SlideShare a Scribd company logo
1 of 5
Mahboob Iqbal
C/o Dr. Akhtar Abbass VO, Civil Veterinary Hospital, opposite
of Post office, KotAdu.
Cell #: +92-333 7069383, 0311 6002783, 0304 3147301
E-mail ID: mahboob10@gmail.com
Career Objective:
To work with the best of my potential for the achievement of organization’s objectives, in a way
this induces learning and growth opportunities and take up challenging projects.
Career Summary:
A multiple construction & Maintenance engineering personal with a 13 Years hands of
experience in planning, construction supervision, inspection and Commissioning
of engineering projects of Electrical/Instruments in the field of Oil and Gas, Fertilizer and
Manufacturing Plants as well as Power Generation including MV/LV Switchgears, PLCs, VFDs
& Soft-starter Motor Controls. Able to work on own initiative and as part of a team. Proven
leadership skills including manage, develop and motivate teams to achieve their targets.
Major Capabilities
Project Execution:
 Review Project Drawings; prepare Bill of Quantities (BoQ) & Job Planning Sheets (JPS).
 Review/inspect all safety aspects regarding electrical construction site work.
 Anticipates problems and actions of the contractor at site and tries to prevent conflicts.
 Validate contractor’s erection procedures and methods to execute the project.
 Participates in the internal site team meetings and in meetings with contractors at site and also in
specialists meetings regarding electrical erection.
 To Record and implement any project design changes influencing the electrical erection work.
 To place required Inspection Test Plans (ITP’s) for Quality Assurance/ Control of works related to
E & I.
 Review Task Risk Assessment (TRA) and Job safety Analysis (JSA) procedures as per site
situation.
 Knowledge and awareness of different engineering standards and specifications (NEC, IEC,
NFPA, IEEE, UL etc).
Testing & commissioning:
 To develop and/or review– Pre-Commissioning / Commissioning plans/check lists for E&I jobs.
 Testing, commissioning of various types of MV & LV Switchgear, VFDs, Soft Starters, Power
Factor Correction Panels….etc.
 Power & Motor Control Centers and MV/LV motors capacity up to 600KW vise-versa.
 Power Generation Plant capacity up to 12 MW
 Circuit Breakers, Switchgear and Power Transformer.
 AC/DC UPS GUTOR-ABB, CCTV System (Honeywell), Public Adress and General Alarm (PAGA)
System and Fire alarm VESDA smoke detection system also.
 Prepare procedures and Inspection checklists for Electrical & Instrument control systems and
equipments.
Page 2 of 5
Maintenance:
 Motor control panel & control interlocks and logic wiring
 Operations/controls of Diesel/Gas Generators
 Breakdown & power calculation of PCC, MCC, MV/LV Panels.
 Periodic Maintenance and testing of MV/LV Motors
 Prepare Plant Maintenance Management Plan
INSTRUMENTATION:
 Prepare cable schedule, index lists and review P & ID drawings.
 Ensure Instruments hook-up drawings and prepare Instrument BoQs and BoMs.
 Calibration of instruments likes differential pressure transmitter, control valves and PRV, etc.
 Supervise Installation of field instruments and prepare loop testing procedures.
 Supervision of the Calibration of instruments like differential pressure transmitter, control valves
and PRVs
 Instrument cable termination & continuity checking at both instrument sides & field junction box
sides in accordance with the design drawings.
 Supervision the Installation and calibration of the Industrial instruments, Emerson Rosemount,
ABB, Rosemount Transmitter, etc.
 Supervising the installation of system cables between marshaling cabinet and the systems
cabinet, foundation field bus segments, all types of field instruments, JBs, primary & secondary
cables, Impulse and pneumatic tubing’s, and DCS, ESD, PLC, SIS, SIS/EBV (Safety Instrument
System / Emergency Block Valve), IRP, MCC, Vibration Monitor, Fire and Gas Panels, etc.
Career Path
E & I Const. Support Supervisor Dec 2014 to Till Date
(Oil & Gas Project Execution)
United Energy Pakistan. Ltd/TUV Austria
Asst. Maintenance Engineer April 2009 to May 2014
(Production Division)
Saudi Bin Ladin Group, Kingdom of Saudi Arabia
Quality Control Inspector October 2006 – March 2009
Plant Maintenance and Installation (PMI)
Aircraft Manufacturing Factory (Pakistan Aeronautical Complex)
Kamra, Pakistan
ElectricalSupervisor July, 2002 – Sep, 2006
(Production and Maintenance)
Dawood Hercules Fertilizer Plant Lahore, Pakistan
Page 3 of 5
Professional Responsibilities
United Energy Pakistan. Ltd/TUV Austria
Project: Erection of 160 MMSCFD Gas Treatment Plant and Utilities of United Energy
Pakistan Ltd (UEPL) at Naimet Basal Facility Phase-5.
 The project comprises on the installation, pre-commissioning and commissioning of Three trains
of Amine Units, Dehydration Unit, Hot Oil System, IA Compressor and Nitrogen Unit, RO Unit
and 3MW Power Generation House. The Naimat Basal Control System comprises of PLC (Allen
Bradley) System for Amine Unites 5A & B (60 and 100 mmscfd).
 Engaged in Gas processing plant construction project at Naimat Basal Gas Processing Facility, the
project includes construction of Amine trains, Dehydration, Hot Oil units along with essential utilities and a
Self-Generating Power Plant.
 Supervising construction activities including cable laying, termination in MV and LV switchgears (ABB)
in side E-Houses, termination of MV and LV Motors, Installation and termination of distribution
transformers, AC/DC UPS (Gutor –Schneider), Local Control Stations (LCS), Overall grounding,
Installation and commissioning of 5 no 6.6 KV GE Waukesha Dresser Gas Gensets and 600 KW
Perkins Diesel generator, Skid and General area lighting works.
 Installation, Termination, testing and commissioning of 17 nos MV Circulation Pump motors up to 600 KW
 Prepared and reviewed engineering plans, specifications, project schedules, designs, circuit diagrams,
and estimates for construction and maintenance of E&I projects.
 Provided technical support for system operations and maintenance.
 Maintained effective working relationships with field crews, contractors, vendors, outside agencies, the
public and staff members.
 Conducted problem-solving investigations related to efficiency issues in the plant operations. Interacted
with operations personnel and provided assembly line solutions to a multi-million dollar manufacturing
facility operating problem.
 Installation and Commissioning of CCTV and PAGA system in Plant area and Camp building area.
 Conduiting, Installation of Cable Trays And Lighting at Plant area and Base Camp.
 Lead the construction activities e.g. Panels Installation, Instrument Hook Up and Installation, JB
Installtions, Cabling, Termination and Trenching.
 Installation & Termination of Marshalling Cabinets, Field Junction Boxes, MCC Panels & Switch Gare
Panal,PDP (Power Distribution Panels),LCP (Local Control Panels) ,SSP (Safty shutdown Panels) and
Different ratings Transformers .
 Lead the pre commissioning and Commissioning activities e.g. Continuity, Loop check, Calibration
,Function, Cause and Effect testing.
 Liaise with PTW and HSE to ensure all UEPL (Formerly BP Pakistan) safety directives are built into job
execution
 Safety Procedures (Control of Work Driving Safety, Lifting Operations ,Management of Change, Work at
Height ,Energy Isolation, Ground Disturbance & Confined Space Entry) AND Emergency Responce Plan
,Spill Responce Plan ,Medical Emergency Plan.
Saudi Bin Ladin Group, Kingdom of Saudi Arabia
 Planning, Scheduling, and load calculation for newly incoming projects
 Tracking, updating & monitoring of running project schedules.
 Direct troubleshooting, identifying reasons and recommending remedial action in running plants.
 Designing of MCCs Panels, Control Rooms as per plant requirement and making modification in
existing system.
 Preparation of Insulation testing schedule for Electric motors and Generators.
 Designing earthing schemes like TN, TT and IT according to requirement of system
 Testing and calculation of soil resistance and earth resistance as per IEC code 250
Page 4 of 5
 Preparation and implementation of Greasing schedule Electrical machines.
 Preparation and implementation preventive maintenance schedules.
 Collect feedback from various sites and analysis the technical issues.
 Power Factor calculation and fault current calculation.
 Preparation of training criteria and held seminars to train personnel
 Maintenance, operation and troubleshooting of CATERPILLAR GEN-SET 700 – 1000KW various
models i.e 3406, 3412, 3508, 3512B, MUI & EUI control Engines and Perkins etc.
 Gen-Set ECM control EMCP-II, EMCP-II+, EMCP-3.1, EMCP-3.3& 4 and Acert Technology.
 PI and IR schedule testing of electric motors, Generators windings and maintain records
 Installation and inspection of PLC Control Panels & MCCs like Siemens SIMATIC S7 300 CPU-
312, S7 200
 Inspection and Maintenance of PLC OMRON SYSMAC CP2AH 12 Channels
 Supervision of the Installation of Pressure/Temperature/Flow/Level Transmitters, Limit Switches,
Solenoids, Proximity Sensors.
 Installation, operation and testing of VFDs, like Hittachi, ABB, Danfos and Fuji.
 Safety Orientation arrangement and site coordination with client
Aircraft Manufacturing Factory (Pakistan Aeronautical Complex Kamra),
Pakistan (Plant Maintenance and Installation team)
 Site Load Distribution between old and newly installed power system.
 Supervision for newly installed 132/11KV power distribution grid station which includes Power
Transformer of 20/26 MVA of Siemens, SF6 circuit breakers and other accessories.
 Arrangement of UPS and standby generators for emergency loads in absence of utility.
 Installation and commissioning of PLCs Siemens S7 200 SIMATIC, Control Panels for Boilers
Company Fulton (2-Steam and 3-Hot water Boiler) Water Tube type
 System operation and maintenance of 132KV Grid station like Power transformer, SF6 Circuit
breaker, 11KV and 6.6KV distribution switchgear operation
 Earthing system execution, Earth resistance testing and comparison with annual records.
 Chillar Plant (Water Cooled Screw Chillar Plant) installation and commissioning supervision
 Coordination with foreign contractors like Chinese, Italian and Francis working on CNC machines,
Short pinning machine, Libratory equipments, Chillers and other precious OEM equipment which
was used for production.
 Adjustment and calibration of Solenoids and Micro Switches and temperature sensors.
 Commissioning of newly installed equipment (Electrical side) with the consultation of Original
Equipment Manufacturer (OEM) team
 To make 100 percent inspections of electrical equipment and material received in stores.
 A member of Board of Officers (BOO) for handing and taking over of completed projects/Works
 Auditing of Quality Management System on annually basis.
 Vast experience on Quality Management System (QMS) and implementation of AS 9100 rev “B”
 A member of Planning team for erection of own Thermal Power Plant
Dawood Hercules Fertilizer Plant (Production and Maintenance)
Lahore, Pakistan
 Troubleshooting of close loop control and open loop control system
 Maintenance of HV and LV Switch Gear (Mitsubishi, ABB & Seimens) like 11KV, 6600 and 380
Volts
 Maintenance of MCCs and Control Panels of different Utility systems
CO2 and Natural air compressors like Uraka (Motor: 3500HP, Type: Induction) etc
 Maintenance of various Synchronous and induction motors upto 3500 hp
 Maintenance of alternators, turbines and auxiliary system (2 x 7.5 MW Units)
 Periling towers, Pumps, backup power system
 Maintenance of different types relays (PV322), sensors, solenoids, switches etc.
Page 5 of 5
Technical Education
Bachelor of Technology – Specialized in Electrical Engineering Bhaudin Zakria University,
Multan.
Session: 2009-2012
Diploma of Associate Engineering – Specialized in Electrical Engineering from
PBTE, Lahore.
Session: 1998-2001
Technical Skills:
Software/ Tools Proficiency
Windows (XP, Vista, Win7) Proficient
MS Office Proficient
MS Project Proficient
MS Visio Proficient
Smart Draw Proficient
NEC & IEC Codes
Quality Tools
Technical Trainings Attended:
Apprenticeship Training Dawood Herculies Fertilizer Plant
Certified Maintenance Manager NPO, Islamabad, Pakistan
Risk Management NPO, Islamabad, Pakistan
Quality Management System Aircraft Manufacturing (PAC) Kamra, Pakistan
(ISO 9001:2000, AS 9100 “Rev” B)
EPG Caterpillar GEN-SET 3500B Series Zahid Tractors Kingdom of Saudi Arabia
Total Productive Maintenance (TPM) National Productive Organization Lahore, Pakistan
PLC Programming (Mitsubishi) Pakistan Institute of Technical Assistance College
Lahore, Pakistan
Microcontroller Programming (ATMEL-8051) Pakistan Institute of Technical Assistance College
Lahore, Pakistan
PTW, LOTO Safety awareness, Permit to work and energy
isolation procedures by United Energy Pakistan Ltd
(URS)
Personnel Detail:
Nationality Pakistani
Passport No FR1330202
Marital Status Married
Languages known English, Urdu, Arabic, Seraiky, Punjabi.
Reference:
Will be furnished upon Request

More Related Content

What's hot

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015roldan retiro
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker ResumeJimmy Barker
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
CV for naukri and COMMON
CV for naukri and COMMONCV for naukri and COMMON
CV for naukri and COMMONEBRAHIM KHALIL
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERGanesan Raja
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 

What's hot (20)

ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015
 
Tim Phillips
Tim PhillipsTim Phillips
Tim Phillips
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker Resume
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
CV for naukri and COMMON
CV for naukri and COMMONCV for naukri and COMMON
CV for naukri and COMMON
 
Cover letter
Cover letterCover letter
Cover letter
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
 
E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 

Similar to CV Mahboob Updated 24.10.15 (20)

SRao_cv
SRao_cvSRao_cv
SRao_cv
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Resume j
Resume jResume j
Resume j
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Vimal cv
Vimal cv Vimal cv
Vimal cv
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Resume
ResumeResume
Resume
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Saif Ismail_CV
Saif Ismail_CVSaif Ismail_CV
Saif Ismail_CV
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 

CV Mahboob Updated 24.10.15

  • 1. Mahboob Iqbal C/o Dr. Akhtar Abbass VO, Civil Veterinary Hospital, opposite of Post office, KotAdu. Cell #: +92-333 7069383, 0311 6002783, 0304 3147301 E-mail ID: mahboob10@gmail.com Career Objective: To work with the best of my potential for the achievement of organization’s objectives, in a way this induces learning and growth opportunities and take up challenging projects. Career Summary: A multiple construction & Maintenance engineering personal with a 13 Years hands of experience in planning, construction supervision, inspection and Commissioning of engineering projects of Electrical/Instruments in the field of Oil and Gas, Fertilizer and Manufacturing Plants as well as Power Generation including MV/LV Switchgears, PLCs, VFDs & Soft-starter Motor Controls. Able to work on own initiative and as part of a team. Proven leadership skills including manage, develop and motivate teams to achieve their targets. Major Capabilities Project Execution:  Review Project Drawings; prepare Bill of Quantities (BoQ) & Job Planning Sheets (JPS).  Review/inspect all safety aspects regarding electrical construction site work.  Anticipates problems and actions of the contractor at site and tries to prevent conflicts.  Validate contractor’s erection procedures and methods to execute the project.  Participates in the internal site team meetings and in meetings with contractors at site and also in specialists meetings regarding electrical erection.  To Record and implement any project design changes influencing the electrical erection work.  To place required Inspection Test Plans (ITP’s) for Quality Assurance/ Control of works related to E & I.  Review Task Risk Assessment (TRA) and Job safety Analysis (JSA) procedures as per site situation.  Knowledge and awareness of different engineering standards and specifications (NEC, IEC, NFPA, IEEE, UL etc). Testing & commissioning:  To develop and/or review– Pre-Commissioning / Commissioning plans/check lists for E&I jobs.  Testing, commissioning of various types of MV & LV Switchgear, VFDs, Soft Starters, Power Factor Correction Panels….etc.  Power & Motor Control Centers and MV/LV motors capacity up to 600KW vise-versa.  Power Generation Plant capacity up to 12 MW  Circuit Breakers, Switchgear and Power Transformer.  AC/DC UPS GUTOR-ABB, CCTV System (Honeywell), Public Adress and General Alarm (PAGA) System and Fire alarm VESDA smoke detection system also.  Prepare procedures and Inspection checklists for Electrical & Instrument control systems and equipments.
  • 2. Page 2 of 5 Maintenance:  Motor control panel & control interlocks and logic wiring  Operations/controls of Diesel/Gas Generators  Breakdown & power calculation of PCC, MCC, MV/LV Panels.  Periodic Maintenance and testing of MV/LV Motors  Prepare Plant Maintenance Management Plan INSTRUMENTATION:  Prepare cable schedule, index lists and review P & ID drawings.  Ensure Instruments hook-up drawings and prepare Instrument BoQs and BoMs.  Calibration of instruments likes differential pressure transmitter, control valves and PRV, etc.  Supervise Installation of field instruments and prepare loop testing procedures.  Supervision of the Calibration of instruments like differential pressure transmitter, control valves and PRVs  Instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the design drawings.  Supervision the Installation and calibration of the Industrial instruments, Emerson Rosemount, ABB, Rosemount Transmitter, etc.  Supervising the installation of system cables between marshaling cabinet and the systems cabinet, foundation field bus segments, all types of field instruments, JBs, primary & secondary cables, Impulse and pneumatic tubing’s, and DCS, ESD, PLC, SIS, SIS/EBV (Safety Instrument System / Emergency Block Valve), IRP, MCC, Vibration Monitor, Fire and Gas Panels, etc. Career Path E & I Const. Support Supervisor Dec 2014 to Till Date (Oil & Gas Project Execution) United Energy Pakistan. Ltd/TUV Austria Asst. Maintenance Engineer April 2009 to May 2014 (Production Division) Saudi Bin Ladin Group, Kingdom of Saudi Arabia Quality Control Inspector October 2006 – March 2009 Plant Maintenance and Installation (PMI) Aircraft Manufacturing Factory (Pakistan Aeronautical Complex) Kamra, Pakistan ElectricalSupervisor July, 2002 – Sep, 2006 (Production and Maintenance) Dawood Hercules Fertilizer Plant Lahore, Pakistan
  • 3. Page 3 of 5 Professional Responsibilities United Energy Pakistan. Ltd/TUV Austria Project: Erection of 160 MMSCFD Gas Treatment Plant and Utilities of United Energy Pakistan Ltd (UEPL) at Naimet Basal Facility Phase-5.  The project comprises on the installation, pre-commissioning and commissioning of Three trains of Amine Units, Dehydration Unit, Hot Oil System, IA Compressor and Nitrogen Unit, RO Unit and 3MW Power Generation House. The Naimat Basal Control System comprises of PLC (Allen Bradley) System for Amine Unites 5A & B (60 and 100 mmscfd).  Engaged in Gas processing plant construction project at Naimat Basal Gas Processing Facility, the project includes construction of Amine trains, Dehydration, Hot Oil units along with essential utilities and a Self-Generating Power Plant.  Supervising construction activities including cable laying, termination in MV and LV switchgears (ABB) in side E-Houses, termination of MV and LV Motors, Installation and termination of distribution transformers, AC/DC UPS (Gutor –Schneider), Local Control Stations (LCS), Overall grounding, Installation and commissioning of 5 no 6.6 KV GE Waukesha Dresser Gas Gensets and 600 KW Perkins Diesel generator, Skid and General area lighting works.  Installation, Termination, testing and commissioning of 17 nos MV Circulation Pump motors up to 600 KW  Prepared and reviewed engineering plans, specifications, project schedules, designs, circuit diagrams, and estimates for construction and maintenance of E&I projects.  Provided technical support for system operations and maintenance.  Maintained effective working relationships with field crews, contractors, vendors, outside agencies, the public and staff members.  Conducted problem-solving investigations related to efficiency issues in the plant operations. Interacted with operations personnel and provided assembly line solutions to a multi-million dollar manufacturing facility operating problem.  Installation and Commissioning of CCTV and PAGA system in Plant area and Camp building area.  Conduiting, Installation of Cable Trays And Lighting at Plant area and Base Camp.  Lead the construction activities e.g. Panels Installation, Instrument Hook Up and Installation, JB Installtions, Cabling, Termination and Trenching.  Installation & Termination of Marshalling Cabinets, Field Junction Boxes, MCC Panels & Switch Gare Panal,PDP (Power Distribution Panels),LCP (Local Control Panels) ,SSP (Safty shutdown Panels) and Different ratings Transformers .  Lead the pre commissioning and Commissioning activities e.g. Continuity, Loop check, Calibration ,Function, Cause and Effect testing.  Liaise with PTW and HSE to ensure all UEPL (Formerly BP Pakistan) safety directives are built into job execution  Safety Procedures (Control of Work Driving Safety, Lifting Operations ,Management of Change, Work at Height ,Energy Isolation, Ground Disturbance & Confined Space Entry) AND Emergency Responce Plan ,Spill Responce Plan ,Medical Emergency Plan. Saudi Bin Ladin Group, Kingdom of Saudi Arabia  Planning, Scheduling, and load calculation for newly incoming projects  Tracking, updating & monitoring of running project schedules.  Direct troubleshooting, identifying reasons and recommending remedial action in running plants.  Designing of MCCs Panels, Control Rooms as per plant requirement and making modification in existing system.  Preparation of Insulation testing schedule for Electric motors and Generators.  Designing earthing schemes like TN, TT and IT according to requirement of system  Testing and calculation of soil resistance and earth resistance as per IEC code 250
  • 4. Page 4 of 5  Preparation and implementation of Greasing schedule Electrical machines.  Preparation and implementation preventive maintenance schedules.  Collect feedback from various sites and analysis the technical issues.  Power Factor calculation and fault current calculation.  Preparation of training criteria and held seminars to train personnel  Maintenance, operation and troubleshooting of CATERPILLAR GEN-SET 700 – 1000KW various models i.e 3406, 3412, 3508, 3512B, MUI & EUI control Engines and Perkins etc.  Gen-Set ECM control EMCP-II, EMCP-II+, EMCP-3.1, EMCP-3.3& 4 and Acert Technology.  PI and IR schedule testing of electric motors, Generators windings and maintain records  Installation and inspection of PLC Control Panels & MCCs like Siemens SIMATIC S7 300 CPU- 312, S7 200  Inspection and Maintenance of PLC OMRON SYSMAC CP2AH 12 Channels  Supervision of the Installation of Pressure/Temperature/Flow/Level Transmitters, Limit Switches, Solenoids, Proximity Sensors.  Installation, operation and testing of VFDs, like Hittachi, ABB, Danfos and Fuji.  Safety Orientation arrangement and site coordination with client Aircraft Manufacturing Factory (Pakistan Aeronautical Complex Kamra), Pakistan (Plant Maintenance and Installation team)  Site Load Distribution between old and newly installed power system.  Supervision for newly installed 132/11KV power distribution grid station which includes Power Transformer of 20/26 MVA of Siemens, SF6 circuit breakers and other accessories.  Arrangement of UPS and standby generators for emergency loads in absence of utility.  Installation and commissioning of PLCs Siemens S7 200 SIMATIC, Control Panels for Boilers Company Fulton (2-Steam and 3-Hot water Boiler) Water Tube type  System operation and maintenance of 132KV Grid station like Power transformer, SF6 Circuit breaker, 11KV and 6.6KV distribution switchgear operation  Earthing system execution, Earth resistance testing and comparison with annual records.  Chillar Plant (Water Cooled Screw Chillar Plant) installation and commissioning supervision  Coordination with foreign contractors like Chinese, Italian and Francis working on CNC machines, Short pinning machine, Libratory equipments, Chillers and other precious OEM equipment which was used for production.  Adjustment and calibration of Solenoids and Micro Switches and temperature sensors.  Commissioning of newly installed equipment (Electrical side) with the consultation of Original Equipment Manufacturer (OEM) team  To make 100 percent inspections of electrical equipment and material received in stores.  A member of Board of Officers (BOO) for handing and taking over of completed projects/Works  Auditing of Quality Management System on annually basis.  Vast experience on Quality Management System (QMS) and implementation of AS 9100 rev “B”  A member of Planning team for erection of own Thermal Power Plant Dawood Hercules Fertilizer Plant (Production and Maintenance) Lahore, Pakistan  Troubleshooting of close loop control and open loop control system  Maintenance of HV and LV Switch Gear (Mitsubishi, ABB & Seimens) like 11KV, 6600 and 380 Volts  Maintenance of MCCs and Control Panels of different Utility systems CO2 and Natural air compressors like Uraka (Motor: 3500HP, Type: Induction) etc  Maintenance of various Synchronous and induction motors upto 3500 hp  Maintenance of alternators, turbines and auxiliary system (2 x 7.5 MW Units)  Periling towers, Pumps, backup power system  Maintenance of different types relays (PV322), sensors, solenoids, switches etc.
  • 5. Page 5 of 5 Technical Education Bachelor of Technology – Specialized in Electrical Engineering Bhaudin Zakria University, Multan. Session: 2009-2012 Diploma of Associate Engineering – Specialized in Electrical Engineering from PBTE, Lahore. Session: 1998-2001 Technical Skills: Software/ Tools Proficiency Windows (XP, Vista, Win7) Proficient MS Office Proficient MS Project Proficient MS Visio Proficient Smart Draw Proficient NEC & IEC Codes Quality Tools Technical Trainings Attended: Apprenticeship Training Dawood Herculies Fertilizer Plant Certified Maintenance Manager NPO, Islamabad, Pakistan Risk Management NPO, Islamabad, Pakistan Quality Management System Aircraft Manufacturing (PAC) Kamra, Pakistan (ISO 9001:2000, AS 9100 “Rev” B) EPG Caterpillar GEN-SET 3500B Series Zahid Tractors Kingdom of Saudi Arabia Total Productive Maintenance (TPM) National Productive Organization Lahore, Pakistan PLC Programming (Mitsubishi) Pakistan Institute of Technical Assistance College Lahore, Pakistan Microcontroller Programming (ATMEL-8051) Pakistan Institute of Technical Assistance College Lahore, Pakistan PTW, LOTO Safety awareness, Permit to work and energy isolation procedures by United Energy Pakistan Ltd (URS) Personnel Detail: Nationality Pakistani Passport No FR1330202 Marital Status Married Languages known English, Urdu, Arabic, Seraiky, Punjabi. Reference: Will be furnished upon Request