbine and BOP ), Boiler/HRSG - Desalination Plant - Oil & Gas - Integrated Waste to Energy
Plant. Substations, Building Projects.
.
May15 ~ to date Ministry Of Housing & Works
Consultant Engineer
• Scope: Bidding Documents Preparation and evaluations:
• Maintain complete updated purchasing records/data and pricing in the system.
• Coordinate with suppliers to ensure on-time delivery.
• Responsible for the preparation and process purchase orders and documents in accordance with
company policies and procedures.
• Monitor and co-ordinate deliveries of items between suppliers to ensure that all items are delivered
to site/store on time.
• Source, select and negotiate for the best purchase package in terms of quality, price, terms,
deliveries and services with suppliers.
• Purchase and issue order in accordance to specification.
• Follow-ups and co-ordination for timely delivery.
• Receiving of BoM, Indents, Drawings, etc
Oct ’11 ~ May15. SHANDONG Electric Power Construction Corporation – SEPCOIII
Ras Al Khair Combined Cycle Power Plant, 2400 MW, Water desalination Plant & 380KV
substation, Kingdom of Saudi Arabia
Senior Design E&I Engineer
Scope: Working as a main contractor and responsible for design, FEED, detail engineering, shop
drawings preparations, Site Observation reports issuance, Handover documents i.e.
ECC,SCC,MCC,CCC,PAC & FAC preparations and reviewing. Carrying out site inspections with
Client engineers. Quality documents follow-up like NCR, RFI’s, MAR, MRIR, FAT& As-built
drawings preparations and reviewing. Attending factory acceptance tests for electrical equipment’s
1
2. prior site shipment & installations. Participating all the coordination meetings among client,
consultants and vendors. Preparation biddings BOQ’s of sub-contractors and reviewing quotations.
Daily coordination with project management and stack holders. Site erection supervision.
The combined cycle power plant consists of 10 Gas Turbines, ten HRSG’s and five
(5) Back pressure Steam Turbines in five combined cycle blocks.
Two (2) gas turbine units and one (1) steam turbine unit are forming a
“Combined cycle Block “. In addition, there is a Simple Cycle Block comprising of two (2) nos.
Simple Cycle Gas turbines. Total Power generated by combination of Twelve (12) nos.
260 MVA Gas Turbine Generators at 18kV and Five (5) nos. 213MVA steam Turbine Generators at
16.5 kV Generation voltage stepped up to 380kV through dedicated Generator Step-up
Transformer for evacuation of power through 380kV Gas Insulated Substation.
The gas turbine and steam turbine generators connected to 380 kV Gas Insulated
Substation via generator step up transformers and 380 kV cables. Each Gas Turbine
Generator rated 260 MVA (at 40 ºC ambient air temperature ), 18 kV, 60 Hz, 3600 rpm, 0.85
power factor, Air Cooled. Each Steam Turbine Generator rated 213 MVA (at 46 ºC ambient
air temperature ), 16.5 kV, 60 Hz, 3600 rpm, 0.85 power factor, Air Cooled. Generator
circuit
breaker and unit auxiliary transformers is provided for each.
Design calculation of transformers, breakers, motors etc. procurement order as per approved
design. SLD Designing, calculation, BOQ dragging.
Applying design knowledge in power distribution, grounding, lighting, control systems, and
equipment specification and selection. Following with all the actors (i.e. consultant, contractor,
clients, and end users) to finalize and close all approvals. Monitoring the progress of the projects
and make necessary adjustments to ensure successful completion. Preparing electrical designs for
large scale industrial projects. And worked on measurement and control equipment’s. Fire Fighting
systems (Deluge Fire, water spray, Sprinkler, Co2 and Organ).PAGA System commissioning and
installation. Gas Detection Systems and complete test and maintenance reports. Troubleshooting
and testing of various types of process control instruments and relay logic, which include
pneumatic, electrical and electronic instruments. Having experience on PLC’s and DCS systems.
Compliance of manufacturer O/M Manuals at erection. Issuance of Design review note (DRN),
Comment review sheets (CRS) & as-built drawings.SLD Calculations.
Oct. ’10 ~ Sep. ’11 Arabian BEMCO Contracting Co., Ltd.
Qurayyah Combined Cycle Power Plant, 3190MW, Kingdom of Saudi Arabia
Electrical Project Engineer
Responsible to monitor the electrical installations as well as coordination with civil & mechanical
teams at site - EPC Project
Detail is as under;
1) The OCGT power plant a nominal rating of 1890 MW, based on 15 GE 7FA gas
turbines rated at 126 MW per unit.
2) The conversion to a CCGT power plant based on five (5) blocks, each block
comprising of 3 GTG + 1 STG, result in a CCGT net power output of approximately 3190 MW
with an expected rating for each of the STGs of approximately 260 MW
3) Installation of HRSG and STG’s for CCPP with associated mechanical,
instrumentation and control equipment and all necessary supporting services which is
required to convert the OCGT power plant to a CCGT power plant.
4) Generator step-up transformer installation.
5) Installation of 4.16KV unit switchgear.
6) Installation of 125V DCDB.
7) Installation of 120V AC UPS.
8) Installation of 120V UPSDB.
9) Installation of battery cell for UPS system.
10) Installation of battery chargers.
2
3. 11) Installation of Paging system/Public Address/telephone &clock system.
12) Auxiliary power supplies, including MV and LV boards,switchgear, MCCs and
distribution boards.
13) Essential supplies including batteries and UPS system.
14) Protective relaying and metering systems including CTs and VTs.
15) Lighting and small power systems and equipment.
16) MV and LV power, instrumentation and control, telephone and emergency cabling
systems.
17) Earthing.
18) Lightning and surge protection.
19) instrumentation.
20) Cable trays & cable ladders installation.
21) Cable pulling & termination.
22) Desalination and water treatment plants.
23) Installation of instru/service Air compressor building.
24) Boiler feed pumps installation.
25) Desalination units’ installation.
26) Familiar with Plant Direct Current System (DC) like Chargers, Converters, Batteries,
Distribution System.
27) Experience of Plant Un Interruptible Power Supply System (UPS).
28) Familiar with Maintenance of MV / LV Motor and MOVs.
29) Understanding of Protection Relay.
30) Through understanding and comfortable while working at the starting and Excitation
System of the Power Generators i.e. Static Frequency Converter (SFC) & Static Excitation
Equipment (SEE) Systems.
Apr. ’09 ~ Sep. ’10 Arabian BEMCO Contracting CO. Ltd.
Riyadh Power Plant PP # 10, 2000MW, Kingdom of Saudi Arabia
Engineer – Electrical & Instrumentation
Engineering, Design, Detail Engineering, FEED, Procurement, Construction / Commission of
Combined Cycle, 7 FA Frame,126 MW x 18 GE Gas Turbines, connected to, 260 MW x 06
STG, through, 18 HRSG, at 3190MW QURAYYAH Combined Cycle Power Plant # 2,
QURAYYAH, Client: SEC, Kingdom of Saudi Arabia.
As Electrical Lead - organized Test Packages submittals to Client: SEC, for Erection
Completion Certificate (ECC).
Engineering, Design, Detail Engineering, FEED, Procurement, Construction / Commission of
Simple Cycle, 7 EA Frame, 56 MW x 36 GE Gas Turbines, at, 3000MW RIYADH Power Plant
# 10, Riyadh, Client: SEC, Kingdom of Saudi Arabia. It is a World Largest Power Plant running
on Crude Oil Responsible to monitor the electrical equipments installations as well as
construction of civil & mechanical works on sites as per drawings.
Detail is as under.
1) Riyadh PP10(Power Plant) project 3.5 billion USD, 36 gas turbine GE frame 7EA
power plant, 2000MW with a Tank Farm capable of holding 420,000m3 of diesel and crude oil.
2) Installation & operation of gas turbines & generators (56MW each) .
3) LV & MV Duct bank: layout of underground cables & cable routing
4) Cathodic protection system installation (transformer rectifier, anode junction box &
test box).
5) Installation of anode ribbons, power feed connection & reference electrodes for
cathodic protection system & its testing commissioning.
6) Lying out of earthing mesh.
7) Potential gradient control system.
8) MV 13.8 KV switchgears installation,
9) Familiar to work with earth resistance ohm meter, digital low resistance ohm meter.
10) Installation of street & fence lighting.
3
4. 11) Expert in Fire alarm system, firefighting stations.( FM200,FOAM,CO2 and Water
System). Following the standard of NFPA (National Fire Protection Association), installation of
NFS2-3030 FACP.
NFPA 12A Halon 1301 Extinguishing systems.
NFPA 13 Splinker systems.
NFPA 15 Water spray system.
NFPA 16 Foam/ Water deluge and Foam/Water spray system.
12) Fuel oil treatment plant.
13) Expert in Water treatment plant.
14) Installation of street light,pole light,fence light and highmast.
15) Grounding and lightning protection.
16) Maintenance of Power Transformers & Their Different Parts
17) Testing Transformer Oil, Lighting Arrester, Batteries & Three different tests of CT.
18) Working Principles of Different Control Penal.
19) High Voltage Lines Installation & Faults Detection
20) Transformer Relays (Differential relay, Distance relay, Buckle relay).
21) Operation, Maintenance & Installation of Current & Potential Transformers,
Isolators, Breakers & Capacitor Banks.
22) Fuel oil unloading and metering stations.
23) Installation of GIB (gas insulated bus duct)
24) Installation of HVAC system.
25) Erection and alignment of panels at foundations.
26) Installation of UPS system.
27) Public address system.
28) National Guard Building construction.
29) Maintaining quality management systems for both internal and external delivery of desi
gn project s.
30) Preparing material requisitions for MV + LV switchboards, transformers, UPS systems,
trace heating and other electrical equipment.
31) Capable to carry out technical investigations, produce technical reports, engineering
standards and procedures.
32) Reviewing of the drawings, specifications and Bills of Quantities.
33) Ensuring that the Electrical Designs are in-line with Company Design guidelines.
34) Making ensure that Electrical designs are value Engineered and cost efficient.
35) Making ensure that the Electrical Designs are in-line with the latest Authority
requirements.
Water & Power Development Authority – WAPDA / PESCO
Bannu, Pakistan (2007 to 2008)
Assistant Manager (2006-2008) & as trainee Engineer (2005-2006)
Worked at 132KV Grid Station Bannu, and was responsible for the followings.
1) Dismantling & Installation of line controlling equipment like Isolators, Circuit Breakers, Current
Transformers, Potential Transformers and their connectivity with main bus bars in case of
permanent faults.
2) Routine inspection of the grid station equipment i.e. Air Pressure, SF6 Gas Pressure of
Breakers, Oil level of C.T’s, P.T’s, Transformers, Counter reading of breakers, lightening
arresters, Visual inspection of C.T’s P.T’s.
3) To arrange the shut downs for routine maintenance (annually) and emergency maintenance
on Power Transformers/Breaker including washing and cleaning of insulator posts of C.T’s,
P.T’s & Transformer bushings. Toping up of oil level and when required for transformers.
Measurement of Contact Resistance of breakers, isolators, opening / closing timing of
breakers. Mechanical parts inspection and cleaning, greasing & lubrication. Verification of
local remote operation of all the equipment. Tightening of Nuts & Bolts, tightening of clamps &
structure. Replacement of spare parts, Gaskets, MCB & Magnetic Contactors if required.
4
5. 4) To keep the DC Battery Charger & Battery Sets healthy by checking its total voltage,
voltage/cell, electrolyte level, specific gravity, corrosion etc.
5) Earth resistance testing of all the equipment and structure on half-yearly basis.
6) Coordinate with management in case of tripping or damage caused to any equipment.
EDUCATION ACADEMIC
• Bachelor of Science in Electrical Engineering (BSEE) >SESSION (2007-2008)
NWFP University of Engineering & Technology, Peshawar, Pakistan
AFFILIATION PROFESSIONAL
• Registered (Electrical) Engineer, with Saudi Council of Engineers, Riyadh,
Kingdom of Saudi Arabia, (SCE #: 80806)
• Registered (Electrical) Engineer, with Pakistan Engineering Council, Islamabad, Pakistan
(PEC #: ELECT - 25575).
• Member, Institute of Engineers, Pakistan.
TRAINING PROFESSIONAL
• OSHA – 30 Hours, Training at Arabian BEMCO Co. Ltd., KSA
SKILLS EXPERTISE
• Inspection, EPC, Project Engineering, Combined Cycle Power Plants,
Construction, Engineering, Project Control, Materials, Tanks, QAQC, Plant Maintenance,
Human Resource Management, OSHA 30 Hours, Leadership, Grid Station, HAZOP, Gas
Turbines, Steam Turbines, Turbines, HRSG / Boilers, Technical Reports, Petrochemical,
Commissioning, Refinery, Onshore, Petroleum, Personnel Management, Refineries, P&ID,
Procurement,
• English
• MS Windows / XP / 07, MS Office, MS Project, Auto CAD, Visio, Primavera Contract Manager
DATA PERSONAL
• Date of Birth January 01, 1985
• Marital Status Married - One Son
• Languages English, Pashto, Urdu. Arabic
• Pakistan National Identity Card # 11101-6112558-3
• Pakistan Passport # JF5145582
• Pakistan Driving License Yes
• Saudi Driving License Yes
5
6. 4) To keep the DC Battery Charger & Battery Sets healthy by checking its total voltage,
voltage/cell, electrolyte level, specific gravity, corrosion etc.
5) Earth resistance testing of all the equipment and structure on half-yearly basis.
6) Coordinate with management in case of tripping or damage caused to any equipment.
EDUCATION ACADEMIC
• Bachelor of Science in Electrical Engineering (BSEE) >SESSION (2007-2008)
NWFP University of Engineering & Technology, Peshawar, Pakistan
AFFILIATION PROFESSIONAL
• Registered (Electrical) Engineer, with Saudi Council of Engineers, Riyadh,
Kingdom of Saudi Arabia, (SCE #: 80806)
• Registered (Electrical) Engineer, with Pakistan Engineering Council, Islamabad, Pakistan
(PEC #: ELECT - 25575).
• Member, Institute of Engineers, Pakistan.
TRAINING PROFESSIONAL
• OSHA – 30 Hours, Training at Arabian BEMCO Co. Ltd., KSA
SKILLS EXPERTISE
• Inspection, EPC, Project Engineering, Combined Cycle Power Plants,
Construction, Engineering, Project Control, Materials, Tanks, QAQC, Plant Maintenance,
Human Resource Management, OSHA 30 Hours, Leadership, Grid Station, HAZOP, Gas
Turbines, Steam Turbines, Turbines, HRSG / Boilers, Technical Reports, Petrochemical,
Commissioning, Refinery, Onshore, Petroleum, Personnel Management, Refineries, P&ID,
Procurement,
• English
• MS Windows / XP / 07, MS Office, MS Project, Auto CAD, Visio, Primavera Contract Manager
DATA PERSONAL
• Date of Birth January 01, 1985
• Marital Status Married - One Son
• Languages English, Pashto, Urdu. Arabic
• Pakistan National Identity Card # 11101-6112558-3
• Pakistan Passport # JF5145582
• Pakistan Driving License Yes
• Saudi Driving License Yes
5