Career Objective
To take up a challenging and innovative job for which I can use my technical and interpersonal skills as part of
a team to increase my level of expertise.
Areas of Expertise- :
• Overall 13+ years of Experience in GIS Sub-Station, Transmission & Distribution Projects.
• Turnkey Project Planning, Scheduling and Monitoring.
• Order Handling & Execution of project
• Handling all construction activities including providing technical inputs for methodologies of
construction & coordination with site management activities.
• Managing site execution, planning co-ordination, construction of transmission line and construction
of GIS Sub-station, HT & LT Networks
• Planning, Procurement, Client relation and Project Co-ordination.
• Complete Material Assessment and Preparation of BOQ.
Role and Responsibility
• Preparation, monitoring, controlling of project execution plans and reporting.
• Manage (plan, steer, follow-up, analyze and report) contracted projects in close
cooperation with the Project Manager according to project execution plans.
• Co-ordinate with clients and resolves their requests promptly, courteously & professionally.
• Implementation of Safety rules, regulation and Clients & company Safety policies at site.
• Quality Assurance and Quality Control of materials and electrical work.
Major Strength
• Flexible in learning New Technologies and creating innovative ideas.
• Variable to change.
• Result Oriented within the given span of time.
1|P a g e
• Comprehensive problem solving ability.
•
Career summary:
1. May 2015 to Present:
Organization : Mohammed Al-Ojaimi Contracting Est.
132KV Projects Division.
Designation : Assistance Project Manager for New construction 132/13.8kv GIS
Substation in Al- Mahdiyah SS# 8244, Riyadh.
Client : SAUDI ELECTRICITY COMPANY, NGSA, KSA
2. August 2013 to April 2015:
Organization : MASCO GROUP of Companies
Advanced Energy Construction Company- Power Projects
Division.
Designation : Site Manager for New construction 132/13.8kv GIS Substation in Al-
Faisalyah & Al-Mansurah SS# 8158 and SS# 8186, Riyadh.
3. Client : SAUDI ELECTRICITY COMPANY, NGSA, KSA
4. August 2012 to July 2013:
Organization : OVERSEAS INSFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LTD
Power Projects Division. Mozambique, Africa.
Designation : Field Construction Engineer
Client : ELECTRICIDADE DE MOCAMBIQUE, Mozambique,
5. January 2008 to July 2012:
Organization : ABB - Power Projects Division.
Designation : Site Manager
Client : Power Grid Corporation of India (PGCIL)
6. February 2006 to December 2007:
Organization : Sterling and Wilson Limited, Power Projects Division
Designation : Project Engineer
2|P a g e
Client : Power Grid Corporation of India (PGCIL)
: Damodar Valley Corporation of India (DVC)
7. August 2004 to January 2006:
Organization : Rajdhani BSES, Power Projects Division
Designation : Site Engineer
Professional Experiences
Current job
Presently working with Mohammed Al-Ojaimi Contracting Est 132KV Projects
Division
PROJECTS
Working as a Site Manager for Al-Mahdiyah – S/S 8244 Substation Project (GIS Substation 132/13.8KV) in
Riyadh.
The aim of this Project is to construct a new 132/13.8 kV Substation to meet load requirements of Riyadh.
Description of Project
• One (1) no. 132 SF6 Gas Insulated Switchgear (GIS) with ten (10) nos. 132 KV GIS Circuit Breakers
and associated equipment
• Three (3) nos. 132/13.8kv, 67MVA Power Transformers
• One (1) 13.8kv Switchgear with forty-four (44) nos. 13.8kv Switchgear circuit breaker panels.
• Three (3) nos. 13.8kv, 7MVAR Capacitor Bank & Associated equipment.
• Remotely controlled through SCADA system through Gateway& fiber optic channels from the
Central Regional Control Center (CRCC).
Activities
• Construction of new 132KV/13.8KV GIS Substation as per approved design conforming to standards
including earthing etc.
• Installation of 132KV 10 bay GIB with all fittings and earthing as per approved drawings.
• Installation of 132KV/13.8KV Power Transformer of Capacity 67 MVA with all fittings and earthing as
per approved drawings.
• Installation of all 13.8KV Switchgear Panel on Switchgear with all accessories including earthing as
per approved drawings.
• Cabling from all equipment to control panels.
• Testing and commissioning of all equipment’s (GIS, Switcher gear, POWER T/F)
• Handling of Client in explaining the Site Situation and Progress.
• Handling of Sub Contractors to execute the work effectively.
Previous jobs
Advanced Energy Company (AECC), (Sister Concern of “MASCO”). (Saudi Arabia)
From August 2013 to April 2015.
3|P a g e
PROJECTS
Working as a Site Manager for Substation Project (GIS Substation 132/13.8KV) in Riyadh.
1.Construction of 132/13.8KV GIS Substation in Faisalyhs – S/S 8158
2. Construction of 132/13.8KV GIS Substation in Mansourah – S/S 8186
The aim of this Project is to construct a new 132/13.8 kV Substation to meet load requirements of Riyadh.
Description of Project
• One (1) no. 132 SF6 Gas Insulated Switchgear (GIS) with ten(10) nos. 132 KV GIS Circuit Breakers
and associated equipment
• Three (3) nos. 132/13.8kv, 67MVA Power Transformers
• One (1) 13.8kv Switchgear with forty four (44) nos. 13.8kv Switchgear circuit breaker panels.
• Three (3) nos. 13.8kv, 7MVAR Capacitor Bank & Associated equipment.
• Remotely controlled through SCADA system through Gateway& fiber optic channels from the
Central Regional Control Center (CRCC).
Activities
• Construction of new 132KV/13.8KV GIS Substation as per approved design conforming to standards
including earthing etc.
• Installation of 132KV 10 bay GIB with all fittings and earthing as per approved drawings.
• Installation of 132KV/13.8KV Power Transformer of Capacity 67 MVA with all fittings and earthing as
per approved drawings.
• Installation of all 13.8KV Switchgear Panel on Switchgear with all accessories including earthing as
per approved drawings.
• Cabling from all equipment to control panels.
• Testing and commissioning of all equipment’s (GIS, Switcher gear, POWER T/F)
• Handling of Client in explaining the Site Situation and Progress.
• Handling of Sub Contractors to execute the work effectively.
OVERSEAS INSFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LTD, FROM AUGUST 2012 TO JULY
2013.
CLIENT : ELECTRICIDADE DE MOCAMBIQUE
PROJECTS
• Field Construction Engineer in Mozambique, Africa Country (132 / 33 KV) (1 × 40) MVA
Substation.
Description of Project
• Two 132 KV incomer bays one 132/33 KV Transformer bay.
• 33 KV & 11KV Switchgear.
• Three 132KV SF6 Circuit Breakers.
4|P a g e
• Five 33 KV Vacuum Circuit Breakers.
Activities
• Erection of new 132KV/33KV Structure as per approved design conforming to standards including
earthing etc.
• Installation of 132KV/33KV Power Transformer of Capacity 40 MVA with all fittings and earthing as
per approved drawings.
• Installation of all Equipments on Switch Yard with all accessories including earthing as per approved
drawings.
• Jumpering of all equipments in Switch Yard with proper connecters.
• Cabling from all equipments to control panels.
• Testing and commissioning of all equipment’s (CT, PT, CVT, VCB, SF6 BREAKER, LA, POWER
T/F)
• Handling of Client in explaining the Site Situation and Progress.
• Handling of Sub Contractors to execute the work effectively.
ABB LIMITED, WORKED AS SITE MANAGER FROM JANUARY 2008 TO JULY 2012.
PROJECTS
• Site Manager of ABB Limited 33 / 11 KV (1 × 5) MVA S/S & Rural Electrification Project.
Description of Project
• 33KV switchyard, Incoming 33KV Feeder Bays, (33/11KV) Transformer Bays.
• 33KV & 11KV Switchgear.
• Three 33KV Vacuum Circuit Breakers.
• Five 11KV Vacuum Circuit Breakers.
Activities
• Make Data Base and indexation of the Substation.
• Make daily & weekly progress reports for all installation works.
• Installation of the electrical Equipments of the Substation.
• Installation of the Earthing grid of the Substation.
• Installation of Bas-bar and Droppers of the electrical Equipments.
• Installation of the control Cables from control and protection panels to LCP.
• Installation of Aux. & power Transformers.
• Laying and termination of power & Control Cables.
• Installation of inner & outer Lighting of the Substation.
• Installation of the Fire fighting system.
• Study tenders and make survey for the substation equipment prices and quantities.
• Make Extracts and the financial Situation of the Substation.
• Co- ordination with Testing Groups.
STERLING & WILSON LIMITED FROM FEBUARY 2006 TO DECEMBER 2007.
5|P a g e
PROJECTS
Project Engineer of Sterling & Wilson Limited, 33 / 11 KV (2 × 3.14 & 3.6) MVA S/S &
Rural Electrical Project work.
Description of Project
• Rural Electrical Project-858 nos. of Habitation for Electrification.
• 33KV switchyard, Incoming 33KV Feeder Bays, (33/11KV) Transformer Bays.
• 33KV & 11KV Switchgear.
• Three 33KV Vacuum Circuit Breakers.
• Five 11KV Vacuum Circuit Breakers.
Activities
• Planning & Material coordination of the Project, It involves vendor Finalization, its approval from
client, manufacturing Clearance, inspection & Dispatches of materials to site.
• Prepare the Bill of Material, Transformer rating, Progress Reports and necessary documents for our
Client and for our Office records.
• Make Data Base and indexation of the Substation.
• Make daily & weekly progress reports for all installation works.
• Follow up for the bills and get payment from client.
• Responsible for optimal utilization of resources
• Monitors the progress of project and updates HO as frequently as required.
• Prepares bills for payments and collects payment in time from client.
• Implements the health and safety measures.
• Responsible for quality assurance and documentation.
RAJDHANI BSES POWER LIMITED, WORKED AS ENGINEER FROM AUGUST 2004 TO
JANUARY 2006.
PROJECTS
Site Engineer of Rajdhani BSES Power Limited, Maintenance up to 220/132/66/33 KV
Switchyard in New Delhi.
.Activities
• Breakdown Maintenance: - If breakdown occurred in running plant due to electrical
equipment. Immediate steps taken for immediate rectification of the equipment within time either
by workmen or by other.
• Schedule Checking/Maintenance: - Checking/Maintenance of plant batteries sets, transformer oil level,
silica gel, Switch Boards, running motors behaviors, plant lighting etc.
• Annual shutdown / Plant Breakdown maintenance: - For this maintenance planning, materials
procurement man-power arrangement etc were done six months before to carry on the maintenance
jobs of the following electrical equipment: -
• Transformer HV/LV windings – Insulation Resistance testing, short circuit testing, tap-changer cleaning
and testing.
Qualification
6|P a g e
Course/Degree School/College/University Year of
Passing
%Marks Division
Bachelor in Electrical
Engineering
Burdwan University, West Bengal
2004 68% 1st.
Diploma in Electrical
Engineering
M.I.T., W.B.S.C.T.E.
2001 78%
1st
Higher Secondary (10+2( Krishnanath College, Berhampore
(W.B(
1998 66%. 1st.
Matriculation (10th( J.N.Accadamy, Berhampore(W.B(.
1996 75% 1st.
Professional Trainings
• 30 days Training in Thermal Power plant for Installation Maintenance and Commissioning of
Transformer.
• Vocation Training in BSNL at Berhampore, Murshidabad. (W.B.)
• Vocation Training in Sub-Station 132KV/66KV/33KV.
• Safety Training and First Aid Training
• SAP Training in ABB
Courses
• Computer Courses & AutoCAD.
• PMP CERTIFICATE
• IOSH CERTIFICAT
Computer Skills
• Windows, XP, Vista & Windows 7 Microsoft office & Photoshop & AutoCAD.
Personal Data
• Date of Birth : 17/12/1979
• Nationality : Indian
• Marital Status : Married
• Address : ¼ Jamindary Road, Gorabazar, Berhampore-742101,
• Murshidabad, India.
Language
• English: Can Read, Write and Speak.
• Hindi: Can Read, Write and Speak.
• Bengali: Can Read, Write and Speak.
Date: - Abdul Alim Dewan
Place: - Signature
7|P a g e

More Related Content

What's hot

GULF TURRETS EXPERIENCE
GULF TURRETS EXPERIENCEGULF TURRETS EXPERIENCE
GULF TURRETS EXPERIENCEBALA MURUGAN
 
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev bDamian Connelly
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen Barkwitch
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
GRADED UNIT POWERPOINT FINISHED!!!!!
GRADED UNIT POWERPOINT FINISHED!!!!!GRADED UNIT POWERPOINT FINISHED!!!!!
GRADED UNIT POWERPOINT FINISHED!!!!!Patrick O'Donnell
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and constructionrana maqsood
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.Russell Bruce
 

What's hot (20)

MNC-14
MNC-14MNC-14
MNC-14
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
GULF TURRETS EXPERIENCE
GULF TURRETS EXPERIENCEGULF TURRETS EXPERIENCE
GULF TURRETS EXPERIENCE
 
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev b
 
Resume
ResumeResume
Resume
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Resume
ResumeResume
Resume
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
GRADED UNIT POWERPOINT FINISHED!!!!!
GRADED UNIT POWERPOINT FINISHED!!!!!GRADED UNIT POWERPOINT FINISHED!!!!!
GRADED UNIT POWERPOINT FINISHED!!!!!
 
Brian Norton
Brian NortonBrian Norton
Brian Norton
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 

Similar to Resume -Abdul Alim Dewan -2017 (20)

PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
CV
CVCV
CV
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
shahid#2
shahid#2shahid#2
shahid#2
 
CV- SHASHI KANT THAKUR
CV- SHASHI KANT THAKURCV- SHASHI KANT THAKUR
CV- SHASHI KANT THAKUR
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
cv umar
cv umarcv umar
cv umar
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
resume N
resume Nresume N
resume N
 
Complex connections Rick Chorley
Complex connections Rick ChorleyComplex connections Rick Chorley
Complex connections Rick Chorley
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 

Resume -Abdul Alim Dewan -2017

  • 1. RESUME Address for Correspondence Abdul Alim Dewan B.E (Electrical) -2004 Present Address: Mohammed Al-Ojaimi Contracting Est. CR 2050004063 Riyadh 11484, P.O. Box 17458 Permanent Address: ¼ Zomindary Road, Gorabazar Berhampore, Murshidabad-742101 West Bengal, India Passport No: K-1494323 Expiry Date: 24.04.2022 dewan.abb@gmail.com Mobile: +966-592616491 . Career Objective To take up a challenging and innovative job for which I can use my technical and interpersonal skills as part of a team to increase my level of expertise. Areas of Expertise- : • Overall 13+ years of Experience in GIS Sub-Station, Transmission & Distribution Projects. • Turnkey Project Planning, Scheduling and Monitoring. • Order Handling & Execution of project • Handling all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities. • Managing site execution, planning co-ordination, construction of transmission line and construction of GIS Sub-station, HT & LT Networks • Planning, Procurement, Client relation and Project Co-ordination. • Complete Material Assessment and Preparation of BOQ. Role and Responsibility • Preparation, monitoring, controlling of project execution plans and reporting. • Manage (plan, steer, follow-up, analyze and report) contracted projects in close cooperation with the Project Manager according to project execution plans. • Co-ordinate with clients and resolves their requests promptly, courteously & professionally. • Implementation of Safety rules, regulation and Clients & company Safety policies at site. • Quality Assurance and Quality Control of materials and electrical work. Major Strength • Flexible in learning New Technologies and creating innovative ideas. • Variable to change. • Result Oriented within the given span of time. 1|P a g e
  • 2. • Comprehensive problem solving ability. • Career summary: 1. May 2015 to Present: Organization : Mohammed Al-Ojaimi Contracting Est. 132KV Projects Division. Designation : Assistance Project Manager for New construction 132/13.8kv GIS Substation in Al- Mahdiyah SS# 8244, Riyadh. Client : SAUDI ELECTRICITY COMPANY, NGSA, KSA 2. August 2013 to April 2015: Organization : MASCO GROUP of Companies Advanced Energy Construction Company- Power Projects Division. Designation : Site Manager for New construction 132/13.8kv GIS Substation in Al- Faisalyah & Al-Mansurah SS# 8158 and SS# 8186, Riyadh. 3. Client : SAUDI ELECTRICITY COMPANY, NGSA, KSA 4. August 2012 to July 2013: Organization : OVERSEAS INSFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LTD Power Projects Division. Mozambique, Africa. Designation : Field Construction Engineer Client : ELECTRICIDADE DE MOCAMBIQUE, Mozambique, 5. January 2008 to July 2012: Organization : ABB - Power Projects Division. Designation : Site Manager Client : Power Grid Corporation of India (PGCIL) 6. February 2006 to December 2007: Organization : Sterling and Wilson Limited, Power Projects Division Designation : Project Engineer 2|P a g e
  • 3. Client : Power Grid Corporation of India (PGCIL) : Damodar Valley Corporation of India (DVC) 7. August 2004 to January 2006: Organization : Rajdhani BSES, Power Projects Division Designation : Site Engineer Professional Experiences Current job Presently working with Mohammed Al-Ojaimi Contracting Est 132KV Projects Division PROJECTS Working as a Site Manager for Al-Mahdiyah – S/S 8244 Substation Project (GIS Substation 132/13.8KV) in Riyadh. The aim of this Project is to construct a new 132/13.8 kV Substation to meet load requirements of Riyadh. Description of Project • One (1) no. 132 SF6 Gas Insulated Switchgear (GIS) with ten (10) nos. 132 KV GIS Circuit Breakers and associated equipment • Three (3) nos. 132/13.8kv, 67MVA Power Transformers • One (1) 13.8kv Switchgear with forty-four (44) nos. 13.8kv Switchgear circuit breaker panels. • Three (3) nos. 13.8kv, 7MVAR Capacitor Bank & Associated equipment. • Remotely controlled through SCADA system through Gateway& fiber optic channels from the Central Regional Control Center (CRCC). Activities • Construction of new 132KV/13.8KV GIS Substation as per approved design conforming to standards including earthing etc. • Installation of 132KV 10 bay GIB with all fittings and earthing as per approved drawings. • Installation of 132KV/13.8KV Power Transformer of Capacity 67 MVA with all fittings and earthing as per approved drawings. • Installation of all 13.8KV Switchgear Panel on Switchgear with all accessories including earthing as per approved drawings. • Cabling from all equipment to control panels. • Testing and commissioning of all equipment’s (GIS, Switcher gear, POWER T/F) • Handling of Client in explaining the Site Situation and Progress. • Handling of Sub Contractors to execute the work effectively. Previous jobs Advanced Energy Company (AECC), (Sister Concern of “MASCO”). (Saudi Arabia) From August 2013 to April 2015. 3|P a g e
  • 4. PROJECTS Working as a Site Manager for Substation Project (GIS Substation 132/13.8KV) in Riyadh. 1.Construction of 132/13.8KV GIS Substation in Faisalyhs – S/S 8158 2. Construction of 132/13.8KV GIS Substation in Mansourah – S/S 8186 The aim of this Project is to construct a new 132/13.8 kV Substation to meet load requirements of Riyadh. Description of Project • One (1) no. 132 SF6 Gas Insulated Switchgear (GIS) with ten(10) nos. 132 KV GIS Circuit Breakers and associated equipment • Three (3) nos. 132/13.8kv, 67MVA Power Transformers • One (1) 13.8kv Switchgear with forty four (44) nos. 13.8kv Switchgear circuit breaker panels. • Three (3) nos. 13.8kv, 7MVAR Capacitor Bank & Associated equipment. • Remotely controlled through SCADA system through Gateway& fiber optic channels from the Central Regional Control Center (CRCC). Activities • Construction of new 132KV/13.8KV GIS Substation as per approved design conforming to standards including earthing etc. • Installation of 132KV 10 bay GIB with all fittings and earthing as per approved drawings. • Installation of 132KV/13.8KV Power Transformer of Capacity 67 MVA with all fittings and earthing as per approved drawings. • Installation of all 13.8KV Switchgear Panel on Switchgear with all accessories including earthing as per approved drawings. • Cabling from all equipment to control panels. • Testing and commissioning of all equipment’s (GIS, Switcher gear, POWER T/F) • Handling of Client in explaining the Site Situation and Progress. • Handling of Sub Contractors to execute the work effectively. OVERSEAS INSFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LTD, FROM AUGUST 2012 TO JULY 2013. CLIENT : ELECTRICIDADE DE MOCAMBIQUE PROJECTS • Field Construction Engineer in Mozambique, Africa Country (132 / 33 KV) (1 × 40) MVA Substation. Description of Project • Two 132 KV incomer bays one 132/33 KV Transformer bay. • 33 KV & 11KV Switchgear. • Three 132KV SF6 Circuit Breakers. 4|P a g e
  • 5. • Five 33 KV Vacuum Circuit Breakers. Activities • Erection of new 132KV/33KV Structure as per approved design conforming to standards including earthing etc. • Installation of 132KV/33KV Power Transformer of Capacity 40 MVA with all fittings and earthing as per approved drawings. • Installation of all Equipments on Switch Yard with all accessories including earthing as per approved drawings. • Jumpering of all equipments in Switch Yard with proper connecters. • Cabling from all equipments to control panels. • Testing and commissioning of all equipment’s (CT, PT, CVT, VCB, SF6 BREAKER, LA, POWER T/F) • Handling of Client in explaining the Site Situation and Progress. • Handling of Sub Contractors to execute the work effectively. ABB LIMITED, WORKED AS SITE MANAGER FROM JANUARY 2008 TO JULY 2012. PROJECTS • Site Manager of ABB Limited 33 / 11 KV (1 × 5) MVA S/S & Rural Electrification Project. Description of Project • 33KV switchyard, Incoming 33KV Feeder Bays, (33/11KV) Transformer Bays. • 33KV & 11KV Switchgear. • Three 33KV Vacuum Circuit Breakers. • Five 11KV Vacuum Circuit Breakers. Activities • Make Data Base and indexation of the Substation. • Make daily & weekly progress reports for all installation works. • Installation of the electrical Equipments of the Substation. • Installation of the Earthing grid of the Substation. • Installation of Bas-bar and Droppers of the electrical Equipments. • Installation of the control Cables from control and protection panels to LCP. • Installation of Aux. & power Transformers. • Laying and termination of power & Control Cables. • Installation of inner & outer Lighting of the Substation. • Installation of the Fire fighting system. • Study tenders and make survey for the substation equipment prices and quantities. • Make Extracts and the financial Situation of the Substation. • Co- ordination with Testing Groups. STERLING & WILSON LIMITED FROM FEBUARY 2006 TO DECEMBER 2007. 5|P a g e
  • 6. PROJECTS Project Engineer of Sterling & Wilson Limited, 33 / 11 KV (2 × 3.14 & 3.6) MVA S/S & Rural Electrical Project work. Description of Project • Rural Electrical Project-858 nos. of Habitation for Electrification. • 33KV switchyard, Incoming 33KV Feeder Bays, (33/11KV) Transformer Bays. • 33KV & 11KV Switchgear. • Three 33KV Vacuum Circuit Breakers. • Five 11KV Vacuum Circuit Breakers. Activities • Planning & Material coordination of the Project, It involves vendor Finalization, its approval from client, manufacturing Clearance, inspection & Dispatches of materials to site. • Prepare the Bill of Material, Transformer rating, Progress Reports and necessary documents for our Client and for our Office records. • Make Data Base and indexation of the Substation. • Make daily & weekly progress reports for all installation works. • Follow up for the bills and get payment from client. • Responsible for optimal utilization of resources • Monitors the progress of project and updates HO as frequently as required. • Prepares bills for payments and collects payment in time from client. • Implements the health and safety measures. • Responsible for quality assurance and documentation. RAJDHANI BSES POWER LIMITED, WORKED AS ENGINEER FROM AUGUST 2004 TO JANUARY 2006. PROJECTS Site Engineer of Rajdhani BSES Power Limited, Maintenance up to 220/132/66/33 KV Switchyard in New Delhi. .Activities • Breakdown Maintenance: - If breakdown occurred in running plant due to electrical equipment. Immediate steps taken for immediate rectification of the equipment within time either by workmen or by other. • Schedule Checking/Maintenance: - Checking/Maintenance of plant batteries sets, transformer oil level, silica gel, Switch Boards, running motors behaviors, plant lighting etc. • Annual shutdown / Plant Breakdown maintenance: - For this maintenance planning, materials procurement man-power arrangement etc were done six months before to carry on the maintenance jobs of the following electrical equipment: - • Transformer HV/LV windings – Insulation Resistance testing, short circuit testing, tap-changer cleaning and testing. Qualification 6|P a g e
  • 7. Course/Degree School/College/University Year of Passing %Marks Division Bachelor in Electrical Engineering Burdwan University, West Bengal 2004 68% 1st. Diploma in Electrical Engineering M.I.T., W.B.S.C.T.E. 2001 78% 1st Higher Secondary (10+2( Krishnanath College, Berhampore (W.B( 1998 66%. 1st. Matriculation (10th( J.N.Accadamy, Berhampore(W.B(. 1996 75% 1st. Professional Trainings • 30 days Training in Thermal Power plant for Installation Maintenance and Commissioning of Transformer. • Vocation Training in BSNL at Berhampore, Murshidabad. (W.B.) • Vocation Training in Sub-Station 132KV/66KV/33KV. • Safety Training and First Aid Training • SAP Training in ABB Courses • Computer Courses & AutoCAD. • PMP CERTIFICATE • IOSH CERTIFICAT Computer Skills • Windows, XP, Vista & Windows 7 Microsoft office & Photoshop & AutoCAD. Personal Data • Date of Birth : 17/12/1979 • Nationality : Indian • Marital Status : Married • Address : ¼ Jamindary Road, Gorabazar, Berhampore-742101, • Murshidabad, India. Language • English: Can Read, Write and Speak. • Hindi: Can Read, Write and Speak. • Bengali: Can Read, Write and Speak. Date: - Abdul Alim Dewan Place: - Signature 7|P a g e