SlideShare a Scribd company logo
1 of 7
PresentAddress:
C/O Abdul Hameed Rural Health center
Qazi Ahmed TalukaDaulapur DistrictNawab Shah SindhPakistan
Zaheer_ei_engineer@yahoo.com
mmmzar@gmail.com
Skype. Zaheerahmed6675
Mob:-# +92334-2728457, +92244-321044
Zaheer Ahmed
Objective
To pursue a challenging career, where my experience can be put in the best use, this demands the
best of my professional ability in terms of technical skills, serving in growth of organization and in
turn getting benefits for successful career.
ProfessionalExperience
Electrical Engineer having 10+ years’ experience with superior project management skills and a
diverse technical background in EPC Projects & Maintenance Shutdowns of Electrical & Instrument
especially in Oil & Gas, Processing Industries, Chemical plants, Fertilizer plants, Aluminum Plants,
Power Plants , Water Reservoirs Barrages, Electrical Infrastructure & Power Distribution Systems
(Substations)
Education
Graduation (BE) Intermediate (Fsc)
Bachelor of Electrical Engineering Intermediate in Pre Engineering
Completion: 2005 Completion: 1999
Duration: 4 Years Duration: 2 Years
Institution: Quaid-e-Awam University Institution: Govt.High Secondary
Of Engineering Sciences and Technology School Qazi Ahmed, Nawab Shah
Nawab Shah, Sindh. Pakistan
Professional Associations
 Member of Pakistan Engineering Council (PEC) ELECT/ 21817
 Member of Saudi Engineering Council 262824
 Key Skills& Competencies
 Design review, Project Site Execution, Construction Management, Material Procurement &
Specs Review, Work Permit System, Safety Review System and Site Activities Monitoring
on MV/HV Substations & live oil & gas Plants.
 Project Planning, Scheduling and monitoring at different activities of the project during
different phases of EPIC projects.
 Project progress Reporting, Preparation of Monthly/Weekly Progress Reports for project
progress monitoring.
 Onsite technical and management support to execution staff during construction
&execution of the Project.
 Cost and Revenue Analysis.
 Preparation of look ahead plans.
 Participation in Project weekly & monthly progress review meetings during installation
phase.
 Key Role in expediting the possible delays during installation phase with other
subcontractors and stakeholders to adopt remedial measures for timely and successful
completion of the project.
 Aware of HSE, Permit to Work System requirements and onsite local working regulations in
Hazardous Areas and live Oil & Gas and Power Plants.
 Costing & Estimation of EPIC Projects E&I & Modification Works E&I especially in Oil &
Gas, Infrastructure, Buildings, Power Transmission and Distribution and Energy Sector.
 Preparation of BOQs, MTOs from Tender Documents and Drawings of EPC Projects.
 Generation of Inquiries and Evaluation of different Suppliers, Venders/subcontractors
proposals and quotations technically and commercially.
 Preparation of Technical, Commercial and Management Documents for Projects as per
project specific requirements.
 Preparation of comparison statements of quotations from different vendors, suppliers and
subcontractors.
 Generation of Project Procurement Requirements based on Engineering Requisition
Packages.
 Close monitoring and follow-ups with different vendors, suppliers and subcontractors
 Basic Design knowledge and study of MV/LV Power, Control Cable, Cable Routing, Cable
Accessories, Layout Drawings, Switchgears, Transformers, Motors, Field Instruments,
Generators, UPS System, LT Distribution Boxes, Junction Boxes, Cable Management
Systems.
 Career Summary
November 2016 Till Date
Designation: Deputy Manager E&I
Company: Descon Engineering Limited Lahore Pakistan
Major Clients:
 Project Management Office Irrigation ( PMOI )
 SMEC Australia
September 2015 – August 2016:
Designation: Project Engineer E&I
Company: Al Yusr Industrial Contracting Co.Saudi Arabia (AYTB)
Major Clients:
 Saudi Chevron ( S-Chem)
January 2008 –May 2015:
Company: Descon Engineering Qatar LLC
Designation: Senior Engineer E&I
Major Clients:
 SIEMENS QATAR LLC
 QATAR GAS OPERATING COMPANY
 RASGAS QATAR
 Dolphin Energy Ltd
 Q-Chemical
 QAPCO
 QAFCO
 QATAR PETROLUM
 ABB QATAR LLC
 GE Qatar
 TECHNIP
 CTJV
 CAEL
 Sino hydro
 JGC
 RLOC
February 2006 – December 2007:
Designation: Engineer (Electrical)
Company: Descon Engineering Limited Lahore Pakistan
Major Clients:
 BHP Zamzama Dadua ( Pakistan)
 Oxechem Shaikhupura ( Pakistan)
Major Executed Projects:
 EPIC New Khanki Barrage Wazirabad ( NKB) ( November 2016 Till date )
 Saudi Chevron IPT Projects ( Sep 2015 – August 2016)
 Barzan Gas onshore Project. ( May 2014 – Dec 2014)
 Replacement of UPS at Qatalum. ( Nov 2013 – Dec 2013)
 EPIC of QG 2 Backup Power Supply System in Qatar Gas. ( May 2013 – Oct 2013)
 EPIC for individual continuous Emission monitoring at Qatar Gas ( Sep 2012 – Dec 2012)
 MEP Project at Lusail city with Sino Hydro. ( May 2012 –Aug 2012)
 Construction work for Qatar gas purge reduction system at Qatar Gas. ( Oct 2011 – Dec
2011)
 Installation and commissioning works for Lusail City CP1 66 kV GIS Substations in Lusail
City SIEMENS/KAHRAMAA. ( March 2011 – Sep 2011)
 Installation of cathodic protection system (Impressed current) at Qatar gas sea water
area. ( Sep 2010 – Dec 2010)
 DGF Purge gas system Project at Qatar Gas (May 2010 – Aug 2010)
 CIWPP Project Ras-Lafan Qatar with SIDEM, France. ( May 2009 – March 2010)
 Ras Lafan Olefin Projects. ( Jan 2008 – Jan 2009)
 Oxychem Pvt ltd. ( Jul 2007 – Dec 2007)
 BHP Zamzama Phase 2 ( Feb 2006 – Jun 2007)
Major Tasks in project execution
 Well versed in reading and understanding specifications, drawings, and all other discipline
related project and engineering documentation.
 Responsible to resolve site issues with consultation of the immediate in-charge/
Departmental Manager and coordination with client representatives.
 Responsible for Completion of work within scheduled times without compromising on
Quality, Health, Safety and Environment requirements.
 Responsible to ensure that the subordinates understand and implement the work plan, by
explaining and engaging in pro-active communication with the crews.
 Responsible to coordinate with QA/QC department for Work Inspection Reports, snagging
list clearance, Preparation of Method Statements, and As-Built Drawings.
 Review project standard and specifications for construction. Monitoring overall performance
in accordance with client requirements.
 Developing project execution plan and strategies for completion of job in time, leading
construction site teams for execution and supervision, and providing selection for the best
technical /economical solutions for power system and assisting in carrying out for final
inspection with client / consultant.
 Submission of progress reports to the line manager, carrying out client meetings/walk
downs to address with immediate action any unexpected technical problems or any kind of
difficulties at the time of execution.
 Electrical design documents reviewing and providing technical evaluations of power
system.
 Installation of 33 KV and 66 KV Gas Insulated Switchgear.
 Installation of local Control cubicles (LCC) for 33 KV GIS and 66 KV GIS Switchgear
 Removal and Re installation of 3.3 KV, 11 KV and 33 KV AIS switchgear., installation of
copper bus bars and bus ducts for switchgears.
 Hi pot test of switchgears
 Installation of protection / control panels for switchgear
 Installation and Inspection of Auxiliary and Power transformers along with assembly of
parts. (1MVA to 40 MVA.) and Sergi System for protection of transformers
 Installation and inspection of AVR panels and Transformer Rectifiers and capacitor banks
for PF improvement.
 Installation of LCP panels for Barrage gates Operation.
 Installation of NGRs and earthing system and conducting earth resistance tests
 Installation and inspection of LVAC switchgear, DCDBs and110 V DC battery bank system.
 Installation and inspection of UPS fire Alarms system, PSS, VESDA and power
management system.
 Involve in installation of electrical systems and equipment and associated devices and
control systems such as but not limited to the following: Medium and Low Voltage cables
and raceways, Medium and Low Voltage Power Distribution System (33 kV, 66 kV), PDCS-
Power Distribution Control System and interface with the DCS, Electrical Protection
System, Programmable Logic Controllers-PLC(Siemens), Medium and Low Voltage
Switchgears (ABB, AREVA,SIEMENS), VSD-Variable Speed Drives and Motor Control
Centers, Medium and Low Voltage Motors, Power and Distribution Transformer.
 Installation and testing of the cathodic protection systems (Impressed Current &Sacrificial).
 Installation of HT/LT transmission line.
 Installation of cable ladders, trays and trucking
 Supervision of underground/above ground fiber optics cable lying and arranging OTDR
Test.
 Supervision of underground/above ground HV, MV, LV and control cable lying and Hi pot,
IR tests for cables
 Oversee the commissioning activities, to give technical solution for any problems
encountered, to prepare and plan for each phase of the commissioning engineer.
 Functional checks like start/stop, phase sequence and tripping test.
 Installation and testing of plant/road lighting and small power outlets.
 Monitoring RPM, Vibration, and Temperature of motors during Motor Solo run activity.
 Installation of fire and gas system, SCADA system at well head facilities.
 Installation of analyzers, Mass-spectrometer, Gas analyzers control valves and field
instruments.
 Installation of different process instruments PT, TT, LT, FT, DPT, VS, Radar Type Level
Transmitters, Control Valves, On/ Off Valves , SDVs, TCVs, BDVs, loop checks and logic
tests for DCS.
 Serial Link checking between PLC and DCS and I/O list and cable schedule preparation.
 Installation of Different types of instruments at Water reservoirs. Like, SCADA System
Piezometers, Water Level Sensor, Gate Position Sensor, VOIP Ethernet
 Installation of system cabinets like PLC, DCS, PCS, PSS, PAGA, FACP, Marshalling
cabinets, Telecommunication cabinets, HMI in control room.
 Installation of console set up in CCR.
 Installation and testing of communication system i.e. PAGA system (Speakers, Beacons
and Intercoms) with Their vendors.
 Installation and inspection of Access Control system (Muster Point and Card Readers)
 Installation of Plant Monitoring Cameras.(Movable PTZ CCTVs)
 Close monitoring and follow-ups with different vendors, suppliers and subcontractors during
different phases of the project.
 Key role in planning of resources (manpower, equipment and tools) as per project
requirements.
 Key role in preparation of estimated man-hours requirement of the project
 Key role in Project Planning, Scheduling and monitoring of different activities during
different phases of the projects.
 Monthly Invoicing and verification of BOQ and Drawing quantities variation.
 Final invoicing and verification of BOQ
Major ExecutedShutdowns
 Dolphin Energy SD 2015
 Qatar Chemical SD 2015
 Ras Lafan Olefin Company Shutdown 2015
 Qatar Gas Train 5 Shutdown 2015
 Qatar Petroleum Refinery Shut down 2015
 NGL Shutdown 2015
 QAPCO SD 2014
 Dolphin Energy SD 2014
 QAFCO SD 2013
 Qatar Petroleum annual SD 2013
 Qatar Gas train 3 SD 2013
 Dolphin energy SD 2013
 Qatar Gas train 4 SD 2012
 Qatar Chemical SD 2012
 Dolphin Energy SD 2012
 Qatar Gas Train 6& 7 SD 2011
 Dolphin Energy SD 2011
 FAHAHAIL ( FMNS) Stripping SD 2010
 QAFCO Urea 4 and Ammonia 4 SD 2010
 Qatar Gas train 3 SD 2010
 Qatar Gas SD train 1 2009
 Dolphin Energy Warranty Shutdown 2008/ 2009
Major Tasks in Shutdown execution
 Evaluation of SOW, Procurement of material according to job and plant requirements and
specifications
 Preparation of Method of statements and JSA according to requirement of job.
 Preparation of work packages to identify the SOW of supervisors, supervisor review and
monitoring of the subcontractors works during SD ensure all compliance according to SOW
and client requirements, discuss the technical quires on site, identify the problems causes
the low productivity, dealing meetings with clients and company management over SD
issues and plan.
 During the Shut downs responsible to monitor all types E&I maintenance and new
installation like all type of electrical maintenance like MV/HV switch gear & testing, relay
adjustment with the concerned vendors and new electrical modification during the
shutdowns like HV/LV panels, system panels, control panel UPS and new transformers,
cable tray installation, cable laying testing and termination.
 Installation of field instruments.
 Installation of MV, LV Switchgear Panels, Control Panels, UPS system, Generators, GIS
System, Distribution Transformers, LVAC/DC Panels.
 Maintenance of HV/LV Switch gear & UPS with their concerned vendor.
 Maintenance of heavy duty Electric motors in shutdown with client and subcontractors
 Adjustment of relays (Electro Mechanical, Static & Microprocessor based) and circuit
breakers of HV and LV switch gears of AREVA AND SCHINDER with the concerned
vendors..
 Laying, Termination & Testing of Power, Control & Instrument Cables.
 Installation of Cable Trays, Ladders and Accessories.
 Installation, Termination & Testing of Distribution & Junction Boxes.
 Arrangement of temporary power supply at plants during Shutdowns
 Pre installation calibration check and pre commissioning loop check of field instruments.
 Overhauling and calibration of pneumatic and hydraulic control valves like,SDVs, On/ Off
Valves, Safety Relief valves with vendor
Worked with several vendors like AREVA, SCHINDER, ABB, EATON, SOLAR, Yokogava,
Rosemount, Emerson,
Job Responsibility as an Estimation Engineer E&I:
 I had been involved an Estimation Engineer (Temporary Basis for critical E&I Proposal) in
proposal Department reported to proposal manager, responsible for preparation and
completion of Techno commercial proposals.
 Preparation of bids for Shutdowns, Turnarounds, and small and mega project related to E&I
On shore Oil Gas and fertilizers Plants.
 Studying Tenders and review all their terms.
 Sending clarification requests to the client, required for the tender´s scope of work &
specifications
 Sending inquires to subcontractors and suppliers.
 Attending pre bid meeting and site visits, to evaluate scope of work and estimation of
resources, regarding manpower, equipment’s and materials.
 For compiling Techno Commercial proposal, preparing the complete cost of bid after
analyzing and estimates whole tender and compiling in accordance with different discipline
to evaluate the total cost of the project.
 Attending commercial negotiation meetings with clients.
Major Techno commercial proposal completed as an estimation engineer
Electrical & Instrument
 Qatar petroleum NGL-3 Shutdown 2009
 Qatar Petroleum Fahahail Main North South and Striping plant shutdown 2010
 Qatar Gas 7 years maintenance shutdown contract 2011 to 2016
 Q-chem. SD 2012
 Dolphin energy 3 years maintenance shut down contact 2011/2012/2013
 Rasgas Train-1 & 2 Gantry Crane extension project.
 Installation of new UPS at LQ platform QG offshore.
 Rasgas Installation of Reverse Rotation checks valves on compressors.
 Qatar gas ESU building relocation project.
 Dolphin Camp removal project
 QP Refinery SD 2013
 QAFCO SD 2013
 Dolphin energy SD maintenance contract 2014 to 2019
 Qapco SD 2014
 Dolphin energy 5 years maintenance shut down contact 2014 to 2018
 Q-chem. SD 2015
 RLOC SD 2015
 QP Refinery SD 2015
 Qatar petroleum NGL SD 2015
 Back Feed Power Supply Project
 Truck waving Installation Project
 QP Refinery SD 2016
 Nitrogen skimming project.
 Rectification of vibration anomalies project.
 Currently Working in Descon Engineering Limited Pakistan as Deputy Manager E&I in
Infrastructure Division
 Worked in ALYUSR INDUSTRIAL CONTRACTING CO. AYTB in Construction &fabrication
department as Project Engineer E&I.
 Worked in Descon Engineering Qatar LLC in plant maintenance and shutdowns
department as Lead Senior Engineer Electrical& Instrument department handled E&l
department in RLIC, MIC and Dukhan industrial area.
Professional Trainings
 CTMP Course from Descon Engineering Ltd. (DWHQ)
 Management Development Program 1 ( DEQ Qatar )
 H2S BA Training
 Safety Induction
 PTW Corse Qualified in QP, Q-Chem, QG and DEL
 Work at height
 Confined Space
 Primavera, MS Office, Mat lab, ACCPAC, GDMS
 DPMS,SMART,GDES,DCS
Computer Proficiency
 MS Office and its applications (Documentation)
 Good Internet skills
 Personal Details
Father’s Name: Abdul Hameed
Nationality: Pakistani
Passport No: HV1152212
Religion: Islam
D.O.B: 11 Feb. 1982
Marital Status: Married
Having valid Saudi license.

More Related Content

What's hot

Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERNguyen Thuc
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 

What's hot (19)

Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 

Viewers also liked

Viewers also liked (11)

Water resources of turag river
Water resources of turag riverWater resources of turag river
Water resources of turag river
 
Career History, Working experience
Career History, Working experienceCareer History, Working experience
Career History, Working experience
 
How to Burn Body Fat in Your Sleep
How to Burn Body Fat in Your SleepHow to Burn Body Fat in Your Sleep
How to Burn Body Fat in Your Sleep
 
Algunos apuntes de sociologia
Algunos apuntes de sociologiaAlgunos apuntes de sociologia
Algunos apuntes de sociologia
 
Mi experiencia
Mi experienciaMi experiencia
Mi experiencia
 
Electric deadbolt locks
Electric deadbolt locksElectric deadbolt locks
Electric deadbolt locks
 
3D printer Cooling test
3D printer Cooling test3D printer Cooling test
3D printer Cooling test
 
II KONFERENCJA NAUKOWA MŁODZI O SPORCIE sejsa posterowa BOHATEROWIE DRUGIEGO ...
II KONFERENCJA NAUKOWA MŁODZI O SPORCIE sejsa posterowa BOHATEROWIE DRUGIEGO ...II KONFERENCJA NAUKOWA MŁODZI O SPORCIE sejsa posterowa BOHATEROWIE DRUGIEGO ...
II KONFERENCJA NAUKOWA MŁODZI O SPORCIE sejsa posterowa BOHATEROWIE DRUGIEGO ...
 
Jaime Munoz Desma Final Project
Jaime Munoz Desma Final ProjectJaime Munoz Desma Final Project
Jaime Munoz Desma Final Project
 
Amit Verma
Amit VermaAmit Verma
Amit Verma
 
ARE 494 Digital Ethnography Benjamin Newton
ARE 494 Digital Ethnography Benjamin NewtonARE 494 Digital Ethnography Benjamin Newton
ARE 494 Digital Ethnography Benjamin Newton
 

Similar to Zaheer Ahmed Resume

INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstaramol bakane
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 

Similar to Zaheer Ahmed Resume (20)

Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
CV PF
CV PFCV PF
CV PF
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 

Zaheer Ahmed Resume

  • 1. PresentAddress: C/O Abdul Hameed Rural Health center Qazi Ahmed TalukaDaulapur DistrictNawab Shah SindhPakistan Zaheer_ei_engineer@yahoo.com mmmzar@gmail.com Skype. Zaheerahmed6675 Mob:-# +92334-2728457, +92244-321044 Zaheer Ahmed Objective To pursue a challenging career, where my experience can be put in the best use, this demands the best of my professional ability in terms of technical skills, serving in growth of organization and in turn getting benefits for successful career. ProfessionalExperience Electrical Engineer having 10+ years’ experience with superior project management skills and a diverse technical background in EPC Projects & Maintenance Shutdowns of Electrical & Instrument especially in Oil & Gas, Processing Industries, Chemical plants, Fertilizer plants, Aluminum Plants, Power Plants , Water Reservoirs Barrages, Electrical Infrastructure & Power Distribution Systems (Substations) Education Graduation (BE) Intermediate (Fsc) Bachelor of Electrical Engineering Intermediate in Pre Engineering Completion: 2005 Completion: 1999 Duration: 4 Years Duration: 2 Years Institution: Quaid-e-Awam University Institution: Govt.High Secondary Of Engineering Sciences and Technology School Qazi Ahmed, Nawab Shah Nawab Shah, Sindh. Pakistan Professional Associations  Member of Pakistan Engineering Council (PEC) ELECT/ 21817  Member of Saudi Engineering Council 262824  Key Skills& Competencies  Design review, Project Site Execution, Construction Management, Material Procurement & Specs Review, Work Permit System, Safety Review System and Site Activities Monitoring on MV/HV Substations & live oil & gas Plants.  Project Planning, Scheduling and monitoring at different activities of the project during different phases of EPIC projects.  Project progress Reporting, Preparation of Monthly/Weekly Progress Reports for project progress monitoring.
  • 2.  Onsite technical and management support to execution staff during construction &execution of the Project.  Cost and Revenue Analysis.  Preparation of look ahead plans.  Participation in Project weekly & monthly progress review meetings during installation phase.  Key Role in expediting the possible delays during installation phase with other subcontractors and stakeholders to adopt remedial measures for timely and successful completion of the project.  Aware of HSE, Permit to Work System requirements and onsite local working regulations in Hazardous Areas and live Oil & Gas and Power Plants.  Costing & Estimation of EPIC Projects E&I & Modification Works E&I especially in Oil & Gas, Infrastructure, Buildings, Power Transmission and Distribution and Energy Sector.  Preparation of BOQs, MTOs from Tender Documents and Drawings of EPC Projects.  Generation of Inquiries and Evaluation of different Suppliers, Venders/subcontractors proposals and quotations technically and commercially.  Preparation of Technical, Commercial and Management Documents for Projects as per project specific requirements.  Preparation of comparison statements of quotations from different vendors, suppliers and subcontractors.  Generation of Project Procurement Requirements based on Engineering Requisition Packages.  Close monitoring and follow-ups with different vendors, suppliers and subcontractors  Basic Design knowledge and study of MV/LV Power, Control Cable, Cable Routing, Cable Accessories, Layout Drawings, Switchgears, Transformers, Motors, Field Instruments, Generators, UPS System, LT Distribution Boxes, Junction Boxes, Cable Management Systems.  Career Summary November 2016 Till Date Designation: Deputy Manager E&I Company: Descon Engineering Limited Lahore Pakistan Major Clients:  Project Management Office Irrigation ( PMOI )  SMEC Australia September 2015 – August 2016: Designation: Project Engineer E&I Company: Al Yusr Industrial Contracting Co.Saudi Arabia (AYTB) Major Clients:  Saudi Chevron ( S-Chem) January 2008 –May 2015: Company: Descon Engineering Qatar LLC Designation: Senior Engineer E&I Major Clients:  SIEMENS QATAR LLC  QATAR GAS OPERATING COMPANY  RASGAS QATAR  Dolphin Energy Ltd  Q-Chemical  QAPCO  QAFCO  QATAR PETROLUM
  • 3.  ABB QATAR LLC  GE Qatar  TECHNIP  CTJV  CAEL  Sino hydro  JGC  RLOC February 2006 – December 2007: Designation: Engineer (Electrical) Company: Descon Engineering Limited Lahore Pakistan Major Clients:  BHP Zamzama Dadua ( Pakistan)  Oxechem Shaikhupura ( Pakistan) Major Executed Projects:  EPIC New Khanki Barrage Wazirabad ( NKB) ( November 2016 Till date )  Saudi Chevron IPT Projects ( Sep 2015 – August 2016)  Barzan Gas onshore Project. ( May 2014 – Dec 2014)  Replacement of UPS at Qatalum. ( Nov 2013 – Dec 2013)  EPIC of QG 2 Backup Power Supply System in Qatar Gas. ( May 2013 – Oct 2013)  EPIC for individual continuous Emission monitoring at Qatar Gas ( Sep 2012 – Dec 2012)  MEP Project at Lusail city with Sino Hydro. ( May 2012 –Aug 2012)  Construction work for Qatar gas purge reduction system at Qatar Gas. ( Oct 2011 – Dec 2011)  Installation and commissioning works for Lusail City CP1 66 kV GIS Substations in Lusail City SIEMENS/KAHRAMAA. ( March 2011 – Sep 2011)  Installation of cathodic protection system (Impressed current) at Qatar gas sea water area. ( Sep 2010 – Dec 2010)  DGF Purge gas system Project at Qatar Gas (May 2010 – Aug 2010)  CIWPP Project Ras-Lafan Qatar with SIDEM, France. ( May 2009 – March 2010)  Ras Lafan Olefin Projects. ( Jan 2008 – Jan 2009)  Oxychem Pvt ltd. ( Jul 2007 – Dec 2007)  BHP Zamzama Phase 2 ( Feb 2006 – Jun 2007) Major Tasks in project execution  Well versed in reading and understanding specifications, drawings, and all other discipline related project and engineering documentation.  Responsible to resolve site issues with consultation of the immediate in-charge/ Departmental Manager and coordination with client representatives.  Responsible for Completion of work within scheduled times without compromising on Quality, Health, Safety and Environment requirements.  Responsible to ensure that the subordinates understand and implement the work plan, by explaining and engaging in pro-active communication with the crews.  Responsible to coordinate with QA/QC department for Work Inspection Reports, snagging list clearance, Preparation of Method Statements, and As-Built Drawings.  Review project standard and specifications for construction. Monitoring overall performance in accordance with client requirements.  Developing project execution plan and strategies for completion of job in time, leading construction site teams for execution and supervision, and providing selection for the best
  • 4. technical /economical solutions for power system and assisting in carrying out for final inspection with client / consultant.  Submission of progress reports to the line manager, carrying out client meetings/walk downs to address with immediate action any unexpected technical problems or any kind of difficulties at the time of execution.  Electrical design documents reviewing and providing technical evaluations of power system.  Installation of 33 KV and 66 KV Gas Insulated Switchgear.  Installation of local Control cubicles (LCC) for 33 KV GIS and 66 KV GIS Switchgear  Removal and Re installation of 3.3 KV, 11 KV and 33 KV AIS switchgear., installation of copper bus bars and bus ducts for switchgears.  Hi pot test of switchgears  Installation of protection / control panels for switchgear  Installation and Inspection of Auxiliary and Power transformers along with assembly of parts. (1MVA to 40 MVA.) and Sergi System for protection of transformers  Installation and inspection of AVR panels and Transformer Rectifiers and capacitor banks for PF improvement.  Installation of LCP panels for Barrage gates Operation.  Installation of NGRs and earthing system and conducting earth resistance tests  Installation and inspection of LVAC switchgear, DCDBs and110 V DC battery bank system.  Installation and inspection of UPS fire Alarms system, PSS, VESDA and power management system.  Involve in installation of electrical systems and equipment and associated devices and control systems such as but not limited to the following: Medium and Low Voltage cables and raceways, Medium and Low Voltage Power Distribution System (33 kV, 66 kV), PDCS- Power Distribution Control System and interface with the DCS, Electrical Protection System, Programmable Logic Controllers-PLC(Siemens), Medium and Low Voltage Switchgears (ABB, AREVA,SIEMENS), VSD-Variable Speed Drives and Motor Control Centers, Medium and Low Voltage Motors, Power and Distribution Transformer.  Installation and testing of the cathodic protection systems (Impressed Current &Sacrificial).  Installation of HT/LT transmission line.  Installation of cable ladders, trays and trucking  Supervision of underground/above ground fiber optics cable lying and arranging OTDR Test.  Supervision of underground/above ground HV, MV, LV and control cable lying and Hi pot, IR tests for cables  Oversee the commissioning activities, to give technical solution for any problems encountered, to prepare and plan for each phase of the commissioning engineer.  Functional checks like start/stop, phase sequence and tripping test.  Installation and testing of plant/road lighting and small power outlets.  Monitoring RPM, Vibration, and Temperature of motors during Motor Solo run activity.  Installation of fire and gas system, SCADA system at well head facilities.  Installation of analyzers, Mass-spectrometer, Gas analyzers control valves and field instruments.  Installation of different process instruments PT, TT, LT, FT, DPT, VS, Radar Type Level Transmitters, Control Valves, On/ Off Valves , SDVs, TCVs, BDVs, loop checks and logic tests for DCS.  Serial Link checking between PLC and DCS and I/O list and cable schedule preparation.  Installation of Different types of instruments at Water reservoirs. Like, SCADA System Piezometers, Water Level Sensor, Gate Position Sensor, VOIP Ethernet
  • 5.  Installation of system cabinets like PLC, DCS, PCS, PSS, PAGA, FACP, Marshalling cabinets, Telecommunication cabinets, HMI in control room.  Installation of console set up in CCR.  Installation and testing of communication system i.e. PAGA system (Speakers, Beacons and Intercoms) with Their vendors.  Installation and inspection of Access Control system (Muster Point and Card Readers)  Installation of Plant Monitoring Cameras.(Movable PTZ CCTVs)  Close monitoring and follow-ups with different vendors, suppliers and subcontractors during different phases of the project.  Key role in planning of resources (manpower, equipment and tools) as per project requirements.  Key role in preparation of estimated man-hours requirement of the project  Key role in Project Planning, Scheduling and monitoring of different activities during different phases of the projects.  Monthly Invoicing and verification of BOQ and Drawing quantities variation.  Final invoicing and verification of BOQ Major ExecutedShutdowns  Dolphin Energy SD 2015  Qatar Chemical SD 2015  Ras Lafan Olefin Company Shutdown 2015  Qatar Gas Train 5 Shutdown 2015  Qatar Petroleum Refinery Shut down 2015  NGL Shutdown 2015  QAPCO SD 2014  Dolphin Energy SD 2014  QAFCO SD 2013  Qatar Petroleum annual SD 2013  Qatar Gas train 3 SD 2013  Dolphin energy SD 2013  Qatar Gas train 4 SD 2012  Qatar Chemical SD 2012  Dolphin Energy SD 2012  Qatar Gas Train 6& 7 SD 2011  Dolphin Energy SD 2011  FAHAHAIL ( FMNS) Stripping SD 2010  QAFCO Urea 4 and Ammonia 4 SD 2010  Qatar Gas train 3 SD 2010  Qatar Gas SD train 1 2009  Dolphin Energy Warranty Shutdown 2008/ 2009 Major Tasks in Shutdown execution  Evaluation of SOW, Procurement of material according to job and plant requirements and specifications  Preparation of Method of statements and JSA according to requirement of job.  Preparation of work packages to identify the SOW of supervisors, supervisor review and monitoring of the subcontractors works during SD ensure all compliance according to SOW and client requirements, discuss the technical quires on site, identify the problems causes the low productivity, dealing meetings with clients and company management over SD issues and plan.  During the Shut downs responsible to monitor all types E&I maintenance and new installation like all type of electrical maintenance like MV/HV switch gear & testing, relay adjustment with the concerned vendors and new electrical modification during the shutdowns like HV/LV panels, system panels, control panel UPS and new transformers, cable tray installation, cable laying testing and termination.  Installation of field instruments.
  • 6.  Installation of MV, LV Switchgear Panels, Control Panels, UPS system, Generators, GIS System, Distribution Transformers, LVAC/DC Panels.  Maintenance of HV/LV Switch gear & UPS with their concerned vendor.  Maintenance of heavy duty Electric motors in shutdown with client and subcontractors  Adjustment of relays (Electro Mechanical, Static & Microprocessor based) and circuit breakers of HV and LV switch gears of AREVA AND SCHINDER with the concerned vendors..  Laying, Termination & Testing of Power, Control & Instrument Cables.  Installation of Cable Trays, Ladders and Accessories.  Installation, Termination & Testing of Distribution & Junction Boxes.  Arrangement of temporary power supply at plants during Shutdowns  Pre installation calibration check and pre commissioning loop check of field instruments.  Overhauling and calibration of pneumatic and hydraulic control valves like,SDVs, On/ Off Valves, Safety Relief valves with vendor Worked with several vendors like AREVA, SCHINDER, ABB, EATON, SOLAR, Yokogava, Rosemount, Emerson, Job Responsibility as an Estimation Engineer E&I:  I had been involved an Estimation Engineer (Temporary Basis for critical E&I Proposal) in proposal Department reported to proposal manager, responsible for preparation and completion of Techno commercial proposals.  Preparation of bids for Shutdowns, Turnarounds, and small and mega project related to E&I On shore Oil Gas and fertilizers Plants.  Studying Tenders and review all their terms.  Sending clarification requests to the client, required for the tender´s scope of work & specifications  Sending inquires to subcontractors and suppliers.  Attending pre bid meeting and site visits, to evaluate scope of work and estimation of resources, regarding manpower, equipment’s and materials.  For compiling Techno Commercial proposal, preparing the complete cost of bid after analyzing and estimates whole tender and compiling in accordance with different discipline to evaluate the total cost of the project.  Attending commercial negotiation meetings with clients. Major Techno commercial proposal completed as an estimation engineer Electrical & Instrument  Qatar petroleum NGL-3 Shutdown 2009  Qatar Petroleum Fahahail Main North South and Striping plant shutdown 2010  Qatar Gas 7 years maintenance shutdown contract 2011 to 2016  Q-chem. SD 2012  Dolphin energy 3 years maintenance shut down contact 2011/2012/2013  Rasgas Train-1 & 2 Gantry Crane extension project.  Installation of new UPS at LQ platform QG offshore.  Rasgas Installation of Reverse Rotation checks valves on compressors.  Qatar gas ESU building relocation project.  Dolphin Camp removal project  QP Refinery SD 2013  QAFCO SD 2013  Dolphin energy SD maintenance contract 2014 to 2019  Qapco SD 2014  Dolphin energy 5 years maintenance shut down contact 2014 to 2018  Q-chem. SD 2015  RLOC SD 2015
  • 7.  QP Refinery SD 2015  Qatar petroleum NGL SD 2015  Back Feed Power Supply Project  Truck waving Installation Project  QP Refinery SD 2016  Nitrogen skimming project.  Rectification of vibration anomalies project.  Currently Working in Descon Engineering Limited Pakistan as Deputy Manager E&I in Infrastructure Division  Worked in ALYUSR INDUSTRIAL CONTRACTING CO. AYTB in Construction &fabrication department as Project Engineer E&I.  Worked in Descon Engineering Qatar LLC in plant maintenance and shutdowns department as Lead Senior Engineer Electrical& Instrument department handled E&l department in RLIC, MIC and Dukhan industrial area. Professional Trainings  CTMP Course from Descon Engineering Ltd. (DWHQ)  Management Development Program 1 ( DEQ Qatar )  H2S BA Training  Safety Induction  PTW Corse Qualified in QP, Q-Chem, QG and DEL  Work at height  Confined Space  Primavera, MS Office, Mat lab, ACCPAC, GDMS  DPMS,SMART,GDES,DCS Computer Proficiency  MS Office and its applications (Documentation)  Good Internet skills  Personal Details Father’s Name: Abdul Hameed Nationality: Pakistani Passport No: HV1152212 Religion: Islam D.O.B: 11 Feb. 1982 Marital Status: Married Having valid Saudi license.