1. To utilize and develop my demonstrated performance as an engineer, where my
potential are put to use for mutual benefits of all concerned, seeking opportunity and
challenges for professional growth.
Qualification
BS- (4 Year) -ELECTRICAL ENGINEERING
FEWA (Federal Electricity & Water Authority) -CERTIFIED
SEWA (Sharjah Electricity & Water Authority) - CERTIFIED
CORE COMPETENCIES & SKILLS
Total 7 YEARS (2008 to 2015)
Completely aware of International Standards of IEC and NEC regarding
transformer and switchgear.
Worked with WAPDA 500KVand BCL Energy systems on HV and MV
switchgear.
220KV & 132KV testing and Design Coordination. Witnessing & participating
in relay and C.B. testing of line.
Worked with BESTWAY Cement Group and on ALFA on cement Plant &MV
& LV Projects.
Worked at ALFA UAE as Design & Site Engineer.
Excellent ability to coordinate and to give technical solution for issues
and problems happening at site.
Capable of Commissioning of Substations and Power Plant.
I have both protection and testing experience working in live substations, DC
& CT isolation, Trouble shooting, modification. CT, VT, Earthling Relay
setting calculations etc.
Electrical Distribution System MV & LV for process industry, High rise
buildings, Airports , Universities and Hospitals
-
Site Engineer:
Responsibilities:
Execute and supervise all Electrical work according to drawing specifications.
Muhammad Asim
Electrical Engineer
Mobile: 0529539688
E-mail: masim368@gmail.com
Career Objective
WORK EXPERIENCE
1. WAHAT AL ZAJIL TECH.CONT (SHARJA UAE)
(Sep 2014 to Present)
2. Bus bar Stability & Sensitivity, Transformer Stability & Sensitivity testing, REF
sensitivity testing. All testing for CT and VT also functional tests in control
and relay, LCC panels, GIS, MV switchgears. Modification works in schematic
as well as in panels.
Design Coordination and Review different Projects.
Circuit breaker testing (timing & contact resistance), Contact resistance
of bus bars, SF6 purity & due point test
Coordinate and Conduct Testing of bus bars, cables also aux relays, trip
relays and MCCBs
Ensured the Quality work on site as per specification of SEWA rules and
regulations.
Preparing Quotation for upcoming projects.
Negotiating with suppliers and purchase items at optimum cost.
Preparation of Electrical procedures for installation test & commissioning.
Procurements of materials as per site condition.
Site& Design Engineer:
Responsibilities:
Prepare Electrical drawing and load schedule for villas for Al Mohandas
Engineering consultant.
Understand and modified the Drawing according to the requirement of Owner
demand.
Design Coordination and Review different Projects.
Execute and Design Coordination of EHV & HV Transmission and
Distribution Projects.
Circuit breaker testing (timing & contact resistance), Contact resistance
of bus bars, SF6 purity & due point test.
Coordinate and Conduct Testing of bus bars, cables also aux relays, trip
relays and MCCBs
Design complete Electrical schemes and Interlocking Schemes as per Project
Requirements.
Prepared technical documents and ensured that the work is carried in
accordance to the drawing specifications.
Provided technical support to the team members and resolved all problems.
POSITION: ELECTRICAL ENGINEER
WORK EXPERIENCE
Raw MILLS, cement MILLs, WHR Power Plant, Packing plant, preblanding
(stacker reclaimer)
Maintenance Installation and Working on the Following.
2. Alfa Electrical & Sanitary Cont.(RAK UAE)
(March 2013 to April 2014)
3. BESTWAY CEMENT LTD PAKISTAN
(June 2009to Feb 2013)
3. ● Maintain record of Installation Maintenance work, analysis of repetitive
Breakdown & its remedies.
● Follow and implement preventive Maintenance Activities for Different
Continuously running Equipments( Motors,Trafos,EPs) Substation
Equipments (Switch gears, Capacitor bank, Liquid Starters,MCCs etc)
● Trouble shooting & Maintenance, of VFDs From several Kilo Watts to
Thousand of WATTS. Of Siemens, ABB, SCHENIDER.
● Having done Installation & Maintenance of AC Induction Motors (slip ring,
squeral cage), LV,MV MOTORS(1400KW,1125KW,4500KW,3500KW Rotor
Control and StatorControl)Working 6.3kvof ABB,SIEMENS.
● Installation Testing & Maintenance of Electrical Block SET MCC,S
Capacitor Banks,Power Factor control Panels ,reactor coils As well as
MV(6.3kv,22kv) Panels.LV Panels (MDB,s 440Volt),Electrical Switchgear
(A.C.B, V.C.B 630 Amps, MCCB’s,.) Power devices, CTs, PTs, Thyristors,
Power contactor, Capacitor Panel, HRC Fuses,overloads,AREVA
ABB,Siemens,Schenider
● Worked on Flow Transmitters, Pressure Transmitter in power plant and Raw
mill AREA (Siemens,ABB,Yocogawa,Telemachinique)
● Also worked for Installation for Catholic Protection system for Under
Ground GAS PIPE Line for Cement plant
● Supervises day-to-day Plant, Substation activities of Maintenance,
Installation to ensure that the process run in proper way.
● Attending meeting with other departments, Electrical & instrument persons
about the technical problems and solve them.
● Maintain Record of Calibration, Inspection, Running Hours and behavior of
Different Equipments, Instruments like Motors, Transformer, Weigh feeders
from its Installation time, or last maintenance to Optimize the maintenance
and failure.
Microsoft Office, AutoCAD,MATLAB
Personal Profile
Date of Birth: 11th Feb 1986
Nationality: Pakistani
Religion: Islam
Marital Status: Single
Computer Skills