SlideShare a Scribd company logo
1 of 6
REX D. SCOTT, P. ENG.
Rex.Scott@telus.net / (587) 785-3098
November 2016
SUMMARY OF EXPERIENCE
27 years’ experience in Department Management, Project Management, Electrical Engineering,
design, construction, Control System programming, commissioning and startup of electrical and
electronic control systems in the oil and gas industry.
EDUDCATION / CERTIFICATES / COURSES
Association of Professional Engineers and Geoscientists of Alberta (APEGA)
Association of Professional Engineers and Geoscientists of British Colombia (APEG)
B. Sc. in Electrical Engineering, University of Calgary, 1989
Protection & Relaying of High Voltage Systems, SAIT, 1990
CSA - Member of Technical Subcommittee for C22.2 No. 254-05 Motor Control Centers
Objective Based Industrial Electrical Code - Member/Writer for Sect. 8 Design
Many misc. industry training courses, ie. LSE, H2S, First Aid, etc.
FUNCTIONS/RESPONSIBILITIES
• Managing Departments
• Managing Projects
• Maintaining Project budgets and
Schedule
• Power system engineering and design
• Power System studies on eTap and SKM
• Field commissioning of controls,
instrumentation, switchgear
• Client Relations
• Facility startups
• Electrical utility co-ordination
• Writing and managing electrical/instrumentation
contracts
• PLC programming
• Control systems engineering
• Arc flash, Motor Starting, Relay Coordination Studies
• Writing and maintaining corporate Specifications
EMPLOYMENT HISTORY
2016 Jan-Sep ILF Engineering Consultants (Contract Consulting)
Commissioning Engineer
2011 – 2016 Pyramid Process Fabricators (Contract Consulting)
Sr. Project Manager and Manager of Projects
2004 – 2011 DPH Engineering Inc. (Focus)
Manager of Electrical & Instrumentation Engineering
1993 – 2004 DPH Engineering Inc.
Senior Electrical/Controls Engineer
1991 – 1993 Raffin Systems Ltd.
Systems Engineer
1989 – 1991 Shell Canada Limited
Electrical Engineer
Summer 1988 Chevron Canada Resources
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22
DETAILED PROFESSIONAL EXPERIENCE
ILF Consultants (Calgary) (Contract Consulting) Jan – Sep 2016
San Luis Potosi & Queretaro, Mexico
Commissioning Engineer – Responsibilities include Full technical responsibility for planning,
organizing, and conducting technical tasks on a broad range of Electrical engineering methods and
techniques in order to confirm Mechanical completion, pre-commissioning, and of the electrical
systems and sub-systems then performing the commissioning and forward reports to bring facility up
to a ready to start condition. This was required for multiple stations along the 290 KM of 42 inch
Pipeline. This was a short term commissioning assignment.
Pyramid Process Fabricators (Contract Consulting) 2011 - 2016
Nisku, Alberta
Manager of Projects – Responsibilities include Project Department Development, Department
Processes and Procedures, Develop Roles and Responsibilities of various department positions,
Staffing of Department, Performing Performance and Salary reviews.
Sr. Project Manager – Responsibilities include Project Development from initial contract to project
closure. This would include scheduling, contract review, budgeting, and trending of Project aspects,
this would include such things as change management, Request for Information (RFI), Non
Compliance Reporting (NCR), Document Management Systems, Reporting, Adherence to Project
Specifications and Deliverables.
DPH Engineering Inc. (DPH Focus) 1993 - 2011
Calgary, Alberta
Manager of Electrical & Instrumentation Engineering – Responsibilities include the supervision of
Engineers and Technologists engaged in Engineering, Design, Equipment specifications, Project
Specifications, Contract Management, Control system programming for many oil and gas production
projects. Other department duties include staffing, Mentoring Junior and Intermediate employees,
QA/QC and departmental organization.
Electrical Engineer - Responsibilities include Project Engineering, all aspects of Contract
Management, Electrical power and control system engineering, Control system programming, HMI
(Human Machine Interface) configurations.
Electrical/Project Engineering
• Suncor Fort Hills – Project Manager for four 4000 HP Electric Driven Slurry Booster pump
houses.
• Shell Scottsford – Project Manager for Modular E-House
• Conoco Surmont 2 – Project Manager for 8 Modular E-houses for Power Distribution through the
Conoco Surmont 2 facility
• Williams Energy – Replacement of the input water cooled transformer on a 19,000 hp VFD in the
Suncor facility.
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22
• PanCanadian Petroleum Ltd. - Consort Well Head Management System - Designed then
purchased all necessary equipment to remote control 40 Wellhead VFD’s via radio
communications. Programmed the Hub PLC and created all computer Graphics for the remote
control.
• Novagas Canada Ltd. - Electrical Design for nine RTU facilities. These RTU facilities included,
block valve sites, meter station sites, and a liquids storage facility.
• PanCanadian Petroleum Ltd. – Upgraded a 425 kW Induction Generator to sell power to the
pool.
• PanCanadian Petroleum Ltd. – Designed and specified 500 kW and 750 kW Induction
Generators for bulk purchase, these units were to be used for selling power back to the Alberta
grid.
• Conoco. – Installation of Nine Induction Generators - 150 – 275 kW, in the Red Earth area, these
were to burn flare gas and generator power to the Alberta grid.
• EnCana – Upgraded 5 kV switchgear and two motors from 2000 hp to 2700 hp for
debottlenecking of gas compressor.
PLC Programming and/or Graphic HMI’s
• PanCanadian Petroleum Limited - Wayne Dalum Desiccant Plant
• Norcen Petroleum - Hays-Enchant Battery
• PanCanadian Petroleum Limited - Twinning Water Injection
• PanCanadian Petroleum - Dimsdale Compressor addition
• PanCanadian Petroleum Limited - Leahurst Oil Battery
• PanCanadian Petroleum - Provost Oil Battery and Water Injection
• PanCanadian Petroleum Limited - Morning Side Compressor Station
• PanCanadian Petroleum - Gayford South Gas Plant
• Norcen Petroleum Limited - Sunset Compressor Station
• Enerplus - Dehydration and Separation
• PanCanadian Petroleum Limited - Consort Oil Battery
• PanCanadian Petroleum - Gayford Nightingale Compressor Station
• Gulf Canada Resources - Compressor Station
• PanCanadian Petroleum - Golden Lake Oil Facility
• PanCanadian Petroleum - Frog Lake
Electrical Engineering/Design
• EnCana – Lyalta – installation of 1200 hp electrically driven compressor c/w all associated 5 kV
switchgear.
• EnCana – Bantry – Added 1725 hp electrically driven compressor c/w all associated 5 kV
switchgear.
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22
• Progress Energy – West Clark Lake Compressor Station – Added 1850 hp engine driven
compressor.
• EnCana – Verger South – Addition of two engine driven compressors, 810 hp and 530 hp.
• EnCana – Wilson Creek – Addition of two 1100 hp engine driven compressors.
• EnCana – Empress Debutanizer – Modified 13.8 kV switchgear and added distribution and
control of equipment.
• EnCana – Distributed Generation – Addition of five 1400 kW gas engine powered generators to
sell power back to the grid.
• Apache Canada – Northern BC Dual primer Powered – Onsite generation for three facilities.
• PanCanadian Petroleum Limited - Wayne Dalum Refrigeration and Compressor Addition -
Included one electric driven refrigeration compressor, 1200 hp gas driven compressor and
control system upgrade on new and existing facilities.
• PanCanadian Petroleum Limited - Dimsdale Compressor Addition - 1200 hp gas driven
compressor, complete with associated electrical upgrades.
• PanCanadian Petroleum Limited - Redlands Gas Plant Compressor Addition - 1600 hp gas
driven compressor, complete with associated electrical upgrades.
• PanCanadian Petroleum Limited - Gayford Nightingale Compressor Station - 2 x 1200 hp gas
driven compressors, one electric driven 1200 hp booster complete with associated electrical
upgrades.
• PanCanadian Petroleum Limited - Redland 8-23 Compressor Station - 1200 hp gas driven
compressor.
• PanCanadian Petroleum Limited - Westerose Compressor Station - 1200 hp gas driven
compressor.
• PanCanadian Petroleum Limited - Bassano Gas Plant - 2 x 1200 hp gas driven compressor and
one electric driven Refrigeration Compressor.
• PanCanadian Petroleum Limited - Entice Bearspaw Compressor Addition - 600 hp electric driven
compressor.
• Novagas Canada Ltd. - Taylor Shipping Station - 3 x 450 hp shipping pumps on variable
frequency drives.
• Apache Canada Ltd. – Added 200 hp Refrigeration Plant to the existing Clive Compressor
Stations.
• Apache Canada Ltd. - Tees Gas Plant - PLC Panel, MCC, UPS, for 2 x 1100 hp gas driven
Compressors, one 800 hp gas driven compressor, 2 separator packages, 150 hp electric driven
Refrigeration Plant, Dehydration Package.
• NovaGas Canada Ltd. – Taylor Straddle Plant - 2 x 8500 hp Compressors with electric drives.
• AEC. – Gas Storage at Hythe - 5000 hp electric Motor on an Auto-transformer start.
• Gulf Rimbey Gas Plant. – Sulphur Recovery Unit - Modified existing 4000 amp low voltage
switchgear.
• Gulf Midstream Services. – Sour Fuel Gas Cleanup - Added two 200 hp electric compressors to
a weak system.
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22
• PanCanadian Petroleum. - Lyalta Compressor Station - Two 1200 hp Engine driven
compressors and one 1200 hp electric driven Booster Compressor, Dehy, Separator, MCC
Building, etc.
• PanCanadian Petroleum. - Lyalta Booster Station - One 1200 hp electric driven compressor.
Raffin Systems Ltd. - December 1991 – 1993
Calgary, Alberta
Systems Engineer:
Responsibilities included designing and manufacturing of custom control panels for Syncrude Canada
and the City of Calgary.
• Participated in startup and commissioning of a 9000 hp hydrogen compressor.
• Programmed on Allen-Bradley PLC 5/30 to apply field excitation to a 9000 hp synchronous
motor, to perform back up shutdowns, to monitor many electrical dynamic variables via
communications to a Multilin 269+ protective relay.
• Designed and drafted all drawings for field and manufacturing of a generator control panel for
two 2.5 MW diesel generators.
• Successfully tested a new Allen-Bradley Line Synchronisation Module (prototype) at SAIT.
Shell Canada Limited - May 1989 - November 1991
Calgary, Alberta
Electrical Engineer, Engineering Services, Engineering & Construction Department:
Responsibilities included: engineering and construction of projects, managing contractors, approving
electrical drawings, technical support to operating facilities, and introducing European products into
hazardous areas.
• Participated in negotiations with Alberta Power Ltd. on contract demand, substation design and
re-routing of a transmission line that saved Shell a capital contribution of $1 Million.
• Classified hazardous areas from Class I, Division 1 to Class I, Division 2 by introducing
mechanical ventilation that resulted in reduced costs and increased safety.
• Applications of variable frequency drives as phase converters.
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22
• PanCanadian Petroleum. - Lyalta Compressor Station - Two 1200 hp Engine driven
compressors and one 1200 hp electric driven Booster Compressor, Dehy, Separator, MCC
Building, etc.
• PanCanadian Petroleum. - Lyalta Booster Station - One 1200 hp electric driven compressor.
Raffin Systems Ltd. - December 1991 – 1993
Calgary, Alberta
Systems Engineer:
Responsibilities included designing and manufacturing of custom control panels for Syncrude Canada
and the City of Calgary.
• Participated in startup and commissioning of a 9000 hp hydrogen compressor.
• Programmed on Allen-Bradley PLC 5/30 to apply field excitation to a 9000 hp synchronous
motor, to perform back up shutdowns, to monitor many electrical dynamic variables via
communications to a Multilin 269+ protective relay.
• Designed and drafted all drawings for field and manufacturing of a generator control panel for
two 2.5 MW diesel generators.
• Successfully tested a new Allen-Bradley Line Synchronisation Module (prototype) at SAIT.
Shell Canada Limited - May 1989 - November 1991
Calgary, Alberta
Electrical Engineer, Engineering Services, Engineering & Construction Department:
Responsibilities included: engineering and construction of projects, managing contractors, approving
electrical drawings, technical support to operating facilities, and introducing European products into
hazardous areas.
• Participated in negotiations with Alberta Power Ltd. on contract demand, substation design and
re-routing of a transmission line that saved Shell a capital contribution of $1 Million.
• Classified hazardous areas from Class I, Division 1 to Class I, Division 2 by introducing
mechanical ventilation that resulted in reduced costs and increased safety.
• Applications of variable frequency drives as phase converters.
/unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc
2015.06.22

More Related Content

What's hot

What's hot (20)

RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Selva updated resume
Selva updated resumeSelva updated resume
Selva updated resume
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Resume
ResumeResume
Resume
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
electrician
electricianelectrician
electrician
 
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
Rich Mathias CV 2016
Rich Mathias CV 2016Rich Mathias CV 2016
Rich Mathias CV 2016
 
MOST_UPDATED_CV
MOST_UPDATED_CVMOST_UPDATED_CV
MOST_UPDATED_CV
 
Professional life
Professional lifeProfessional life
Professional life
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
TEXT RESUME FOR SENDING
TEXT RESUME FOR SENDINGTEXT RESUME FOR SENDING
TEXT RESUME FOR SENDING
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 

Viewers also liked

The art of shifting perspectives - Rachel Davies
The art of shifting perspectives - Rachel DaviesThe art of shifting perspectives - Rachel Davies
The art of shifting perspectives - Rachel DaviesJAXLondon_Conference
 
Text and data mining - the opportunities and the EU conundrum - why aren’t we...
Text and data mining - the opportunities and the EU conundrum - why aren’t we...Text and data mining - the opportunities and the EU conundrum - why aren’t we...
Text and data mining - the opportunities and the EU conundrum - why aren’t we...FutureTDM
 
IT 101 for Entrepreneurs
IT 101 for EntrepreneursIT 101 for Entrepreneurs
IT 101 for EntrepreneursMichael King
 
Visita al Alcázar de los Reyes Católicos
Visita al Alcázar de los Reyes CatólicosVisita al Alcázar de los Reyes Católicos
Visita al Alcázar de los Reyes Católicospimasan
 
Lesson 1 visual illusion
Lesson 1   visual illusionLesson 1   visual illusion
Lesson 1 visual illusioncoburgpsych
 
Use of hog descriptors in phishing detection
Use of hog descriptors in phishing detectionUse of hog descriptors in phishing detection
Use of hog descriptors in phishing detectionSelman Bozkır
 
Ch05 Concepts, Operationalization, and Measurement
Ch05 Concepts, Operationalization, and MeasurementCh05 Concepts, Operationalization, and Measurement
Ch05 Concepts, Operationalization, and Measurementyxl007
 
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσης
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσηςΣύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσης
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσηςAthanasios Nousis
 
Literature Reviews and APA style
Literature Reviews and APA styleLiterature Reviews and APA style
Literature Reviews and APA stylephdserena
 
Les universités françaises et l'Open Data après la loi "République numérique"
Les universités françaises et l'Open Data après la loi "République numérique"Les universités françaises et l'Open Data après la loi "République numérique"
Les universités françaises et l'Open Data après la loi "République numérique"Calimaq S.I.Lex
 
Workshop ict inclusief publiversie
Workshop ict inclusief publiversieWorkshop ict inclusief publiversie
Workshop ict inclusief publiversieJan De Craemer
 
AOPs Report on Resiliency (Final)
AOPs Report on Resiliency (Final)AOPs Report on Resiliency (Final)
AOPs Report on Resiliency (Final)Steve Gao
 
Basic: Bulgarian wine regions
Basic: Bulgarian wine regionsBasic: Bulgarian wine regions
Basic: Bulgarian wine regionsMelinda Dothan
 
2015 Player Personnel-Scouting Portfolio
2015 Player Personnel-Scouting Portfolio2015 Player Personnel-Scouting Portfolio
2015 Player Personnel-Scouting PortfolioRashad Elby
 

Viewers also liked (19)

The art of shifting perspectives - Rachel Davies
The art of shifting perspectives - Rachel DaviesThe art of shifting perspectives - Rachel Davies
The art of shifting perspectives - Rachel Davies
 
Text and data mining - the opportunities and the EU conundrum - why aren’t we...
Text and data mining - the opportunities and the EU conundrum - why aren’t we...Text and data mining - the opportunities and the EU conundrum - why aren’t we...
Text and data mining - the opportunities and the EU conundrum - why aren’t we...
 
IT 101 for Entrepreneurs
IT 101 for EntrepreneursIT 101 for Entrepreneurs
IT 101 for Entrepreneurs
 
Visita al Alcázar de los Reyes Católicos
Visita al Alcázar de los Reyes CatólicosVisita al Alcázar de los Reyes Católicos
Visita al Alcázar de los Reyes Católicos
 
Lesson 1 visual illusion
Lesson 1   visual illusionLesson 1   visual illusion
Lesson 1 visual illusion
 
Use of hog descriptors in phishing detection
Use of hog descriptors in phishing detectionUse of hog descriptors in phishing detection
Use of hog descriptors in phishing detection
 
Ch05 Concepts, Operationalization, and Measurement
Ch05 Concepts, Operationalization, and MeasurementCh05 Concepts, Operationalization, and Measurement
Ch05 Concepts, Operationalization, and Measurement
 
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσης
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσηςΣύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσης
Σύγχρονες τεχνολογίες στη διαδικασία θεραπευτικής αφαίρεσης
 
Literature Reviews and APA style
Literature Reviews and APA styleLiterature Reviews and APA style
Literature Reviews and APA style
 
Les universités françaises et l'Open Data après la loi "République numérique"
Les universités françaises et l'Open Data après la loi "République numérique"Les universités françaises et l'Open Data après la loi "République numérique"
Les universités françaises et l'Open Data après la loi "République numérique"
 
Workshop ict inclusief publiversie
Workshop ict inclusief publiversieWorkshop ict inclusief publiversie
Workshop ict inclusief publiversie
 
AOPs Report on Resiliency (Final)
AOPs Report on Resiliency (Final)AOPs Report on Resiliency (Final)
AOPs Report on Resiliency (Final)
 
Slides-Soutenance-Pi2-English
Slides-Soutenance-Pi2-EnglishSlides-Soutenance-Pi2-English
Slides-Soutenance-Pi2-English
 
Basic: Bulgarian wine regions
Basic: Bulgarian wine regionsBasic: Bulgarian wine regions
Basic: Bulgarian wine regions
 
BRANCAS pro
BRANCAS proBRANCAS pro
BRANCAS pro
 
Aulafacil y aulaclic diapositivas
Aulafacil y aulaclic diapositivasAulafacil y aulaclic diapositivas
Aulafacil y aulaclic diapositivas
 
Capacitación
CapacitaciónCapacitación
Capacitación
 
2015 Player Personnel-Scouting Portfolio
2015 Player Personnel-Scouting Portfolio2015 Player Personnel-Scouting Portfolio
2015 Player Personnel-Scouting Portfolio
 
SpiesFinalEthics
SpiesFinalEthicsSpiesFinalEthics
SpiesFinalEthics
 

Similar to Rex Scott 2016-11-03 resume (20)

ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
 
AdamEshkanian_EngProjects
AdamEshkanian_EngProjectsAdamEshkanian_EngProjects
AdamEshkanian_EngProjects
 
venkatCV
venkatCVvenkatCV
venkatCV
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 
CV_ RKS 2016
CV_ RKS 2016 CV_ RKS 2016
CV_ RKS 2016
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan Resume 2
Mahmood Hasan Resume 2
 
CV-JAYA MISHRA
CV-JAYA MISHRACV-JAYA MISHRA
CV-JAYA MISHRA
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
RamCV1
RamCV1RamCV1
RamCV1
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
Raghu Resume
Raghu Resume Raghu Resume
Raghu Resume
 
Raju cv
Raju cv Raju cv
Raju cv
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 

Rex Scott 2016-11-03 resume

  • 1. REX D. SCOTT, P. ENG. Rex.Scott@telus.net / (587) 785-3098 November 2016 SUMMARY OF EXPERIENCE 27 years’ experience in Department Management, Project Management, Electrical Engineering, design, construction, Control System programming, commissioning and startup of electrical and electronic control systems in the oil and gas industry. EDUDCATION / CERTIFICATES / COURSES Association of Professional Engineers and Geoscientists of Alberta (APEGA) Association of Professional Engineers and Geoscientists of British Colombia (APEG) B. Sc. in Electrical Engineering, University of Calgary, 1989 Protection & Relaying of High Voltage Systems, SAIT, 1990 CSA - Member of Technical Subcommittee for C22.2 No. 254-05 Motor Control Centers Objective Based Industrial Electrical Code - Member/Writer for Sect. 8 Design Many misc. industry training courses, ie. LSE, H2S, First Aid, etc. FUNCTIONS/RESPONSIBILITIES • Managing Departments • Managing Projects • Maintaining Project budgets and Schedule • Power system engineering and design • Power System studies on eTap and SKM • Field commissioning of controls, instrumentation, switchgear • Client Relations • Facility startups • Electrical utility co-ordination • Writing and managing electrical/instrumentation contracts • PLC programming • Control systems engineering • Arc flash, Motor Starting, Relay Coordination Studies • Writing and maintaining corporate Specifications EMPLOYMENT HISTORY 2016 Jan-Sep ILF Engineering Consultants (Contract Consulting) Commissioning Engineer 2011 – 2016 Pyramid Process Fabricators (Contract Consulting) Sr. Project Manager and Manager of Projects 2004 – 2011 DPH Engineering Inc. (Focus) Manager of Electrical & Instrumentation Engineering 1993 – 2004 DPH Engineering Inc. Senior Electrical/Controls Engineer 1991 – 1993 Raffin Systems Ltd. Systems Engineer 1989 – 1991 Shell Canada Limited Electrical Engineer Summer 1988 Chevron Canada Resources /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22
  • 2. DETAILED PROFESSIONAL EXPERIENCE ILF Consultants (Calgary) (Contract Consulting) Jan – Sep 2016 San Luis Potosi & Queretaro, Mexico Commissioning Engineer – Responsibilities include Full technical responsibility for planning, organizing, and conducting technical tasks on a broad range of Electrical engineering methods and techniques in order to confirm Mechanical completion, pre-commissioning, and of the electrical systems and sub-systems then performing the commissioning and forward reports to bring facility up to a ready to start condition. This was required for multiple stations along the 290 KM of 42 inch Pipeline. This was a short term commissioning assignment. Pyramid Process Fabricators (Contract Consulting) 2011 - 2016 Nisku, Alberta Manager of Projects – Responsibilities include Project Department Development, Department Processes and Procedures, Develop Roles and Responsibilities of various department positions, Staffing of Department, Performing Performance and Salary reviews. Sr. Project Manager – Responsibilities include Project Development from initial contract to project closure. This would include scheduling, contract review, budgeting, and trending of Project aspects, this would include such things as change management, Request for Information (RFI), Non Compliance Reporting (NCR), Document Management Systems, Reporting, Adherence to Project Specifications and Deliverables. DPH Engineering Inc. (DPH Focus) 1993 - 2011 Calgary, Alberta Manager of Electrical & Instrumentation Engineering – Responsibilities include the supervision of Engineers and Technologists engaged in Engineering, Design, Equipment specifications, Project Specifications, Contract Management, Control system programming for many oil and gas production projects. Other department duties include staffing, Mentoring Junior and Intermediate employees, QA/QC and departmental organization. Electrical Engineer - Responsibilities include Project Engineering, all aspects of Contract Management, Electrical power and control system engineering, Control system programming, HMI (Human Machine Interface) configurations. Electrical/Project Engineering • Suncor Fort Hills – Project Manager for four 4000 HP Electric Driven Slurry Booster pump houses. • Shell Scottsford – Project Manager for Modular E-House • Conoco Surmont 2 – Project Manager for 8 Modular E-houses for Power Distribution through the Conoco Surmont 2 facility • Williams Energy – Replacement of the input water cooled transformer on a 19,000 hp VFD in the Suncor facility. /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22
  • 3. • PanCanadian Petroleum Ltd. - Consort Well Head Management System - Designed then purchased all necessary equipment to remote control 40 Wellhead VFD’s via radio communications. Programmed the Hub PLC and created all computer Graphics for the remote control. • Novagas Canada Ltd. - Electrical Design for nine RTU facilities. These RTU facilities included, block valve sites, meter station sites, and a liquids storage facility. • PanCanadian Petroleum Ltd. – Upgraded a 425 kW Induction Generator to sell power to the pool. • PanCanadian Petroleum Ltd. – Designed and specified 500 kW and 750 kW Induction Generators for bulk purchase, these units were to be used for selling power back to the Alberta grid. • Conoco. – Installation of Nine Induction Generators - 150 – 275 kW, in the Red Earth area, these were to burn flare gas and generator power to the Alberta grid. • EnCana – Upgraded 5 kV switchgear and two motors from 2000 hp to 2700 hp for debottlenecking of gas compressor. PLC Programming and/or Graphic HMI’s • PanCanadian Petroleum Limited - Wayne Dalum Desiccant Plant • Norcen Petroleum - Hays-Enchant Battery • PanCanadian Petroleum Limited - Twinning Water Injection • PanCanadian Petroleum - Dimsdale Compressor addition • PanCanadian Petroleum Limited - Leahurst Oil Battery • PanCanadian Petroleum - Provost Oil Battery and Water Injection • PanCanadian Petroleum Limited - Morning Side Compressor Station • PanCanadian Petroleum - Gayford South Gas Plant • Norcen Petroleum Limited - Sunset Compressor Station • Enerplus - Dehydration and Separation • PanCanadian Petroleum Limited - Consort Oil Battery • PanCanadian Petroleum - Gayford Nightingale Compressor Station • Gulf Canada Resources - Compressor Station • PanCanadian Petroleum - Golden Lake Oil Facility • PanCanadian Petroleum - Frog Lake Electrical Engineering/Design • EnCana – Lyalta – installation of 1200 hp electrically driven compressor c/w all associated 5 kV switchgear. • EnCana – Bantry – Added 1725 hp electrically driven compressor c/w all associated 5 kV switchgear. /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22
  • 4. • Progress Energy – West Clark Lake Compressor Station – Added 1850 hp engine driven compressor. • EnCana – Verger South – Addition of two engine driven compressors, 810 hp and 530 hp. • EnCana – Wilson Creek – Addition of two 1100 hp engine driven compressors. • EnCana – Empress Debutanizer – Modified 13.8 kV switchgear and added distribution and control of equipment. • EnCana – Distributed Generation – Addition of five 1400 kW gas engine powered generators to sell power back to the grid. • Apache Canada – Northern BC Dual primer Powered – Onsite generation for three facilities. • PanCanadian Petroleum Limited - Wayne Dalum Refrigeration and Compressor Addition - Included one electric driven refrigeration compressor, 1200 hp gas driven compressor and control system upgrade on new and existing facilities. • PanCanadian Petroleum Limited - Dimsdale Compressor Addition - 1200 hp gas driven compressor, complete with associated electrical upgrades. • PanCanadian Petroleum Limited - Redlands Gas Plant Compressor Addition - 1600 hp gas driven compressor, complete with associated electrical upgrades. • PanCanadian Petroleum Limited - Gayford Nightingale Compressor Station - 2 x 1200 hp gas driven compressors, one electric driven 1200 hp booster complete with associated electrical upgrades. • PanCanadian Petroleum Limited - Redland 8-23 Compressor Station - 1200 hp gas driven compressor. • PanCanadian Petroleum Limited - Westerose Compressor Station - 1200 hp gas driven compressor. • PanCanadian Petroleum Limited - Bassano Gas Plant - 2 x 1200 hp gas driven compressor and one electric driven Refrigeration Compressor. • PanCanadian Petroleum Limited - Entice Bearspaw Compressor Addition - 600 hp electric driven compressor. • Novagas Canada Ltd. - Taylor Shipping Station - 3 x 450 hp shipping pumps on variable frequency drives. • Apache Canada Ltd. – Added 200 hp Refrigeration Plant to the existing Clive Compressor Stations. • Apache Canada Ltd. - Tees Gas Plant - PLC Panel, MCC, UPS, for 2 x 1100 hp gas driven Compressors, one 800 hp gas driven compressor, 2 separator packages, 150 hp electric driven Refrigeration Plant, Dehydration Package. • NovaGas Canada Ltd. – Taylor Straddle Plant - 2 x 8500 hp Compressors with electric drives. • AEC. – Gas Storage at Hythe - 5000 hp electric Motor on an Auto-transformer start. • Gulf Rimbey Gas Plant. – Sulphur Recovery Unit - Modified existing 4000 amp low voltage switchgear. • Gulf Midstream Services. – Sour Fuel Gas Cleanup - Added two 200 hp electric compressors to a weak system. /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22
  • 5. • PanCanadian Petroleum. - Lyalta Compressor Station - Two 1200 hp Engine driven compressors and one 1200 hp electric driven Booster Compressor, Dehy, Separator, MCC Building, etc. • PanCanadian Petroleum. - Lyalta Booster Station - One 1200 hp electric driven compressor. Raffin Systems Ltd. - December 1991 – 1993 Calgary, Alberta Systems Engineer: Responsibilities included designing and manufacturing of custom control panels for Syncrude Canada and the City of Calgary. • Participated in startup and commissioning of a 9000 hp hydrogen compressor. • Programmed on Allen-Bradley PLC 5/30 to apply field excitation to a 9000 hp synchronous motor, to perform back up shutdowns, to monitor many electrical dynamic variables via communications to a Multilin 269+ protective relay. • Designed and drafted all drawings for field and manufacturing of a generator control panel for two 2.5 MW diesel generators. • Successfully tested a new Allen-Bradley Line Synchronisation Module (prototype) at SAIT. Shell Canada Limited - May 1989 - November 1991 Calgary, Alberta Electrical Engineer, Engineering Services, Engineering & Construction Department: Responsibilities included: engineering and construction of projects, managing contractors, approving electrical drawings, technical support to operating facilities, and introducing European products into hazardous areas. • Participated in negotiations with Alberta Power Ltd. on contract demand, substation design and re-routing of a transmission line that saved Shell a capital contribution of $1 Million. • Classified hazardous areas from Class I, Division 1 to Class I, Division 2 by introducing mechanical ventilation that resulted in reduced costs and increased safety. • Applications of variable frequency drives as phase converters. /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22
  • 6. • PanCanadian Petroleum. - Lyalta Compressor Station - Two 1200 hp Engine driven compressors and one 1200 hp electric driven Booster Compressor, Dehy, Separator, MCC Building, etc. • PanCanadian Petroleum. - Lyalta Booster Station - One 1200 hp electric driven compressor. Raffin Systems Ltd. - December 1991 – 1993 Calgary, Alberta Systems Engineer: Responsibilities included designing and manufacturing of custom control panels for Syncrude Canada and the City of Calgary. • Participated in startup and commissioning of a 9000 hp hydrogen compressor. • Programmed on Allen-Bradley PLC 5/30 to apply field excitation to a 9000 hp synchronous motor, to perform back up shutdowns, to monitor many electrical dynamic variables via communications to a Multilin 269+ protective relay. • Designed and drafted all drawings for field and manufacturing of a generator control panel for two 2.5 MW diesel generators. • Successfully tested a new Allen-Bradley Line Synchronisation Module (prototype) at SAIT. Shell Canada Limited - May 1989 - November 1991 Calgary, Alberta Electrical Engineer, Engineering Services, Engineering & Construction Department: Responsibilities included: engineering and construction of projects, managing contractors, approving electrical drawings, technical support to operating facilities, and introducing European products into hazardous areas. • Participated in negotiations with Alberta Power Ltd. on contract demand, substation design and re-routing of a transmission line that saved Shell a capital contribution of $1 Million. • Classified hazardous areas from Class I, Division 1 to Class I, Division 2 by introducing mechanical ventilation that resulted in reduced costs and increased safety. • Applications of variable frequency drives as phase converters. /unoconv/20161115184338_1ec621e30454162c3a6b91baaa60b5e049e37e34/5d919be2-102d-409e-81f3-388b242af4b9-161115184338.doc 2015.06.22